Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIAL ACTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

A Technical Overview of the Mission Engagement Onboarding Process Managed by the Mission Engagement Working Group (MEWG)

NASA's intricate network, encompassing the Near Space Network (NSN) and Deep Space Network (DSN), plays a pivotal role in supporting an array of space missions. These range from those in Low Earth Orbit (LEO) and Geosynchronous Orbit (GEO), to the more distant Cislunar and Deep Space endeavors. To manage the vast communications needs, we utilize multiple ground stations globally, coupled with the Tracking and Data Relay Satellite System (TDRSS). The Mission Engagement Working Group (MEWG), within the Commercialization, Innovation, and Synergies (CIS) division, stands as the primary gateway for all Space Communications and Network (SCaN) communication and navigation requests. This includes not only NASA's internal missions but also extends to other governmental agencies and commercial sector endeavors. How does the MEWG Process Work? - Initial Contact : Clients initiate their interaction with the NSN by submitting their service requirements through a dedicated online portal. - Preliminary Assessment by MEWG: Upon submission, MEWG embarks on a primary screening of the request. This involves evaluating the client's identity and the foundational concept of their mission. - Detailed Analysis by the NSN Team: Parallelly, the NSN team conducts a comprehensive review of the service request. This often necessitates additional clarification from the requester, ensuring that the final assessment is both thorough and accurate. - Coordination & Streamlining: MEWG's overarching objective is to effectively log, classify, orchestrate, and guarantee that pertinent actions are delegated based on initial client interactions. Acting as the central hub for these primary contacts, MEWG ensures that each request is sufficiently detailed for an in-depth evaluation. - Feedback & Remediation: If a request is deemed unsuitable or lacking, MEWG doesn't merely reject it. Instead, the team discerns the reasons for the inadequacy and suggests potential rectification strategies. This approach ensures that feedback delivered to clients is precise, prompt, constructive, and actionable. Conclusion: This plenary presentation will detail the efforts of the MEWG resulting in a greatly streamlined and refined onboarding process for space communication Direct-To-Earth (DTE) and Space Relay (SR) support requests. By centralizing the preliminary interactions and assessments, we've reduced the complexity for clients, ensuring they engage with a singular, efficient, and responsive point of contact. This initiative, we believe, fortifies NASA's commitment to fostering effective and synergistic collaborations with its partners.

Devin Bitner↗

Cost and Benefit Analysis of Mitigating, Tracking, and Remediating Orbital Debris

Presentation accompanying the technical report with the same name. The abstract for the report and the full study is repeated below. Orbital debris may collide with crewed and robotic spacecraft, placing them at risk. The wide range of debris, from 9,000-kilogram rocket bodies to millions of millimeter-size debris, has led to a similarly wide range of proposed actions for addressing the risks posed by debris. However, the costs and benefits of these actions have historically been unknown. This is a challenge for decision makers who are choosing which actions to support through technology development or policy changes. NASA’s Office of Technology, Policy, and Strategy is addressing these technical and economic uncertainties by building a capability to (1) complete rigorous calculations of the net present value of each action, (2) identify an optimal portfolio of actions to reduce risk, and (3) quantitatively analyze policies related to space sustainability. This report describes our progress toward that capability and to solicit feedback from the space and economic communities. Our previous work, referred to here as Phase 1, assessed the costs and benefits of performing debris remediation on operationally relevant timescales. The current analysis contains major updates to the risk model used in Phase 1 and expands the breadth of actions considered to include mitigating the creation of debris, improving the ability to track debris, and more methods for cleaning up existing debris. We demonstrate that our approach of measuring risks in dollars allows for the effectiveness of seemingly incommensurate actions to be compared and generates insights that other approaches to measuring risk have missed.

Jericho Locke↗

Biota Modeling in EPA’s Preliminary Remediation Goal and Dose Compliance Concentration Calculators for Use in EPA Superfund Risk Assessment: Explanation of Intake Rate Derivation, Transfer Factor Compilation, and Mass Loading Factor Sources

The Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) calculators are screening level risk assessment tools that set forth the Environmental Protection Agency’s (EPA) recommended approaches and currently available risk assessment guidance for response actions at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites, commonly known as Superfund. The environmental screening levels derived by the PRG and DCC calculators are used to identify isotopes contributing the highest risk and dose as well as establish preliminary remediation goals. Each calculator has residential gardening and subsistence farmer exposure scenarios that model transfer of contaminants from soil and water into various types of biota (crops and animal products). New publications of human intake rates of biota; farm animal intakes of water, soil, and fodder; and soil to plant interactions require updates be implemented into the PRG and DCC calculators. Recent improvements in the biota modeling for these calculators include newly derived biota intake rates, enhanced soil mass loading factors (MLFs), and more comprehensive soil to plant transfer factors (BV’s) and soil to tissue transfer factors (TFs) for animals. New biota have been added in both the produce and animal products categories that greatly improve the accuracy and utility of the PRG and DCC calculators and encompass greater geographic diversity on a national and international scale.

54 ENVIRONMENTAL SCIENCES↗

Mechanisms of Water-Stimulated Mg 2+ Intercalation in Vanadium Oxide: Toward the Development of Hydrated Vanadium Oxide Cathodes for Mg Batteries

As lithium-ion batteries approach their theoretical limits for energy density, magnesium-ion batteries are emerging as a promising next-generation energy storage technology. However, progress in magnesium-ion battery research has been stymied by a lack of available high capacity cathode materials that can reversibly insert magnesium ions. Vanadium Oxide (V 2 O 5 ) has emerged as one of the more promising candidate cathode materials, owing to its high theoretical capacity, facile synthesis methods, and relatively high operating voltage. This review focuses on the outlook of hydrated V 2 O 5 structures as a high capacity cathode material for magnesium-ion batteries. In general, V 2 O 5 structures exhibit poor experimental capacity for magnesium-ion insertion due to sluggish magnesium-ion insertion kinetics and poor electronic conductivity. However, several decades ago, it was discovered that the addition of water to organic electrolytes significantly improves magnesium-ion insertion into V 2 O 5 . This review clarifies the various mechanisms that have been used to explain this observation, from charge shielding to proton insertion, and offers an alternative explanation that examines the possible role of structural hydroxyl groups on the V 2 O 5 surface. While the mechanism still needs to be further studied, this discovery fueled new research into V 2 O 5 electrodes that incorporate water directly as a structural element. The most promising of these hydrated V 2 O 5 materials, many of which incorporate conductive additives, nanostructured architectures, and thin film morphologies, are discussed. Ultimately, however, these hydrated V 2 O 5 structures still face a significant barrier to potential applications in magnesium-ion batteries. During full cell electrochemical cycling, these hydrated structures tend to leach water into the electrolyte and passivate the surface of the magnesium anode, leading to poor cycle life and low capacity retention. Recently, some promising strides have been made to remedy this problem, including the use of artificial solid electrolyte interphase layers as an anode protection scheme, but a call to action for more anode protection strategies that are compatible with trace water and magnesium metal is required.

25 ENERGY STORAGE↗

Zero-Valent Iron Permeable Reactive Barrier to Remediate Volatile Organic Compounds in Groundwater - 20209

The US DOE-SRS, the US EPA, and the South Carolina Department of Health and Environmental Control determined it was appropriate to perform a non-time critical removal action at the P-Area Groundwater Operable Unit at the SRS to reduce the mass and downgradient transport of trichloroethylene in the P-Area groundwater plume. Contaminated groundwater discharges to a nearby stream, Steel Creek, within the SRS boundaries, resulting in trichloroethylene concentrations above the maximum contaminant level. Impact to surface water is limited in areal extent and supported by recently collected characterization data. The P-Area Groundwater Operable Unit encompasses the groundwater beneath an industrial area within SRS, P Area, where the P-Reactor once operated. The boundaries of the P-Area Groundwater Operable Unit extend northwest to Steel Creek, northeast toward PAR Pond, and southeast to Meyers Branch. Groundwater in the Upper Three Runs Aquifer of the P-Area Groundwater Operable Unit has been impacted by reactor and facility operations between 1954 and 1991, including tritium and volatile organic compounds. The P-Area surface units contributing to groundwater contamination were remediated as part of the P-Area Operable Unit in 2011. The P-Reactor closure is one of the first of its kind in the DOE Complex and is one of only a few full-sized production reactors in the US to undergo completion of final closure activities. The nature and extent of groundwater contamination was determined using a variety of investigative approaches such as groundwater monitoring wells, direct-push technology, and surface water samples. Groundwater contamination associated with trichloroethylene is primarily exhibited in a narrow plume that extends from the source area at P-Reactor and west to Steel Creek. Maximum contaminant level exceedances in groundwater occur over an area of ∼6.9 hectares for trichloroethylene with concentrations as high as 7.7 milligrams per liter. To the west of the P-Area facility area, the trichloroethylene groundwater plume is controlled by a buried geologic feature, assumed to be an old stream bed, that further narrows the groundwater plume in what has been designated as the 'neck area.' This narrowing of the groundwater plume provides an ideal location for a treatment barrier. The non-time critical removal action alternative chosen is to install a zero-valent iron permeable reactive barrier within the neck area of the trichloroethylene groundwater plume, perpendicular to groundwater flow direction. This technology will provide a treatment barrier that will reduce trichloroethylene groundwater concentrations by 90% and has an anticipated useful life of at least 25 years. A pre-design investigation was performed in the neck area to confirm site lithology, hydrogeology, geochemistry, and extent of trichloroethylene contamination prior to a final design. A treatability study, conducted as part of the pre-design investigation, indicated that the subsurface and groundwater in the PArea Groundwater Operable Unit is compatible with the zero-valent iron and will not lead to excessive buildup from mineralization/precipitation or biofouling. Probabilistic modeling was conducted using field and laboratory data to determine the expected performance of the zero-valent iron permeable reactive barrier. The model simulations indicated that a 3.81-centimeter thick barrier would provide greater than 90% reduction of trichloroethylene groundwater concentration. The final design of the zero-valent iron permeable reactive barrier is a barrier that will extend 80.5 linear meters in a 'zigzag' orientation to best transect the trichloroethylene plume and account for varying groundwater flow. The barrier will be installed from 13.7 meters below ground surface to 41.1 meters below ground surface for 65.8 linear meters and from 13.7 meters below ground surface to 36.6 meters below ground surface for 14.6 linear meters, the base of which is 'keyed' into a low permeability zone. The barrier is designed to a thickness of 10.2 centimeters, which was determined to reduce the trichloroethylene groundwater concentrations by greater than 90% with a safety factor of 2.67. A total of approximately 689 metric tons of zero-valent iron will be injected through 22 injection wells spaced 3.66 meters apart, using guar to suspend the zero-valent iron. Zero-valent iron permeable reactive barrier construction will be monitored through 23 installed resistivity receivers offset 7.32 meters from the zerovalent iron permeable reactive barrier. The zero-valent iron will be energized with a low-voltage 100 Hertz signal during injection and will be monitored using the resistivity receivers to ensure complete coalescence of the zero-valent iron permeable reactive barrier. The zero-valent iron was sized to have a hydraulic conductivity greater than the natural subsurface, thus promoting groundwater flow through the barrier. As contaminated groundwater contacts the zero-valent iron, volatile organic compounds, including trichloroethylene, are immediately degraded to harmless compounds such as ethylene. The performance of the zero-valent iron permeable reactive barrier will be monitored using three upgradient monitoring well clusters, six downgradient monitoring well clusters, and four in-wall monitoring wells. The in-wall monitoring wells will indicate immediate reduction of trichloroethylene mass in the groundwater and allow analyses of the zero-valent iron permeable reactive barrier health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

Bioremediation of Chlorinated Volatile Organic Compounds: DOE Experiences and Lessons Learned

From the mid-1980s to the present, the Department of Energy (DOE) has developed, tested, and deployed diverse bioremediation strategies for chlorinated volatile organic compounds (cVOCs). A systematic review of these projects after decades of activity provides an opportunity to identify crosscutting themes and lessons learned. The knowledge provided by a DOE bioremediation retrospective represents a resource to support current and future bioremediation operations, and future decisions related to cVOC bioremediation. This systematic review examined the design, objectives, performance and outcomes for remediation projects at DOE sites including Savannah River, Hanford, Idaho, Mound and Pinellas. The results were used to identify emergent themes to provide actionable insights. The bioremediation retrospective technical team first developed standardized criteria to support the systematic review. Then, the evaluation was performed using a sequential process that was informed by local technical experts who identified and provided the structured information that served as the basis for the evaluation. The participation of these experts was invaluable to the effort. Importantly, DOE cVOC bioremediation efforts were implemented based on the foundational knowledge developed by U.S. Department of Defense (DoD) strategic and applied environmental technology development and certification programs, as well as technical, policy and regulatory guidance from the U.S. Environmental Protection Agency (EPA), Interstate Technology and Regulatory Council (ITRC), U.S. Geological Survey (USGS), industry, and universities. To maximize the value of the DOE cVOC bioremediation retrospective, the systematic review strategy focused on identifying important DOE-specific experiences, trends and lessons learned that would extend the knowledge available from these other key entities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Agentic Diagrammatica: Towards Autonomous Symbolic Computation in High Energy Physics

We present Diagrammatica, a symbolic computation extension to the HEPTAPOD agentic framework, which enables LLM agents to plan and execute multi-step theoretical calculations. Symbolic computation poses a distinctive reliability challenge for LLM agents, as correctness is governed by implicit mathematical conventions that are not encoded in a form that can be easily checked in the computational backend. We identify two complementary remedies, tool-constrained computation and targeted knowledge grounding, and pursue the first as the primary architecture. Concretely, we concentrate the agent's action distribution onto tool calls with convention-fixing semantics, in which the agent specifies a compact, human-auditable diagram specification and a trusted backend performs the symbolic or numerical manipulations exactly. The toolkit provides two complementary calculation paths consuming a shared diagram specification: Naive Dimensional Analysis (NDA) for order-of-magnitude rate estimates and Exact Diagrammatic Analysis (EDA) for tree-level symbolic calculations via automatic FeynCalc code generation, both supplemented by automatic Feynman diagram enumeration and a navigable theory knowledge base. The architecture is validated on two benchmarks: (1) an exhaustive catalog of all tree-level, single-vertex $1\to 2$ partial decay widths across scalar, fermion, and vector parents, with complete massless and threshold limits and Standard Model validation; and (2) an NDA sensitivity study of the muon decay multiplicity $μ^+ \to ν_μ\barν_e + n(e^+e^-) + e^-$, determining the maximum observable $n$ at current and planned muon experiments.

Menzo, Tony [Alabama U.; Fermilab] (ORCID:00000002↗

Selective Sorbent Design: CaS Aerogel for Rapid Remediation of Aqueous Pb (II)

Heavy metals are a persistent environmental problem due to their high toxicity, even at very low concentrations (parts per billion, ppb). The removal of such diluted heavy metals is challenging because of the competition the counterions (Ca 2+ , Na + , Mg 2+ , etc.) present in natural water bodies. The design of sorbents capable of removing ions below the action limit (15 ppb for Pb 2+ ) requires a strong driving force for selective uptake and rapid removal. In this work, we report the synthesis of porous CaS aerogels (surface area = 143.6 m 2 /g) by oxidative assembly of CaS nanoparticles and describe their use in selective Pb 2+ ion remediation from water. Despite the presence of amorphous CaCO 3 (up to 50 wt %) in the gel network, the gels demonstrated a capacity of 17.1 mmol Pb/g aerogel (3543 mg/g), and this could be augmented to 22.5 mmol Pb/g aerogel (4593 mg/g) by modifying the synthesis to reduce CaCO 3 content to ca. 15 wt %. Moreover, the selectivity of CaS aerogels toward Pb 2+ ions is high, as evidenced by little-to-no change in the distribution constant (K d ∼ 10 4 ) in the presence of competing ions (1 M) such as Na + , Mg 2+ , and Ca 2+ . During remediation with low concentrations (100 ppb) of Pb 2+ with CaS aerogels, the level of Pb 2+ dropped to 5.4 ppb (below the 15 ppb EPA limit) within 1 h with a 95.4% removal efficiency. In contrast to the CO 2 supercritically dried aerogels, lower surface area ambient dried gels (xerogels) only remove 40% of the lead ions from a 100 ppb solution, saturating within 1 h. The efficiency and rapidity of selective Pb 2+ uptake using CdS aerogels arise from a combination of a strong thermodynamic driving force for cation exchange (K eq = 2.5 × 10 27 ) and chemisorption along with favorable kinetics associated with the high surface area porous architecture. These results show that formation of high surface area metal chalcogenide aerogels by oxidative assembly to form nanocrystalline architectures, as previously demonstrated for II−VI and IV−VI semiconductors, can be extended to the more highly ionic alkaline earth sulfides.

Aerogels↗

Operational and Performance Monitoring of East Tennessee Technology Park Ponds—2023 Results

Performance and operational monitoring are regulatory requirements associated with a non–time-critical removal action for three surface water bodies at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee: the K-1007-P1 Pond, the K-901-A Pond, and the K-720 Slough. This progress report summarizes the monitoring activities and results from fiscal year (FY) 2023. The goal of ecological enhancement of the K-1007-P1 and K-901-A Ponds is to reduce risk from polychlorinated biphenyl (PCB) contamination in fish to humans and wildlife. Lowering PCB concentrations in the water column and in the food that fish eat is expected to decrease PCB bioaccumulation in fish. Performance monitoring of the K-1007-P1 Pond focuses on annual PCB trends in water, clams, and fish. PCBs in fish also are sampled annually at the K-720 Slough. Operational monitoring ensures that ecological enhancement measures—including water quality, plant community, fish community, and wildlife actions—have been implemented as intended. Monitoring provides the information necessary to determine whether modifications are needed to attain the design end state (i.e., a heavily vegetated, clearwater pond dominated by sunfish with significantly diminished or at least downwardly trending PCB levels in fish). In FY 2023, fish removal efforts and vegetation planting primarily focused on the K-901-A Pond. These actions were implemented to help push the systems toward the desired end state. Descriptions of the various monitoring activities and preliminary 2023 results are provided in the following sections. An update on fish and plant management actions in FY 2023 is also included in this report. A summary of the more detailed information in this report will be presented as required in the upcoming Remediation Effectiveness Report.

54 ENVIRONMENTAL SCIENCES↗

Operational and Performance Monitoring of East Tennessee Technology Park Ponds—2025 Results

Performance and operational monitoring are regulatory requirements associated with a non–time-critical removal action for three surface water bodies at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee (Figure 1): the K-1007-P1 Pond, the K-901-A Pond, and the K-720 Slough. This progress report summarizes the monitoring activities and results from FY 2025. The goal of ecological enhancement of the K-1007-P1 and K-901-A Ponds is to reduce risk from polychlorinated biphenyl (PCB) contamination in fish to humans and wildlife. Lowering PCB concentrations in the water column and in the food that fish eat is expected to decrease PCB bioaccumulation in fish. Performance monitoring of the K-1007-P1 Pond focuses on annual PCB trends in water, clams, and fish. PCBs in fish also are sampled annually at the K-720 Slough. Operational monitoring ensures that ecological enhancement measures—including water quality, plant community, fish community, and wildlife actions—have been implemented as intended. Monitoring provides the information necessary to determine whether modifications are needed to attain the design end state (i.e., a heavily vegetated, clearwater pond dominated by sunfish with significantly diminished or at least downwardly trending PCB levels in fish). In FY 2025, fish removal efforts and vegetation planting primarily focused on the K-901-A Pond. These actions were implemented to help push the systems toward the desired end state. Descriptions of the various monitoring activities and preliminary 2025 results are provided in the following sections. An update on fish and plant management actions in FY 2025 is also included in this report. A summary of the more detailed information in this report will be presented as required in the upcoming Remediation Effectiveness Report.

54 ENVIRONMENTAL SCIENCES↗

Area South of K7-516, SWMU 100 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

This Operations, Maintenance, and Monitoring Report documents groundwater interim measure activities from March 30, 2019 through December 31, 2019 at the Area South of K7-516 site located at Kennedy Space Center (KSC), Florida. An air sparge (AS) system consisting of 16 AS wells was installed along the Barge Canal in 2012 to be protective of the Outstanding Florida Waters (OFW). The AS system was expanded in 2015 by installing 40 AS wells to remediate the hot spot (HS) area. Additional expansion activities were performed in 2018 through the installation of eight additional AS wells along the Barge Canal. Currently 24 OFW and 40 HS AS wells are in operation. This report includes performance monitoring events for the OFW and HS areas, along with an annual Interim Groundwater Monitoring (IGWM) event in the Western Area. The 516S site has been designated Solid Waste Management Unit 100 under KSC’s Resource Conservation and Recovery Act Corrective Action program. This document was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011/80KSC019F0068. The OFW and HS AS systems are meeting the performance criteria and IM objectives of preventing contaminant migration and remediating groundwater within the treatment zone. Team consensus was reached to continue operation of the combined OFW and HS AS systems (Meeting Minute 2002-M02, Decisions 2002-D06, D09 and D04). Team consensus was also reached to continue semi-annual OFW performance monitoring and annual monitoring for the IGWM Western Area for the same wells sampled during 2019 events. In the eastern area, MW13, MW14, and MW15 will be reduced from semi-annual to annual frequency. For the HS Area, team consensus was reached to continue the current annual/biennial monitoring program (Meeting Minute 2002-M02, Decisions 2002-D02, D03, D05, D07 and D08).

Patrice L. Lehocky↗

RECOVER: An Automated Cloud-Based Decision Support System for Post-fire Rehabilitation Planning

RECOVER is a site-specific decision support system that automatically brings together in a single analysis environment the information necessary for post-fire rehabilitation decision-making. After a major wildfire, law requires that the federal land management agencies certify a comprehensive plan for public safety, burned area stabilization, resource protection, and site recovery. These burned area emergency response (BAER) plans are a crucial part of our national response to wildfire disasters and depend heavily on data acquired from a variety of sources. Final plans are due within 21 days of control of a major wildfire and become the guiding document for managing the activities and budgets for all subsequent remediation efforts. There are few instances in the federal government where plans of such wide-ranging scope and importance are assembled on such short notice and translated into action more quickly. RECOVER has been designed in close collaboration with our agency partners and directly addresses their high-priority decision-making requirements. In response to a fire detection event, RECOVER uses the rapid resource allocation capabilities of cloud computing to automatically collect Earth observational data, derived decision products, and historic biophysical data so that when the fire is contained, BAER teams will have a complete and ready-to-use RECOVER dataset and GIS analysis environment customized for the target wildfire. Initial studies suggest that RECOVER can transform this information-intensive process by reducing from days to a matter of minutes the time required to assemble and deliver crucial wildfire-related data.

cloud computing↗

C-5 Electrical Substation (SWMU 066) Performance Monitoring Report

The C-5 Electrical Substation (C5ES) is a National Aeronautics and Space Administration (NASA) operated electrical power substation located at the John F. Kennedy Space Center (KSC), Florida. This facility has been designated Solid Waste Management Unit (SWMU) 066 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. This Performance Monitoring Report (PMR) presents the Interim Measure (IM) activities, including baseline sampling, air sparge system construction and operation, and performance monitoring, that were completed to remediate chlorinated volatile organic compounds (CVOC) in groundwater exceeding the Florida Department of Environmental Protection (FDEP) natural attenuation default concentrations (NADC).

Andrew Scott Starr↗

Complexity and near extremal charged black branes

Highlights: • Trying to explore a remedy to overcome the puzzle in holographic complexity by assuming a cutoff behind the horizon and the corresponding boundary term. • Holographic complexity growth obtained by the WDW patch on shell action is insensitive to the UV cutoff at the late time. Therefore one may conclude that either on shell action does not compute complexity, or the late time is not given by the physical charges, or in our computations we have missed something! • We find that one needs to carefully compute on shell action taking into account the behind the horizon and the corresponding boundary term. Doing so, one arrives at a consistent picture. • We check this consistency by evaluating the late time complexity growth for near horizon limit of the near extremal black hole using two different methods. We would have obtained non-consistent picture, if we had not considered the behind the horizon cutoff as well as the corresponding boundary term. We compute holographic complexity of charged black brane solutions in arbitrary dimensions for the near horizon limit of near extremal case using two different methods. The corresponding complexity may be obtained either by taking the limit from the complexity of the charged black brane, or by computing the complexity for near horizon limit of near extremal solution. One observes that these results coincide if one assumes to have a cutoff behind horizon whose value is fixed by UV cutoff and also taking into account a proper counterterm evaluated on this cutoff. We also consider the situation for Vaidya charged black branes too.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Applied Science Investigations to Facilitate Closure of the F-Area and H-Area Seepage Basins

This report provides a roadmap of applied science studies that will facilitate reaching long term monitoring end state corrective actions for groundwater contamination at the F-Area Seepage Basins and the H-Area Seepage Basins at the Savannah River Site in Aiken, SC. The F-Area and H-Area Seepage Basins are waste units on the Savannah River Site in Aiken, SC at which low-level radioactive solutions were disposed into unlined basins, resulting in groundwater contamination. The current contaminants of interest in the groundwater are tritium, iodine-129, strontium-90, uranium isotopes and nitrate. Remediation at both sites has continued since 1988, consisting of closure and capping of the basins, operation of a groundwater pump-and-treat system from 1997 to 2004, and replacement of this system with a comprehensive in situ attenuation-based remedy. This report was requested by the U.S. Department of Energy - Office of Environmental Management in consultation with the Savannah River National Laboratory and Savannah River Nuclear Solutions - Area Completions Projects to provide a scientific basis for proactively addressing groundwater issues that may need to be resolved prior to final corrective actions at the F-Area and H-Area Seepage Basins.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The adult literacy evaluator: An intelligent computer-aided training system for diagnosing adult illiterates

An important part of NASA's mission involves the secondary application of its technologies in the public and private sectors. One current application being developed is The Adult Literacy Evaluator, a simulation-based diagnostic tool designed to assess the operant literacy abilities of adults having difficulties in learning to read and write. Using ICAT system technology in addition to speech recognition, closed-captioned television (CCTV), live video and other state-of-the art graphics and storage capabilities, this project attempts to overcome the negative effects of adult literacy assessment by allowing the client to interact with an intelligent computer system which simulates real-life literacy activities and materials and which measures literacy performance in the actual context of its use. The specific objectives of the project are as follows: (1) To develop a simulation-based diagnostic tool to assess adults' prior knowledge about reading and writing processes in actual contexts of application; (2) to provide a profile of readers' strengths and weaknesses; and (3) to suggest instructional strategies and materials which can be used as a beginning point for remediation. In the first and developmental phase of the project, descriptions of literacy events and environments are being written and functional literacy documents analyzed for their components. Examples of literacy events and situations being considered included interactions with environmental print (e.g., billboards, street signs, commercial marquees, storefront logos, etc.), functional literacy materials (e.g., newspapers, magazines, telephone books, bills, receipts, etc.) and employment related communication (i.e., job descriptions, application forms, technical manuals, memorandums, newsletters, etc.). Each of these situations and materials is being analyzed for its literacy requirements in terms of written display (i.e., knowledge of printed forms and conventions), meaning demands (i.e., comprehension and word knowledge) and social situation. From these descriptions, scripts are being generated which define the interaction between the student, an on-screen guide and the simulated literacy environment. The proposed outcome of the Evaluator is a diagnostic profile which will present broad classifications of literacy behaviors across the major areas of metacognitive abilities, word recognition, vocabulary knowledge, comprehension and writing. From these classifications, suggestions for materials and strategies for instruction with which to begin corrective action will be made. The focus of the Literacy Evaluator will be essentially to provide an expert diagnosis and an interpretation of that assessment which then can be used by a human tutor to further design and individualize a remedial program as needed through the use of an authoring system.

Yaden, David B., Jr.↗

Contextual specificity in perception and action

The visually guided control of helicopter flight is a human achievement, and, thus, understanding this skill is, in part, a psychological problem. The abilities of skilled pilots are impressive, and yet it is of concern that pilots' performance is less than ideal: they suffer from workload constraints, make occasional errors, and are subject to such debilities as simulator sickness. Remedying such deficiencies is both an engineering and a psychological problem. When studying the psychological aspects of this problem, it is desirable to simplify the problem as much as possible, and thereby, sidestep as many intractable psychological issues as possible. Simply stated, we do not want to have to resolve such polemics as the mind-body problem in order to contribute to the design of more effective helicopter systems. On the other hand, the study of human behavior is a psychological endeavor and certain problems cannot be evaded. Four related issues that are of psychological significance in understanding the visually guided control of helicopter flight are discussed. First, a selected discussion of the nature of descriptive levels in analyzing human perception and performance is presented. It is argued that the appropriate level of description for perception is kinematical, and for performance, it is procedural. Second, it is argued that investigations into pilot performance cannot ignore the nature of pilots' phenomenal experience. The conscious control of actions is not based upon environmental states of affairs, nor upon the optical information that specifies them. Actions are coupled to perceptions. Third, the acquisition of skilled actions in the context of inherent misperceptions is discussed. Such skills may be error prone in some situations, but not in others. Finally, I discuss the contextual relativity of human errors. Each of these four issues relates to a common theme: the control of action is mediated by phenomenal experience, the veracity of which is context specific.

Proffitt, Dennis R.↗