Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Coordination challenges for autonomous spacecraft

While past flight projects involved a single spacecraft in isolation, over forty proposed future missions involve multiple coordinated spacecraft. This paper presents characteristics of such missions in terms of properties of the phenomena being measured as well as the rationale for using multiple spacecraft. We describe the coordination problems associated with operating these missions and identify needed technologies.

multiple agents coordination planning scheduling M↗

Open and Extensible Control & Analytics Platform for Synchrophasor Data (Final Report)

The objective of the Open and Extensible Control and Analytics (openECA) Platform for Phasor Data project was to develop an open source software platform that significantly accelerates the production, use, and ongoing development of real-time decision support tools, automated control systems, and off-line planning systems that (1) incorporate synchrophasor data and (2) enhance system reliability while enabling the North American Electric Reliability Corporation (NERC) operating functions of reliability coordinator, transmission operator, and/or balancing authority to be executed more effectively.

99 GENERAL AND MISCELLANEOUS↗

Research and Technology Operating Plan Summary: Fiscal Year 1973 Research and Technology Program

Abstracts are presented of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA. This RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and universities. The summary is arranged in five sections consisting of citations and abstracts of the RTOPs and subject, technical monitor, responsible NASA organization, and RTOP number indexes.

Source record↗

Trajectory Orientation: A Technology-Enabled Concept Requiring a Shift in Controller Roles and Responsibilities

The development of a decision support tool (DST) for the en-route domain with accurate conflict prediction time horizons of 20 minutes has introduced an interesting problem. A 20 minute time horizon for conflict prediction often results in the predicted conflict occurring one or more sectors downstream from the sector controller who "owns" (i-e., is responsible for the safe separation of aircraft) one or both of the aircraft in the conflict pair. Based on current roles and responsibilities of today's en route controllers, the upstream controller would not resolve this conflict. In most cases, the downstream controller would wait until the conflicting aircraft entered higher sector before resolving the conflict. This results in a delay of several minutes from the time when the conflict was initially predicted. This delay is inefficient from both a controller workload and user's cost of operations perspective. Trajectory orientation, a new concept for facilitating an efficient, conflict-free flight path across several sectors while conforming to metering or miles-in-trail spacing, is proposed as an alternative to today's sector-oriented method. This concept necessitates a fundamental shift in thinking about inter-sector coordination. Instead of operating independently, with the main focus on protecting their internal airspace, controllers would work cooperatively, depending on each other for well-planned, conflict-free flow of aircraft. To support the trajectory orientation concept, a long time horizon (15 to 20 minutes) for conflict prediction and resolution would most likely be a primary requirement. In addition, new tools, such as controller-pilot data link will be identified to determine their necessity and applicability for trajectory orientation. Finally, with significant controller participation from selected Air Route Traffic Control Centers, potential shifts in R-side/D-side roles and responsibilities as well as the creation of a new controller position for multi-sector planning will be examined to determine the most viable solutions.

Leiden, Ken↗

Automated Signal Timing Plan Reconstruction Using High-Resolution Event-Based Controller Data for Digital Twins

Transportation digital twins are essential tools for evaluating emerging technologies such as connected and automated vehicles, adaptive traffic signal control, and mobility optimization strategies. Realistic digital twins require accurate emulation of real-world signal controllers and detailed signal timing plans. However, signal timing plans are often unavailable or difficult to access, forcing researchers and modelers to rely on assumed fixed timings or halt their analysis. To overcome this challenge, we present a method that directly estimates signal timing plan parameters using high-resolution, event-based data from traffic signal controllers. The proposed method extracts key parameters, including cycle length, offset, phase sequence, coordinated phases, phase-specific minimum and maximum green durations, vehicle extensions, and splits under coordination. A rule-based deterministic signal timing reconstruction algorithm based on traffic signal operation rules, such as those outlined in the Signal Timing Manual, is developed and validated. We evaluate this method, which uses high-resolution controller event logs and verified signal timing plans, on 94 signalized intersections in Nashville, Tennessee, demonstrating their ability to generate accurate, simulation-ready signal timing plans for tools such as SUMO and Vissim.

Saroj, Abhilasha [ORNL] (ORCID:0000000191178063)↗

A Petri-net coordination model for an intelligent mobile robot

The authors present a Petri net model of the coordination level of an intelligent mobile robot system (IMRS). The purpose of this model is to specify the integration of the individual efforts on path planning, supervisory motion control, and vision systems that are necessary for the autonomous operation of the mobile robot in a structured dynamic environment. This is achieved by analytically modeling the various units of the system as Petri net transducers and explicitly representing the task precedence and information dependence among them. The model can also be used to simulate the task processing and to evaluate the efficiency of operations and the responsibility of decisions in the coordination level of the IMRS. Some simulation results on the task processing and learning are presented.

Wang, F.-Y.↗

UTM and D-NET: NASA and JAXA's Collaborative Research on Integrating Small UAS with Disaster Response Efforts

Natural disasters, such as flooding, wildfire, hurricane, tornadoes, earthquakes and tsunamis, pose challenges in preserving human life and minimizing the damages to a region. During catastrophic events, timely response of disaster relief personnel, an efficient deployment of resources in the recovery effort, and coordinated information sharing amongst different relief agencies can make a substantial difference in responding to those impacted by the disaster. Many relief activities currently utilize both ground personnel and manned airborne assets during different phases of the disaster response. Typically, multiple organizations support relief activities and this often creates logistics coordination challenges between agencies which can result in wasted time or resources. The Japan Aerospace Exploration Agency (JAXA) has been developing an "Integrated aircraft operation system for disaster relief (D-NET)", which assists collection and sharing of disaster information through the integrated operation of aircraft such as helicopters, aircraft, and satellites, for efficient and safe rescue operations by disaster relief aircraft. Due to the advancement in unmanned aircraft systems (UAS) technologies, public safety organizations have started incorporating small UAS (sUAS) as an asset in their disasters response activities. To address the airspace integration challenges of the influx of sUAS in the United States the National Aeronautics and Space Administration (NASA), under the UAS Traffic Management (UTM) project, has been engaged in research to enable large-scale commercial applications of sUAS operating in low altitude airspace. This paper presents the integration of D-NET, which incorporate sUAS in the planning, information sharing, and operation support of disasters response activities, and UTM, which provides airspace management to enable large scale high density operations. The integration of the DNET and UTM systems enables coordination, data sharing, and airspace management to improve the timeliness of the disaster response, enable relief organization to reduce cost and overhead by using UAS assets and still maintain airspace safety during the relief activities.

UTM↗

An automated system for spacecraft proximity operations

With the advent of multiple-vehicle operations in support of the space station, on-orbit refurbishment, and several other missions, there is a need to intelligently plan proximity operations trajectories that will conserve limited available fuel while avoiding collisions. Upon reaching the objective, the capture process entails several unique considerations, such as coordinating motion with a tumbling target, the capture itself, and adapting to control of the new configuration resulting from the capture operation. This paper outlines a systematic process of technical development over several years at the Draper laboratory, culminating in a capability to perform manual augmented or fully autonomous rendezvous, capture, and control of the resulting configuration.

Bergmann, E.↗

Developing a Reduced 240-Bus WECC Dynamic Model for Frequency Response Study of High Renewable Integration

The ongoing changes in the generation resource mix, driven by the rapid adoption of inverter-based resources (IBR) as well as the early retirement of synchronous generators, are bringing new challenges to the planning and operation of bulk electric power systems. Consequently, there is an increasing need to understand, design, and quantify the reliability service provision from IBRs by performing integrated scheduling and dynamic simulations. However, test systems that have consistent scheduling and dynamic models rarely exist largely because of the decoupled nature of the two simulations on a synchronous generator-dominated system. This paper develops the dynamic model of a reduced Western Electricity Coordinating Council (WECC) system. In conjunction with the existing scheduling model, it is suitable for integrating scheduling and dynamic simulations. The reduced 240-bus WECC model reflects the generation resource mix of the Western Interconnection as of 2018. Moreover, the developed dynamic model is validated against field frequency events measured by FNET/GridEye and preserves the dominant inter-area oscillation mode in WECC.

dynamic simulation↗

Impacts of Integrating Topology Reconfiguration and Vehicle-to-Grid Technologies on Distribution System Operation

Autonomous electric vehicles (AEVs) provide unique opportunities to cope with the uncertainties of distributed energy generation in distribution networks. But the effects are limited by both inherent radial topology and the behaviors of decentralized AEVs. As such, we investigate the potential benefits of dynamic distribution network reconfiguration (DDNR), taking into account AEVs' spatial-temporal availability and their charging demand. We propose a mixed integer programming model to optimally coordinate the charging/discharging of AEVs with DDNR, while satisfying AEVs' original travel plan. Numerical studies based on a test system overlaying the IEEE 33-node test feeder and Sioux Falls transportation network show that DDNR and AEV complement each other, which improves the operation of the distribution system. We also conduct sensitivity analyses on inputs including renewable fluctuation and AEVs penetration level.

33 ADVANCED PROPULSION SYSTEMS↗

Direct Feed Low Activity Waste Integrated Permitting - 16642

An overall Hanford permitting strategy for the U. S. Department of Energy (DOE) Office of River Protection (ORP) is being developed to support the Direct Feed Low- Activity Waste (DFLAW) Program. The strategy identifies new permits and modifications of existing permits, as well as major regulatory approvals to support the startup and operation of nuclear systems necessary to feed low activity tank waste, pretreat the waste, operate the Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) facility to treat tank waste, and dispose of waste streams. Types of permits include hazardous waste, toxic air, and radiological air licenses. Four different Contractors manage operations at Tank Farms, WTP, Utilities/Infrastructure, and Waste Disposal. Due to this complexity and the number of interfaces required, the need to have a strategic overview of all permits was evident. Approximately 25 permits and 4 major regulatory approvals are identified to implement DFLAW. The strategy will help guide integrated planning, scheduling and sequencing of permits and regulatory approvals to support DOE ORP's overall schedule for construction, commissioning and operation of DFLAW. Development of the strategy included extensive collaboration and coordination of an Integrated Permitting Team with staff and management representation from DOE, CH2M Hill Plateau Remediation Contractor (CHPRC), Washington River Protection Solutions LLC (WRPS), and Bechtel National Inc. (BNI). Information sessions and briefings have been conducted with the Washington State Department of Ecology (Ecology) and Washington State Department of Health (DOH) in the development of this overall strategy. Additionally, interface meetings are held with Ecology and DOH on specific projects early in the design phase to validate the permitting approach, identify key issues and information, and discuss requirements and assumptions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low Cost Mission Operations Workshop

The presentations given at the Low Cost (Space) Mission Operations (LCMO) Workshop are outlined. The LCMO concepts are covered in four introductory sections: Definition of Mission Operations (OPS); Mission Operations (MOS) Elements; The Operations Concept; and Mission Operations for Two Classes of Missions (operationally simple and complex). Individual presentations cover the following topics: Science Data Processing and Analysis; Mis sion Design, Planning, and Sequencing; Data Transport and Delivery, and Mission Coordination and Engineering Analysis. A list of panelists who participated in the conference is included along with a listing of the contact persons for obtaining more information concerning LCMO at JPL. The presentation of this document is in outline and graphic form.

Source record↗

Experimental Assessment of the Reciprocating Feed System

The primary goal of this project was to design, construct, and test a full scale, high pressure simulated propellant feed system test bed that could evaluate the ability of the Reciprocating Feed System (RFS) to provide essentially constant flow rates and pressures to a rocket engine. The two key issues addressed were the effects of the transition of the drain cycle from tank to tank and the benefits of other hardware such as accumulators to provide a constant pressure flow rate out of the RFS. The test bed provided 500 psi flow at rates of the order of those required for engines in the 20,000 lbf thrust class (e.g., 20 to 40 lb/sec). A control system was developed in conjunction with the test article and automated system operation was achieved. Pre-test planning and acceptance activities such as a documented procedure and hazard analysis were conducted and the operation of the test article was approved by, and conducted in coordination with, appropriate NASA Marshall Space Flight Center personnel under a Space Act Agreement. Tests demonstrated successful control of flow rates and pressures.

Eddleman, David E.↗

Post-Service Examination of PWR Baffle Bolts, Part I. Examination and Test Plan

In support of extended service and current operations of the US nuclear reactor plants, the Oak Ridge National Laboratory (ORNL), through the Department of Energy (DOE), Light Water Reactor Sustainability (LWRS) Program, is coordinating with Ginna Nuclear Power Plant, The Westinghouse Electric Company, LLC, and ATI Consulting, the selective procurement of baffle bolts that were withdrawn from service in 2011 and currently stored on site at Ginna. The goal of this program is to perform detailed microstructural and mechanical property characterization of baffle former bolts following in-service exposures. This report outlines the selection criteria of the bolts and the techniques to be used in this study. The bolts available are the original alloy 347 steel fasteners used in holding the baffle plates to the baffle former structures within the lower portion of the pressurized water reactor vessel. Of the eleven possible bolts made available for this work, none were identified to have specific damage. The bolts, however, did show varying levels of breakaway torque required in their removal. The bolts available for this study varied in peak fluence (highest dose within the head of the bolt) between 9.9 and 27.8x10 21 n/cm 2 (E>1MeV). As no evidence for crack initiation was determined for the available bolts from preliminary visual examination, two bolts with the higher fluence values were selected for further post-irradiation examination. The two bolts showed different breakaway torque levels necessary in their removal. The information from these bolts will be integral to the LWRS program initiatives in evaluating end of life microstructure and properties. Furthermore, valuable data will be obtained that can be incorporated into model predictions of long-term irradiation behavior and compared to results obtained in high flux experimental reactor conditions. The two bolts selected for the ORNL study will be shipped to Westinghouse with bolts of interest to their collaborative efforts with the Electric Power Research Institute. Westinghouse will section the ORNL bolts into samples specified in this report and return them to ORNL. Samples will include bend bars for fracture toughness and crack propagation studies along with thin sections from which specimens for bend testing, subscale tensile and microstructural analysis can be obtained. Additional material from the high stress concentration region at the transition between the bolt head and shank will also be preserved to allow for further investigation of possible crack initiation sites.

42 ENGINEERING↗

Evaluating the Feasibility to Use Microgrids as a Resiliency Resource

Regulated electricity utilities are required to provide safe and reliable service to their customers at a reasonable cost. To balance the objectives of reliable service and reasonable cost, utilities build and operate their systems to operate under typical historic conditions. As a result, when abnormal events such as major storms or disasters occur, it is not uncommon to have extensive interruptions in service to the end-use customers. Because it is not cost effective to make the existing electrical infrastructure 100% reliable, society has come to expect disruptions during abnormal events. However, with the increasing number of abnormal weather events, the public is becoming less tolerant of these disruptions. One possible solution is to deploy microgrids as part of a coordinated resiliency plan to minimize the interruption of power to essential loads. This paper evaluates the feasibility of using microgrids as a resiliency resource, including their possible benefits and the associated technical challenges. A use-case of an operational microgrid is included.

Schneider, Kevin↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Coordinated Scheduling for Interdependent Electric Power and Natural Gas Infrastructures

The extensive installation of gas-fired power plants in many parts of the world has led electric systems to depend heavily on reliable gas supplies. The use of gas-fired generators for peak load and reserve provision causes high intraday variability in withdrawals from high-pressure gas transmission systems. Such variability can lead to gas price fluctuations and supply disruptions that affect electric generator dispatch, electricity prices, and threaten the security of power systems and gas pipelines. These infrastructures function on vastly different spatio-temporal scales, which prevents current practices for separate operations and market clearing from being coordinated. Here in this article, we apply new techniques for control of dynamic gas flows on pipeline networks to examine day-ahead scheduling of electric generator dispatch and gas compressor operation for different levels of integration, spanning from separate forecasting, and simulation to combined optimal control. We formulate multiple coordination scenarios and develop tractable physically accurate computational implementations. These scenarios are compared using an integrated model of test networks for power and gas systems with 24 nodes and 24 pipes, respectively, which are coupled through gas-fired generators. The analysis quantifies the economic efficiency and security benefits of gas-electric coordination and dynamic gas system operation.

03 NATURAL GAS↗

Multi-Time Scale Coordinated Control and Scheduling of Inverter-Based TCLs With Variable Wind Generation

To address microgrid tie flow errors caused by wind generation variability, here we propose and develop a multi-time scale coordinated control and scheduling strategy for inverter-based thermostatically controlled loads (TCLs). First, in hour-time scale, inverter-based TCLs with adjusting temperature set-point are modeled as virtual generators to compensate tie flow deviations in the day-ahead plan. Next, in minute-time scale, virtual batteries representing operating behaviors of inverter-based TCLs with frequency control are scheduled determined by the control of virtual generators in hour-time scale. The virtual batteries are scheduled to smooth out tie flow errors corresponding to day-ahead plan and hour-time scale schedules. The multi-time scale control methods are coordinated to employ the response potential of inverter-based TCLs and response curve-based methods are proposed to control inverter-based TCLs considering the customer privacy. The multi-time scale stochastic schedules which are based on response curves of inverter-based TCLs are coordinated to accommodate wind generation variability. Simulation results demonstrate that the microgrid tie flow errors are effectively mitigated by the proposed multi-time scale coordinated control and scheduling of inverter-based TCLs.

24 POWER TRANSMISSION AND DISTRIBUTION↗