Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project X”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Plate Fin Heat Exchanger Model with Axial Conduction and Variable Properties

Future superconducting radio frequency (SRF) cavities, as part of Project X at Fermilab, will be cooled to superfluid helium temperatures by a cryogenic distribution system supplying cold supercritical helium. To reduce vapor fraction during the final Joule-Thomson (J-T) expansion into the superfluid helium cooling bath, counter-flow, plate-fin heat exchangers will be utilized. Due to their compact size and ease of fabrication, plate-fin heat exchangers are an effective option. However, the design of compact and high-effectiveness cryogenic heat exchangers operating at liquid helium temperatures requires consideration of axial heat conduction along the direction of flow, in addition to variable fluid properties. Here we present a numerical model that includes the effects of axial conduction and variable properties for a plate fin heat exchanger. The model is used to guide design decisions on heat exchanger material choice and geometry. In addition, the J-T expansion process is modeled with the heat exchanger to analyze the effect of heat load and cryogenic supply parameters. A numerical model that includes the effects of axial conduction and variable properties for a plate fin heat exchanger was developed and the effect of various design parameters on overall heat exchanger size was investigated. It was found that highly conductive metals should be avoided in the design of compact JT heat exchangers. For the geometry considered, the optimal conductivity is around 3.5 W/m-K and can range from 0.3-10 W/m-K without a large loss in performance. The model was implemented with an isenthalpic expansion process. Increasing the cold side inlet temperature from 2K to 2.2 K decreased the liquid fraction from 0.856 to 0.839 which corresponds to a 0.12 g/s increase in supercritical helium supply needed to maintain liquid level in the cooling bath. Lastly, it was found that the effectiveness increased when the heat load was below the design value. Therefore, the heat exchanger should be sized on the high end of the required heat load.

43 PARTICLE ACCELERATORS↗

RF Cavity Characterization with VORPAL

When designing a radio frequency (RF) accelerating cavity structure various figures of merit are considered before coming to a final cavity design. These figures of merit include specific field and geometry based quantities such as the ratio of the shunt impedance to the quality factor (R/Q) or the normalized peak fields in the cavity. Other important measures of cavity performance include the peak surface fields as well as possible multipacting resonances in the cavity. High fidelity simulations of these structures can provide a good estimate of these important quantities before any cavity prototypes are built. We will present VORPAL simulations of a simple pillbox structure where these quantities can be calculated analytically and compare them to the results from the VORPAL simulations. We will then use VORPAL to calculate these figures of merit and potential multipacting resonances for two cavity designs under development at Jefferson National Lab for Project X.

43 PARTICLE ACCELERATORS↗

Electron cloud experiments at Fermilab: Formation and mitigation

We have performed a series of experiments at Fermilab to explore the electron cloud phenomenon. The Main Injector will have its beam intensity increased four-fold in the Project X upgrade, and would be subject to instabilities from the electron cloud. We present measurements of the cloud formation in the Main Injector and experiments with materials for the mitigation of the Cloud. An experimental installation of Titanium-Nitride (TiN) coated beam pipes has been under study in the Main Injector since 2009; this material was directly compared to an adjacent stainless chamber through electron cloud measurement with Retarding Field Analyzers (RFAs). Over the long period of running we were able to observe the secondary electron yield (SEY) change and correlate it with electron fluence, establishing a conditioning history. Additionally, the installation has allowed measurement of the electron energy spectrum, comparison of instrumentation techniques, and energydependent behavior of the electron cloud. Finally, a new installation, developed in conjunction with Cornell and SLAC, will allow direct SEY measurement of material samples irradiated in the accelerator.

43 PARTICLE ACCELERATORS↗

Status and Plans for an SRF Accelerator Test Facility at Fermilab

A superconducting RF accelerator test facility is currently under construction at Fermilab. The accelerator will consist of an electron gun, 40 MeV injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, and multiple downstream beam lines for testing diagnostics and performing beam experiments. With 3 cryomodules installed this facility will initially be capable of generating an 810 MeV electron beam with ILC beam intensity. The facility can accommodate up to 6 cryomodules for a total beam energy of 1.5 GeV. This facility will be used to test SRF cryomodules under high intensity beam conditions, RF power equipment, instrumentation, and LLRF and controls systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

43 PARTICLE ACCELERATORS↗

Discovering New Light States at Neutrino Experiments

Experiments designed to measure neutrino oscillations also provide major opportunities for discovering very weakly coupled states. In order to produce neutrinos, experiments such as LSND collide thousands of Coulombs of protons into fixed targets, while MINOS and MiniBooNE also focus and then dump beams of muons. The neutrino detectors beyond these beam dumps are therefore an excellent arena in which to look for long-lived pseudoscalars or for vector bosons that kinetically mix with the photon. We show that these experiments have significant sensitivity beyond previous beam dumps, and are able to partially close the gap between laboratory experiments and supernovae constraints on pseudoscalars. Future upgrades to the NuMI beamline and Project X will lead to even greater opportunities for discovery. We also discuss thin target experiments with muon beams, such as those available in COMPASS, and show that they constitute a powerful probe for leptophilic PNGBs.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

World-Wide Experience with SRF Facilities

The speaker will review and analyze the performance of existing SRF facilities in the world, addressing issues of usage and availability for different customers (HEP research, material sciences, ADS). Lessons learned should be summarized for proposed future facilities (ILC, Project X, Muon Collider). The first use of superconducting cavities for accelerating beams was at HEPL, Stanford University in the early sixties. Rather quickly, other laboratories followed suit, notably the University of Illinois at Champagne, Urbana and Cornell University. There were two main uses, which still persist today. The first is to provide accelerated particles as an injector or for fixed target experiments. The second is to maintain circulating beams, either for synchrotron light sources or for colliding beam experiments. Given the differing requirements, these two uses led to rather different implementations and, in particular, different average operating gradients. A second difference in the implementation is the speed of the particle being accelerated. Electrons are sufficiently relativistic at low beam energies (> {approx} 5 MeV) that cavities designed for relativistic beams can also function acceptably at low energy. This is not the case for protons or ion accelerators so, until recently, copper cavities were used to cover the first {approx} 100 MeV. Superconducting cavities are now also being proposed to cover this energy range as well using a series of superconducting cavities, each of which is matched to the particle velocity.

43 PARTICLE ACCELERATORS↗

Single/Few Bunch Space Charge Effects at 8 GeV in the Fermilab Main Injector

For Project X, it is planned to inject a beam of 3 10{sup 11} particles per bunch into the Main Injector. Therefore, at 8 GeV, there will be increased space charge tune shifts and an increased incoherent tune spread. In preparation for these higher intensity bunches exploratory studies have commenced looking at the transmission of different intensity bunches at different tunes. An experiment is described with results for bunch intensities between 20 and 300 10{sup 9} particles. To achieve the highest intensity bunches coalescing at 8 GeV is required, resulting in a longer bunch length. Comparisons show that similar transmission curves are obtained when the intensity and bunch length have increased by similar factors. This indicates the incoherent tune shifts are similar, as expected from theory. The results of these experiments will be used in conjugation with simulations to further study high intensity bunches in the Main Injector.

43 PARTICLE ACCELERATORS↗

Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab

The Advanced Superconducting Test Accelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beam lines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating a 750 MeV electron beam with ILC beam intensity. An expansion of this facility was recently completed that will provide the capability to upgrade the accelerator to a total beam energy of 1.5 GeV. Two new buildings were also constructed adjacent to the ASTA facility to house a new cryogenic plant and multiple superconducting RF (SRF) cryomodule test stands. In addition to testing accelerator components, this facility will be used to test RF power systems, instrumentation, and control systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.

43 PARTICLE ACCELERATORS↗

Accelerators for Intensity Frontier Research

In 2008, the Particle Physics Project Prioritization Panel identified three frontiers for research in high energy physics, the Energy Frontier, the Intensity Frontier, and the Cosmic Frontier. In this paper, I will describe how Fermilab is configuring and upgrading the accelerator complex, prior to the development of Project X, in support of the Intensity Frontier.

43 PARTICLE ACCELERATORS↗

Coalescing at 8 GeV in the Fermilab Main Injector

For Project X, it is planned to inject a beam of 3 10{sup 11} particles per bunch into the Main Injector. To prepare for this by studying the effects of higher intensity bunches in the Main Injector it is necessary to perform coalescing at 8 GeV. The results of a series of experiments and simulations of 8 GeV coalescing are presented. To increase the coalescing efficiency adiabatic reduction of the 53 MHz RF is required. This results in {approx}70% coalescing efficiency of 5 initial bunches. Data using wall current monitors has been taken to compare previous work and new simulations for 53 MHz RF reduction, bunch rotations and coalescing, good agreement between experiment and simulation was found. By increasing the number of bunches to 7 and compressing the bunch energy spread a scheme generating approximately 3 10{sup 11} particles in a bunch has been achieved. These bunches will then be used in further investigations.

43 PARTICLE ACCELERATORS↗

BLV-2011 Workshop, September 22-24, 2011. Final Report

The 3rd International 3-days Workshop "Baryon and Lepton Number Violations: BLV-2011" took place at Gatlinburg, TN for September 22-24, 2011. Workshop was organized by the International Organizing Committee and had received advice from the International Program Advisory Committee (see Appendix 1). Workshop was co-chaired by Pavel Fileviez Perez (University of Wisconsin) for theory and Yuri Kamyshkov (University of Tennessee) for experiment and local organization. Workshop was supported and sponsored by the University of Tennessee, Indiana University, North Carolina State University together with TUNL, and by the HEP office of the Department of Energy. DOE financial support in this sponsoring grant was $8,000; that was 23% of the overall budget of the Workshop. Remaining 77% were provided by the sponsoring Universities. Workshop sponsors including DOE are shown on the Workshop webpage. There were 90 workshop participants with 52 from US and remaining from Bosnia/Herzegovina (1), Brazil (1), China (1), Columbia (1), France (1), Germany (10), Italy (9), Japan (4), Russian Federation (3), Slovenia (2), Spain (4), and Switzerland (1). Among Workshop participants there were 17 postdocs and young researchers and 11 graduate students. Total 67 talks and 14 posters were presented at Workshop during 3 days of sessions. Appendix 2 shows the list of talks and posters. Main topic of the Workshop was Baryon and Lepton number violation that has become a vital part of the current discussions of the physics beyond the Standard Model (SM), specifically in connection with understanding the nature of neutrinos, origin of matter in universe, as well as possible Grand Unification of matter and forces. The goal of the Workshop was to have a focused comprehensive discussion of the Baryon (B) and Lepton (L) number violating processes, and possible new physics combining violation of both, including (B-L) violation, as a probe of unification, baryo- and lepto-genesis, Left-Right symmetry restoration, matter-antimatter asymmetry, sterile matter, mirror matter, dark matter, low-scale gravity, etc. Related experimental observations to these physics aspects included searches for Majorana neutrinos (2βΟν decays), proton decays, neutron-antineutron oscillations, μe transitions, mirror and sterile matter transformations, and possible other new phenomena that can be seen at LHC and future colliders. Combination of theoretical and experimental discussions at the Workshop was most stimulating for germinating of new theoretical ideas and promoting new experimental efforts in particle physics. As one of new developments stemmed from this Workshop was an idea of performing new neutron-antineutron transformation search at the Project X accelerator to be built at Fermilab. BLV2011 Workshop website: http://www.phys.utk.edu/BLV2011/ contains all the talks delivered at this Workshop. Agenda of the Workshop can be found in Appendix 2 to this report. During the Workshop all presentation talks were available at the web in parallel with the talks. This made the discussions of the new ideas and results at the meeting more prompt and efficient. Previous Workshops on Baryon and Lepton Number Violation search in 2007 at LBL and 2009 at the University of Wisconsin were organized essentially by the same initiative group of people as this Workshop. We are observing increased interest in the community to this physics topic. Next BLV-2013 Workshop now at bi-annual basis is being organized at the Max Plank Institute at Heidelberg by Pavel Fileviez Perez.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Designs of Superconducting Parallel-Bar Deflecting Cavities for Deflecting/Crabbing Applications

The superconducting parallel-bar cavity is a deflecting/crabbing cavity with attractive properties, compared to other conventional designs, that is currently being considered for a number of applications. The new parallel-bar design with curved loading elements and circular or elliptical outer conductors have improved properties compared to the designs with rectangular outer conductors. We present the designs proposed as deflecting cavities for the Jefferson Lab 12 GeV upgrade and for Project-X and as crabbing cavities for the proposed LHC luminosity upgrade and electron-ion collider at Jefferson Lab.

43 PARTICLE ACCELERATORS↗

Research and Development of H Ion Source and LEBT for a Kaon-neutrino Factory

A baseline H{sup -} ion source and low energy beam transport system (LEBT) have been identified for Project X. The filament-discharge H{sup -} ion source has been fabricated by D-Pace, Inc. and is now in operation at LBNL. The source is capable of delivering over 10mA of H{sup -} beam in cw operation with normalized 4rms emittances less than 0.7 {pi} mm mrad. A two-solenoid magnetic lens LEBT system has been design. The design has been validated with simulations of beam transport for 5 mA 30 keV H- beams using various simulation codes.

43 PARTICLE ACCELERATORS↗

Predicting Reactor Antineutrino Emissions Using New Precision Beta Spectroscopy

Neutrino experiments at nuclear reactors are currently vital to the study of neutrino oscillations. The observed antineutrino rates at reactors are typically lower than model expectations. This observed deficit is called the “reactor neutrino anomaly”. A new understanding of neutrino physics may be required to explain this deficit, though model estimation uncertainties may also play a role in the apparent discrepancy. PNNL is currently investigating an experimental technique that promises reduced uncertainties for measured data to support these hypotheses and interpret reactor antineutrino measurements. The experimental approach is to 1) direct a proton accelerator beam on a metal target to produce a source of neutrons, 2) use spectral tailoring to modify the neutron spectrum to closely simulate the energy distribution of a power reactor neutron spectrum, 3) irradiate isotopic fission foils (235U, 238U, 239Pu, 241Pu) in this neutron spectrum so that fissions occur at energies representative of a reactor, 4) transport the beta particles released by the fission products in the foils to a beta spectrometer, 5) measure the beta energy spectrum, and 6) invert the measured beta energy spectrum to an antineutrino energy spectrum. A similar technique using a beta spectrometer and isotopic fission foils was pioneered in the 1980’s at the ILL thermal reactor. Those measurements have been the basis for interpreting all subsequent antineutrino measurements at reactors. A basic constraint in efforts to reduce uncertainties in predicting the antineutrino emission from reactor cores is any underlying limitation of the original measurements. This may include beta spectrum energy resolution, the absolute normalization of beta emission to number of fission, statistical counting uncertainties, lack of 238U data, the purely thermal nature of the IIL reactor neutrons used, etc. An accelerator-based neutron source that can be tailored to match various reactor neutron spectra provides an advantage for control in studying how changes in the neutron spectra (i.e. "in the reactor core") affects the resulting fission product beta spectrum. Furthermore, the 238U antineutrino spectrum, which has not been measured, can be studied directly because of the enhanced 1 MeV fast neutron flux available at the accelerator source. A facility such as the Project X Injector Experiment (PXIE) 30 MeV proton linear accelerator at Fermilab is being considered for this experiment. The hypothesis is that a new approach utilizing the flexibility of an accelerator neutron source with spectral tailoring coupled with a careful design of an isotopic fission target and beta spectrometer and the inversion of the beta spectrum to the neutrino spectrum will allow further reduction in the uncertainties associated with prediction of the reactor antineutrino spectrum.

Asner, David M.↗

RF Modeling of a Helical Kicker for Fast Chopping

High intensity proton particle accelerators that supports several simultaneous physics experiments requires sharing the beam. A bunch by bunch beam chopper system located after the Radio Frequency Quadrupole (RFQ) is required in this case to structure the beam in the proper bunch format required by the several experiments. The unused beam will need to be kicked out of the beam path and is disposed in a beam dumb. In this paper, we report on the RF modeling results of a proposed helical kicker. Two beam kickers constitutes the proposed chopper. The beam sequence is formed by kicking in or out the beam bunches from the streamline. The chopper was developed for Project X Injection Experiment (PXIE).

43 PARTICLE ACCELERATORS↗

Enabling Intensity and Energy Frontier Science with a Muon Accelerator Facility in the U.S.: A White Paper Submitted to the 2013 U.S. Community Summer Study of the Division of Particles and Fields of the American Physical Society

A staged approach towards muon based facilities for Intensity and Energy Frontier science, building upon existing and proposed facilities at Fermilab, is presented. At each stage, a facility exploring new physics also provides an R&D platform to validate the technology needed for subsequent stages. The envisioned program begins with nuSTORM, a sensitive sterile neutrino search which also provides precision neutrino cross-section measurements while developing the technology of using and cooling muons. A staged Neutrino Factory based upon Project X, sending beams towards the Sanford Underground Research Facility (SURF), which will house the LBNE detector, could follow for detailed exploration of neutrino properties at the Intensity Frontier, while also establishing the technology of using intense bunched muon beams. The complex could then evolve towards Muon Colliders, starting at 126 GeV with measurements of the Higgs resonance to sub-MeV precision, and continuing to multi-TeV colliders for the exploration of physics beyond the Standard Model at the Energy Frontier. An Appendix addresses specific questions raised by the Lepton Colliders subgroup of the CSS2013 Frontier Capabilities Study Group.

43 PARTICLE ACCELERATORS↗

Study of Electron Cloud Instability in Fermilab Main Injector

Electron cloud has been observed in Fermilab main injector. Electron signal is enhanced near the transition. The slippage factor which suppress instabilities approach to zero at the transition. Instabilities must be most serious near the trans ition. The instability caused by the electron cloud is an important issue for high intensity operation and the future toward Project-X. Simulations of electron cloud instability near the transition is presented.

43 PARTICLE ACCELERATORS↗

Reliability Modeling Method for Proton Accelerator

Reliability Analysis is an essential part of designing any complex system in order to predict performance and understand availability. However modeling complex systems has been a challenging task due to the large number of components and inter -dependencies. The options have been custom written simulation packages, requiring large investment of programming and debugging time; or standard commercial software running for many days. In our research we developed a hierarchical method to represent t he reliability model of Project X, * a proposed linear accelerator at Fermi National Accelerator Laboratory. The system is first divided into subsystems small enough to readily simulate. Each subsystem is then separately simulated and parameterized so th ey can be represented as simple blocks in the top level system diagram. This allows standard, commercial software to model systems with many tens of thousands of components without requiring many days of computer time. Simulation were run and compared wit h data gathered from existing accelerators.

43 PARTICLE ACCELERATORS↗