Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

The Use of the Hanford Onsite Packaging and Transportation Safety Program to Meet Cleanup Milestones Under the Hanford Site Cleanup 2015 Vision and the American Recovery and Reinvestment Act of 2009 - 12403

The Hanford Site presents unique challenges in meeting the U.S. Department of Energy Richland Operations Office (DOE-RL) 2015 Cleanup Vision. CH2M Hill Plateau Remediation Company (CHPRC), its subcontractors, and DOE-RL were challenged to retrieve, transport and remediate a wide range of waste materials. Through a collaborative effort by all Hanford Onsite Central Plateau Cleanup Team Members, disposition pathways for diverse and seemingly impossible to ship wastes were developed under a DOE Order 460.1C-compliant Hanford Onsite Transportation Safety Program. The team determined an effective method for transporting oversized compliant waste payloads to processing and disposition facilities. The use of the onsite TSD packaging authorizations proved to be vital to safely transporting these materials for processing and eventual final disposition. The American Recovery and Reinvestment Act of 2009 (ARRA) provided additional resources to expedite planning and execution of these important cleanup milestones. Through the innovative and creative use of the TSD, the Hanford Onsite Central Plateau Cleanup Team Members have developed and are executing an integrated project plan that enables the safe and compliant transport of a wide variety of difficult-to-transport waste items, accelerating previous cleanup schedules to meet cleanup milestones. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updated Baseline Cost Model for Hydropower (2023)

The "Updated Baseline Cost Model (BCM) for Hydropower" is an empirical model for estimating the costs of US hydropower projects in six categories (Non-Powered Dam (NPD), New Stream Development (NSD), Canal/Conduit, Pumped Storage Hydro (PSH), Capacity Expansion, Generator Rewind). The model equations have been estimated with data on existing or planned projects obtained from various sources. NOTE: This is a macro-enabled workbook, so Excel may block it on the first opening. In that case: 1. Save the workbook to a local directory 2. Right-click on the workbook in the local directory and select “Properties” 3. Then check “Unblock” at the bottom of the “General” tab.

13 HYDRO ENERGY↗

MY EXES and EDM for Automated Remediation Data Quality Assessments - 19053

MY Electronic data exchange and Evaluation System (EXES) is a new web-based technology providing external admin access and full control to the Web-based EXES tool developed by GD for EPA for automated environmental remediation data quality assessments. EXES replaces most manual assessment processes, reducing remediation data review time and costs and ensuring that data are of known and documented quality. This tool is available from EPA to federal agencies and remediation firms and has successfully been used to support over 190 site investigations, 105 Remedial investigations and over 20 compliance monitoring efforts. The new MY EXES functionality has been developed for project managers and decision makers to setup projects, track receipt of environmental remediation monitoring data, assess data quality, and manage data. It is designed to be flexible and configurable to meet any government agency's data review and data management needs. It is accessible 24/7 through a secure portal. MY EXES efficiently evaluates analytical data regardless of the underlying method and data reporting requirements. It is a centralized project and data assessment tool that is scalable, flexible and configurable; improving data quality while reducing cost through the following: - Provides users with the ability to create a project and to specify the analytical methods corresponding to the data that will be submitted for that project. A project can be modified and managed anytime during the project's life cycle. - Allows users to manage a library of analytical methods that can be made available for association to their projects. - Users can specify the automated tests and assessment that needs to be performed on the analytical data deliverables based on specific requirements in the project's Quality Assurance Project Plan (QAPP). - Users specify: - The format of the incoming data deliverables from the laboratory; - The type and level of review services to be performed; - The assessment deliverables to be generated - output spreadsheets and reports; - Project owner sets up system access and permissions for members of the project team. - A faster (600%) and less expensive (85%) process than the traditional data usability/validation. The EXES Data Manager application (EDM) provides a centralized data repository to view and retrieve generated reports, spreadsheets, and other data deliverables as defined by the client, eliminating the need for data transfer between project team members. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of environmental impact assessment system in Pakistan

Environmental impact assessment (EIA) was first introduced in Pakistan based on the Environmental Protection Ordinance 1983. The EIA process was further strengthened under the Pakistan Environmental Protection Act 1997, which became operational under EIA Regulations 2000. Despite a sound legal basis and comprehensive guidelines, evidence suggests that EIA has not yet evolved satisfactorily in Pakistan. An evaluation of the EIA system against systematic evaluation criteria, based on interviews with EIA approval authorities, consulting firms and experts, reveals various shortcomings of the EIA system. These mainly include; inadequate capacity of EIA approval authorities, deficiencies in screening and scoping, poor EIA quality, inadequate public participation and weak monitoring. Overall, EIA is used presently as a project justification tool rather than as a project planning tool to contribute to achieving sustainable development. Whilst shortcomings are challenging, central government has recently shown a high degree of commitment to the environmental protection by making EIA compulsory for all the public sector projects likely to have adverse environmental impacts. The paper identifies opportunities for taking advantage of the current environment for strengthening the EIA process.

54 ENVIRONMENTAL SCIENCES↗

Advanced Mixed Mode Combustor for Hydrogen F-Class Retrofit (Final Report)

This objective of this project was to develop a retrofittable combustor module for the GE Vernova Operations LLC (GE Vernova, GEV) frame 7F gas turbine (GT) that would allow operation on blends of hydrogen in Natural Gas (NG) between 0% and 100%. The new system was to be part of a package that retained current cycle performance while limiting the increase in NOx emissions to the equivalent of 25ppm (parts per million by volume dry at 15% O2, ppmvd15) with consideration for the impact of hydrogen fuel on the O2 correction. The expectation was that with the addition of Axial Fuel Staging (AFS), turndown within emission compliance would be extended to below 20% GT load. The original project plan included three budget periods (BPs): BP1 spanning October 1, 2022 through August 31, 2024; BP2 spanning September 1, 2024 through December 31, 2025; and BP3 spanning January 1, 2026 through September 30, 2026. The project was terminated early by the DOE on October 10, 2025 about three months prior to the end of BP2. BP3 activities were therefore cancelled. The program was on track to meet all objectives prior to the DOE termination. This Final Report covers work completed during BP1 and BP2 prior to the program termination.

08 HYDROGEN↗

Final Technical Report - Kotzebue Wind Power Project - Volume II

The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

17 WIND ENERGY↗

Design options for a superconducting ion linac

Following a review of the design options for a superconducting ion linac, we present here an alternative design for the pre-stripper section of the superconducting driver linac for the rare isotope science project (RISP) of the Institute for Basic Science in Korea. The proposed alternative design takes advantage of the recent accelerator developments at Argonne, namely for the recent ATLAS intensity and efficiency upgrade and the Fermilab proton improvement plan project (PIP-II). In particular, the state-of-the-art performance of quarter-wave (QWRs) and half-wave resonators (HWRs), the integrated steering correctors and cold beam position monitors (BPMs) for a compact cryomodule design. In order to simplify the design and avoid frequency transitions, we used two types of QWRs at 81.25 MHz while the baseline design has QWRs at 81.25 MHz and HWRs at 162.5 MHz. The new QWR types were optimized for β ~0.05 and ~0.11, respectively, and corrected for beam steering effects. Nine cryomodules are required to reach the stripping energy of 18.5 MeV/u for uranium beam. An alternative radio-frequency quadrupole (RFQ) design was also developed. It is optimized with the multi-harmonic buncher (MHB) to produce a much smaller longitudinal emittance, offering much needed flexibility for beam tuning and more tolerance to errors. Following the lattice design optimization, end-to-end beam dynamics simulations including most important sources of machine error were performed. The results showed that the design is robust and tolerant to errors with no beam loss observed for typical machine errors.

43 PARTICLE ACCELERATORS↗

Development of Enhanced Remedial Techniques for Petroleum Fuel and Related Contaminants in Soil and Groundwater

Western Research Institute (WRI) in conjunction with Earth Tech and the U.S. Department of Energy (DOE) was to identify proper sites with soils and/or groundwater contaminated by petroleum constituents and MTBE. Biodegradation rates would have been quantitatively assessed in both laboratory and field tests to achieve the optimal destruction of contaminants of concern. WRI and Earth Tech identified a site contaminated with high concentrations of methanol associated with petroleum hydrocarbons. The site was assessed and a remediation project plan was prepared; however, the site was soon acquired by a new company. An agreement between Earth Tech, WRI, and the new site owners could not be reached; therefore, a work was performed to identify a new project site. Task 33 was terminated and the available funding was redeployed to other Tasks after receiving approval from the U.S. DOE task manager.

02 PETROLEUM↗

Thermal Analysis of Thermal Shield for PIP-II SSR1 Cryomodule

Fermilab's PIP-II project plans to enhance the onsite accelerator into the world's most intense neutrino beam, bringing Fermilab into the next generation of particle accelerators. The five different types of cryomodules are vital parts of the PIP-II project and each requires numerous engineering analyses to prove operation. For example, the thermal shield of the Single Spoke Resonator-1 (SSR1) cryomodule required a thermal analysis to ensure the design was operating as intended before fabrication commenced. The thermal shield is cooled by the supercritical helium inside of the extrusion and must remain between 45 and 80 Kelvin. The main purpose of the thermal shield is to intercept different high heat loads and thermal radiation and prevent them from reaching the more sensitive internal components. Finite Element Analysis (FEM) was used to determine temperature estimates of the thermal shield based on the location of a variety of heat sources. Results determined temperatures exceeding the design limit around the crucial component of the current leads. Due to superconducting properties, the areas around the current leads cannot surpass 68 Kelvin. Different solutions to the critical high-temperature areas will be proposed. These solutions range from changing the properties of the helium flow to designing an attachment for the thermal shield. Each proposition works as a viable solution, however, each proposition also has its own set of advantages and disadvantages that are described for further design consideration.

43 PARTICLE ACCELERATORS↗

The role of historical operations information for supporting remedial investigation work at the former Harshaw Chemical Site - 8279.

In the early stages of hazardous, toxic, and radioactive waste (HTRW) site investigations, basic record searches are performed to help direct the agencies investigating contaminated sites to areas of concern and to identify contaminants of interest (COI). Plans developed on the basis of this preliminary research alone are often incomplete and result in unexpected discoveries either while in the field investigating the site or after the reports have been written. Many of the sites investigated under the Formerly Utilized Sites Remedial Action program (FUSRAP) have complex histories that are slowly uncovered over the life of the project. Because of programmatic constraints, nuances of these sites are often discovered late in their programs and result in increased expenditures in order to fully characterize the site, perform a robust feasibility study, and recommend appropriate alternatives for remediation. By identifying resources for public records, classified records, historic aerial photographs, and other sources of site-specific historical information, a process can be established to optimize the collection of information and to develop efficient and complete project plans. In many cases, interviews with past site employees are very useful tools. In combining what is found in the records, observed on historic aerial photographs, and heard from former employees and family members, teams investigating these sites can begin to compile sound and more complete conceptual site models (CSMs). The former Harshaw Chemical Site (HCS) illustrates this discovery process. HCS is part of FUSRAP. Preliminary investigations by the US Department of Energy (DOE) in the 1970s provided an initial CSM of activities that had taken place that may have resulted in contamination. The remedial investigation (RI) conducted by the US Army Corps of Engineers (USACE) was designed around this CSM. The RI work, however, identified a number of site conditions that were unexpected, including new potential COI associated with recycled uranium and contaminant locations that were inconsistent with the original CSM. As part of an RI Addendum effort, the USACE reconsidered its understanding of HCS historical activities. This effort included an intensive review of available historical aerial photography, an in-depth Potentially Responsible Parties (PRP) investigation, additional analysis of the production processes in place at HCS, and targeted supplemental data collection. The result of this effort was a revised CSM that included a number of previously unidentified potential COI and a much clearer understanding of the processes and resulting waste streams potentially associated with environmental contamination. Because of their complex and often poorly documented operational histories, unexpected discoveries will always be a part of investigating sites such as HCS. Taking advantage of available resources and expending funds for thorough historical research early in the life of a project will help to reduce the chances for expensive field remobilizations and significant schedule delays. A complete and accurate site history also allows for more efficient long-term technical and budgetary planning, thus eliminating many obstacles associated with the ultimate disposition of HTRW sites.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Role of Historical Operations Information for Supporting Remedial Investigation Work at the Former Harshaw Chemical Site

In the early stages of hazardous, toxic, and radioactive waste (HTRW) site investigations, basic record searches are performed to help direct the agencies investigating contaminated sites to areas of concern and to identify contaminants of interest (COI). Plans developed on the basis of this preliminary research alone are often incomplete and result in unexpected discoveries either while in the field investigating the site or after the reports have been written. Many of the sites investigated under the Formerly Utilized Sites Remedial Action Program (FUSRAP) have complex histories that are slowly uncovered over the life of the project. Because of programmatic constraints, nuances of these sites are often discovered late in their programs and result in increased expenditures in order to fully characterize the site, perform a robust feasibility study, and recommend appropriate alternatives for remediation. By identifying resources for public records, classified records, historic aerial photographs, and other sources of site-specific historical information, a process can be established to optimize the collection of information and to develop efficient and complete project plans. In many cases, interviews with past site employees are very useful tools. In combining what is found in the records, observed on historic aerial photographs, and heard from former employees and family members, teams investigating these sites can begin to compile sound and more complete conceptual site models (CSM(s). The former Harshaw Chemical Site (HCS) illustrates this discovery process. HCS is part of FUSRAP. Preliminary investigations by the U.S. Department of Energy (DOE) in the 1970's provided an initial CSM of activities that had taken place that may have resulted in contamination. The remedial investigation (RI) conducted by the U.S. Army Corps of Engineers (USACE) was designed around this CSM. The RI work, however, identified a number of site conditions that were unexpected, including new potential COI associated with recycled uranium and contaminant locations that were inconsistent with the original CSM. As part of an RI Addendum effort, the USACE reconsidered its understanding of HCS historical activities. This effort included an intensive review of available historical aerial photography, an in-depth Potentially Responsible Parties (PRP) investigation, additional analysis of the production processes in place at HCS, and targeted supplemental data collection. The result of this effort was a revised CSM that included a number of previously unidentified potential COI and a much clearer understanding of the processes and resulting waste streams potentially associated with environmental contamination. Because of their complex and often poorly documented operational histories, unexpected discoveries will always be a part of investigating sites such as HCS. Taking advantage of available resources and expending funds for thorough historical research early in the life of a project will help to reduce the chances for expensive field re-mobilizations and significant schedule delays. A complete and accurate site history also allows for more efficient long-term technical and budgetary planning, thus eliminating many obstacles associated with the ultimate disposition of HTRW sites. (authors)

54 ENVIRONMENTAL SCIENCES↗

BUILDING 9204-4

Building 9204-4 is associated with the Y-12 Plant located on the Oak Ridge Reservation, which was originally developed during World War II. Building 9204-2 (Beta-4) functioned as a uranium enrichment facility during World War II and furthered the plant’s mission of producing enriched uranium for the atomic bomb. Following the Manhattan era, Building 9204-4 functioned as a nuclear weapons production facility. As a Beta processing facility associated with the Manhattan Project, and later serving as the site for the production of nuclear weapon components during the Cold War years. Building 9204-4 aided in the development of wholly new technology and substantially advanced the field of nuclear science. In terms of facility planning, project engineers originally designed all Alpha and Beta buildings with “zero tolerance” for building for movement or settling as the successful operation of the Y-12 Plant’s calutrons depended on absolute structural stability.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

ANALYTICAL LABORATORY AT IDAHO NATIONAL LABORATORY COUNTING EQUIPMENT STANDARDIZATION AND QUALITY CONTROL IMPROVEMENT

The Analytical Laboratory at Idaho National Laboratory (INL) is a growing program with an emphasis on providing high quality results to customers, and an increasing focus on independent research. The Analytical Laboratory Counting Group has a number of capabilities: six gamma-ray counters, one gamma-ray sample changer, four gas flow proportional counter drawers, an auto-changing gas flow proportional counter, two liquid scintillation counters, and an alpha spectroscopy system. Other capabilities within the Analytical Laboratory include quadrupole inductively coupled plasma mass spectrometry (ICP-MS), high resolution ICP-MS, multi-collector ICP-MS, ICP atomic emission spectrometry (ICP-AES), gas mass spectrometry, thermal ionization mass spectrometry (TIMS), several glove boxes and fume hoods for sample preparation, and six interconnected hot cells for sample receipt and dissolution. In order to position the Analytical Laboratory as a world-class research institution, the Counting Group has recently begun making improvements to its analytical techniques, calibrations, standardization, and quality control procedures. A large part of this effort is to increase the level of documentation of instrument work. One project is to re-calibrate all of the gamma systems with newly purchased standards. One of the changes made in the purchase of the new standards was to lower the total activity so that the dead time of the calibration would more closely match the dead time of typical samples. Similarly, another planned project is to use new standards to re-calibration the gas flow proportional counters. Additional work has focused on testing and improving alpha spectroscopy sample preparation techniques. Plutonium separations have been tested to improve tracer recovery and to verify the separation technique in the presence of typical sample matrices. A final planned area of improvements has focused on liquid scintillation counting. One difficulty the Counting Group has encountered in liquid scintillation counting is an inflated gross alpha count relative to other analysis methods in the presence of high gross beta activity. Ideas include investigating the impact of choice of scintillation cocktail, as well as the effects of sample dilution.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Plug-In Hybrid Electric Vehicle Value Proposition Study: Phase 1, Task 2: Select Value Propositions/Business Model for Further Study

The Plug-In Hybrid Electric Vehicle (PHEV) Value Propositions Workshop held in Washington, D.C. in December 2007 served as the Task 1 Milestone for this study. Feedback from all five Workshop breakout sessions has been documented in a Workshop Summary Report, which can be found at www.sentech.org/phev. In this report, the project team compiled and presented a comprehensive list of potential value propositions that would later serve as a 'grab bag' of business model components in Task 2. After convening with the Guidance and Evaluation Committee and other PHEV stakeholders during the Workshop, several improvements to the technical approach were identified and incorporated into the project plan to present a more realistic and accurate case study and evaluation. The assumptions and modifications that will have the greatest impact on the case study selection process in Task 2 are described in more detail in this deliverable. The objective of Task 2 is to identify the combination of value propositions that is believed to be achievable by 2030 and collectively hold promise for a sustainable PHEV market by 2030. This deliverable outlines what the project team (with input from the Committee) has defined as its primary scenario to be tested in depth for the remainder of Phase 1. Plans for the second and third highest priority/probability business scenarios are also described in this deliverable as proposed follow up case studies in Phase 2. As part of each case study description, the proposed utility system (or subsystem), PHEV market segment, and facilities/buildings are defined.

33 ADVANCED PROPULSION SYSTEMS↗

Salt Heater Test (FY19)

This report discusses the fiscal year 2019 (FY19) design, implementation, and preliminary data interpretation plan for a set of borehole heater tests call the brine availability tests in salt (BATS), which is funded by the DOE Office of Nuclear Energy (DOE-NE) at the Waste Isolation Pilot Plant (WIPP). The organization of BATS is outlined in Project Plan: Salt In-Situ Heater Test. An early design of the field test is laid out in Kuhlman et al., including extensive references to previous field tests, which illustrates aspects of the present test. The previous test plan by Stauffer et al., places BATS in the context of a multi-year testing strategy, which involves tests of multiple scales and processes, possibly culminating in a drift-scale disposal demonstration.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Carbon dioxide (CO 2 ) concentrations and emission in the newly constructed Belo Monte hydropower complex in the Xingu River, Amazonia

The Belo Monte hydropower complex located in the Xingu River is the largest run-of-the-river (ROR) hydroelectric system in the world and has one of the highest energy production capacities among dams. Its construction received significant media attention due to its potential social and environmental impacts. It is composed of two ROR reservoirs: the Xingu Reservoir (XR) in the Xingu's main branch and the Intermediate Reservoir (IR), an artificial reservoir fed by waters diverted from the Xingu River with longer water residence time compared to XR. We aimed to evaluate spatiotemporal variations in CO 2 partial pressure ( p CO 2 ) and CO 2 fluxes ( F CO 2 ) during the first 2 years after the Xingu River impoundment under the hypothesis that each reservoir has contrasting F CO 2 and p CO 2 as vegetation clearing reduces flooded area emissions. Time of the year had a significant influence on p CO 2 with the highest average values observed during the high-water season. Spatial heterogeneity throughout the entire study area was observed for pCO2 during both low- and high-water seasons. F CO 2 , on the other hand, only showed significant spatial heterogeneity during the high-water period. F CO 2 (0.90±0.47 and 1.08±0.62 µmol m 2 d –1 for XR and IR, respectively) and p CO 2 (1647±698 and 1676±323 µatm for XR and IR, respectively) measured during the high-water season were on the same order of magnitude as previous observations in other Amazonian clearwater rivers unaffected by impoundment during the same season. In contrast, during the low-water season F CO 2 (0.69±0.28 and 7.32±4.07 µmol m 2 d –1 for XR and IR, respectively) and p CO 2 (839±646 and 1797±354 µatm for XR and IR, respectively) in IR were an order of magnitude higher than literature F CO 2 observations in clearwater rivers with naturally flowing waters. When CO 2 emissions are compared between reservoirs, IR emissions were 90 % higher than values from the XR during low-water season, reinforcing the clear influence of reservoir characteristics on CO 2 emissions. Based on our observations in the Belo Monte hydropower complex, CO 2 emissions from ROR reservoirs to the atmosphere are in the range of natural Amazonian rivers. However, the associated reservoir (IR) may exceed natural river emission rates due to the preimpounding vegetation influence. Since many reservoirs are still planned to be constructed in the Amazon and throughout the world, it is critical to evaluate the implications of reservoir traits on F CO 2 over their entire life cycle in order to improve estimates of CO 2 emissions per kilowatt for hydropower projects planned for tropical rivers.

54 ENVIRONMENTAL SCIENCES↗

Environmental impact assessment in urban transport planning: Exploring process-related barriers in Spanish practice

The effectiveness of EIA for evaluating transport planning projects is increasingly being questioned by practitioners, institutions and scholars. The academic literature has traditionally focused more on solving content-related problems with EIA (i.e. the measurement of environmental effects) than on process-related issues (i.e. the role of EIA in the planning process and the interaction between key actors). Focusing only on technical improvements is not sufficient for rectifying the effectiveness problems of EIA. In order to address this knowledge gap, the paper explores how EIA is experienced in the Spanish planning context and offers in-depth insight into EIA process-related issues in the field of urban transport planning. From the multitude of involved actors, the research focuses on exploring the perceptions of the two main professional groups: EIA developers and transport planners. Through a web-based survey we assess the importance of process-related barriers to the effective use of EIA in urban transport planning. The analyses revealed process issues based fundamentally on unstructured stakeholders involvement and an inefficient public participation - Highlights: • Qualitative research on perceptions of EIA participants on EIA processes. • Web-based survey with different participants (EIA-developers; transport planners). • It was seen an inefficient participation of stakeholders during the EIA processes.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Comprehensive Land Use and Environmental Stewardship Report

Land and facility use planning and decisions at the Idaho National Laboratory (INL) Site are guided by a comprehensive site planning process in accordance with Department of Energy Policy 430.1, 'Land and Facility Use Policy,' that integrates mission, economic, ecologic, social, and cultural factors. The INL Ten-Year Site Plan, prepared in accordance with Department of Energy Order 430.1B, 'Real Property Asset Management,' outlines the vision and strategy to transform INL to deliver world-leading capabilities that will enable the Department of Energy to accomplish its mission. Land use planning is the overarching function within real property asset management that integrates the other functions of acquisition, recapitalization, maintenance, disposition, real property utilization, and long-term stewardship into a coordinated effort to ensure current and future mission needs are met. All land and facility use projects planned at the INL Site are considered through a formal planning process that supports the Ten-Year Site Plan. This Comprehensive Land Use and Environmental Stewardship Report describes that process. The land use planning process identifies the current condition of existing land and facility assets and the scope of constraints across INL and in the surrounding region. Current land use conditions are included in the Comprehensive Land Use and Environmental Stewardship Report and facility assets and scope of constraints are discussed in the Ten-Year Site Plan. This report also presents the past, present, and future uses of land at the INL Site that are considered during the planning process, as well as outlining the future of the INL Site for the 10, 30, and 100-year timeframes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗