Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

5G-TSN Architecture Capable of Providing Real-time Situational Awareness to Fossil-Energy (FE) Generation Systems (Final Technical Report)

This final report highlights the comprehensive achievements of the project focused on developing and validating a 5G-Time Sensitive Networking (TSN) architecture tailored for real-time operational awareness in fossil energy systems. The initiative successfully advanced through a series of technical milestones, including the integration of EMI-aware network models, deployment of advanced simulation frameworks, and real-world performance characterization at key sites such as UTEP and Fabens. Through the strategic use of NetSim® software, the team created and validated network configurations for wired and wireless environments, tested under varying congestion conditions, and verified network slicing implementations for URLLC-specific applications. Major accomplishments include the migration of simulation tools to the latest NetSim® version to support accurate modeling of TSN and network slicing, extensive EMI measurement campaigns, and the development of a robust simulation model for end-to-end SCADA system integration. Simulations compared both TDD and FDD duplexing modes, revealing insights into their performance under congested conditions. The wireless network was benchmarked for throughput, jitter, and delay metrics, aligning with 3GPP Release 15/16 and IEEE 802.1-TSN standards. A peer-reviewed conference paper was accepted and published, contributing to the broader academic and industrial discourse on 5G-TSN integration in energy systems, in addition to a journal article. Despite minor delays due to software limitations, the project achieved its objectives and delivered validated architecture ready for deployment in advanced energy network environments.

01 COAL, LIGNITE, AND PEAT↗

Regulation of the Shutdown Defueling and Decommissioning Reactors in the United Kingdom - 16576

Nuclear policy, including for decommissioning, in the United Kingdom is set by the UK Government. The Nuclear Decommissioning Authority, NDA, is responsible for managing the clean-up of the UK's nuclear legacy which includes the first generation of Magnox power stations. Magnox Ltd (MXL), owned by Cavendish Fluor Partnership, is the licensee and the management and operations contractor responsible for ten Magnox reactor sites and two restoration sites in the UK, working for the sites' owner, NDA. The work of the company is diverse covering electricity generation at Wylfa (until December 2015), defueling, and preparation for an interim end state, known as Care and Maintenance (C and M) which will precede the final site clearance. The C and M phase is expected to last over 75 years during which the sites are maintained in a passively safe and secure state while radiation levels are left to decay naturally. Preparations for this phase include removing fuel from the reactors and storage ponds; retrieving intermediate level waste from current stores and treating it or converting it to forms suitable for long-term storage or disposal and making sure of the integrity of critical safety systems of the de-fuelled reactors. The Decommissioning, Fuel and Waste programme within the Office for Nuclear Regulation, ONR, regulates nuclear safety in the 12 Magnox nuclear licensed sites. ONR works with the environmental regulators who are responsible for environmental protection on nuclear sites. The focus of this paper is the regulation of nuclear safety by ONR across the Magnox sites and the interactions with nuclear security and the environmental aspects required to achieve effective, proportionate and efficient regulation of these sites in the UK. ONR's strategy for regulating the Magnox defueling and decommissioning sites is focused on enabling the licensee to complete the initial stages of decommissioning and reduce the nuclear and radioactive hazards on its sites. To this effect, ONR's revised inspection guidance is centred on inspecting the (remaining) important systems for safety identified in the safety cases. Other interventions focus on engaging with the licensee on safety significant decommissioning projects to gain evidence of the licensee's readiness prior to and during these activities rather than formal assessment of the associated safety cases. In light of reduced hazards and risks across the de-fueled and decommissioning Magnox reactors, ONR's revised regulatory expectation regarding evolution of emergency arrangements during decommissioning is based on key transition points that follow electricity generation. Implementation of these revised strategies as well as organisational restructuring within the team responsible for regulation of the Magnox fleet has resulted in improved efficiency and consistency in regulatory approach whilst securing the required safety standards in managing decommissioning activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Kilopower Project: The KRUSTY Fission Power Experiment and Potential Missions

The Kilopower Project was initiated by NASA’s Space Technology Mission Directorate/Game Changing Development Program in fiscal year 2015 to demonstrate subsystem-level technology readiness of small space fission power in a relevant environment (Technology Readiness Level 5) for space science and human exploration power needs. The Kilopower Project centerpiece is the Kilowatt Reactor Using Stirling TechnologY (KRUSTY) test, which consists of the development and testing of a ground technology demonstrator of a 1-kW(electric)–class fission power system (FPS). The technologies to be developed and validated by KRUSTY are extensible to space FPSs from 1 to 10 kW(electric), which can enable modular surface FPSs for human exploration as well as higher-power future potential deep space science missions. The KRUSTY demonstration is cofunded by NASA and the U.S. Department of Energy National Nuclear Security Administration. The KRUSTY demonstration in the National Critical Experiment Research Center’s Device Assembly Facility was completed in the first quarter of 2018.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

FY 18 Status Report on the Computing Systems for the Yucca Mountain Project TSPA-LA Models and Inventory of Software used for Process Models

Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014), Hadgu et al. (2015) and Hadgu and Appel (2016), and Hadgu et al. (2017). The TSPA computing hardware (2014 server cluster -CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of Gold Sim with Versions 9.60.300, 10.5, 11.1 and 12.0 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA-type analysis on the server cluster. The FY18 task included developing an inventory of software used for the Yucca Mountain Project process models and preliminary assessment of status of the software; enhancing security of the cluster and setting a backup system. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Beta Beams for Neutrino Production

This paper gives an overview of the work done so far to produce sufficient neutrino fluxes for neutrino oscillation physics using beta beams. The design study on a beta beam scenario, the EURISOL (European Isotope Separation On-Line Radioactive Ion Beam Facility) Design Study, a project funded by the European Commission (EC), is now ready to be published. The study is based on the acceleration of {sup 6}He and {sup 18}Ne ions to produce the (anti-)neutrino beam using the existing CERN infrastructure for acceleration of the ions. We will here briefly describe the work with emphasis on how potential showstoppers, in particular radiation safety and equipment damage, have been dealt with. New results for the production of {sup 6}He show very encouraging results. We are now confident that this ion is a good choice to produce antineutrinos. However, the ion production needed for the physics experiments could not, up to now, be reasonably satisfied for {sup 18}Ne. Therefore, studies of alternative beta emitters, {sup 8}Li and {sup 8}B, with properties interesting for physics reach, have been proposed. The production of these ions is studied within the EC funded EUROnu project, ''A High Intensity Neutrino Oscillation Facility for Europe.'' This project will end in 2012. A small storage ring, in which the beam traverses a target, creating the {sup 8}Li and {sup 8}B isotopes that will be collected and accelerated, is studied in this proposal. We present the latest developments for the production of these ions, including a production ring lattice. Extensive Geant4 simulations have been done with the aim of developing a model of the production target that can be used for simulations of the necessary cooling system. In this paper we present the status of the work performed and an overview of ongoing and planned activities to make the beta beam project a solid proposal for neutrino production within the EUROnu project.

43 PARTICLE ACCELERATORS↗

Hydrogen Selective Inorganic membranes for Gas Separations under High Pressure Intermediate Temperature Hydrocarbonic Envrionment

In this project, we have successfully developed a full scale commercially ready carbon molecular sieve (CMS) based membrane for applications in H 2 recovery from refinery waste and other aggressive gas streams. Field tests at a refinery pilot plant and a coal gasification facility have successfully demonstrated its ability to recovery hydrogen from hydrotreating and raw syngas respectively. High purity H 2 and excellent stability of the membrane permeance and selectivity were obtained in testing conducted over >500 hours at each site. The results from these field tests as well as laboratory testing conclude that the membranes can be operated at high pressures (up to 1,000 psig) and temperatures (up to 300°C) in presence of aggressive contaminants, such as sulfur and nitrogen containing species (H 2 S, CO 2 , NH 3 , etc), condensable hydrocarbons, tar-like species, heavy metals, etc. with no observable effect on membrane performance. By comparison, similar operating conditions and/or environments would rapidly destroy competing membranes, such as polymeric, palladium, zeolitic, etc. Significant cost savings can be achieved through recovering H 2 from refinery waste gas using this newly developed CMS membrane. Annual savings of $\$$2 to 4MM/year (per 20,000 scfd of waste gas) can be realized by recovering the H 2 for reuse (versus fuel). Projecting these values over the entire US market, potential H 2 savings from refinery waste gases on the order of 750 to 1,000MM scfd and $\$$750 to $\$$1,000MM per year are possible. In addition to the cost savings, potential energy savings are projected to be ca. 150 to 220 tBTU/yr and CO 2 gas emission reductions are projected to be ca. 5,000 to 6,500MMtons/year. The full scale membrane bundle developed as part of this project, i.e., 85 x 30 inch ceramic membrane tubes packaged into a full ceramic potting, is an important accomplishment. No comparable commercial scale product exists in the inorganic membrane field. Further, this newly developed full scale bundle concept can be extended to other thin film inorganic membrane technology (Pd, zeolite, etc), providing a potential commercialization pathway for these membrane materials that demonstrate high potential in a variety of separation applications yet remain a laboratory 'novelty' for lack of a full scale support. Overall, the project has been highly successful and all of the project objectives have been met. We have developed the first of its kind commercial scale carbon molecular sieve membrane and demonstrated its performance in field testing under aggressive operating conditions and in the presence of chemical contaminants that would rapidly destroy alternative organic and inorganic membranes. This innovative membrane permits H 2 recovery from gas streams that up until now have not been successfully treated with membrane or conventional technology. Our end user participant is currently pursuing the field demonstration of this membrane for hydrogen recovery at its refinery site.

01 COAL, LIGNITE, AND PEAT↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

GaN-Ready Aluminum Nitride Substrates for Cost-Effective, Very Low Dislocation Density III-Nitride LED's

The objective of this project was to develop and then demonstrate the efficacy of a costeffective approach for a low defect density substrate on which AlInGaN LEDs can be fabricated. The efficacy of this “GaN-ready” substrate would then be tested by growing high efficiency, long lifetime InxGa1-xN blue LEDs. The approach used to meet the project objectives was to start with low dislocation density AlN single-crystal substrates and grow graded AlxGa1-xN layers on top. Pseudomorphic AlxGa1-xN epitaxial layers grown on bulk AlN substrates were used to fabricate light emitting diodes and demonstrate better device performance as a result of the low defect density in these layers when benched marked against state-of-the-art LEDs fabricated on sapphire substrates. The pseudomorphic LEDs showed excellent output powers compared to similar wavelength devices grown on sapphire substrates, with lifetimes exceeding 10,000 hours (which was the longest time that could reliably be estimated). In addition, high internal quantum efficiencies were demonstrated at high driving current densities even though the external quantum efficiencies were low due to poor photon extraction. Unfortunately, these pseudomorphic LEDs require high Al content so they emit in the ultraviolet. Sapphire based LEDs typically have threading dislocation densities (TDD) > 108 cm-2 while the pseudomorphic LEDs have TDD ≤ 105 cm-2. The resulting TDD, when grading the AlxGa1-xN layer all the way to pure GaN to produce a “GaN-ready” substrate, has varied between the mid 108 down to the 106 cm-2. These inconsistencies are not well understood. Finally, an approach to improve the LED structures on AlN substrates for light extraction efficiency was developed by thinning and roughening the substrate.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A Novel Sediment Passage Module Design in Support of Standard Modular Hydropower

This document is the Final Technical Report (FTR) for University of Minnesota (UMN) project on the development of a novel sediment (e.g., sand) bypass technology for new stream reach development (NSD). The project duration was slightly over four years and organized over two budget periods (BPs), i.e., BP1 and BP2, with a Go/No-Go review at the end of BP1. The initial technology had a Technology Readiness Level (TRL) of two (2) and, over the life of the project, advanced substantially to TRL 3 or 4.

13 HYDRO ENERGY↗

Development of a Modular, Crushed-Rock Thermal Energy Storage Pilot Design

The goal of this project, primarily funded by the U.S. Department of Energy, is to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The current effort will complete a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. The TES technology is being designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) natural gas combined cycle (NGCC) plant. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. Final sizing is being determined during the ongoing feasibility study. The next-step pilot being designed as part of the current project will represent a 5-fold increase in scale for this TES technology, and will be used to validate the technology’s ability to provide effective and economical energy storage. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. This project is expected to design the critical next-step pilot, which will be undertaken in real-world operating conditions to better determine the crushed rock TES technology’s ability to be integrated with an NGCC plant and assess degradation over transient cycling at rates befitting various marketplaces. The crushed-rock TES pilot design is a technically feasible next step in the development of the technology and is built upon years of prior testing and demonstration. The proposed TES technology was developed by Brenmiller over the last 8 years and has been tested in 3 generations of demonstration units at various sites, globally. During this field testing, different characteristics and performance of the technology were validated, including the following key features: energy storage capacity, energy storage charge/discharge rate, energy storage loses, energy storage mechanical testing. This presentation will provide an update on the results of the conceptual design study for the modular crushed-rock TES system, integrated with a NGCC power plant.

03 NATURAL GAS↗

Carbon Utilization and Storage Partnership of the Western United States

This technical report documents research conducted under DOE Award No. DE-FE0031837 focused on evaluating the feasibility of carbon capture, utilization, and storage (CCUS) systems in the central and western United States. The project integrated geologic characterization, reservoir simulation, infrastructure modeling, and economic analysis to assess CO₂ storage potential near industrial sources and develop strategies for transport and sequestration. The work included subsurface modeling, risk assessment, monitoring and verification (MRV) planning, and evaluation of regulatory pathways such as EPA Underground Injection Control (UIC) Class VI permitting and IRS 45Q tax credit eligibility. Results demonstrate the viability of multiple storage approaches, including saline formations, enhanced coalbed methane recovery, and basalt mineralization, supported by data-driven workflows and regional analyses. The project also produced permitting templates, technology transfer activities, and stakeholder engagement efforts to support deployment readiness. These findings contribute to the development of scalable, economically viable CCUS systems and provide a repeatable framework for future carbon management projects.

20 FOSSIL-FUELED POWER PLANTS↗

Pre-Commercial Scale-Up of a Gas-Fired Absorption Heat Pump

The project sought to advance the maturity of SMTI’s 80 kBTU/hr residential space and water heating GAHP from the engineering prototype stage (TRL-7) to pre-production readiness by addressing manufacturing, balance of system design and installation, cost, reliability, and field application questions. As part of this project, the project team has: (1) Matured the design package for a commercially ready product (2) Demonstrated compliance with relevant ANSI standards (3) Completed manufacturing and assembly process specifications (4) Completed total production cost estimates and capital equipment requirements (5) Initiated component and system level reliability assessments (6) Completed a small field demonstration including measured performance, installation requirements and expected costs, and customer/key stakeholder feedback. (7) Completed a Techno-economic analysis for representative applications and climate zones, including justification for utility incentive programs. (8) Completed a market intelligence report. Scope of Work: A multi-faceted project was completed that included: (a) design for manufacturing tasks for both the sealed system and balance of system, (b) development and trial of key manufacturing processes and techniques, (c) evaluation of component and system level reliability, (d) exploration of make/buy decisions including impact on cost and required capital. Additionally, (e) installation and monitoring of a small number of field test units was completed to demonstrate energy savings and collect customer/installer feedback, and (f) a focused market research task was completed to explore potential barriers and improve market introduction plans. These tasks addressed many of the remaining technical risks regarding long-term reliability, verification of manufacturing cost estimates and identification of cost concerns, identify installation and balance of system design criteria necessary to achieve energy savings and installed cost goals, and identify market barriers and strategies prior to product market introduction.

03 NATURAL GAS↗

Integrating Marine Hydrokinetic and Offshore Wind Energy: A Review of Technologies, Deployment, and Challenges

Together, offshore wind (OSW) and marine hydrokinetic (MHK) technologies have vast potential to expand the world’s access to abundant energy resource. With more than 60 GW of offshore wind energy capacity and 527 MW of ocean energy deployed globally by 2023, there is a significant amount of available resources; however, technical and non-technical challenges prevent the combined large-scale deployment of these technologies. There is still a lack of research that provides a parallel review of both MHK and OSW technologies in order to better understand their synergistic working principles. This paper aimed to address that research gap by presenting a comprehensive side-by-side review of the worldwide technological landscape, global deployment trends, integration strategies, and modeling approaches for MHK and OSW. A particular focus has been given on analyzing existing modeling and simulation techniques, assessing integration and control strategies, and comparing technologies based on water depth. Furthermore, this study provides important insights into the readiness levels of both technologies by highlighting ongoing international projects. By addressing these issues, this review will give researchers and industry stakeholders an outline for assessing the maturity of OSW and MHK systems and facilitating their transition to large-scale, sustainable deployment.

16 - TIDAL AND WAVE POWER↗

Uncertainty Quantification of Metal Additive Manufacturing Processing Conditions Through the use of Exascale Computing

Metal additive manufacturing (AM) is a disruptive manufacturing technology that opens the design space for parts outside those possible from traditional manufacturing methods. In order to accelerate industry and R&D needs to certify AM parts, the Exascale Additive Manufacturing project (ExaAM) has developed a suite of exascale-ready computational tools to model the process-to-structure-to-properties (PSP) relationship for additively manufactured metal components. One such tool is an uncertainty quantification (UQ) pipeline to quantify the effect that uncertainty in processing conditions has on local mechanical responses. We present an overview of this pipeline and its required simulation and workflow codes. Using the Oak Ridge National Laboratory’s (ORNL) exascale computer, Frontier, we utilize this pipeline to cross multiple length and time scales to predict the local mechanical response of a location within a complex AM bridge part, AMB2018-01 produced by the National Institute of Standards and Technology (NIST) as part of their 2018 AM-Bench test series. Our results are then compared to experimental mechanical tests of parts from the NIST build to quantify the error in the ExaAM UQ workflow.

Carson, Robert↗

Mercury Metadata Toolset

Mercury is a federated metadata harvesting, search and retrieval tool based on both open source software and software developed at Oak Ridge National Laboratory. It was originally developed for NASA, and the Mercury development consortium now includes funding from NASA, USGS, and DOE. A major new version of Mercury (version 3.0) was developed during 2007 and released in early 2008. This Mercury 3.0 version provides orders of magnitude improvements in search speed, support for additional metadata formats, integration with Google Maps for spatial queries, facetted type search, support for RSS delivery of search results, and ready customization to meet the needs of the multiple projects which use Mercury. For the end users, Mercury provides a single portal to very quickly search for data and information contained in disparate data management systems. It collects metadata and key data from contributing project servers distributed around the world and builds a centralized index. The Mercury search interfaces then allow the users to perform simple, fielded, spatial, and temporal searches across these metadata sources. This centralized repository of metadata with distributed data sources provides extremely fast search results to the user, while allowing data providers to advertise the availability of their data and maintain complete control and ownership of that data.

Palanisamy, Giri↗

Final Report Report: Smart Grid Ready PV Inverters with Utility Communication

In 2011, EPRI began a four-year effort under the Department of Energy (DOE) SunShot Initiative Solar Energy Grid Integration Systems - Advanced Concepts (SEGIS-AC) to demonstrate smart grid ready inverters with utility communication. The objective of the project was to successfully implement and demonstrate effective utilization of inverters with grid support functionality to capture the full value of distributed photovoltaic (PV). The project leveraged ongoing investments and expanded PV inverter capabilities, to enable grid operators to better utilize these grid assets. Developing and implementing key elements of PV inverter grid support capabilities will increase the distribution system’s capacity for higher penetration levels of PV, while reducing the cost. The project team included EPRI, Yaskawa-Solectria Solar, Spirae, BPL Global, DTE Energy, National Grid, Pepco, EDD, NPPT and NREL. The project was divided into three phases: development, deployment, and demonstration. Within each phase, the key areas included: head-end communications for Distributed Energy Resources (DER) at the utility operations center; methods for coordinating DER with existing distribution equipment; back-end PV plant master controller; and inverters with smart-grid functionality. Four demonstration sites were chosen in three regions of the United States with different types of utility operating systems and implementations of utility-scale PV inverters. This report summarizes the project and findings from field demonstration at three utility sites.

14 SOLAR ENERGY↗

FY17 Status Report on the Computing Systems for the Yucca Mountain Project TSPA-LA Models.

Sandia National Laboratories (SNL) continued evaluation of total system performance assessment (TSPA) computing systems for the previously considered Yucca Mountain Project (YMP). This was done to maintain the operational readiness of the computing infrastructure (computer hardware and software) and knowledge capability for total system performance assessment (TSPA) type analysis, as directed by the National Nuclear Security Administration (NNSA), DOE 2010. This work is a continuation of the ongoing readiness evaluation reported in Lee and Hadgu (2014), Hadgu et al. (2015) and Hadgu and Appel (2016). The TSPA computing hardware (CL2014) and storage system described in Hadgu et al. (2015) were used for the current analysis. One floating license of GoldSim with Versions 9.60.300, 10.5, 11.1 and 12.0 was installed on the cluster head node, and its distributed processing capability was mapped on the cluster processors. Other supporting software were tested and installed to support the TSPA- type analysis on the server cluster. The current tasks included preliminary upgrade of the TSPA-LA from Version 9.60.300 to the latest version 12.0 and address DLL-related issues observed in the FY16 work. The model upgrade task successfully converted the Nominal Modeling case to GoldSim Versions 11.1/12. Conversions of the rest of the TSPA models were also attempted but program and operational difficulties precluded this. Upgrade of the remaining of the modeling cases and distributed processing tasks is expected to continue. The 2014 server cluster and supporting software systems are fully operational to support TSPA-LA type analysis.

97 MATHEMATICS AND COMPUTING↗

Sighten Final Technical Report DEEE0006690 Deploying an integrated and comprehensive solar financing software platform

Over the project, Sighten built a comprehensive software-as-a-service (Saas) platform to automate and streamline the residential solar financing workflow. Before the project period, significant time and money was spent by companies on front-end tools related to system design and proposal creation, but comparatively few resources were available to support the many back-end calculations and data management processes that underpin third party financing. Without a tool like Sighten, the solar financing processes involved passing information from the homeowner prospect into separate tools for system design, financing, and then later to reporting tools including Microsoft Excel, CRM software, in-house software, outside software, and offline, manual processes. Passing data between tools and attempting to connect disparate systems results in inefficiency and inaccuracy for the industry. Sighten was built to consolidate all financial and solar-related calculations in a single software platform. It significantly improves upon the accuracy of these calculations and exposes sophisticated new analysis tools resulting in a rigorous, efficient and cost-effective toolset for scaling residential solar. Widely deploying a platform like Sighten’s significantly and immediately impacts the residential solar space in several important ways: 1) standardizing and improving the quality of all quantitative calculations involved in the residential financing process, most notably project finance, system production and reporting calculations; 2) representing a true step change in terms of reporting and analysis capabilities by maintaining more accurate data and exposing sophisticated tools around simulation, tranching, and financial reporting, among others, to all stakeholders in the space; 3) allowing a broader group of developers/installers/finance companies to access the capital markets by providing an out-of-the-box toolset that handles the execution of running investor capital through a rooftop solar financing program. Standardizing and improving all calculations, improving data quality, and exposing new analysis tools previously unavailable affects investment in the residential space in several important ways: 1) lowering the cost of capital for existing capital providers by mitigating uncertainty and de-risking the solar asset class; 2) attracting new, lower cost investors to the solar asset class as reporting and data quality resemble standards of more mature asset classes; 3) increasing the prevalence of liquidity options for investors through back leverage, securitization, or secondary sale by providing the tools necessary for lenders, ratings agencies, etc. to properly understand a portfolio of residential solar assets. During the project period, Sighten successfully built and scaled a commercially ready tool for the residential solar market. The software solution built by Sighten has been deployed with key target customer segments identified in the award deliverables: solar installers, solar developers/channel managers, and solar financiers, including lenders. Each of these segments greatly benefits from the availability of the Sighten toolset.

14 SOLAR ENERGY↗