Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

NASA's UAS NAS Access Project

The vision of the Unmanned Aircraft System (UAS) Integration in the National Airspace System (NAS) Project is "A global transportation system which allows routine access for all classes of UAS." The goal of the UAS Integration in the NAS Project is to "contribute capabilities that reduce technical barriers related to the safety and operational challenges associated with enabling routine UAS access to the NAS." This goal will be accomplished through a two-phased approach based on development of system-level integration of key concepts, technologies and/or procedures, and demonstrations of integrated capabilities in an operationally relevant environment. Phase 1 will take place the first two years of the Project and Phase 2 will take place the following three years. The Phase 1 and 2 technical objectives are: Phase 1: Developing a gap analysis between current state of the art and the Next Generation Air Transportation System (NextGen) UAS Concept of Operations . Validating the key technical areas identified by this Project . Conducting initial modeling, simulation, and flight testing activities . Completing Sub-project Phase 1 deliverables (spectrum requirements, comparative analysis of certification methodologies, etc.) and continue Phase 2 preparation (infrastructure, tools, etc.) Phase 2: Providing regulators with a methodology for developing airworthiness requirements for UAS, and data to support development of certifications standards and regulatory guidance . Providing systems-level, integrated testing of concepts and/or capabilities that address barriers to routine access to the NAS. Through simulation and flight testing, address issues including separation assurance, communications requirements, and human systems integration in operationally relevant environments. The UAS in the NAS Project will demonstrate solutions in specific technology areas, which will address operational/safety issues related to UAS access to the NAS. Since the resource allocation for this Project is limited ($150M over the five years), the focus is on reducing the technical barriers where NASA has unique capabilities. As a result, technical areas, such as Sense and Avoid (SAA) and beyond line of sight command and control will not be addressed. While these are critical barriers to UAS access, currently, there is a great deal of global effort being exercised to address these challenge areas. Instead, specific technology development in areas where there is certainty that NASA can advance the research to high technology readiness levels will be the Project's focus. Specific sub-projects include Separation Assurance, Human Systems Integration, Communications, Certification, and Integrated Test and Evaluation. Each sub-project will transfer technologies to relevant key stakeholders and decision makers through research transition teams, technology forums, or through other analogous means.

Johnson, Charles W.↗

Integrated Medical Model (IMM) Project Verification, Validation, and Credibility (VVandC)

The Integrated Medical Model (IMM) Project supports end user requests by employing the Integrated Medical Evidence Database (iMED) and IMM tools as well as subject matter expertise within the Project. The iMED houses data used by the IMM. The IMM is designed to forecast relative changes for a specified set of crew health and mission success risk metrics by using a probabilistic model based on historical data, cohort data, and subject matter expert opinion. A stochastic approach is taken because deterministic results would not appropriately reflect the uncertainty in the IMM inputs. Once the IMM was conceptualized, a plan was needed to rigorously assess input information, framework and code, and output results of the IMM, and ensure that end user requests and requirements were considered during all stages of model development and implementation, as well as lay the foundation for external review and application. METHODS: In 2008, the Project team developed a comprehensive verification and validation (VV) plan, which specified internal and external review criteria encompassing 1) verification of data and IMM structure to ensure proper implementation of the IMM, 2) several validation techniques to confirm that the simulation capability of the IMM appropriately represents occurrences and consequences of medical conditions during space missions, and 3) credibility processes to develop user confidence in the information derived from the IMM. When the NASA-STD-7009 (7009) [1] was published, the Project team updated their verification, validation, and credibility (VVC) project plan to meet 7009 requirements and include 7009 tools in reporting VVC status of the IMM. Construction of these tools included meeting documentation and evidence requirements sufficient to meet external review success criteria. RESULTS: IMM Project VVC updates are compiled recurrently and include updates to the 7009 Compliance and Credibility matrices. Reporting tools have evolved over the lifetime of the IMM Project to better communicate VVC status. This has included refining original 7009 methodology with augmentation from the HRP NASA-STD-7009 Guidance Document working group and the NASA-HDBK-7009 [2]. End user requests and requirements are being satisfied as evidenced by ISS Program acceptance of IMM risk forecasts, transition to an operational model and simulation tool, and completion of service requests from a broad end user consortium including operations, science and technology planning, and exploration planning. IMM v4.0 is slated for operational release in the FY015 and current VVC assessments illustrate the expected VVC status prior to the completion of customer lead external review efforts. CONCLUSIONS: The VVC approach established by the IMM Project of incorporating Project-specific recommended practices and guidelines for implementing the 7009 requirements is comprehensive and includes the involvement of end users at every stage in IMM evolution. Methods and techniques used to quantify the VVC status of the IMM Project represented a critical communication tool in providing clear and concise suitability assessments to IMM customers. These processes have not only received approval from the local NASA community but have also garnered recognition by other federal agencies seeking to develop similar guidelines in the medical modeling community.

Walton, M.↗

Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P-CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P-CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects. Because NASA implements a diverse and unique portfolio of projects, those projects have traditionally created project-specific systems to manage planning and performance analysis. However, establishment and implementation of a project management system that is common across all centers and mission directorates will facilitate the adoption of best business practices. In addition, the application of timely and predictive analysis, as well as, providing all stakeholders with greater insight into project performance will enhance opportunities for project success. For more detailed information, refer to the NASA EVM System Description; Integrated Baseline Review (IBR) Handbook; EVM Implementation Handbook; Schedule Management Handbook; Work Breakdown Structure (WBS) Handbook; and other agency/industry documentation. In addition, you may contact your local center’s EVM Focal Points. All this information and more can be found at and/or the NASA Engineering Network located at https://nen.nasa.gov/web/pm.

Christopher Lewis Sadler↗

Waste Management Project Success - Regulatory Assurance Systems - 20118

Waste management (WM) and remediation projects are essential within a restorative environmental culture. Despite years of experience, challenges and obstacles associated with efficient and effective WM project execution remain. Although some obstacles are project specific, a common challenge is navigating the regulatory landscape from planning through execution, particularly with first of a kind (FOAK) and first in a while (FIAW) projects. The absence of a comprehensive regulatory assurance strategy places significant hurdles in the path of project success. To clear a path for the successful execution of increasingly complex WM projects, this paper focuses on development of a comprehensive regulatory assurance strategy and implementation plan that effectively engages stakeholders, agencies, and performers to produce project plans that fully and cost effectively integrate applicable regulatory requirements. The most reliable way to align regulatory processes and decisions needed for mission success is through a regulatory assurance system. This system establishes a healthy interface with regulatory decision makers, to work in a collaborative manner, to create a common vision for regulatory decisions on an agreed upon schedule. A regulatory assurance system consists of several elements. Although the mission may vary from cleanup to site closure to nuclear component production, the elements of a regulatory assurance system remain essentially constant and must include: 1) identifying a common vision or end state, 2) developing a long-term, integrated strategy and schedule, 3) establishing a regulatory partnering team consisting of key decision-makers, 4) regular and frequent communication with decision-makers, 5) ensuring consistent surveillance for early identification of issues and changes that may impact the project, 6) quick resolution of emerging issues to prevent schedule impact, 7) identifying core compliance functions, 8) periodically assessing progress of the project as it relates to regulatory assurance and, 9) providing constructive feedback to improve the process. A regulatory assurance system provides a living, multi-faceted approach to planning, visioning, communicating and tracking to avoid surprises and ensure smooth and timely progress to the project. The overall success measures will be whether the system produces common sense regulatory decisions supporting the vision on time without appeal. Effective regulatory frameworks rarely happen on their own. Balanced, common-sense regulatory decisions stem from teams that are trained to work together to achieve shared goals. In this paper, particular attention is placed on the importance of starting with a shared vision for a regulatory assurance and execution strategy that leverages experience to establish optimal approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Are scenario projections overly optimistic about future yield progress?

Historical increases in agricultural production were achieved predominantly by large increases in agricultural productivity. Intensification of crop and livestock production also plays a key role in future projections of agricultural land use. Here, we assess and discuss projections of crop yields by global agricultural land-use and integrated assessment models. To evaluate these crop yield projections, we compare them to empirical data on attainable yields by employing a linear and plateauing continuation of observed attainable yield trends. While keeping in mind the uncertainties of attainable yields projections and future climate change impacts, we find that, on average for all cereals on the global level, global projected yields by 2050 remain below the attainable yields. Additionally, this is also true for future pathways with high technological progress and mitigation efforts, indicating that projected yield increases are not overly optimistic, even under systemic transformations. Furthermore, on a regional scale, we find that for developing regions, specifically for sub-Saharan Africa, projected yields stay well below attainable yields, indicating that the large yield gaps which could be closed through improved crop management, may also persist in the future. In OECD countries, in contrast, current yields are already close to attainable yields, and the projections approach or, for some models, even exceed attainable yields by 2050. This observation parallels research suggesting that future progress in attainable yields in developed regions will mainly have to be achieved through new crop varieties or genetic improvements. The models included in this study vary widely in their implementation of yield progress, which are often split into endogenous (crop management) improvements and exogenous (technological) trends. More detail and transparency are needed in these important elements of global yields and land use projections, and this paper discusses possibilities of better aligning agronomic understanding of yield gaps and yield potentials with modelling approaches.

54 ENVIRONMENTAL SCIENCES↗

Spatial Bayesian models project shifts in suitable habitat for Pacific Northwest tree species under climate change

Abstract We developed spatial Bayesian hierarchical models to assess potential climate change impacts on suitable habitat for five important tree species in the Pacific northwestern United States (California, Oregon, and Washington). Individual‐species models were fit with presence–absence data from forest inventory field plots and spatial relationships were specified through a conditional autoregressive model. This modeling approach allowed us to visualize uncertainty in response curves, map current and future prediction uncertainty, and provide interval estimates for change. Upward elevational or northward latitudinal shifts in climatically suitable habitat were projected for all species. Climate change impacts were the most damaging for noble fir ( Abies procera ), for which 79%–100% of the current range was projected to become climatically unsuitable by the 2080s. Although coastal Douglas‐fir ( Pseudotsuga menziesii var. menziesii ) has been projected by others to gain habitat in Canada, within our study area we projected a net loss of climatically suitable habitat (ca. 8000–31,400 km 2 ) under three of four future climate scenarios. A net loss in habitat was also projected for Oregon white oak ( Quercus garryana ) under three of four scenarios, with 40%–60% of the current range becoming unsuitable. Although there was no net loss of habitat for forest land blue oak under any scenario, other factors like competition may inhibit blue oak ( Quercus douglasii ) and white oak from occupying areas projected to increase in climatic suitability. Additionally, between 13% and 32% of blue oak's current range was projected to become unsuitable; some of these areas aligned with dieback following the 2012–2015 California drought, which our data set predates. Unlike the other four species, we projected a 17%–25% increase in climatically suitable habitat for California black oak ( Quercus kelloggii ), although 1%–20% of the current range was still projected to become unsuitable. Our findings indicate that, although some species will face more pressure in tracking climatically suitable habitat than others, climate change will impact the location of suitable habitat for many species.

Kralicek, Karin↗

Novel Earned Value Management System Maturity Framework and Its Relation to Project Performance

Earned value management systems (EVMS) are used by industry practitioners to successfully manage projects and programs; however, there has been no past study to characterize and evaluate the impact of EVMS maturity on project performance. This paper introduces a novel framework, developed to measure the EVMS maturity, composed of 56 attributes arrayed across ten subprocesses, which together make up an integrated project/program management system. This paper describes how the framework was conceived and developed, based on literature review and data collected from industry workshops. Then, it examines the relationship between EVMS maturity and ten project performance metrics through statistical analyses. The study analyzed project data from 35 projects and programs worth over $21.8 billion in total cost. For this sample, results showed statistically significant differences between projects with high and low EVMS maturity; on average, projects exhibiting high EVMS maturity have 54% less cost overruns and 19% less change orders versus their performance measurement baseline. Higher maturity projects and programs also achieve better customer satisfaction, meet business objectives more often, and are more often in compliance with EVMS standards and guidelines. This paper contributes to the body of knowledge by providing a practical and novel framework for assessing the maturity of earned value management systems. Practitioners can use the framework to improve their integrated project and program management.

99 GENERAL AND MISCELLANEOUS↗

Divergent urban land trajectories under alternative population projections within the Shared Socioeconomic Pathways

Population change is a main driver behind global environmental change, including urban land expansion. In future scenario modeling, assumptions regarding how populations will change locally, despite identical global constraints of Shared Socioeconomic Pathways (SSPs), can have dramatic effects on subsequent regional urbanization. Using a spatial modeling experiment at high resolution (1 km), this study compared how two alternative US population projections, varying in the spatially explicit nature of demographic patterns and migration, affect urban land dynamics simulated by the Spatially Explicit, Long-term, Empirical City development (SELECT) model for SSP2, SSP3, and SSP5. The population projections included: (1) newer downscaled state-specific population (SP) projections inclusive of updated international and domestic migration estimates, and (2) prevailing downscaled national-level projections (NP) agnostic to localized demographic processes. Our work shows that alternative population inputs, even those under the same SSP, can lead to dramatic and complex differences in urban land outcomes. Under the SP projection, urbanization displays more of an extensification pattern compared to the NP projection. This suggests that recent demographic information supports more extreme urban extensification and land pressures on existing rural areas in the US than previously anticipated. Urban land outcomes to population inputs were spatially variable where areas in close spatial proximity showed divergent patterns, reflective of the spatially complex urbanization processes that can be accommodated in SELECT. Although different population projections and assumptions led to divergent outcomes, urban land development is not a linear product of population change but the result of complex relationships between population, dynamic urbanization processes, stages of urban development maturity, and feedback mechanisms. These findings highlight the importance of accounting for spatial variations in the population projections, but also urbanization process to accurately project long-term urban land patterns.

54 ENVIRONMENTAL SCIENCES↗

Safeguards by Design Projects (FY2020 Final Report)

This University Engagement project challenged engineering students at universities, that do not have Bachelor degrees in nuclear engineering but do have research reactors and some nuclear engineering coursework, to incorporate Safeguards by Design concepts into their Senior Capstone Design Project. This University Engagement project was part of the U. S. Department of Energy’s (DOE) National Nuclear Security Administration (NNSA), Office of Defense Nuclear Nonproliferation, Office of International Nuclear Safeguards, Next Generation Safeguards Initiative, Human Capital Development: University Engagement Program. This program exposed university students with Mechanical Engineering majors and Nuclear Engineering minors to the concepts of international nuclear safeguards. FY20, three teams at the University of Rhode Island and one team at the University of Texas - Austin participated in researching, designing, building, and testing projects to support international nuclear safeguards measurements or verification. The projects involved engaging in activities at the university’s research reactors. All the projects engaged students with prototyping a design and/or tool for application at the Universities’ reactor. At the end of the course, most of the students expressed the experience was a positive and they learned more about international nuclear safeguards and applying requirements than they had previously encountered. This school year the projects were further complicated by the COVID-19 pandemic. Both universities cancelled in class room classes, and limited direct student/professor interactions. Furthermore, Los Alamos National Laboratory (LANL) greatly restricted travel, therefore making it impossible to visit the students at the end of the semester for the review of their design projects. The final design and review meeting for the projects happened via the internet. Additionally, while the teams planned to build prototypes this did not happen since there was a social distancing ban on students meeting in person.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Adaptable and Comprehensive Project Assessment Tool

Most companies, agencies, and other real property owners require capital asset projects to pass some type of scrutiny before budgets and authority to expend funds for the design, construction and eventual operations are approved. This process typically involves management approval of key/critical decision(s) or a project’s passage through gates (or critical decisions). Cost, functionality, safety, and risk are just some of the factors typically considered during project assessment processes. This paper describes a tool that was developed and is used by the Department of Energy to facilitate this project assessment process. There are three versions of this tool for construction, decontamination and decommissioning (D&D), and environmental restoration/cleanup project types. The tool’s elements and associated criteria are tailored for each project type; although some elements, such as cost estimating and scheduling, are used in common. The tool is easy to use, requiring little or no training. It provides a common assessment tool for project self-appraisals and independent project reviews. It promotes efficiency and reduces disagreements and unnecessary effort. A comprehensive array of elements covers the gamut of cost, schedule, scope/technical, and safety/security ensuring that no important project attributes are overlooked. The tool is adaptable for use by any organization.

97 MATHEMATICS AND COMPUTING↗

Safeguards by Design Projects (Final Report-FY-22)

This University Engagement project challenged engineering students at universities, that do not have Bachelor degree programs in nuclear engineering but do have research reactors and some nuclear engineering coursework, to incorporate Safeguards by Design concepts into their Senior Capstone Design Project. This University Engagement project was part of the U. S. Department of Energy’s (DOE) National Nuclear Security Administration (NNSA), Office of Defense Nuclear Nonproliferation, Office of International Nuclear Safeguards, Next Generation Safeguards Initiative (NGSI), Human Capital Development (HCD): University Engagement Program. This program exposed university students with Mechanical Engineering majors and Nuclear Engineering minors to the concepts of international nuclear safeguards. In FY22, three teams at the University of Rhode Island and two teams at the University of Texas - Austin participated in researching, designing, building, and testing projects to support international nuclear safeguards measurements or verification. The projects involved engaging in activities at the university’s research reactors. All the projects engaged students with prototyping a design and/or tool for application at the Universities’ reactor. At the end of the course, most of the students expressed the experience was positive and they learned more about international nuclear safeguards and applying requirements than they had previously encountered. This school year the projects were further complicated by the COVID-19 pandemic. Both universities had limited in classes on campus, still relying on Zoom classes, and limited direct student/professor interactions. Furthermore, Los Alamos National Laboratory (LANL) greatly restricted travel, therefore making it impossible to visit the students at the end of the semester for the review of their design projects. The final design and review meeting for the projects happened via meetings over the internet. Additionally, the teams did build and test some prototypes but could only do so in a limited capacity.

42 ENGINEERING↗

LH CO 2 MENT Colorado Project (Final Report)

The objective of Electricore’s pre-FEED project “LH CO 2 MENT COLORADO PROJECT” is to accelerate the implementation of a 1.5 million tonnes per year (TPY), and first-of-a-kind (FOAK) at world scale, Svante VeloxoTherm™ carbon capture plant. This project represents a quantum leap to a large-scale facility that will launch Svante’s carbon capture technology into the next era of accomplishments and market acceptance. By completing the Front-End Loading (FEL) Feasibility Study Report (FEL-2) for a fit-for-purpose design at the HOLCIM cement plant, located near Florence Colorado, USA, this technology can be proven as the future of large-scale deployment for carbon capture and storage. This carbon capture plant was designed with the goal of reaching a target of near Net Zero Emissions by capturing 90% of the carbon dioxide (CO 2 ) emissions from the HOLCIM cement plant and from the boiler which produces steam required to regenerate the adsorbent. Additionally, this project will be leveraging a renewable Power Purchase Agreement (PPA) using solar energy to acquire power at the target price of 0.04 $/kWh or less. In its current configuration CO 2 emissions from the HOLCIM cement plant is around 700 – 800 kg/ton of clinker produced. The proposed new carbon capture plant will allow a reduction of CO 2 emissions to about 100 kg/ton of clinker produced. The scope of work consists of the process design and capital & operating cost estimation (Class IV) for a total plant capacity of 4,750 TPD of pipeline grade CO 2 . The Svante VeloxoTherm™ technology is comprised of a Rotary Adsorption Machine (RAM) for intensified Thermal Swing Adsorption (TSA) using Structured Adsorbent Beds (SABs) and related Balance of Plant (BOP), including CO 2 compression. A business case (financial analysis) evaluation has been undertaken for the Owner’s management review. Recommendations on how best to proceed to the next stage of the project have been conveyed and are documented within this report. This analysis has relied on a detailed and comprehensive Project Financial Model, evaluating the Total Project IRR (after tax, unlevered, and including all forecast 45Q PTCs and 100% tax efficiency) – the project financial analysis (as opposed to standard TEA analysis) only considered a 12 year plant economic lifetime as a result of 45Q being the sole driver considered at this stage. The Total Project IRR was evaluated across a large number of potential scenarios. The evaluation demonstrated that if the 45Q PTD is increased to $85/MT for sequestration, there are a large number of feasible scenarios which demonstrate economic returns.

01 COAL, LIGNITE, AND PEAT↗

IACMI Project 4.10: Blade Finishing Automation (Final Report)

IACMI Project 4.10, the Innovative Wind Turbine Blade Finishing with Advanced Automated Technology project, performed research addressing the challenges and opportunities associated with automating wind turbine blade finishing operations, including blade trimming and grinding. These activities, developed and conducted in close cooperation with wind industry partners, included: • The development of new automation technology and systems; • The integration of automation technology and components; • The improvements of sensor technology and their deployment in automation systems • The elimination of extensive manual programing for the automation of wind blade finishing; • The rethinking of the approach to specific work tasks for automation systems; • The demonstration at scale of innovative wind turbine blade finishing automations systems. The IACMI Wind TA team worked with GE Renewable Energy and LM Wind Power to establish the metrics of the automated blade finishing system developed in the project. In addition, the project team helped to integrate the advanced automated systems into wind turbine blade production facilities. This project was divided into two phases. Phase I provided project management, preliminary techno-economic model development, early US wind turbine industry outreach, and early research into robotic solutions for automated wind blade finishing. This second phase continued with project management, as well as final techno-economic model development, advanced research into robotic solutions for automated wind blade finishing, as well as specifications and procurement of a robotic system for automated wind blade finishing. The 4.10 project leveraged the capabilities and facilities established through the Institute for Advanced Composites Manufacturing Innovation (IACMI), the Colorado Office of Economic Development and International Trade (OEDIT) and the National Renewable Energy Laboratory (NREL). The IACMI Wind Technology Area (TA) designed and prepared for deployment a robotic automated wind turbine blade finishing system at the NREL/IACMI Composites Manufacturing Education and Technology (CoMET) facility. The results of this project led to follow-on funding to build upon and expand research in automated wind turbine blade finishing.

17 WIND ENERGY↗

Are long-term climate projections useful for on-farm adaptation decisions?

The current literature on climate services for farmers predominantly focuses on seasonal forecasts, with an assumption that longer-term climate projections may not be suitable for informing farming decisions. In this paper, we explore whether certain types of long-term climate projections may be useful for some specific types of farming decisions. Through interviews with almond tree crop farmers and farm advisors in California, we examine how farmers perceive the utility and accuracy levels of long-term climate projections and identify the types of projections that they may find useful. The interviews revealed that farmers often perceive long-term climate projections as an extension of weather forecasts, which can lead to their initial skepticism of the utility of such information. However, we also found that when farmers were presented with long-term trends or shifts in crop-specific agroclimatic metrics (such as chill hours or summer heat), they immediately perceived these as valuable for their decision-making. Hence, the manner in which long-term projections are framed, presented, and discussed with farmers can heavily influence their perception of the potential utility of such projections. The iterative conversations as part of the exploratory interview questions, served as a tool for “ joint construction of meaning” of complex and ambiguous terms such as “long-term climate projections,” “long-term decisions” and “uncertainty.” This in-turn supported a joint identification (and understanding) of the types of information that can potentially be useful for on-farm adaptive decisions, where the farmer and the interviewer both improvise and iterate to find the best types of projections that fit specific decision-contexts. Overall, this research identifies both the types of long-term climate information that farmers may consider useful, and the engagement processes that are able to effectively elicit farmers' long-term information needs.

Jagannathan, Kripa↗

Transport Cost for Carbon Removal Projects With Biomass and CO2 Storage

Strategies to remove carbon from the atmosphere are needed to meet global climate goals. Promising strategies include the conversion of waste biomass to hydrogen, methane, liquid fuels, or electricity coupled with CO 2 capture and storage (CCS). A key challenge for these projects is the need to connect geographically dispersed biomass supplies with geologic storage sites by either transporting biomass or CO 2 . We assess the cost of transport for biomass conversion projects with CCS using publicly available cost data for trucking, rail, and CO 2 pipelines in the United States. We find that for large projects (order of 1 Mt/yr CO 2 or greater), CO 2 by pipeline is the lowest cost option. However, for projects that send most of the biomass carbon to storage, such as gasification to hydrogen or electricity production, biomass by rail is a competitive option. For smaller projects and lower fractions of carbon sent to storage, such as for pyrolysis to liquid fuels, CO 2 by rail is the lowest cost option. Assessing three plausible example projects in the United States, we estimate that total transport costs range from $24/t-CO 2 stored for a gasification to hydrogen project traversing 670 km to $\$ 36$/t for a gasification to renewable natural gas project traversing 530 km. In general, if developers have flexibility in choosing transport mode and project type, biomass sources and storage sites can be connected across hundreds of kilometers for transport costs in the range of $20-40/t-CO 2 stored. Truck and rail are often viable modes when pipelines cannot be constructed. Distances of 1,000 km or more can be connected in the same cost range when shared CO 2 pipelines are employed.

09 BIOMASS FUELS↗

Development of a funding, cost, and spending model for satellite projects

The need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.

Johnson, Jesse P.↗

Accomplishments of the Advanced Reusable Technologies (ART) RBCC Project at NASA/Marshall Space Flight Center

The focus of the NASA / Marshall Space Flight Center (MSFC) Advanced Reusable Technologies (ART) project is to advance and develop Rocket-Based Combined-Cycle (RBCC) technologies. The ART project began in 1996 as part of the Advanced Space Transportation Program (ASTP). The project is composed of several activities including RBCC engine ground testing, tool development, vehicle / mission studies, and component testing / development. The major contractors involved in the ART project are Aerojet and Rocketdyne. A large database of RBCC ground test data was generated for the air-augmented rocket (AAR), ramjet, scramjet, and ascent rocket modes of operation for both the Aerojet and Rocketdyne concepts. Transition between consecutive modes was also demonstrated as well as trajectory simulation. The Rocketdyne freejet tests were conducted at GASL in the Flight Acceleration Simulation Test (FAST) facility. During a single test, the FAST facility is capable of simulating both the enthalpy and aerodynamic conditions over a range of Mach numbers in a flight trajectory. Aerojet performed freejet testing in the Pebble Bed facility at GASL as well as direct-connect testing at GASL. Aerojet also performed sea-level static (SLS) testing at the Aerojet A-Zone facility in Sacramento, CA. Several flight-type flowpath components were developed under the ART project. Aerojet designed and fabricated ceramic scramjet injectors. The structural design of the injectors will be tested in a simulated scramjet environment where thermal effects and performance will be assessed. Rocketdyne will be replacing the cooled combustor in the A5 rig with a flight-weight combustor that is near completion. Aerojet's formed duct panel is currently being fabricated and will be tested in the SLS rig in Aerojet's A-Zone facility. Aerojet has already successfully tested a cooled cowl panel in the same facility. In addition to MSFC, other NASA centers have contributed to the ART project as well. Inlet testing and parametrics were performed at NASA / Glenn Research Center (GRC) and NASA / Langley Research Center (LaRC) for both the Aerojet and Rocketdyne concepts. LaRC conducted an Air-Breathing Launch Vehicle (ABLV) study for several vehicle concepts with RBCC propulsion systems. LaRC is also performing a CFD analysis of the ramjet mode for both flowpaths based on GASL test conditions. A study was performed in 1999 to investigate the feasibility of performing an RBCC flight test on the NASA / Dryden Flight Research Center (DFRC) SR-71 aircraft. Academia involvement in the ART project includes parametric RBCC flowpath testing by Pennsylvania State University (PSU). In addition to thrust and wall static pressure measurements, PSU is also using laser diagnostics to analyze the flowfield in the test rig. MSFC is performing CFD analysis of the PSU rig at select test conditions for model baseline and validation. Also, Georgia Institute of Technology (GT) conducted a vision vehicle study using the Aerojet RBCC concept. Overall, the ART project has been very successful in advancing RBCC technology. Along the way, several major milestones were achieved and "firsts" accomplished. For example, under the ART project, the first dynamic trajectory simulation testing was performed and the Rocketdyne engine A5 logged over one hour of accumulated test time. The next logical step is to develop and demonstrate a flight-weight RBCC engine system.

Nelson, Karl W.↗

Portsmouth Atmospheric Science School (PASS) Project

The Portsmouth Atmospheric Science School Project (PASS) Project was granted a one-year no cost extension for 2001-2002. In year three of the project, objectives and strategies were modified based on the previous year-end evaluation. The recommendations were incorporated and the program was replicated within most of the remaining elementary schools in Portsmouth, Virginia and continued in the four middle schools. The Portsmouth Atmospheric Science School Project is a partnership, which includes Norfolk State University, Cooperating Hampton Roads Organizations for Minorities in Engineering (CHROME), NASA Langley Research Center, and the City of Portsmouth, Virginia Public Schools. The project seeks to strengthen the knowledge of Portsmouth Public Schools students in the field of atmospheric sciences and enhance teacher awareness of hands on activities in the atmospheric sciences. The project specifically seeks to: 1) increase the interest and participation of elementary and middle school students in science and mathematics; 2) strengthen existing science programs; and 3) facilitate greater achievement in core subjects, which are necessary for math, science, and technical careers. Emphasis was placed on providing training activities, materials and resources for elementary students (grades 3 - 5) and middle school students (grades 6 - 8), and teachers through a CHROME club structure. The first year of the project focused on introducing elementary students to concepts and activities in atmospheric science. Year two of the project built on the first year's activities and utilizes advanced topics and activities appropriate for middle school students. During the third year of the project, in addition to the approaches used in years one and two, emphasis was placed on activities that enhanced the Virginia Standards of Learning (SOL).

Coleman, Clarence D.↗