Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Analytical Results of the Tank 51H Sludge Batch 11 As-Received Qualification Sample

Savannah River National Laboratory (SRNL) has been requested by Savannah River Mission Completion (SRMC) to qualify the next sludge batch, Sludge Batch 11 (SB11), for processing at the Defense Waste Processing Facility (DWPF). This report documents the first steps of the qualification process, characterization of the Tank 51H as-received qualification material. SRMC sent SRNL two 200 mL samples received from Tank 51H on the 12th of August 2024. The combined sample, HTF-51-24-85/86, was analyzed for the following: supernate and slurry density, weight percent solids, settling, chemical composition, and radionuclides.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Savannah River Site FY23 Salt Waste Qualification Data

The Savannah River National Laboratory (SRNL) analyzed samples from Savannah River Site (SRS) Waste Tanks 41H and 21H to support qualification of Salt Waste Processing Facility (SWPF) Waste Batches 8 and 9 for processing (the FY23 Salt Batch Qualification samples). These Tanks (i.e. 41H and 21H) are blend tanks for feed to SWPF. None of the samples displayed any unusual or unexpected characteristics such as large amounts of solids, floating solids, or unusual color. Characterization of these samples confirmed similar chemical composition and characteristics to previous salt waste batches. The results for Batches 8 and 9 were provided by SRNL to Savannah River Mission Completion (SRMC), the Liquid Waste Operations subcontractor at SRS, as External Sample Results (Laboratory Information Management System (LIMS)) Reports. Additionally, a separate technical memo was issued by SRNL to report re-test data for Batch 8 for Cs-137 for filtered samples only which were run at the request of SWPF. For Batch 9, a set of samples was also analyzed in parallel by the SWPF-Analytical Laboratory (SWPF-AL). The SWPF-AL data is included herein for comparison with the SRNL data where applicable. The analytical results (both rapid, typically 4 weeks, and long term, typically 8 weeks) for Batches 8 and 9 are now summarized and discussed in this technical report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal Performance of Neutron Sensor Qualification Device

The neutron sensor qualification device was developed to provide a temperature-controlled environment for neutron sensors and dosimetry, enabling irradiation in a neutron field at the Armed Forces Radiobiology Research Institute (AFRRI) TRIGA reactor facility. The device, constructed from low-activation and low neutron cross-section materials, features a modular tube furnace design with three independently controlled heating zones for controlling axial temperature distribution. Laboratory testing validated the device's thermal performance, including uniform temperature distribution with less than 6°C variation across the central region, a steady-state operational temperature of 350°C achieved in approximately 3 hours, and a cooling time constant of 3.5 hours. External surface temperatures remained safe for handling, with the surrounding aluminum structure remaining at ambient conditions. The results confirm the device’s suitability for neutron sensor qualification experiments, with potential for future operation at higher temperatures and further optimization of performance.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Lightning arrestor connector lead magnesium niobate qualification pellet test procedures.

Enhanced knowledge preservation for DOE DP technical component activities has recently received much attention. As part of this recent knowledge preservation effort, improved documentation of the sample preparation and electrical testing procedures for lead magnesium niobate--lead titanate (PMN/PT) qualification pellets was completed. The qualification pellets are fabricated from the same parent powders used to produce PMN/PT lightning arrestor connector (LAC) granules at HWF&T. In our report, the procedures for fired pellet surface preparation, electrode deposition, electrical testing and data recording are described. The dielectric measurements described in our report are an information only test. Technical reasons for selecting the electrode material, electrode size and geometry are presented. The electrical testing is based on measuring the dielectric constant and dissipation factor of the pellet during cooling from 280 C to 220 C. The most important data are the temperature for which the peak dielectric constant occurs (Curie Point temperature) and the peak dielectric constant magnitude. We determined that the peak dielectric constant for our procedure would be that measured at 1 kHz at the Curie Point. Both the peak dielectric constant and the Curie point parameters provide semi-quantitative information concerning the chemical and microstructural homogeneity of the parent material used for the production of PMN/PT granules for LACs. Finally, we have proposed flag limits for the dielectric data for the pellets. Specifically, if the temperature of the peak dielectric constant falls outside the range of 250 C {+-} 30 C we propose that a flag limit be imposed that will initiate communication between production agency and design agency personnel. If the peak dielectric constant measured falls outside the range 25,000 {+-} 10,000 we also propose that a flag limit be imposed.

36 MATERIALS SCIENCE↗

SLUDGE WASHING AND DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS FOR SLUDGE BATCH 6 QUALIFICATION

Prior to initiating a new sludge batch in the Defense Waste Processing Facility (DWPF), Savannah River National Laboratory (SRNL) is required to simulate this processing, including Chemical Process Cell (CPC) simulation, waste glass fabrication, and chemical durability testing. This report documents this simulation for the next sludge batch, Sludge Batch 6 (SB6). SB6 consists of Tank 12 material that has been transferred to Tank 51 and subjected to Low Temperature Aluminum Dissolution (LTAD), Tank 4 sludge, and H-Canyon Pu solutions. Following LTAD and the Tank 4 addition, Liquid Waste Operations (LWO) provided SRNL a 3 L sample of Tank 51 sludge for SB6 qualification. Pu solution from H Canyon was also received. SB6 qualification included washing the sample per LWO plans/projections (including the addition of Pu from H Canyon), DWPF CPC simulations, waste glass fabrication (vitrification), and waste glass characterization and chemical durability evaluation. The following are significant observations from this demonstration. Sludge settling improved slightly as the sludge was washed. SRNL recommended (and the Tank Farm implemented) one less wash based on evaluations of Tank 40 heel projections and projections of the glass composition following transfer of Tank 51 to Tank 40. Thorium was detected in significant quantities (>0.1 wt % of total solids) in the sludge. In past sludge batches, thorium has been determined by Inductively Coupled Plasma-Mass Spectroscopy (ICP-MS), seen in small quantities, and reported with the radionuclides. As a result of the high thorium, SRNL-AD has added thorium to their suite of Inductively Coupled Plasma-Atomic Emission Spectroscopy (ICP-AES) elements. The acid stoichiometry for the DWPF Sludge Receipt and Adjustment Tank (SRAT) processing of 115%, or 1.3 mol acid per liter of SRAT receipt slurry, was adequate to accomplish some of the goals of SRAT processing: nitrite was destroyed to below 1,000 mg/kg and mercury was removed to below the DWPF target with 750 g of steam per g of mercury. However, rheological properties did not improve and were above the design basis. Hydrogen generation rates did not exceed DWPF limits during the SRAT and Slurry Mix Evaporator (SME) cycles. However, hydrogen generation during the SRAT cycle approached the DWPF limit. The glass fabricated with the Tank 51 SB6 SME product and Frit 418 was acceptable with respect to chemical durability as measured by the Product Consistency Test (PCT). The PCT response was also predictable by the current durability models of the DWPF Product Composition Control System (PCCS). It should be noted, however, that in the first attempt to make glass from the SME product, the contents of the fabrication crucible foamed over. This may be a result of the SME product's REDOX (Reduction/Oxidation - Fe{sup 2+}/{Sigma}Fe) of 0.08 (calculated from SME product analytical results). The following are recommendations drawn from this demonstration. In this demonstration, at the request of DWPF, SRNL caustic boiled the SRAT contents prior to acid addition to remove water (to increase solids concentration). During the nearly five hours of caustic boiling, 700 ppm of antifoam was required to control foaming. SRNL recommends that DWPF not caustic boil/concentrate SRAT receipt prior to acid addition until further studies can be performed to provide a better foaming control strategy or a new antifoam is developed for caustic boiling. Based on this set of runs and a recently completed demonstration with the SB6 Waste Acceptance Product Specifications (WAPS) sample, it is recommended that DWPF not add formic acid at the design addition rate of two gallons per minute for this sludge batch. A longer acid addition time appears to be helpful in allowing slower reaction of formic acid with the sludge and possibly decreases the chance of a foam over during acid addition.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Methods Data Qualification Interim Report

The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Techniques for control of long-term reliability of complex integrated circuits. I - Reliability assurance by test vehicle qualification.

Development of an alternate approach to the conventional methods of reliability assurance for large-scale integrated circuits. The product treated is a large-scale T squared L array designed for space applications. The concept used is that of qualification of product by evaluation of the basic processing used in fabricating the product, providing an insight into its potential reliability. Test vehicles are described which enable evaluation of device characteristics, surface condition, and various parameters of the two-level metallization system used. Evaluation of these test vehicles is performed on a lot qualification basis, with the lot consisting of one wafer. Assembled test vehicles are evaluated by high temperature stress at 300 C for short time durations. Stressing at these temperatures provides a rapid method of evaluation and permits a go/no go decision to be made on the wafer lot in a timely fashion.

Van Vonno, N. W.↗

Qualification plan for the ultraviolet spectrometer experiment (S-169), revision A

The qualification methods used to verify that the UVS hardware meets the technical requirements of the contract are defined. Included in this plan are test location, the qualification UVS to be tested, test objectives, and all tests required to verify that the UVS meets all performance and environmental requirements of the CEI specification. Additionally, environmental test conditions, testing time or cycles, allowable maintenance, logging requirements, manner of analysis, and utilization of test results, disposition of test specimens, failure criteria, retest requirements, facilities and support requirements, and the time phasing of the tests are presented.

Eckard, L. D., Jr.↗

Flight qualification of mortar-actuated parachute deployment systems

A brief discussion outlines background of mortar use in parachute deployment systems. A description of the system operation is presented. Effects of the environment on performance are discussed as well as the instrumentation needed to assess this performance. Power unit qualification and lot qualification for shear pins and cartridges is delineated. Functional mortar system tests are described. Finally, bridle deployment and parachute deployment are discussed.

Pleasants, J. E.↗

Environmental qualification testing of terrestrial solar cell modules

The placement of solar cell modules in various climates and locations throughout the world results in different degrees and combinations of environmental stresses. Coupled with a design lifetime goal of 20 years, early detection and correction of module design deficiencies can result in significantly better long-term economics. This paper describes an environmental test research program for developing qualification requirements and procedures for flat-plate solar cell modules. A multiple iterative approach for establishing and evaluating test requirements is discussed as well as the rationale for the selection of levels and durations for the current qualification tests. The status of study efforts involving optical surface soiling, encapsulation delamination, and voltage bias-humidity testing is reviewed.

Hoffman, A. R.↗

Space Shuttle solid rocket motor /SRM/ development and qualification

The configuration of the reusable Space Shuttle solid rocket motors is described. In addition, their design evolution is reviewed, noting that the requirement that certain components be recovered, refurbished, and used on as many as 20 flights dictated a conservative design approach, the validity of which has been proven by successful testing of all development and qualification motors. Aspects discussed include ballistics, the motor case, nozzle, nozzle materials, and the ignition system. Finally, summary results of the first two of three qualification motor firings designated QM-1 and QM-2 are presented.

Lund, R. K.↗

Development of electrical test procedures for qualification of spacecraft against EID. Volume 1: The CAN test and other relevant data

A combined experimental and analytical program to develop system electrical test procedures for the qualification of spacecraft against damage produced by space-electron-induced discharges (EID) occurring on spacecraft dielectric outer surfaces is described. The data on the response of a simple satellite model, called CAN, to electron-induced discharges is presented. The experimental results were compared to predicted behavior and to the response of the CAN to electrical injection techniques simulating blowoff and arc discharges. Also included is a review of significant results from other ground tests and the P78-2 program to form a data base from which is specified those test procedures which optimally simulate the response of spacecraft to EID. The electrical and electron spraying test data were evaluated to provide a first-cut determination of the best methods for performance of electrical excitation qualification tests from the point of view of simulation fidelity.

Wilkenfeld, J. M.↗

Development of electrical test procedures for qualification of spacecraft against EID. Volume 2: Review and specification of test procedures

A combined experimental and analytical program to develop system electrical test procedures for the qualification of spacecraft against damage produced by space-electron-induced discharges (EID) occurring on spacecraft dielectric outer surfaces is described. A review and critical evaluation of possible approaches to qualify spacecraft against space electron-induced discharges (EID) is presented. A variety of possible schemes to simulate EID electromagnetic effects produced in spacecraft was studied. These techniques form the principal element of a provisional, recommended set of test procedures for the EID qualification spacecraft. Significant gaps in our knowledge about EID which impact the final specification of an electrical test to qualify spacecraft against EID are also identified.

Wilkenfeld, J. M.↗

Development of a qualification standard for adhesives used in hybrid microcircuits

Improved qualification standards and test procedures for adhesives used in microelectronic packaging are developed. The test methods in specification for the Selection and Use of Organic Adhesives in Hybrid Microcircuits are reevaluated versus industry and government requirements. Four electrically insulative and four electrically conductive adhesives used in the assembly of hybrid microcircuits are selected to evaluate the proposed revised test methods. An estimate of the cost to perform qualification testing of an adhesive to the requirements of the revised specification is also prepared.

Licari, J. J.↗

Qualification tests and electrical measurements: Practice and problems

As part of the Flat-Plate Solar Array Project, 138 different module designs were subjected to qualification tests. Electrical measurements were subjected on well over a thousand modules representing more than 150 designs. From this experience, conclusions are drawn regarding results and problems, with discussion of the need for change or improvement. The qualification test sequence incuded application of environmental and electrical stresses to the module. With few exceptions, the tests have revealed defects necessitation of environmental and electrical stresses to the module. With few exceptions, the tests have revealed defects necessitating module design or process changes. However, the continued need for these tests may be questioned on the basis of technical and logistical factors. Technically, the current test sequence does not cover all design characteristics, does not include all field conditions and is not known to represent the desired 30-year module life. Logistically, the tests are time-consuming and costly, and there is a lack of, fully qualified independent test organizations. Alternatives to the current test program include simplification based on design specification and site environment, and/or the use of warranties or other commercial practices.

Smokler, M. I.↗

Qualification testing and electrical measurement experience: A manufacturer's view

ARCO Solar's experiences as a participant in an industry-utility-government environmental qualification team examining photovoltaic devices are discussed. Included is an assessment of the applicability, completeness and appropriateness of the testing procedures and of the acceptance criteria for megawatt-sized procurements for utilities. Like the stand-alone users, the utility industry is interested in obtaining low costs, but additional concerns exist related to reliability and durability, safety, grounding and overall system criteria including performance prediction (related to output power acceptance testing), power quality and dispatchability. For purposes of this first major purchase of photovoltaic modules and panels by the utility industry, there was a carry-over of the JPL specifications. The need exists for futher development, assessement, and selection of qualification and testing standards and evaluation criteria specifically addressing these additional concerns for utility-connected PV power-plant applications.

Arnett, J. C.↗

Qualification needs for advanced integrated aircraft

In an effort to achieve maximum aircraft performance, designers are integrating aircraft systems. The characteristics of aerodynamics, vehicle structure, and propulsion systems are being integrated and controlled through embedded, often flight critical, electronic systems. The qualification needs for such highly integrated aircraft systems are addressed. Based on flight experience with research aircraft, a set of test capabilities is described which allows for complete and efficient qualification of advanced integrated aircraft.

Mackall, D. A.↗

Qualification needs for advanced integrated aircraft

In an effort to achieve maximum aircraft performance, designers are integrating aircraft systems. The characteristics of aerodynamics, vehicle structure, and propulsion systems are being integrated and controlled through embedded, often flight-critical, electronic systems. This paper addresses the qualification needs for such highly integrated aircraft systems. Based on flight experience with research aircraft, a set of test capabilities is described which allows for complete and efficient qualification of advanced integrated aircraft.

Mackall, D. A.↗