Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Acquisition-Management Program

NASA Acquisition Management Subsystem (AMS) program integrated NASA-wide standard automated-procurement-system program developed in 1985. Designed to provide each NASA installation with procurement data-base concept with on-line terminals for managing, tracking, reporting, and controlling contractual actions and associated procurement data. Subsystem provides control, status, and reporting for various procurement areas. Purpose of standardization is to decrease costs of procurement and operation of automatic data processing; increases procurement productivity; furnishes accurate, on-line management information and improves customer support. Written in the ADABAS NATURAL.

Avery, Don E.↗

Progress on Resuming Full Construction on the Waste Treatment and Immobilization Plant's High-Level Waste Facility - 16283

The U.S. Department of Energy (DOE) restricted certain engineering, procurement and construction work on the Waste Treatment and Immobilization Plant's (WTP) High-Level Waste (HLW) Facility in 2012 and early 2013 because of unresolved technical issues, and a need to align the nuclear safety basis with the design as the HLW Facility technical issues were resolved. The DOE Office of River Protection (ORP) needed a way to minimize the government's risk exposure, while continuing limited critical path construction work and resolving the technical and safety basis issues. ORP issued the Plan for Evaluation and Decision to Proceed for the High-Level Waste Facility in October 2013 to establish the process to evaluate the WTP contractor's progress on resolving the issues and to identify actions and deliverables needed to facilitate an ORP decision to resume production activities. This process provided for a phased resumption of HLW engineering, procurement and construction activities, with two decision points: Decision 1: Authorization to resume design/production engineering along with limited procurements and construction ramp-up. Decision 2: Full authorization to resume engineering, procurement and construction. In August 2014, ORP provided authorization for the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. The decision to proceed with production engineering in the HLW Facility was based on significant progress in resolving technical issues and improving work processes to align the HLW design and safety basis. ORP is working closely with the WTP contractor to facilitate decisions for resuming procurement of HLW Facility equipment with safety functions, and resuming full construction in the most complex process cells in the Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Empowered communities: The rise of community choice aggregation in the United States

Community choice aggregation (CCA) is a new model of energy procurement that allows local governmental entities to procure electricity on behalf of retail electricity customers. Through CCA, local governments can control local electricity portfolios while investor-owned utilities remain responsible for transmission and distribution. In this article, we use a combination of publicly-available data, data obtained directly from CCAs, and stakeholder interviews to explore the rise of CCAs, the current and potential future impacts of CCAs on demand for renewable energy, and the factors that will determine future CCA expansion. We believe that CCAs procured about 42 million megawatt-hours of electricity on behalf of about 5 million customers in the United States in 2017. We estimate that CCAs already procure about 8.9 million megawatt-hours more renewable energy than required by state mandates, and that CCAs could procure as much as 28.9 million megawatt-hours of voluntary renewable energy if the CCA model is permitted in more states. The ongoing expansion of CCAs could significantly affect electricity markets, electricity portfolios, and the future role of utilities. We investigate various challenges associated with the further expansion of CCAs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Statistical analysis of the Nb 3 Sn strand production for the ITER toroidal field coils

The ITER toroidal field (TF) strand procurement initiated the largest Nb 3 Sn superconducting strand production hitherto. The industrial-scale production started in Japan in 2008 and finished in summer 2015. Six ITER partners (so-called Domestic Agencies, or DAs) are in charge of the procurement and involved eight different strand suppliers all over the world, of which four are using the bronze route (BR) process and four the internal-tin (IT) process. In total more than 500 tons have been produced including excess material covering losses during the conductor manufacturing process, in particular the cabling. The procurement is based on a functional specification where the main strand requirements like critical current, hysteresis losses, Cu ratio and residual resistance ratio are specified but not the strand production process or layout. We introduce the analysis on the data acquired during the quality control (QC) process that was carried out to ensure the same conductor performance requirements are met by the different strand suppliers regardless of strand design. The strand QC is based on 100% billet testing and on applying statistical process control (SPC) limits. Throughout the production, samples adjacent to the strand pieces tested by the suppliers are cross-checked ('verified') by their respective DAs reference labs. The level of verification was lowered from 100% at the beginning of the procurement progressively to approximately 25% during the final phase of production. Based on the complete dataset of the TF strand production, an analysis of the SPC limits of the critical strand parameters is made and the related process capability indices are calculated. In view of the large-scale production and costs, key manufacturing parameters such as billet yield, number of breakages and piece-length distribution are also discussed. Furthermore, the results are compared among all the strand suppliers, focusing on the difference between BR and IT processes. Following the completion of the largest Nb 3 Sn strand production, our experience gained from monitoring the execution of the QC activities and from auditing the results from the measurements is summarised for future superconducting strand material procurement activities.

Vostner, A.↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Status and Trends in the U.S. Voluntary Power Market: 2023 Data

Voluntary green power, for this report, refers to renewable energy procurement by retail electricity customers above what is otherwise provided by load-serving entities. This report is part of an annual series of reports synthesizing trends in the U.S. voluntary green power market. In 2023, about 9.7 million retail electricity customers procured about 319 million megawatt-hours (MWh) of voluntary green power (Figure ES-1), representing a 17% increase over sales in 2022. Estimated voluntary green power market sales represented about 44% of non-hydropower renewable energy sales and about 8% of all U.S. retail electricity sales in 2023. Most of the remainder of U.S. renewable energy sales reflects renewable energy procured by load-serving entities to comply with state renewable energy mandates, also known as compliance-based procurement. The U.S. voluntary green power market is undergoing a clear shift toward long-term contracts, driven primarily by increasingly ambitious corporate renewable energy procurement targets.

2023↗

NASA Alternate Access to Station Service Concept

The evolving nature of the NASA space enterprise compels the agency to develop new and innovative space systems concepts. NASA, working with increasingly strained budgets and a declining manpower base, is attempting to transform from operational activities to procurement of commercial services. NASA's current generation reusable launch vehicle, the Shuttle, is in transition from a government owned and operated entity to a commercial venture to reduce the civil servant necessities for that program. NASA foresees its second generation launch vehicles being designed and operated by industry for commercial and government services. The "service" concept is a pioneering effort by NASA. The purpose the "service" is not only to reduce the civil servant overhead but will free up government resources for further research - and enable industry to develop a space business case so that industry can sustain itself beyond government programs. In addition, NASA desires a decreased responsibility thereby decreasing liability. The Second Generation Reusable Launch Vehicle (RLV) program is implementing NASA's Space Launch Initiative (SLI) to enable industry to develop the launch vehicles of the future. The Alternate Access to Station (AAS) project office within this program is chartered with enabling industry to demonstrate an alternate access capability for the International Space Station (ISS). The project will not accomplish this by traditional government procurement methods, not by integrating the space system within the project office, or by providing the only source of business for the new capability. The project funds will ultimately be used to purchase a service to take re-supply cargo to the ISS, much the same as any business might purchase a service from FedEx to deliver a package to its customer. In the near term, the project will fund risk mitigation efforts for enabling technologies. AAS is in some ways a precursor to the 2nd Generation RLV. By accomplishing ISS resupply with existing technologies, not only will a new category of autonomous vehicles deliver cargo, but a commercial business base will be incubated that will improve the likelihood of commercial convergence with the next generation of RLVs. Traditional paradigms in government management and acquisition philosophy are being challenged in order to bring about the objective of the AAS project. The phased procurement approach is proving to be the most questionable aspect to date. This work addresses the fresh approach AAS is adopting in management and procurement through a study of the AAS history, current solutions, key technologies, procurement complications, and an incremental forward plan leading to the purchase of a service to deliver goods to ISS. Included in this work is a discussion of the Commercial Space Act of 1998 and how it affects government purchase of space launch and space vehicle services. Industry should find these topics pertinent to their current state of business.

Bailey, Michelle D.↗

Status and Trends in the U.S. Voluntary Green Power Market (2021 Data)

Voluntary green power, for the purposes of this report, refers to renewable energy procurement by retail electricity customers above state renewable energy mandates. In this report, we present data and key trends for voluntary green power markets, except for a small portion of voluntary purchasing where no data are available. In 2021, about 8 million retail electricity customers procured about 244 million megawatt-hours (MWh) of voluntary green power (Figure ES-1), representing about 27% of all U.S. renewable energy sales, about 39% of non-hydro renewable energy sales, and about 6% of all U.S. retail electricity sales. Most of the remainder of U.S. renewable energy sales reflects renewable energy procured by load-serving entities to comply with state renewable energy mandates, also known as compliance-based procurement.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Comparative life cycle assessment of remote potable water supply for the Department of Defense

The Department of Defense (DOD) and other agencies, including relief organizations, require potable water for remote missions around the globe. As part of recent initiative by the U.S. Federal government through Executive Order 14057, the DOD has been instructed to investigate the sustainability of operations and practices within the context of climate change. One such practice that needs to be addressed is the procurement of potable water, an essential requirement of any remote mission or location. Currently, there are three primary means of procuring potable water at remote locations: bottled water, on-site purification, or tie-in to existing, local infrastructure. The first two operations are often considered the most secure options, but have sustainability concerns. The purpose of this study is to compare the environmental impacts of bottled water procurement versus on-site treatment via a mobile Reverse Osmosis Water Purification Unit (ROWPU), which uses multiple levels of filtration to make potable water from a local source. A cradle-to-gate assessment was developed for both systems to compare different options for potable water supply. An in person inventory was paired with data taken from the Ecoinvent 3.8 database to directly compare the two systems. The two systems are compared on a 5-year timeline to analyze the environmental impact of repeated bottled water transport versus diesel generator-fueled on-site treatment. Across all impact categories, the results indicate that high energy costs of the reverse osmosis process have significantly less impact on the environment than the repetitive transport and procurement of bottled water. The results of the study have important implications for advancing sustainable operations for remote communities or temporary settlements.

54 ENVIRONMENTAL SCIENCES↗

Optimal Black Start Resource Allocation

The restoration of the bulk power system after a partial or complete blackout relies on black-start (BS) resources. To prepare for system restoration, it is important to procure the right amount of BS resources at the right locations in the grid so that the total restoration time can be minimized. Achieving this goal requires that resource procurement planning takes the restoration process into account. In this study, we integrate the BS resource procurement decision with a restoration planning model and develop an optimization model that produces a minimal cost procurement plan that satisfies the restoration time requirement.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Path to Savings: Understanding the Federal Purchase of Energy-Consuming Products

Energy efficiency has been a federal procurement policy objective since at least 1992, with the origin of the Energy Efficient Product Procurement (EEPP) program within the larger Federal Energy Management Program (FEMP). Today, the EEPP program’s mandate is based on requirements that 95% of new contract actions, task orders, and delivery orders for products and services be energy and water efficient, as laid out in Executive Order 13514 in 2009. Facilitating full compliance with EO 13514 presents a significant strategic planning challenge to the FEMP EEPP program, given the size of the federal government, the range of missions of its many agencies, the mix of management approaches for its buildings, and the diverse set of roughly 80 energy efficient products which has been established through preceding legislation and executive orders. The goal of this report is to aid the program in prioritizing its resources by providing an overview of how the purchase of energy-consuming products occurs in today’s evolving federal procurement system, as well as identify likely intervention points and compliance review mechanisms. Through a synthesis of the literature on U.S. federal sector procurement and two dozen primary interviews, the report particularly focuses on the importance of price in determining the actor(s) responsible for any given purchase of an energy-consuming product. This identification is important, as the relevant actors are trained and reviewed in different ways that the FEMP EEPP program can prioritize for targeting, based on the decision criteria such as the potential energy savings associated with the actor’s purchases or the administrative ease of the intervention.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Controlled Environmental Agriculture and Energy Project

Task A: Heating Plant - To design/build a Heating Plant Building with associated heating components for heating the greenhouse and to house the biomass gasification system. The subtasks for this task was and Engineering Design, Procurement and Construction activities. Overall milestones for this task were one construction permit, a code review and stamped drawings, engineered building vendor supplied sealed drawings, and the actual erection of a 1250 sq.ft. building. Task B: Heating System - The activities for this task included the procurement of the heating boilers and all ancillary components. This also included the installation of all heating system components in the new building plus the existing greenhouse structure. The milestone for this task was for the ability to heat 2500 gallons of water to 80 degrees F. Task C: Organic Matter Automated Hopper - The activities involved in this task involved design/fabrication of an automated hopper to feed the biomass gasification system. We need to procure materials and the automated motion components, have the system installed and factory acceptance test of the system. The milestone is to be able to feed wood chips at a rate of 20 Kg/Hr. Task D: Imbert Gasification System - The activities involved in this include the design/build of the gasifier with all accompany ductwork, cyclones and feeding system. Also there is a modification to the scrubber assembly with an automated ash removal system. Lastly a modification to the exhaust/flair system is made to capture heat from this component. Milestone for this task was to be able to produce 15 CFM of SynGas. Task E: Generator Powered by SynGas - Procure two 20kW 4 pole generator heads for installation on the gasifier system. Modification of the fuel plenum manifold with adjustment to the fuel curves for maximum power and load points. Milestone for this task is the ability to run two fuels, either SynGas or propane. This continues with the following tasks: Controls Heating System; Controls Generators 20kW; Controls Gasification; Algae System; and Final Evaluation/Operation.

60 APPLIED LIFE SCIENCES↗

Financing Microgrids in the Federal Sector

Recent high-impact events such as hurricanes and wildfires highlight the need for energy system resilience. One potential impact of these events is the loss of utility grid power to federal sites, negatively affecting the ability to carry out their missions. Depending on the need to sustain critical functions, it may be important to continue operations during an outage of the electric grid, or at least have power restored quickly after the event. One approach to addressing this need is through a microgrid. Microgrids can provide a more reliable solution than the traditional approach of using a backup generator at individual buildings. A microgrid can enhance a site’s electrical power system during normal operations, as well as provide reliable backup power to critical loads when electric utility power is interrupted. Many times, certain components of a microgrid (and potentially the entire system) can be justified economically and paid for out of energy savings or avoided costs. In cases where savings can cover the project costs, one of several privately financed procurement mechanisms may be used to implement the project. Procurement options available to all federal agencies include utility energy services contracts (UESC), energy savings performance contracts (ESPC), and utility services contracts (USC); other mechanisms such as a power purchase agreement (PPA), enhanced use lease (EUL), and utility privatization (UP) may also be useful to agencies that have the authority to use them. Implementing a microgrid in a comprehensive effort that also includes energy efficiency can provide an important savings component, while reducing power requirements for critical loads, thus reducing the cost of the microgrid and associated distributed energy resources (DER). However, it can be difficult to achieve enough savings and avoided costs to cover the entire microgrid system, so leveraging these avoided costs in combination with appropriated funds may be necessary to implement the full project. When a site is deciding if a microgrid is the best solution, activities early in the process include identifying critical loads and existing DERs, conversations with the local electric utility, and implementation options that work best for the agency and site. This paper explores procurement options and agreements that may be useful to federal agencies interested in implementing microgrids at their sites. Microgrid complexities, implementation considerations, and suggestions to get started are also discussed. This information will be most useful to agencies when they are exploring electric energy system resilience options and/or considering different procurement options to meet their needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Status and Trends in the U.S. Voluntary Green Power Market: 2022 Data

Voluntary green power, for the purposes of this report, refers to renewable energy procurement by retail electricity customers above what is otherwise provided by load-serving entities. This report is part of an annual series of reports synthesizing trends in the United States voluntary green power market. In 2022, about 9.6 million retail electricity customers procured about 272 million megawatt-hours (MWh) of voluntary green power, representing about 38% of non-hydro renewable energy sales and about 6% of all U.S. retail electricity sales. Most of the remainder of U.S. renewable energy sales reflects renewable energy procured by load-serving entities to comply with state renewable energy mandates, also known as compliance-based procurement.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Toxic substances alert program

A toxicity profile is provided, of 187 toxic substances procured by NASA Lewis Research Center during a 3 1/2 year period, including 27 known or suspected carcinogens. The goal of the program is to assure that the center's health and safety personnel are aware of the procurement and use of toxic substances and to alert and inform the users of these materials as to the toxic characteristics and the control measures needed to ensure their safe use. The program also provides a continuing record of the toxic substances procured, who procured them, what other toxic substances the user has obtained in the past, and where similar materials have been used elsewhere at the center.

Junod, T. L.↗