Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “POWER PLANT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Coal Power Plant Reinvestment Visualization Tool

This tool, available at https://energycommunities.gov/coal-power-plant-reinvestment-visualization-tool/, serves as a public database and map for the purposes of enabling state and local economic development officials, project developers, and power plant owners to identify and pursue opportunities for plant and community reinvestment. The Coal Power Plant Reinvestment Visualization Tool focuses on coal power plants that have been closed or set-to-retire, alongside key infrastructure characteristics that are relevant for potential redevelopment reinvestment opportunities, including the opportunity to query these data based off pre-defined or user-set queries to identify opportunities for coal power facility reinvestment to support solar, wind, manufacturing, and nuclear. These Data for visualization and query include, but are not limited to: • Electric Transmission Lines • EPA Brownfield Sites (assessed with Federal funding) • Petroleum Terminals • Ports • Railroads • Others The tool will be updated periodically to provide relevant information to enable state and local economic development officials, project developers, and power plant owners to identify and pursue opportunities for economic revitalization and community reinvestment. Within this application data are focused on U.S. power plants with coal generation, where at least one on-site generator utilizes or utilized coal as a fuel source, including planned retirements through 2058 (EIA, 2024). Additional information on energy communities and revitalization opportunities can be accessed on the Interagency Working Group on Coal & Power Plant Communities & Economic Revitalization Energy Communities website (https://energycommunities.gov).

Closures↗

Behavior of Radioactive Cesium in Municipal Solid Waste of Thermal Treatment Plants after Fukushima Nuclear Power Plant Accident - 16626

Municipal solid waste (MSW) contaminated by radioactive cesium (r-Cs) has been treated by various thermal treatment facilities in Japan. However, the behavior of r-Cs in their plants is scarcely known. Therefore, we investigated 4 types of the thermal treatment plants to understand the r-Cs behavior during different thermal treatments of the MSW. The distribution of r-Cs between residue discharged from bottom of furnace (bottom ash, non-combustibles or slag) and fly ash was affected by furnace type. The leaching rate of r-Cs from the fly ash and the bottom residues were measured. The leaching rate from the former was high and ranged from 40 to 100%. In contrast, the most of r-Cs in the latter did not dissolve into water. Furthermore, we evaluated whether baghouse (an air-pollution control equipment) successfully removed r-Cs compound in flue gas. R-Cs was efficiently removed regardless of thermal treatment type. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geothermal Risk Reduction via Geothermal/Solar Hybrid Power Plants. Final Report

There are numerous technical merits associated with a renewable geothermal-solar hybrid plant concept. The performance of air-cooled binary plants is lowest when ambient temperatures are high due to the decrease in air-cooled binary plant performance that occurs when the working fluid condensing temperature, and consequently the turbine exhaust pressure, increases. Electrical power demand is generally at peak levels during periods of elevated ambient temperature and it is therefore especially important to utilities to be able to provide electrical power during these periods. The time periods in which air-cooled binary geothermal power plant performance is lowest generally correspond to periods of high solar insolation. Use of solar heat to increase air-cooled geothermal power plant performance during these periods can improve the correlation between power plant output and utility load curves. While solar energy is a renewable energy source with long term performance that can be accurately characterized, on shorter time scales of hours or days it can be highly intermittent. Concentrating solar power (CSP), aka solar-thermal, plants often incorporate thermal energy storage to ensure continued operation during cloud events or after sunset. Hybridization with a geothermal power plant can eliminate the need for thermal storage due to the constant availability of geothermal heat. In addition to the elimination of the requirement for solar thermal storage, the ability of a geothermal/solar-thermal hybrid plant to share a common power block can reduce capital costs relative to separate, stand-alone geothermal and solar-thermal power plant installations. The common occurrence of long-term geothermal resource productivity decline provides additional motivation to consider the use of hybrid power plants in geothermal power production. Geothermal resource productivity decline is a source of significant risk in geothermal power generation. Many, if not all, geothermal resources are subject to decreasing productivity manifested in the form of decreasing production fluid temperature, flow rate, or both during the life span of the associated power generation project. The impacts of geothermal production fluid temperature decline on power plant performance can be significant; a reduction in heat input to a power plant not only decreases the thermal energy available for conversion to electrical power, but also adversely impacts the power plant efficiency. The impact of resource productivity decline on power generation project economics can be equally detrimental. The reduction in power generation is directly correlated to a reduction in revenues from power sales. Further, projects with Power Purchase Agreement (PPA) contracts in place may be subject to significant economic penalties if power generation falls below a specified default level. While the magnitude of PPA penalties varies on a case-by-case basis, it is not unrealistic for these penalties to be on the order of the value of the deficit power sales such that the utility may purchase the power elsewhere. This report evaluates the use of geothermal/solar-thermal hybrid plant technology for mitigation of resource productivity decline, which has not been a primary topic of investigation in previous analyses in the open literature.

14 SOLAR ENERGY↗

Automation of Data Collection Methods for Online Monitoring of Nuclear Power Plants

Maintenance activities in the United States nuclear power industry are mainly centered on preventive and corrective maintenance. Predictive maintenance, which is a variable time basis maintenance strategy that is dependent on the condition of the equipment, is less utilized but potentially more effective. In the current maintenance practices, the nuclear power plants rely on manual processes to supply information to a human decision making process. The plants have several processes that generate information that is not typically used beyond the intended target for collecting that information. This information is a source of data that is manually collected by labor intensive tasks. The data is therefore expensive to collect, yet limited in use. The industry has realized the opportunity present in reducing the labor intensive tasks by automating them and increasing the uses of the data collected by either developing advanced predictive maintenance methods using data-driven decision making that could span from trending to machine learning and artificial intelligence. This shift in maintenance strategy may result in high cost saving impact. In addition to reducing labor requirements and frequency of maintenance activities, this shift in strategy will reduce the materials portion of the operations and maintenance cost as well. The aim of this specific effort is to focus on the automation of data collection process. It is part of a series of planned efforts to target multiple elements of migrating the current preventive maintenance approach in nuclear power plants to a data-driven approach. These elements include data collection, management, analysis, visualization, in addition to value analysis and change enabling. The other five elements of migration were not considered because they are planned to be explicitly studied in multiple parallel efforts. Challenges including regulations requirements or limitations are planned in a future effort that focuses on change enabling. The risk and benefit/cost of the approach shift is planned in another effort targeted towards value. The storage, communication, computational power, data architecture, and protection are part of the information infrastructure and are planned in dedicated data management effort. The best means to present the data for assisted human decision making is planned in a data visualization effort. The data interpretation and patterns recognition for machine decision making is planned through multiple efforts in data analytics over the following years. This work identified seventeen data sources collection methods in nuclear power plants that could be automated for an integrated data platform that enables comprehensive and informed decision making. For each of the identified seventeen data sources, the base, modern, and state of the art states were described. The current state of data collection used by most utilities was identified as the "base state". The current achievable state was identified as the "modern state", a state that has either been achieved by at least some US utilities or in other industries. The future state that requires research and development to reach was identified as the "state of the art" state. The described states used an out-of-the-box thinking approach. This effort found that there is a hug potential for task automation and data fidelity improvements by evolving the current industry data collection methods. The majority of the processes analyzed were found to be manual and labor intensive and fell in the base state. As a result, the modern state often targeted reducing the manual logging efforts by using electronic and semi-intelligent means or complementing the work with sensors and mobile or fixed technologies that can reduce the demand of labor activities. The state of the art state involved applications advanced methods of data correlation, data mining, and machine learning along with increasing the spatial distribution and fidelity of data, coupling multiple data sources, and enabling the use of sophisticated mobile devices and machine comprehension methods.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Variable-Speed Wind Power Plant Operating With Reserve Power Capability: Preprint

As the level of wind penetration increases, wind turbine technology must move from merely generating power from wind to taking a role in supporting the bulk power system. Wind turbines should have the capability to provide inertial response and primary frequency (governor) response. Wind turbine generators with this capability can support the frequency stability of the grid. To provide governorresponse, wind turbines should be able to generate less power than the available wind power and hold the rest in reserves, ready to be accessed as needed. In this paper, we explore several ways to control wind turbine output to enable reserve-holding capability. The focus of this paper is on doubly-fed induction generator (also known as Type 3) and full-converter (also known as Type 4) windturbines.

17 WIND ENERGY↗

Optimal Synthesis of a Pulverized Coal Power Plant with Carbon Capture

Coal constitutes an important source of fuel for the production of power in the United States. For instance, in January 2009, pulverized coal (PC) power plants alone contributed to over 45 percent of the Nation's total electric power production. However, PC power plants also contribute to increased emissions of greenhouse gases principally carbon-dioxide (CO2). Recently, various carbon capture strategies have been under active investigation so as to make these plants compete with the more environmental friendly renewable energy sources. One such technology that has received considerable success is the capture of CO2 by an amine-based solvent extraction process. However, an aqueous absorption/stripping technology when used in a PC power plant can reduce the net power output of the plant by as much as 20-40%. The energy penalty comes from heating up the solvent in the regenerator, balancing the enthalpy of reaction, and water stripping. This energy penalty poses considerable limitations on commercial viability of the solvent extraction process and, as a result, various energy-saving modifications have been proposed in the literature ranging from the use of hybrid solvents to novel stripper configurations. In this paper, we show that the energy penalty can be further reduced by heat integration of various PC plant components with the carbon capture system. In addition to the release of greenhouse gases to the environment, PC plants also consume a large amount of freshwater. It is estimated that subcritical and supercritical PC plants have water losses of 714 gal/MWh and 639 gal/MWh, respectively. Water loss is based on an overall balance of the plant source and exit streams. This includes coal moisture, air humidity, process makeup, cooling tower makeup (equivalent to evaporation plus blowdown), process losses (including losses through reactions, solids entrainment, and process makeup/blowdown) and flue gas losses. The primary source of water used in PC power plants is the closed-loop steam-based (Rankine) power cycles. These plants need to condense large quantities of low-pressure steam back to water so that it can be reused to produce high pressure steam. However, this requires the removal of large quantities of heat from the low pressure steam in the condensation process. This is usually done by transferring the heat to cooling water, which in turn transfers this heat to the environment by evaporation to the atmosphere. Also, the inclusion of a carbon capture process can increase the raw water usage by as much as 95 percent. In this work, we use heat exchanger network synthesis followed by an optimization approach to process synthesis for developing strategies for reducing water use in a supercritical PC power plant with a carbon capture and compression system. Uncertainties associated with dry bulb temperature, relative humidity, and demand will also be considered in this analysis.

01 COAL, LIGNITE, AND PEAT↗

Estimation of uncertainty bounds for the future performance of a power plant

Prediction of the future performance of large-scale power plants can be very relevant for the operators of these plants, as the predictions can indicate possible problems or failures due to current operating conditions and/or future possible operating conditions. A problem in predicting the future performance of these plants is that available models of the plants are uncertain. In this brief, three schemes for predicting uncertain dynamical systems are presented. The schemes estimate upper and lower bounds on the system performance. Two of the schemes are statistically based, one only based on recent data and the other is based on operating points as well. The third proposed scheme uses dynamical models of the prediction uncertainties. The proposed schemes are subsequently applied to experimental data from a coal-fired power plant. Two sets of data from an actual power plant are used, one containing normal plant operation and in the second set, coal is accumulating in the coal mill due to an unbalance in the operating conditions. These tests showed that Schemes II and III did bound the real system performance, while Scheme I failed doing so. In addition, the plant was simulated operating under the same conditions with additional large disturbances. These simulations were used to investigate the robustness and conservatism of the proposed schemes. In this test, Schemes I and II failed, while Scheme III succeeded.

20 FOSSIL-FUELED POWER PLANTS↗

Dispatchable Solar Power Plant Project

As penetration of intermittent renewable power increases, grid operators must manage greater variability in the supply and demand on the grid. One result is that utilities are planning to build many new natural gas peaking power plants that provide added flexibility needed for grid management. This report discusses the development of a dispatchable solar power (DSP) plant that can be used in place of natural gas peakers. Specifically, a new molten-salt tower (MST) plant has been developed that is designed to allow much more flexible operation than typically considered in concentrating solar power plants. As a result, this plant can provide most of the capacity and ancillary benefits of a conventional natural gas peaker plant but without the carbon emissions. The DSP system presented was designed to meet the specific needs of the Arizona Public Service (APS) utility 2017 peaking capacity request for proposals (RFP). The goal of the effort was to design a MST peaker plant that had the operational capabilities required to meet the peaking requirements of the utility and be cost competitive with the natural gas alternative. The effort also addresses many perceived barriers facing the commercial deployment of MST technology in the US today. These include MST project development issues such as permitting, avian impacts, visual impacts of tower CSP projects, project schedule, and water consumption. The DSP plant design is based on considerable analyses using sophisticated solar system design tools and in-depth preliminary engineering design. The resulting DSP plant design uses a 250 MW steam power cycle, with solar field designed to fit on a square mile plot of land that has a design point thermal rating of 400 MWt. The DSP plant has an annual capacity factor of about 16% tailored to deliver greater than 90% capacity during the critical Arizona summer afternoon peak. The table below compares the All-In energy cost and capacity payment of conventional combustion turbines to DSP plants. These results estimate that the cost of the DSP plant is about 10% higher than a similarly-sized and operated frame combustion turbine and slightly cheaper than an aero derivative combustion turbine when APS reference fuel and emissions costs are included. The DSP plant cost is based on a single, first-of-a-kind plant, and it is likely that subsequent plants would be less expensive.

14 SOLAR ENERGY↗

Transient Stability Analysis for Offshore Wind Power Plant Integration Planning Studies - Part I: Short Term Faults

Power system planning is the process of forecasting load demand and ensuring sufficient generation and reserve capacities over some planning horizon. This process includes investigation of steady-state and dynamic operation of power system of interest. This paper addresses the transient stability (also known as large-signal stability) analysis of power systems for offshore wind power plant integration planning studies. In particular, this study develops a comprehensive practical methodology to assess transient stability of power systems, including rotor angle stability, voltage stability and frequency response for all fault types for large scale power systems. This methodology considers variability of the offshore wind power plants as well as the type of any faulted components present and is applicable to the study of both short term and long term faults, though only short term faults are considered here (long term faults are treated sequentially in a companion paper). Furthermore, this paper considers the integration of offshore wind power plants into existing power systems and demonstrates the utility of this methodology through the examination of the specific case of integrating 1,000MW of offshore wind power into the FirstEnergy/PJM service territory using a realistic model of 63k-bus test system that represents the U.S. Eastern Interconnection.

17 WIND ENERGY↗

Flow Control Leveraging Downwind Rotors for Improved Wind Power Plant Operation

Controlling the air flow within wind power plants has the potential to improve plant performance and is an active area of research in the wind energy control community. In order to develop, test, and tune wind power plant controllers efficiently, an accurate engineering model of the turbine wake dynamics is required. Two elements of flow control are wake steering via yaw and tilt of a turbine. When a turbine is yawed or tilted away from the incoming wind field, the wake shape is changed. This is largely due to shed vortices that produce a curled wake. In this work, the well-known wake engineering model FLOw Redirection and Induction in Steady State (FLORIS) wake engineering model is enhanced to include these curled wake effects due to tilt. Since decay of these vortices has not been previously captured in an engineering model, the authors describe how vortices with decay have been added to FLORIS and how the updated model has been used to study the effects due to tilt in the wake. Results are demonstrated and compared to high-fidelity large-eddy simulations. Potential wind power plant performance gains due to flow control using tilt are investigated across different wind conditions and sites. Preliminary results show power gains by using tilt to implement flow control in a variety of wind distributions and tilt values.

17 WIND ENERGY↗

Simulating Solar Power Plant Variability: A Review of Current Methods

It is important to be able to accurately simulate the variability of solar PV power plants for grid integration studies. We aim to inform integration studies of the ease of implementation and application-specific accuracy of current PV power plant output simulation methods. This report reviews methods for producing simulated high-resolution (sub-hour or even sub-minute) PV power plant output profiles for variability studies and describes their implementation. Two steps are involved in the simulations: estimation of average irradiance over the footprint of a PV plant and conversion of average irradiance to plant power output. Six models are described for simulating plant-average irradiance based on inputs of ground-measured irradiance, satellite-derived irradiance, or proxy plant measurements. The steps for converting plant-average irradiance to plant power output are detailed to understand the contributions to plant variability. A forthcoming report will quantify the accuracy of each method using application-specific validation metrics.

Lave, Matthew Samuel↗

Metal hydride based thermal energy storage system requirements for high performance concentrating solar power plants

High temperature concentrating solar power plants require suitable thermal energy storage systems to produce electric power efficiently. Thermochemical energy storage based on metal hydrides represents a very appealing prospect for low cost and high efficient solar storage systems. The objective of the paper is to assess the properties required by the metal hydride systems to achieve the U.S. Department of Energy’s SunShot techno-economic targets. A simplified model has been developed to evaluate the cost and the exergetic efficiency of hydridebased storage systems. Results demonstrate that metal hydride materials, operating at temperatures higher than 650 °C, with reaction enthalpy on the order of 95-110 kJ/molH 2 , raw material cost on the order of 1.4-2 $/kg, weight capacities on the order of 3-4% and operating pressures on the order of tens of bars have the potential to closely approach the targets. Selected sensitivity analyses have also been carried out showing that the raw material cost, the material weight capacity and the metal hydride reaction enthalpy are the properties that strongly affect the performance of the storage system.

08 HYDROGEN↗

Slipstream pilot-scale demonstration of a novel amine-based post-combustion technology for carbon dioxide capture from coal-fired power plant flue gas

Post-combustion CO 2 capture (PCC) technology offers flexibility to treat the flue gas from both existing and new coal-fired power plants and can be applied to treat all or a portion of the flue gas. Solvent-based technologies are today the leading option for PCC from commercial coal-fired power plants as they have been applied in large-scale in other applications. Linde and BASF have been working together to develop and further improve a PCC process incorporating BASF’s novel aqueous amine-based solvent technology. This technology offers significant benefits compared to other solvent-based processes as it aims to reduce the regeneration energy requirements using novel solvents that are very stable under the coal-fired power plant feed gas conditions. BASF has developed the desired solvent based on the evaluation of a large number of candidates. In addition, long-term small pilot-scale testing of the BASF solvent has been performed on a lignite-fired flue gas. In coordination with BASF, Linde has evaluated a number of options for capital cost reduction in large engineered systems for solvent-based PCC technology. This report provides a summary of the work performed and results from a project supported by the US DOE (DE-FE0007453) for the pilot-scale demonstration of a Linde-BASF PCC technology using coal-fired power plant flue gas at a 1-1.5 MWe scale in Wilsonville, AL at the National Carbon Capture Center (NCCC). Following a project kick-off meeting in November 2011 and the conclusion of pilot plant design and engineering in February 2013, mechanical completion of the pilot plant was achieved in July 2014, and final commissioning activities were completed to enable start-up of operations in January 2015. Parametric tests were performed from January to December 2015 to determine optimal test conditions and evaluate process performance over a variety of operation parameters. A long-duration 1500-hour continuous test campaign was performed from May to August 2016 at a selected process condition to evaluate process performance and solvent stability over a longer period similar to how the process would operate as a continuously running large-scale PCC plant. The pilot plant integrated a number of unique features of the Linde-BASF technology aimed at lowering overall energy consumption and capital costs. During the overall test period including startup, parametric testing and long-duration testing, the pilot plant was operated for a total of 6,764 hours out of which testing with flue gas was performed for 4,109 hours. The pilot plant testing demonstrated all of the performance targets including CO 2 capture rate exceeding 90%, CO 2 purity exceeding 99.9 mol% (dry), flue gas processing capacity up to 15,500 lbs/hr (equivalent to 1.5 MWe capacity slipstream), regeneration energy as low as 2.7 GJ/tonne CO 2 , and regenerator operating pressure up to 3.4 bara. Excellent solvent stability performance data was measured and verified by Linde and BASF during both test campaigns. In addition to process data, significant operational learnings were gained from pilot tests that will contribute greatly to the commercial success of PCC. Based on a thorough techno-economic assessment (TEA) of the Linde-BASF PCC process integrated with a 550 MWe supercritical coal-fired power plant, the net efficiency of the integrated power plant with CO 2 capture is increased from 28.4% with the DOE/NETL Case 12 reference to 30.9% with the Linde-BASF PCC plant previously presented utilizing the BASF OASE® blue solvent [Ref. 4], and is further increased to 31.4% using a Linde-BASF PCC plant with BASF OASE® blue solvent and an advanced stripper interstage heater (SIH) configuration. The Linde-BASF PCC plant incorporating the BASF OASE® blue solvent also results in significantly lower overall capital costs, thereby reducing the cost of electricity (COE) and cost of CO 2 captured from $147.25/MWh and $56.49/MT CO 2 , respectively, for the reference DOE/NETL Case 12 plant, to $128.49/MWh and $41.85/MT CO2 for process case LB1, respectively, and $126.65/MWh and $40.66/MT CO 2 for process case SIH, respectively. With additional innovative Linde-BASF PCC process configuration improvements, the COE and cost of CO 2 captured can be further reduced to $125.51/MWh and $39.90/MT CO 2 for a further optimized PCC process defined as LB1-CREB. Most notably, the Linde-BASF process options assessed have already demonstrated the potential to lower the cost of CO 2 captured below the DOE target of $40/MT CO 2 at the 550 MWe scale for second generation PCC technologies. Project organization, structure, goals, tasks, accomplishments, process criteria and milestones will be presented in this report along with highlights and key results from parametric and long-duration testing of the Linde-BASF PCC pilot. The parametric and long-duration testing campaigns were aimed at validating the performance of the PCC technology against targets determined from a preliminary techno-economic assessment. The stability of the solvent with extended operation in a realistic power plant setting was measured with performance verified. Additionally, general solvent classification information, process operating conditions, normalized solvent performance data, solvent stability test results, flue gas conditions data, CO 2 purity data in the gaseous product stream, steam requirements and process flow diagrams, and updated process economic data for a scaled-up 550 MWe supercritical power plant with CO 2 capture are presented and discussed in this report.

20 FOSSIL-FUELED POWER PLANTS↗

Use of a Geothermal-Solar Hybrid Power Plant to Mitigate Declines in Geothermal Resource Productivity

Many, if not all, geothermal resources are subject to decreasing productivity manifested in the form of decreasing brine temperature, flow rate, or both during the life span of the associated power generation project. The impacts of resource productivity decline on power plant performance can be significant; a reduction in heat input to a power plant not only decreases the thermal energy available for conversion to electrical power, but also adversely impacts the power plant conversion efficiency. The reduction in power generation is directly correlated to a reduction in revenues from power sales. Further, projects with Power Purchase Agreement (PPA) contracts in place may be subject to significant economic penalties if power generation falls below the default level specified. A potential solution to restoring the performance of a power plant operating from a declining productivity geothermal resource involves the use of solar thermal energy to restore the thermal input to the geothermal power plant. There are numerous technical merits associated with a renewable geothermal-solar hybrid plant in which the two heat sources share a common power block. The geo-solar hybrid plant could provide a better match to typical electrical power demand profiles than a stand-alone geothermal plant. The hybrid plant could also eliminate the stand-alone concentrated solar power plant thermal storage requirement for operation during times of low or no solar insolation. This paper identifies hybrid plant configurations and economic conditions for which solar thermal retrofit of a geothermal power plant could improve project economics. The net present value of the concentrated solar thermal retrofit of an air-cooled binary geothermal plant is presented as functions of both solar collector array cost and electricity sales price.

14 SOLAR ENERGY↗

Development and Application of Virtual Nuclear Power Plant Platform Concerning Environment and Society Digitally

Virtual Nuclear Power Plant, named Virtual4DS, which is developed by the advanced nuclear energy research team (FDS Team), is a platform for full range, whole cycle safety assessment and emergency decision of nuclear power plant in the digital environment and society. The function framework of Virtual4DS is shown in Fig. 1, and it is designed to ensure an overall optimization design of nuclear power plant, achieve comprehensive evaluation of safety and control of risk, and supply the decision support for accident emergency by the accident probability analysis, environmental consequence assessment and public risk evaluation built on the core of digital reactor and the foundation of the nuclear energy big data. Therefore, Virtual4DS is eligible to be applied in reactor safety, radiation safety and environment impact, emergency and public safety. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

cerf: A Python package to evaluate the feasibility and costs of power plant siting for alternative futures

Long-term electric power sector planning and capacity expansion is a key area of interest to stakeholders across a wide range of organizations because it helps in making informed decisions about investments in infrastructure within the context of potential future vulnerabilities under various natural and human stressors. Future power plant siting costs will depend on a number of factors including the characteristics of the electricity capacity expansion and electricity demand (e.g., fuel mix of future electric power capacity, and the magnitude and geographic distribution of electricity demand growth) as well as the geographic location of power plants. Electricity technology capacity expansion plans modeled to represent alternate future conditions meeting a set of scenario assumptions are traditionally compared against historical trends which may not be consistent with current and future conditions. We present the `cerf` Python package (a.k.a., the Capacity Expansion Regional Feasibility model) which helps evaluate the feasibility and structure of future, scenario-driven electricity capacity expansion plans by siting power plants in areas that have been deemed the least cost option while considering dynamic future conditions. We can use `cerf` to gain insight to research topics such as: 1) under what conditions future projected electricity expansion plans from models such as GCAM-USA are possible to achieve, 2) where and which on-the-ground barriers to siting (e.g., protected areas, cooling water availability) may influence our ability to achieve certain expansions, and 3) how electricity infrastructure build-outs and value may evolve into the future when considering locational marginal pricing (LMP) based on the supply and demand of electricity from a grid operations model.

20 FOSSIL-FUELED POWER PLANTS↗

Activities in Support of Continuing the Service of Nuclear Power Plant Safety-Related Concrete Structures

Nuclear power plant concrete structures are described. In-service inspection and testing requirements in the U.S. are summarized. The license renewal process in the U.S. is outlined and its current status provided. Operating experience related to performance of the concrete structures is presented. Basic components of a program to manage aging of the concrete structures are identified and described: degradation mechanisms, damage models, and material performance; assessment and remediation (i.e., component selection, in-service inspection, non-destructive examinations, and remedial actions); and estimation of performance at present or some future point in time (i.e., application of structural reliability theory to the design and optimization of in-service inspection/maintenance strategies, and determination of the effects of degradation on plant risk). Finally, areas are noted where additional research would be of benefit to aging management of nuclear power plant concrete structures.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗