Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Induced seismicity potential based on probabilistic geomechanics for the San Juan Basin CarbonSAFE project

Although geologic carbon sequestration projects have yet to induce — or may never induce — a damaging earthquake, experiences from other deep injection industries such as hydraulic fracturing, enhanced geothermal systems, and saltwater disposal suggest that effective quantitative seismic risk assessment is necessary for deep saline carbon capture and sequestration (CCS) projects. One such imminent CCS project is the San Juan Basin CarbonSAFE Phase III program. We use Monte Carlo probabilistic geomechanical analyses combined with observations of the geologic and operational parameters of the San Juan Basin site and suggest that this project is of low-induced seismic risk. The primary analysis is split into four sections. First, we assess the literature for faults and past seismicity, and at least five faulting scenarios are directly relevant. Second, we develop and calibrate an integrated earth model for the project site. Third, we perform Monte Carlo simulations that consider reasonable uncertainties of the geomechanical parameters. Of five tested faulting scenarios, only one presents high Coulomb failure functions, but fourth, we determine the risk to be low based on the combined lack of historical seismicity, the geologic framework of the faulting scenario, and the presence of saltwater injection at the same depth as the proposed supercritical carbon dioxide injection. The most sensitive parameters in the geomechanical calculations are the fault dip and the coefficient of friction. The least sensitive are the fault strike and the orientation of the maximum horizontal principal stress.

58 GEOSCIENCES↗

Considering uncertainties expands the lower tail of maize yield projections

Crop yields are sensitive to extreme weather events. Improving the understanding of the mechanisms and the drivers of the projection uncertainties can help to improve decisions. Previous studies have provided important insights, but often sample only a small subset of potentially important uncertainties. Here we expand on a previous statistical modeling approach by refining the analyses of two uncertainty sources. Specifically, we assess the effects of uncertainties surrounding crop-yield model parameters and climate forcings on projected crop yield. We focus on maize yield projections in the eastern U.S.in this century. We quantify how considering more uncertainties expands the lower tail of yield projections. We characterized the relative importance of each uncertainty source and show that the uncertainty surrounding yield model parameters is the main driver of yield projection uncertainty.

59 BASIC BIOLOGICAL SCIENCES↗

Permafrost Thaw, Uneven Subsidence and Projected Drying of Ice-wedge Polygon Tundra: Modeling Archive

This dataset is a model archive of the paper Permafrost Thaw, Uneven Subsidence and Projected Drying of Ice-wedge Polygon Tundra (in prep) to support a modeling study investigating how projected increases in Arctic temperature and precipitation will jointly influence hydrologic conditions in ice-rich tundra landscapes. With this dataset, this study is to address the research question: Will Arctic tundra landscapes become wetter or drier with increasing precipitation and temperature in the future when thaw-induced ground subsidence and associated microtopographic evolution are represented? The simulations focus on ice-wedge polygon tundra, a widespread form of ice-rich permafrost terrain that is highly sensitive to thaw-driven landscape change. This dataset contains model input and output data for four study watersheds in Alaska: Anaktuvuk, Utqiagvik (formerly Barrow), Brooks Foothills, and Prudhoe Bay. Simulations were performed using the Advanced Terrestrial Simulator (ATS, v1.5), a physics-rich integrated surface–subsurface hydrologic model. For each watershed, ten modeling cases were performed representing two landscape evolution conditions (with subsidence and without subsidence) combined with five climate forcing scenarios derived from Shared Socioeconomic Pathways (SSP5, SSP5 with precipitation trend, SSP2, SSP2 with precipitation trend, and SSP2 with double precipitation trend). Particularly, for each watershed under the forcing SSP2 with precipitation trend, there are two additional simulations considering spatially heterogeneous subsidence distributions: one assumes randomly distributed scaling and the other includes elevation dependent distribution scaling. These simulations span 1980–2099 and include spin-up runs (1980–2009) followed by transient projections (2010–2099). To facilitate reproducibility of simulations, all datasets are organized by watershed. For each study watershed, the dataset contains: (1) Pre-partitioned mesh files for 32-core modeling (.par.32.XX), located in EACH_WATERSHED/mesh/basin; and also a non-partitioned mesh file (.exo) located in EACH_WATERSHED/mesh; (2) Climate forcings corresponding to the five SSP scenarios (.h5), located in EACH_WATERSHED/data; (3) Final states (.h5) from column spin-up modeling used to initialize historical watershed-scale spin-up runs from 1980 to 2009, located in EACH_WATERSHED/PreSpinupHistorical; (4) Final states (.h5) of historical watershed-scale spin-up runs from 1980 to 2009 used to initialize projection runs, located in EACH_WATERSHED/Spinup_daymetERA5; (5) ATS modeling input files (.xml), located in EACH_WATERSHED/EACH_SIMULATION_SCENARIO/inputfiles; (6) ATS modeling output files (.dat), located in in EACH_WATERSHED/EACH_SIMULATION_SCENARIO/combined_obs; (7) For the Brooks Foothills watershed, additional spatial model outputs are provided (.h5) for selected years (2033 and 2093) used to generate spatial figures in this study, located in Brooksfoothills/EACH_SIMULATION_SCENARIO/results-WITH/WITHOUT_SUBSIDENCE-year2033/2093. All data files with suffix .h5 can be accessible through Python h5py, and all data files with suffix of .dat can be imported by Python pandas. Mesh file with .exo can be visualized through Paraview or read by Python netCDF. The Next-Generation Ecosystem Experiments in the Arctic (NGEE Arctic) project is a research effort to reduce uncertainty in the Department of Energy’s Energy Exascale Earth System Model (E3SM) by developing a predictive understanding of Arctic tundra ecosystems underlain by permafrost and to quantify feedbacks from the Arctic tundra to the Earth system. NGEE Arctic is supported by the Department of Energy's Office of Biological and Environmental Research. Over Phases 1–3, observations made by the NGEE Arctic team across a gradient of permafrost landscapes in Arctic Alaska improved the representation of tundra processes in the land surface component of E3SM (the E3SM Land Model, ELM). Model improvements emphasized unique aspects of permafrost environments and explored reductions in model complexity while retaining predictive power. The Arctic-informed ELM developed by NGEE Arctic has been used to make novel predictions on processes ranging from permafrost thaw to soil biogeochemical cycling to Earth system feedbacks associated with the unique characteristics of tundra plants. In Phase 4, the NGEE Arctic team is evaluating our new predictive understanding under novel conditions across the Arctic domain. In collaboration with partners at long-term pan-Arctic research sites we are examining whether an Arctic-informed ELM can faithfully simulate interactions among surface and subsurface processes at site, regional, and pan-Arctic scales. In turn, we are using variety of tools to dynamically extend and evaluate ELM inference, with an emphasis on data synthesis and pan-Arctic model evaluation, reintegration of code with an evolving E3SM, scaling across heterogeneous Arctic landscapes, and the appropriate representation of the impacts of increasingly frequent Arctic disturbances.

EARTH SCIENCE > ATMOSPHERE > PRECIPITATION↗

Hybrid Power Plants: Status of Installed and Proposed Projects [Slides]

As battery prices fall and wind and solar generation rises, power plant developers are increasingly combining wind and solar projects with on-site batteries, creating “hybrid” power plants. But hybrid or co-located plants have been part of the U.S. electricity mix for decades, with widely ranging configurations that extend beyond pairing a generator with a battery. This new summary tracks and maps existing hybrid and co-located plants across the United States while also synthesizing data from generation interconnection queues to illustrate developer interest in the next wave of plants. The scope is inclusive of co-located hybrid plants that pair two or more generators and/or that pair generation with storage at a single point of interconnection, and also full hybrids that feature co-location and co-control. The focus is on larger, 1 MW+ systems: smaller (often behind-the-meter) projects are also increasingly common, but are not included in the data synthesis. Based in part on EIA Form 860 data, there were at least 125 co-located hybrid plants (>1 MW) already operating across the United States at the end of 2019, totaling over 14 GW of aggregate capacity. Some of the most common configurations include wind+storage (13 projects, 1,290 MW wind, 184 MW storage), PV+storage (40 projects, 882 MW PV, 169 MW storage), and fossil+storage (10 projects, 2,414 MW fossil, 91 MW storage). Data from interconnection queues demonstrates the considerable commercial interest that exists in hybrid power plants, especially solar co-located with storage. By the end of 2019, there were at least 367 GW of solar plants in the nation’s queues; 102 GW (~28%) of this capacity was proposed as a hybrid, most typically pairing PV with battery storage. For wind, 225 GW of capacity sat in the queues, with 11 GW (~5%) proposed as a hybrid, again most-often pairing wind with storage. The proposed solar+storage plants are located throughout the United States, but with California and the non-ISO West being the most prominent areas of commercial interest. Proposed wind+storage and standalone storage plants also center to a degree on these regions of the country.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Phase 1 NuScale SMR FOAK Nuclear Demonstration Readiness Project (Final Scientific/Technical Report)

The overarching objective of the Phase 1 NuScale SMR First-of-a-Kind (FOAK) Nuclear Demonstration Readiness Project was to enhance competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale small modular reactor (SMR). The scope of this Phase 1 project continued to advance the licensing and design maturity, particularly in those areas related to supporting customer readiness, supply chain integration, cost competitiveness, and cost confidence. This investment provided by the Government has accelerated development of these designs and technologies so that the existing domestic fleet of nuclear power plants remains viable and the most mature in the nuclear industry. The intent is to have the new, advanced U.S. designs be deployed as early 2026, and be globally competitive. As a part of the First-of-a-Kind Nuclear Demonstration Readiness Project, NuScale has been developing an advanced reactor design, leading the path for other development projects or complex technology advancements for existing plants that have significant technical and licensing risk. The NuScale Power team (NuScale) is advancing licensing, engineering, supply chain development, testing, and other required activities to enhance the innovation and competitiveness of the U.S. nuclear industry by enabling timely deployment of the NuScale SMR. Specifically, NuScale is performing the following activities in Phase 1. Fully supporting the NRC review of the NuScale DCA to ensure approval of a final safety evaluation report by the end of 2020. Improving plant cost confidence and cost competitiveness through design and supply chain advancement, incorporation of constructability best practices, and margin recovery to increase plant power output. Accelerating design maturity, technology development, and operational program readiness to support a customer commitment for plant deployment. The Department of Energy (DOE) Office of Scientific and Technical Information (OSTI), a unit of the Office of Science, fulfills agency-wide responsibilities to collect, preserve, and disseminate both unclassified and classified scientific and technical information (STI) emanating from DOE-funded research and development (R&D) activities at DOE national laboratories and facilities and at universities and other institutions nationwide. This scientific and technical report provides summaries of the analyses and research that was performed by NuScale under this project that achieves the objective of disseminating information to the nuclear industry to ensure the innovations realized are shared for the benefit of the industry at large.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

PSIP For HDF5 Pilot Project (Final Report)

Productivity and Sustainability Improvement Planning (PSIP) is a lightweight, incremental and iterative approach (much in the same spirit as Agile methodologies) for making routine software process improvements in software projects. It is designed to be easily applied in existing development workflows. Quoting from a November 2019 workshop paper describing PSIP. PSIP breaks from classic software process improvement approaches such as CMM(I), SPICE, ISO 9000 or Six Sigma, in that it trades comprehensive standards and certification-driven assessment for self-defined, internally driven goals. It does, however, carry forward such ideas as having staged models of improvement (like CMM(I)) in the form of progress tracking cards. Additionally, PSIP is more aligned with lean and agile methods; it adopts their emphasis on iterative improvement and continuous learning. At its core, PSIP is an instantiation of the Plan-Do-Check-Act management cycle (PDCA, also known as Plan-Do-Study-Adjust) which provides the foundation for much of the modern software process improvement literature. This situates PSIP within a constellation of bottom-up, inductive software process improvement methods. PSIP is designed around the notion that already overburdened teams can define and carry out a series of small, incremental steps of progression towards improvement goals without significant (there will be some, but the goal is to avoid significant) disruption to ongoing development activities. A key enabling tool in PSIP is the use of Progress Tracking Cards (PTCs) which define the steps of progression towards a given improvement goal. This is the theory of PSIP. The PSIP for HDF5 project was aimed at putting PSIP into practice with the purpose of evaluating its effectiveness in planning and facilitating quality and process improvements in a scientific software project as well as its associated artifacts. The HDF5 project was chosen as a use case to evaluate PSIP for several reasons. First, NNSA labs and LLNL in particular have a keen interest in how HDF5 quality impacts its uptake and sustainability as a community adopted and supported code. Next, HDF5 is a foundational library, a key substrate in the HPC/CSE software stack, and any improvements there realized through this contract will have benefits to many DOE applications depending on it. HDF5 also represents an older, legacy code with technical debts to pay down. These characteristics are similar to many NNSA and even some ECP code projects. But, because HDF5 is an I/O library, it represents a simpler use case within which to study PSIP than a full-fledged and significantly more complex PDE simulation code. We believe these attributes make HDF5 an ideal use case for evaluating PSIP.

97 MATHEMATICS AND COMPUTING↗

Early Application Results on Pre-exascale Architecture with Analysis of Performance Challenges and Projections (Milestone PM-AD-1080 WBS 2.2)

This Exascale Computing Project (ECP) Milestone Report summarizes the status of all 30 ECP Applications Development (AD) sub-projects at the end of FY19. In August and September of 2019, a comprehensive assessment of AD projects was conducted jointly by the ECP leadership and a team of external subject matter experts. Reviews took place in person over five days-two at the National Renewable Energy Laboratory and three at Argonne National Laboratory and the University of Chicago. The review committees were tasked with evaluating each sub-project's progress in porting their code(s) to current multi-GPU architectures considered precursors to planned exascale machines. This includes characterizing which modules have been ported to multi-accelerator nodes, initial performance analyses, the status of software integration, and a current vision of successes, obstacles, and next steps. As such this report contains not only an accurate snapshot of each sub-project's current status, but also represents an unprecedentedly broad account of experiences porting large scientific applications to next-generation HPC architectures.

97 MATHEMATICS AND COMPUTING↗

SECARB Regional Project Assessment

The SECARB Cranfield Early Test Project was designed to safely demonstrate large-scale, long-term CO 2 injection and storage in a CO 2 -enhanced oil recovery (EOR) operation and associated saline reservoir. Storage during EOR operations has the potential to offset commercial costs, holding a significant promise for future large-scale deployment in the southeastern United States. Denbury Onshore LLC began CO 2 -EOR operations in July 2008 at the Cranfield oilfield located east of Natchez, Mississippi (Figure 1). The location offered an ideal setting to investigate storage monitoring at a commercial CO 2 -EOR operation. The field team, led by the Gulf Coast Carbon Center of the Bureau of Economic Geology at the University of Texas at Austin, deployed the largest suite of monitoring, verification, accounting (MVA) technologies to collect data to assess long-term CO 2 utilization and storage. The CO 2 injection interval is within the 3,000-meter-deep fluvial lower Tuscaloosa Formation, a large and regionally extensive saline reservoir, at a broad four-way structural closure that defines the Cranfield oilfield. Tests were conducted in the oil-producing area as well as in the non-oil-producing brine aquifer. The CO 2 used during EOR operation was transported via pipeline from the Jackson Dome, a natural source of CO 2 . The study focused on four integrated research areas: (1) the High-Volume Injection Test area (HiVIT); (2) the Detailed Area of Study (DAS); (3) the Geomechanical area; and (4) the near-surface observatory, also called the “P-site.” CO 2 injection occurred at the HiVIT and the DAS (Figure 2 and Figure 3). The DAS was located down-dip of the oil-water interface of the Cranfield oilfield. The well layout included one injection well and two down-dip observation wells. The team was the first of the regional partnerships to monitor more than 1 million metric tons of CO 2 . At the end of the project, the team monitored more than 11 million metric tons of CO 2 injected and 5 million metric tons of CO 2 stored. The Cranfield Project was the fifth project worldwide, and the first such project in the United States, to reach this CO 2 injection volume while being monitored to demonstrate storage effectiveness.

01 COAL, LIGNITE, AND PEAT↗

Project 57 Air Monitoring Report: January 1 through September 30, 2020, with a Review of the Period of Record Radionuclide Analyses

The DOE Environmental Management Nevada Program (EM NV) identified the Project 57 contaminated area as Corrective Action Unit (CAU) 415, Project 57 No. 1 Plutonium Dispersion Site, which consisted of one Corrective Action Site (CAS): NAFR-23- 02, Pu Contaminated Soil (U.S. DOE, 2014). The CAS included several Project 57 operational facilities in addition to the plutonium-contaminated soil. With approval of the State of Nevada Division of Environmental Protection, the DOE closed the Project 57 surface soil contamination site in October 2020. Closure was accomplished by installing a clean soil cap constructed over ground zero and the surrounding areas of the CA that may be entrained with wind-transported soil particles. After completion of the ground zero cap in October 2020, DRI discontinued monitoring of meteorological and associated environmental conditions at the Project 57 site as directed by DOE EM NV. Navarro dismantled air monitoring stations P57-3 and P57-4 and removed the equipment on October 20, 2020. This report presents the meteorological and dust observations and radiological analyses accomplished during the approximately 10 months when the air monitoring data collection equipment was operational during CY2020.

54 ENVIRONMENTAL SCIENCES↗

Retail Rate Projections for Long-Term Electricity System Models

Electricity prices reported in most electricity-system planning studies leave out many price components and do not translate into retail rates, making it difficult to interpret how projected electricity system changes will impact costs to consumers. Full transmission costs are left out of many studies; distribution and administration costs are similarly excluded or highly simplified. Here, we present a detailed bottom-up accounting method for projecting future retail electricity rates in the United States. Making the simplifying assumption that each state is served by an investor-owned utility (IOU), we translate projected generation and transmission capacity and costs from the Regional Energy Deployment System (ReEDS) capacity-expansion model into IOU balance sheet expenditures, accounting for depreciation, taxes, and the breakdown between operating and capitalized (rate-based) expenses. Distribution, administration, and intra-regional transmission costs are projected forward based on empirical trends over the past decade. Modeled bottom-up electricity rates are compared to historical rates from 2010-2019, and the sensitivity of modeled rates to a range of financing and modeling assumptions is explored. Distribution and administration rate components account for roughly 40% (4.4 ¢/kWh) of the projected national-average retail rate over 2020-2050 under central assumptions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Bay Area Regional Energy: Network Integrated Commercial Retrofits (BRICR) Project. Final Report

The BRICR project applied large-scale building energy modeling concepts with the aim of reducing the cost of energy efficiency targeting, design, and project development, and measurement of energy savings for energy efficiency programs implemented by local governments that serve small and medium commercial buildings (SMB). The project leveraged the services and resources of existing local government energy programs serving disadvantaged and hard-to-reach SMB customers. In contrast to programs run by utilities, local government programs generally do not have direct access to energy billing records for an entire class of customers in a geographic area, which prior research demonstrated useful for large-scale building energy model baseline development and calibration. , However, local governments are rich in public records that offer important clues about physical attributes and uses that, along with behavior, determine energy use. Relying only on public records, BRICR demonstrated development of credible baseline energy models for 3,792 office, retail, and hotel buildings. Publicly disclosed annual energy use data from a local energy benchmarking program and anonymized data from the Building Performance Database, the nation’s largest dataset about energy-related characteristics of buildings, were utilized to validate and calibrate energy models via an innovative method comparing distributions of energy intensity by fuel type for portfolios of buildings of similar size, vintage, and use. Portfolio calibration does not provide certainty that an energy model fits an individual building; the method is useful when billing data is not accessible – a common situation for researchers, energy service providers and ESCOs, local governments, and any party other than a utility. A software component was developed, the BRICR gem, which automates simulation when relevant data is added or edited by the user to a file saved in the standardized BuildingSync XML schema for energy audit data. The component was demonstrated as a simplified means to generate a mass of energy models corresponding to public records containing basic attributes such as building scale, location, use, year built, and aspect ratio in combination with building energy code prototype data corresponding to use and vintage. The component was also demonstrated as a simplified means to automate energy simulation when attributes are revised; the intention was to enable iterative improvement of the baseline model and energy savings estimates for common energy conservation measures as users revise relevant attributes based on their observations. In the context of institutional change and uncertainty for the participating local government energy programs, 13 whole building retrofits were completed. Impacts were measured by applying the CalTRACK2.0 methods to standardize measurement of normalized metered energy consumption. The GRIDMeter methods of stratified sampling and individual load shape analysis were applied to adjust for impacts of the effect of COVID-19 on retrofitted buildings in the context of all local buildings of similar size and use. Excluding impacts of the pandemic, retrofitted buildings demonstrated between 1.6% and 25.1% reduction in energy use. The project contributed use cases and feedback that helped inform evolution of the software tools and data formats that were combined for the first time in the BRICR project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LLNS Request for Variance from 10 CFR 851 for Construction of LLNL Digital Infrastructure Capabilities Expansion Project

Lawrence Livermore National Security, LLC (LLNS) requests variance to 10 CFR 851 (the Rule) for the construction of the Digital Infrastructure Capabilities Expansion (DICE) project. The request isin continued support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line-item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach. Experience gained in the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Facility (EOC) under the variance granted in June 2020 is very encouraging. While detailed analysis will be forthcoming after that project is completed, there are strong indicators that a benefit has been realized by the subcontractors executing the work. The variance has permitted local/regional construction businesses contracted to Management & Operation contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the EOC construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851.

99 GENERAL AND MISCELLANEOUS↗

Phase I Summary of Management Activities - Advanced Construction Technology Initiative Project

As the end of the year is approached, it is essential to review the National Reactor Innovation Center (NRIC) management activities undertaken during the Advanced Construction Technology Initiative (ACTI) project. The ACTI project was launched to support a transformation in nuclear energy construction, management, and deployment costs, enabling nuclear energy to make important contributions to the energy systems of the future. This transformation will increase the confidence of investors, energy system planners, policymakers, and ultimately consumers in the capability of nuclear energy to meet future needs; thus, it represents a critical element of advanced nuclear energy system demonstration. Development and/or demonstration project(s) will consider regulatory requirements for commercial nuclear implementation and will incorporate strategies to develop regulator experience and review of the technology. GE Hitachi (GEH), a leading player in the nuclear industry that offers a range of products and services including nuclear reactor design, fuel supply, and decommissioning solutions, submitted a proposal for the ACTI project. GEH was awarded the contract for the first phase of the project.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Los Alamos National Laboratory Laboratory Directed Research and Development Program: FY23 Annual Progress Report- Compendium of Project Summaries

The project summaries are organized by Capability Pillar – Complex Natural and Engineered Systems, Information Science and Technology, Materials for the Future, Nuclear and Particle Futures, Science of Signatures, and Weapons Systems. Project summaries for continuing projects appear first, followed by project summaries and technical outcomes for projects that ended in FY23.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

SMART Task 6: Evaluation of the Costs of Geologic CO2 Storage for the Illinois Basin Decatur Project Site Using the NRAP/SMART Technoeconomic and Liability Evaluation for Storage (TALES) Model

This is a presentation featuring an analysis related to SMART Task 6 in which CO2 storage costs are presented. The National Energy Technology Laboratory has developed the NRAP/SMART Technoeconomic and Liability Evaluation for Storage (TALES) model to provide quantitative cost-based insights to support developers planning CO2 injection and storage projects. TALES calculates the revenues, costs, and financial performance of candidate CO2 saline storage project based on site-specific activity costs and financial parameters. TALES is being integrated as a module pertaining to storage cost as part of the broader SMART Visualization and Decision Support Platform (SVDSP). In this study, the TALES model was applied using real activity cost data associated with the development and operations at the Illinois Basin Decatur Project (IBDP) CO2 storage project site. Scenario analysis was implemented in which crucial operational and cost attributes were varied and the associated cost implications observed. Key results data and project cost summary metrics like first-year breakeven price of CO2 ($/tonne) and net present value (NPV) are presented in similar fashion to how they will appear in the SVDSP.

Vikara, Derek↗

The Port of Los Angeles Zero- and Near-Zero-Emission Freight Facilities Shore to Store Project

The City of Los Angeles Harbor Department (Harbor Department, Port of Los Angeles) partnered with Equilon Enterprises LLC (d/b/a Shell Oil Products US) (Shell), Toyota Motor North America (Toyota), and Kenworth Truck Company (Kenworth) partnered with the Port of Hueneme, United Parcel Service, Total Transportation Services Inc., Southern Counties Express, Toyota Logistics Services, Air Liquide, National Renewable Energy Laboratory, Coalition For A Safe Environment, and the South Coast Air Quality Management District to introduce hydrogen fuel into the Southern California drayage truck market by demonstrating near-commercial heavy-duty hydrogen fuel cell electric trucks at and between freight facilities throughout the region, while continuing to lay the groundwork for battery-electric operations. The Shore to Store project built on project team experience to help realize our vision of zero-emission freight operations in the future. Ten Kenworth zero-emission Class 8 fuel cell electric trucks, integrated with Toyota’s fuel cell drive technology, were operated by United Parcel Service, Total Transportation Services Inc., Southern Counties Express, and Toyota Logistics Services in commercial service. The demonstration fleet fueled at the Shore to Store hydrogen fueling stations that were built in Ontario, California, and Wilmington, California. An additional station at the Port of Long Beach (Portal Station) was available for fueling the fleet. Portal Station was supported by grants from the California Energy Commission and South Coast Air Quality Management District and used as match funding for the Shore to Store project. The Port of Hueneme demonstrated two battery-electric yard tractors, and Toyota Logistics Services demonstrated two zero-emission forklifts at their warehouse facility, showcasing elements of the entire supply chain operating with zero emissions. This project showcased a snapshot of the zero-emission supply chain of the future, providing a model by which freight facilities can support zero-emission operations. The Shore to Store project: Demonstrated the technical feasibility of zero-emission hydrogen fueled Class 8 heavy-duty trucks and electric cargo handling equipment in rigorous goods movement operation throughout the Southern California region. Cumulatively completed 59,212 miles of zero-emission operation, with 21,650 miles driven in-service with the fleets, using hydrogen fuel cell electric Class 8 heavy-duty trucks. Operated zero-emission yard tractors for a total of 2,749.6 hours. Created direct localized emission reductions in designated disadvantaged communities, including those in zip codes 90220, 90247, 90248, 90731, 90744, 90802, and 91761. For the 59,212 miles of zero-emission operation, reduced emissions by an estimated total of 15.5 kg NOX (0.163 g/km), 1.01 kg SOX (0.0106 g/km), and 304.8 metric tonnes of CO2e (3.2 kg/km) compared to diesel baseline vehicles including both tailpipe emissions and the emissions from producing the fuel sources.

08 HYDROGEN↗

Managing Subsurface Pressure Buildup and Interference in Commercial-Scale CO 2 Storage Project with Proximal Injection Wells

Large-scale decarbonization using carbon capture and storage (CCS) is likely to involve many commercial-scale CO 2 storage projects located in close proximity to each other. This close proximity raises concerns over pressure interference among the storage projects. Pressure interference between injection and storage efforts can reduce the practicable CO 2 storage resource and force wells to inject CO 2 at a lower rate to avoid the fracture pressure thresholds per United States Environmental Protection Agency (EPA) Class VI well regulations to preserve injection and confining zone integrity and potentially mitigate against inducing seismic activity. These analyses employ numerical full-physics reservoir modeling to evaluate how pressure buildup fronts and CO 2 plumes evolve under commercial-scale injection volumes of CO 2 in which multiple storage sites located in close proximity occur in tandem. The simulation models mimic injection at pseudo basin-scale and assume homogeneous saline formation(s) as storage targets with a pair of upper and lower homogeneous seal layer/s. These analyses specifically investigate the efficacy of two basin-wide reservoir pressure management strategies in addressing the technical challenges associated with pressure buildup and CO 2 plume commingling. The strategies explored include: 1) enlarging the area of injection well spacing (WS) and 2) storing CO 2 in a stacked sequence (SSS) of saline formations compared to a single formation. The storage and confining zones properties assumed were held common across the scenarios, unless specified otherwise. Analyses results show that after injecting 4 million tons per year for 30 years using 4 separate wells (each injecting 1 million metric tons per year), the radius of CO 2 plume extends to a mere 3 km or less from injection wells. Meanwhile, the radius of pressure buildup ranges on the order of tens to a few hundreds of kilometers, depending on the magnitude of pressure buildup threshold that one would use to define the front. CO 2 plume commingling from different injection wells appears to occur 50 years post-injection, especially under scenarios with narrowly spaced (i.e., < 5 km apart) injection well locations. Findings from sensitivity cases on the well spacing suggest that storage formations modeled would require different well spacing to avoid fracture pressure thresholds. For instance, modeled storage formations with high fracture gradients (i.e., 0.8 psi/ft) would need less than 5–km well spacing, whereas those with lower fracture gradients (i.e., 0.7 psi/ft) would need approximately 20–km well spacing, based on assumed modeling parameters. Under stacked injection, the pressure challenges (described above) still exist but are more alleviated due to distributing the same injection volume across more available reservoir volume. These analyses demonstrate that stacked-sequence storage can effectively address the challenges, while still providing the same target CO 2 storage volumes and allowing a large number of storage projects to be deployed in the same basin by better utilizing the available storage resource across different reservoir depths. Among cases modeled, the resulting pressure buildup front is most suppressed when each storage project distributes injection volumes over several wells, each of which injects a portion of the total CO 2 across the stacked sequence. This strategy results in the smallest CO 2 aerial footprint amongst scenarios evaluated but also shows the largest reduction in the pressure buildup at the top of perforation at the injection wells (upwards of approximately 42 percent compared to the commercial-scale single-formation storage), the result of which is crucial to maintain caprock integrity. The findings presented by this research draw attention to the importance of greater coordination among storage operators and regulatory stakeholders to foster the upscaling and deployment of CCS. These analyses provide insights into required decision-making when considering multi-project deployment in a shared basin. Because these analyses evaluate a very specific geologic situation, they bear further investigations across other geologic situations.

42 ENGINEERING↗