Sodium Components Maintenance Shop (SCMS) Carbonation Vessel – Partial HWMA/RCRA Closure Certification Report

This report documents the Hazardous Waste Management Act (HWMA)/ Resource Conservation and Recovery Act (RCRA) Partial Closure Certification of the Sodium Components Maintenance Shop (SCMS) Carbonation Vessel. The HWMA/RCRA Closure followed the multi step review and evaluation closure process identified in the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) HWMA/RCRA Partial Permit Closure Plan, October 1, 2015. This closure certification report documents that the SCMS Carbonation Vessel was removed from the SCMS, packaged as hazardous waste and stored for future treatment and disposal, and therefore has met the closure performance standards in accordance with the Department of Energy Idaho National Laboratory Materials and Fuels Complex HWMA/RCRA Partial Permit Closure Plan (EPA No. ID4890008952, October 1, 2015).

99 GENERAL AND MISCELLANEOUS↗

COMPOSITE ANALYSIS OF LLW DISPOSAL FACILITIES AT THE U.S. DEPARTMENT OF ENERGY'S SAVANNAH RIVER SITE

Composite Analyses (CA's) are required per DOE Order 435.1 [1], in order to provide a reasonable expectation that DOE low-level waste (LLW) disposal, high-level waste tank closure, and transuranic (TRU) waste disposal in combination with Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), Resource Conservation and Recovery Act (RCRA), and deactivation and decommissioning (D&D) actions, will not result in the need for future remedial actions in order to ensure radiological protection of the public and environment. This Order requires that an accounting of all sources of DOE man-made radionuclides and DOE enhanced natural radionuclides that are projected to remain on the site after all DOE site operations have ceased. This CA updates the previous CA that was developed in 1997. As part of this CA, an inventory of expected radionuclide residuals was conducted, exposure pathways were screened and a model was developed such that a dose to the MOP at the selected points of exposure might be evaluated.

54 ENVIRONMENTAL SCIENCES↗

FEMP Focus: 2011 Volume 20 Issue 1

Department of Energy (DOE); Federal Energy Management Program; FEMP Focus Newsletter; December 2010; Alternative Financing, Guidance Documents, Recovery Act Technical Assistance, Training, Energy Awareness

Alternative Financing, Guidance Documents, Recover↗

Road to Recovery: Bringing Recovery to Small Town America

The Recovery Act hits the road to reach out to surrounding towns of the Savannah River Site that are struggling with soaring unemployment rates. This project helps recruit thousands of people to new jobs in environmental cleanup at the Savannah River Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SWPF Crane Lift Operation

A multiple view shot of the SWPF crane lift operation at the Savannah River Site. Funded by the Recovery Act.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Update: Superfund Job Training

A quick look at how the Savannah River Site is reaching out in surrounding communities to help underprivileged graduates in pursuing a career under the Recovery Act.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Hampshire Better Buildings (Final Interim Report)

With $10 million in funding from the U.S. Department of Energy's (DOE) Better Buildings Neighborhood Program, the NH Better Buildings program was established as an initiative that initially empowered the three “Beacon Communities” of Berlin, Nashua and Plymouth to achieve transformative energy savings and reductions in fossil fuel use and greenhouse gases through deep energy retrofits and complementary sustainable energy solutions. The program also enabled those Communities to provide leadership to other communities around the state as “beacons” of energy efficiency. The goal of the program was to reduce energy use by a minimum of 15% through energy efficiency upgrades in residential and commercial buildings in the communities. The program expanded statewide in April 2012 by issuing a competitive solicitation for additional commercial projects non-profit, and municipal energy efficiency projects from any community in the state, and a partnership with the state’s utility-run, ratepayer-funded residential Home Performance with ENERGY STAR ® (HPwES) program. The NH Better Buildings program was administered by the New Hampshire Office of Energy and Planning (OEP) and managed by the NH Community Development Finance Authority (CDFA). The program started in July 2010 and the last projects funded with American Reinvestment and Recovery Act (ARRA) funds were completed in August 2013. The program will continue after the American Recovery and Reinvestment Act program period as a Revolving Loan Fund, enabling low-interest financing for deep energy retrofits into the future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

New Hampshire Better Buildings - Final Report

With $10 million in funding from the U.S. Department of Energy's (DOE) Better Buildings Neighborhood Program, the NH Better Buildings program was established as an initiative that initially empowered the three “Beacon Communities” of Berlin, Nashua and Plymouth to achieve transformative energy savings and reductions in fossil fuel use and greenhouse gases through deep energy retrofits and complementary sustainable energy solutions. The program also enabled those Communities to provide leadership to other communities around the state as “beacons” of energy efficiency. The goal of the program was to reduce energy use by a minimum of 15% through energy efficiency upgrades in residential and commercial buildings in the communities. The program expanded statewide in April 2012 by issuing a competitive solicitation for additional commercial projects non-profit, and municipal energy efficiency projects from any community in the state, and a partnership with the state’s utility-run, ratepayer-funded residential Home Performance with ENERGY STAR® (HPwES) program. The NH Better Buildings program was administered by the New Hampshire Office of Energy and Planning (OEP) and managed by the NH Community Development Finance Authority (CDFA). The program started in July 2010 and the last projects funded with American Reinvestment and Recovery Act (ARRA) funds were completed in August 2013. The program will continue after the American Recovery and Reinvestment Act program period as a Revolving Loan Fund, enabling low-interest financing for deep energy retrofits into the future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Heavy Water Test Reactor Dome Removal

A high speed look at the removal of the Heavy Water Test Reactor Dome Removal. A project sponsored by the Recovery Act on the Savannah River Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site: New Bubbler Technology

A close look at new SRS Bubbler technology that processes liquid waste. A 7 million dollar project funded by the Recovery Act. Production nearly doubles with this new technology

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental requirements management: Maintaining an effective compliance program is key to a robust environmental management system - 15184

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organisation's ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: - Communicating requirements- Planning work - Maintaining work controls - Maintaining compliance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

P Reactor Grouting

Filling the P Reactor with grout. This seals the radioactive material and reduces the environmental footprint left from the Cold War. Project sponsored by the Recovery Act at the Savannah River Site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Requirements Management

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

Cusack, Laura J.↗

25 Years Of Environmental Remediation In The General Separations Area Of The Savannah River Site: Lessons Learned About What Worked And What Did Not Work In Soil And Groundwater Cleanup

The Savannah River Site (SRS) is owned and administered by the US Department of Energy (DOE). SRS covers an area of approximately 900 square kilometers. The General Separation Area (GSA) is located roughly in the center of the SRS and includes: radioactive material chemical separations facilities, radioactive waste tank farms, a variety of radioactive seepage basins, and the radioactive waste burial grounds. Radioactive wastes were disposed in the GSA from the mid-1950s through the mid-1990s. Radioactive operations at the F Canyon began in 1954; radioactive operations at H Canyon began in 1955. Waste water disposition to the F and H Seepage Basins began soon after operations started in the canyons. The Old Radioactive Waste Burial Ground (ORWBG) began operations in 1952 to manage solid waste that could be radioactive from all the site operations, and ceased receiving waste in 1972. The Mixed Waste Management Facility (MWMF) and Low Level Radioactive Waste Disposal Facility (LLRWDF) received radioactive solid waste from 1969 until 1995. Environmental legislation enacted in the 1970s, 1980s, and 1990s led to changes in waste management and environmental cleanup practices at SRS. The US Congress passed the Clean Air Act in 1970, and the Clean Water Act in 1972; the Resource Conservation and Recovery Act (RCRA) was enacted in 1976; the Comprehensive Environmental Response Compensation, and Liability Act (CERCLA) was enacted by Congress in 1980; the Federal Facilities Compliance Act (FFCA) was signed into law in 1992. Environmental remediation at the SRS essentially began with a 1987 Settlement Agreement between the SRS and the State of South Carolina (under the South Carolina Department of Health and Environmental Control - SCDHEC), which recognized linkage between many SRS waste management facilities and RCRA. The SRS manages several of the larger groundwater remedial activities under RCRA for facilities recognized early on as environmental problems. All subsequent environmental remediation projects tend to be managed under tri-party agreement (DOE, Environmental Protection Agency, and SCDHEC) through the Federal Facilities Agreement. During 25 years of environmental remediation SRS has stabilized and capped seepage basins, and consolidated and capped waste units and burial grounds in the GSA. Groundwater activities include: pump and treat systems in the groundwater, installation of deep subsurface barrier systems to manage groundwater flow, in situ chemical treatments in the groundwater, and captured contaminated groundwater discharges at the surface for management in a forest irrigation system. Over the last 25 years concentrations of contaminants in the aquifers beneath the GSA and in surface water streams in the GSA have dropped significantly. Closure of 65 waste sites and 4 RCRA facilities has been successfully accomplished. Wastes have been successfully isolated in place beneath a variety of caps and cover systems. Environmental clean-up has progressed to the stage where most of the work involves monitoring, optimization, and maintenance of existing remedial systems. Many lessons have been learned in the process. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. SRS operated two very large pump and treat systems at the F and H Seepage Basins to attempt to limit the release of tritium to Fourmile Branch, a tributary of the Savannah River. The systems were designed to extract contaminated acidic groundwater, remove all contamination except tritium (not possible to remove the tritium from the water), and inject the tritiated groundwater up-gradient of the source area and the plume. The concept was to increase the travel time of the injected water for radioactive decay of the tritium. The two systems were found to be non-effective and potentially mobilizing more contamination. SRS invested approximately $50 million in construction and approximately $100 million in 6 years of operation. The H Seepage Basin pump and treat system was replaced by a series of subsurface barriers that alters the groundwater velocity; the F Seepage Basin pump and treat system was replaced by subsurface barriers forming a funnel and gate augmented by chemical treatment within the gates. These replacement systems are mostly passive and cost approximately $13 million to construct, and have reduced the tritium flux to Fourmile Branch, in these plumes, by over 70%. SRS manages non-acidic tritiated groundwater releases to Fourmile Branch from the southwest plume of the MWMF with a forest irrigation system. Tritiated water is captured with a sheetpile dam below the springs that caused releases to Fourmile Branch. Water from the irrigation pond is pumped to a filter plant prior to irrigation of approximately 26 hectares of mixed forest and developing pine plantation. SRS has almost achieved a 70% reduction in tritium flux to the Branch from this plume. The system cost approximately $5 million to construct with operation cost of approximately $500K per year. In conclusion, many lessons have been learned in 25 years of relatively aggressive remedial activities in the GSA. Geotextile covers outperform low permeability clay caps, especially with respect to the amount of repairs required to upkeep the drainage layers as the caps age. Passive, enhanced natural processes to address groundwater contamination are much more cost effective than pump and treat systems. In water management situations with non-accumulative contaminants (tritium, VOCs, etc.) irrigation in a forest setting can be very effective.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatability Test Plan for Deep Vadose Zone Remediation at the Hanford Site's Central Plateau

A treatability test plan has been prepared to address options for remediating portions of the deep vadose zone beneath the U.S. Department of Energy's (DOE's) Hanford Site. The vadose zone is the region of the subsurface that extends from the ground surface to the water table. The overriding objective of the treatability test plan is to recommend specific remediation technologies and laboratory and field tests to support the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 and Resource Conservation and Recovery Act of 1976 remedial decision-making process in the Central Plateau of the Hanford Site. Most of the technologies considered involve removing water from the vadose zone or immobilizing the contaminants to reduce the risk of contaminating groundwater. A multi-element approach to initial treatability testing is recommended, with the goal of providing the information needed to evaluate candidate technologies. The proposed tests focus on mitigating two contaminants - uranium and technetium. Specific technologies are recommended for testing at areas that may affect groundwater in the future, but a strategy to test other technologies is also presented. (authors)

54 ENVIRONMENTAL SCIENCES↗

TREATABILITY TEST PLAN FOR DEEP VADOSE ZONE REMEDIATION AT THE HANFORD SITE CENTRAL PLATEAU

A treatability test plan has been prepared to address options for remediating portions of the deep vadose zone beneath a portion of the U.S. Department of Energy's (DOE's) Hanford Site. The vadose zone is the region of the subsurface that extends from the ground surface to the water table. The overriding objective of the treatability test plan is to recommend specific remediation technologies and laboratory and field tests to support the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 and Resource Conservation and Recovery Act of 1976 remedial decision-making process in the Central Plateau of the Hanford Site. Most of the technologies considered involve removing water from the vadose zone or immobilizing the contaminants to reduce the risk of contaminating groundwater. A multi-element approach to initial treatability testing is recommended, with the goal of providing the information needed to evaluate candidate technologies. The proposed tests focus on mitigating two contaminants--uranium and technetium. Specific technologies are recommended for testing at areas that may affect groundwater in the future, but a strategy to test other technologies is also presented.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Home Weatherization Visit

Secretary Steven Chu visits a home that is in the process of being weatherized in Columbus, OH, along with Ohio Governor Ted Strickland and Columbus Mayor Michael Coleman. They discuss the benefits of weatherization and how funding from the recovery act is having a direct impact in communities across America.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Progress Update: H4 Basin Concrete Pour

The Recovery Act funded project in the H area basin. A concrete ditch built longer than half a mile to prevent contaminated water from expanding and to reduce the footprint on the environment.