Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operating systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Implementation and Demonstration of the Digital Twin Certification System Remote Operations Framework

Microreactors are one promising advanced-reactor concept being pursued by the nuclear industry. They are distinguished by a relatively low power output of 20 MWth or less. These microreactors are intended for deployment in applications where conventional small-capacity power solutions, such as diesel generators, are either economically unfeasible or logistically challenging. Such applications include providing electric power and/or heat for remote communities, mining sites, defense installations, and humanitarian and disaster-relief missions. An important feature for the successful deployment of microreactors is their capability to be operated remotely. This capability can significantly reduce staffing costs by eliminating the need for licensed operators to be physically present at each reactor site. Instead, operators can be centralized in a single remote operations center placed in an economically advantageous location, thereby optimizing resources by consolidating expertise and enhancing operational efficiency. However, the implementation of a remote operation system for nuclear reactors raises new concerns regarding the security, reliability, and resilience of such a system. One way in which remote operations can be supported in a manner that maintains system security, reliability, and resilience is through the use of digital twins in a novel framework designed to verify and validate sensor data and commands communicated between the remote operations center and reactor. This framework, known as the Digital Twin Certification System (DTCS), has previously been proposed as an operations architecture that can bring security and resiliency levels of remote nuclear-reactor operations to a level acceptable for commercial deployment. This paper moves the proposed DTCS architecture from concept to reality by presenting the implementation and testing of the system. The rationale and implementation of the DTCS using tools such as DeepLynx and Apache Airflow, is covered in-depth. This is followed by a demonstration of the DTCS by applying the implemented system architecture to the Single Primary Heat Extraction and Removal Emulator, a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The demonstration includes both normal and abnormal operating scenarios to highlight how the DTCS can increase the security, reliability, and resilience of a remote operations system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Implementation and Demonstration of the Digital Twin Certification System Remote Operations Framework

Microreactors are one promising advanced-reactor concept being pursued by the nuclear industry. They are distinguished by a relatively low power output of 20 MWth or less. These microreactors are intended for deployment in applications where conventional small-capacity power solutions, such as diesel generators, are either economically unfeasible or logistically challenging. Such applications include providing electric power and/or heat for remote communities, mining sites, defense installations, and humanitarian and disaster-relief missions. An important feature for the successful deployment of microreactors is their capability to be operated remotely. This capability can significantly reduce staffing costs by eliminating the need for licensed operators to be physically present at each reactor site. Instead, operators can be centralized in a single remote operations center placed in an economically advantageous location, thereby optimizing resources by consolidating expertise and enhancing operational efficiency. However, the implementation of a remote operation system for nuclear reactors raises new concerns regarding the security, reliability, and resilience of such a system. One way in which remote operations can be supported in a manner that maintains system security, reliability, and resilience is through the use of digital twins in a novel framework designed to verify and validate sensor data and commands communicated between the remote operations center and reactor. This framework, known as the Digital Twin Certification System (DTCS), has previously been proposed as an operations architecture that can bring security and resiliency levels of remote nuclear-reactor operations to a level acceptable for commercial deployment. This paper moves the proposed DTCS architecture from concept to reality by presenting the implementation and testing of the system. The rationale and implementation of the DTCS using tools such as DeepLynx and Apache Airflow, is covered in-depth. This is followed by a demonstration of the DTCS by applying the implemented system architecture to the Single Primary Heat Extraction and Removal Emulator, a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The demonstration includes both normal and abnormal operating scenarios to highlight how the DTCS can increase the security, reliability, and resilience of a remote operations system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Chance-Constrained System of Systems Based Operation of Power Systems

In this paper, a chance-constrained system of systems (SoS) based decision-making approach is presented for stochastic scheduling of power systems encompassing active distribution grids. Based on the concept of SoS, the independent system operator (ISO) and distribution companies (DISCOs) are modeled as self-governing systems. These systems collaborate with each other to run the entire power system in a secure and economic manner. Each self-governing system accounts for its local reserve requirements and line flow constraints with respect to the uncertainties of load and renewable energy resources. A set of chance constraints are formulated to model the interactions between the ISO and DISCOs. The proposed model is solved by using analytical target cascading (ATC) method, a distributed optimization algorithm in which only a limited amount of information is exchanged between collaborative ISO and DISCOs. In this paper, a 6-bus and a modified IEEE 118-bus power systems are studied to show the effectiveness of the proposed algorithm.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wind Power Forecasting Error Distributions: An International Comparison; Preprint

Wind power forecasting is expected to be an important enabler for greater penetration of wind power into electricity systems. Because no wind forecasting system is perfect, a thorough understanding of the errors that do occur can be critical to system operation functions, such as the setting of operating reserve levels. This paper provides an international comparison of the distribution of wind power forecasting errors from operational systems, based on real forecast data. The paper concludes with an assessment of similarities and differences between the errors observed in different locations.

17 WIND ENERGY↗

Operational Characteristics of an Accelerator Driven Fissile Solution System

Operational characteristics represent the set of responses that a nuclear system exhibits during normal operation. Operators rely on this behavior to assess the status of the system and to predict the consequences of off-normal events. These characteristics largely refer to the relationship between power and system operating conditions. The static and dynamic behavior of a chain-reacting system, operating at sufficient power, is primarily governed by reactivity effects. The science of reactor physics has identified and evaluated a number of such effects, including Doppler broadening and shifts in the thermal neutron spectrum. Often these reactivity effects are quantified in the form of feedback coefficients that serve as coupling coefficients relating the neutron population and the physical mechanisms that drive reactivity effects, such as fissile material temperature and density changes. The operational characteristics of such nuclear systems usually manifest themselves when perturbations between system power (neutron population) and system operating conditions arise. Successful operation of such systems requires the establishment of steady equilibrium conditions. However, prior to obtaining the desired equilibrium (steady-state) conditions, an approach from zero-power (startup) must occur. This operational regime may possess certain limiting system conditions that must be maintained to achieve effective startup. Once steady-state is achieved, a key characteristic of this operational regime is the level of stability that the system possesses. Finally, a third operational regime, shutdown, may also possess limiting conditions of operation that must be maintained. This report documents the operational characteristics of a “generic” Accelerator Driven Fissile Solution (ADFS) system during the various operational regimes of startup, steady-state operation, and shutdown. Typical time-dependent behavior for each operational regime will be illustrated, and key system parameters, such as response times, will be quantified. A generalized linear systems analysis of steady-state operations will be performed to evaluate the level of stability of ADFS systems. This information should provide a basic understanding of typical ADFS system operational behavior, and facilitate the development of monitoring procedures and operator aids.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Performance of a Low Activity Beta-Sensitive SR{sup 90} Water Monitor for Fukushima

There are large volumes of contaminated water from the stabilization efforts at the damaged Fukushima Nuclear Power Plants. This water is being processed to remove radioactivity for eventual release to the environment. An on-line continuously operating system to confirm that the clean-up system is working properly, and to provide prompt feedback of the results is required by the system operator. While gamma emitting nuclides allow for the straight forward approach of gamma spectroscopy to identify and quantify radioactivity in water, pure beta emitting nuclides such as Sr{sup 90} pose a challenging problem. The relatively short range of beta radiation in water requires optimization of the measurement geometry in terms of the source-detector distance and source-detector interface while retaining a background sensitivity low enough to meet the Minimum Detectable Concentration (MDC) of 10 Bq/kg in 180 minutes. This issue is complicated by the continuum nature of the beta spectrum which does not allow for simple nuclide identification. The use of the Monte-Carlo code MCNP to estimate system performance before prototyping vastly increases the success of the end product. Various parameters such as detector size and thickness, water chamber size, water chamber construction materials were evaluated to help choose the optimum geometry. The final design was a system consisting of two large-area (16 x 35 cm) and thin (0.15 mm) plastic scintillators placed very close to a sealed a water chamber. The size of the chamber was optimized to obtain the maximum efficiency for the nuclide being measured (Sr/Y{sup 90}) but to minimize the efficiency for possible interferences (Ru/Rh{sup 106}, Cs{sup 137}). A thin carbon fiber window was selected with adequate material and thickness to contain the water under pressure, but also thin enough (0.5 mm) to allow enough beta radiation to pass through to the active detector volume. The entire measurement geometry is then housed in a thick lead shield to reduce contributions from external sources to an acceptable level. Data acquisition is accomplished through customized application-specific software that allows for long counting times to attain a low MDC, but also simultaneously provides alarms on short averaging times to achieve a fast response to sudden changes in activity concentration. Multiple monitors are then linked to supervisory software where real time data and alarms are available for analysis in remote locations. The system also allows for remote operation of the unit; check sources, background checks, systems settings and more may be accessed remotely. Testing of the production devices has shown that we can achieve the 10 Bk/kg MDC requirement for Sr{sup 90} in equilibrium with Y{sup 90} with a count time of approximately 20 minutes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impacts of Varying Penetration of Distributed Resources with & without Volt/Var Control: Case Study of Varying Load Types

This paper provides a follow-up to an earlier one on impacts of distributed energy resources (DR) on distribution feeders. As DR penetration level on the feeder increases, there can be impacts to distribution system/feeder capacity, line losses, and voltage regulation. These can vary as the penetration level reaches the capacity of the distribution feeder/system or loading. The question is how high of a DR level can be accommodated without any major changes to system operation, system design and protection. Our objective for this work was to address the question of how the DR impacts vary in regards to both DR voltage regulation capability and load mix. A dynamic analysis was used to focus on the impacts of DR with and without volt/var control with different load composition on the distribution feeder. The study considered an example 10MVA distribution feeder in which two inverter-based DRs were used to provide voltage regulation. The results due to DR without voltage regulation capability are compared with DR capable of providing local (at its bus) voltage regulation. The analysis was repeated for four different feeder load compositions consisting of (1) constant power, (2) constant impedance, (3) constant current and (4) ZIP (equal combination of previous three).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operating Procedure Extender For Novel Systems

Operating procedures that are used in nuclear power plants are primarily paper. These paper documents are functional for normal operations, but the process has remained relatively unchanged for thirty years. This neglects the digital technology advancements that have been made in that time. There are objectively more efficient ways to present a procedure to an operator using a digital interface. These digital interfaces require structured information to be able to function. This tool takes the procedure that has been written and converts it into the structured from required by the presentation system. This is accomplished through a reliable four phase compilation algorithm.

Lehmer, Jacob P↗

The Initial Development of a Computerized Operator Support System

A computerized operator support system (COSS) is a collection of resilient software technologies to assist operators in monitoring overall nuclear power plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast- moving, complex events. A prototype COSS for a chemical volume control system at a nuclear power plant has been developed in order to demonstrate the concept and provide a test bed for further research. The development process identified four underlying elements necessary for the prototype, which consist of a digital alarm system, computer-based procedures, piping and instrumentation diagram system representations, and a recommender module for mitigation actions. An operational prototype resides at the Idaho National Laboratory (INL) using the U.S. Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). Several human-machine interface (HMI) considerations are identified and incorporated in the prototype during this initial round of development.

99 GENERAL AND MISCELLANEOUS↗

Short-Term Load Forecasting Based Automatic Distribution Network Reconfiguration

In a traditional dynamic network reconfiguration study, the optimal topology is determined at every scheduled time point by using the real load data measured at that time. The development of the load forecasting technique can provide an accurate prediction of the load power that will happen in a future time and provide more information about load changes. With the inclusion of load forecasting, the optimal topology can be determined based on the predicted load conditions during a longer time period instead of using a snapshot of the load at the time when the reconfiguration happens; thus, the distribution system operator can use this information to better operate the system reconfiguration and achieve optimal solutions. This paper proposes a short-term load forecasting approach to automatically reconfigure distribution systems in a dynamic and pre-event manner. Specifically, a short-term and high-resolution distribution system load forecasting approach is proposed with a forecaster based on support vector regression and parallel parameters optimization. The network reconfiguration problem is solved by using the forecasted load continuously to determine the optimal network topology with the minimum amount of loss at the future time. The simulation results validate and evaluate the proposed approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comparison of Wind Power and Load Forecasting Error Distributions: Preprint

The introduction of large amounts of variable and uncertain power sources, such as wind power, into the electricity grid presents a number of challenges for system operations. One issue involves the uncertainty associated with scheduling power that wind will supply in future timeframes. However, this is not an entirely new challenge; load is also variable and uncertain, and is strongly influencedby weather patterns. In this work we make a comparison between the day-ahead forecasting errors encountered in wind power forecasting and load forecasting. The study examines the distribution of errors from operational forecasting systems in two different Independent System Operator (ISO) regions for both wind power and load forecasts at the day-ahead timeframe. The day-ahead timescale iscritical in power system operations because it serves the unit commitment function for slow-starting conventional generators.

17 WIND ENERGY↗

Characterizing HVDC Transmission Flexibility under Extreme Operating Conditions

System operators rely on system flexibility, traditionally mainly from generation, to handle unexpected reliability and resilience events, ranging from excessive resource forecast errors to extreme events like heatwaves, earthquakes, and cyberattacks. Flexible transmission, such as controllable high voltage direct current (HVDC) transmission systems present an opportunity to increase overall system flexibility to accommodate operational challenges. This paper provides a methodology to study contributions to system flexibility by controllable, power electronics based transmission. The Western Electricity Coordinating Council (WECC) system is used as an example to study contributions from existing and future HVDC lines. Under extreme system conditions, it is identified that HVDC transmission flexibility can contribute with 24.8 to 28% of avoided unserved energy, and in some areas, the benefits amount to 50 to 70%.

HVDC transmission, PCM, Balancing authorities↗

Production Operations Management System

The Production Operations Management System (POMS) is a set of software tools which allows production teams and analysis groups across multiple Fermilab experiments to launch, modify and monitor large scale campaigns of related Monte Carlo or data processing jobs. POMS provides a web service interface that enables automated jobs submission on distributed resources according to customers’ requests and subsequent monitoring and recovery of failed submissions, debugging and record keeping. POMS interfaces with existing HEP data access, processing, movement and monitoring tools at Fermilab, including Jobsub, dCache, SAM, and FIFEmon, and in combination with them handles the creation and tracking of unique filenames for multistage campaigns. A flexible, interactive GUI interface exists as part of the system to visualize campaign stages, parallelization tracks and data flow. An important feature of POMS is a one-to-one connection between the GUI campaign visualizer and a text based representation of the complete campaign configuration. An extensible library of template campaign configurations is available. The templates are user modifiable and map cleanly to and from the GUI description of the campaign. Future releases of POMS will interface with Rucio for file movement.

97 MATHEMATICS AND COMPUTING↗

Methods and systems for operating a redox flow battery system

A method of operating a redox flow battery, may include maintaining a positive electrode compartment pressure greater than a negative electrode compartment pressure, and maintaining a cross-over pressure less than a membrane break-through pressure, wherein the cross-over pressure equals the negative electrode compartment pressure subtracted from the positive electrode compartment pressure. In this way, ionic resistance across the separator can be maintained at a lower level by reducing gas bubbles trapped therein while reducing separator break-through, thereby increasing performance of the redox flow battery system.

25 ENERGY STORAGE↗

A COMPUTERIZED OPERATOR SUPPORT SYSTEM PROTOTYPE

A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. A prototype COSS was developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, piping and instrumentation diagram system representations, and a recommender module for mitigation actions. The initial version of the prototype is now operational at the Idaho National Laboratory using the Human System Simulation Laboratory.

99 GENERAL AND MISCELLANEOUS↗

A Robust Yule-Walker Method for Online Monitoring of Power System Electromechanical Modes of Oscillation

Reliable power system operation requires that system operators maintain a satisfactory small-signal stability margin at all times. Mode meters allow system operators to continuously monitor the stability margin by analyzing synchrophasor measurements. Experience with mode meters at the Bonneville Power Administration (BPA) has revealed that mode meters sometimes suffer severe bias following transient disturbances. In this paper, a robust version of the Yule-Walker mode meter algorithm is proposed to mitigate this bias. The robust capability is introduced by modifying the estimator of the autocovariance sequence (ACS) on which the algorithm depends. Tests with field-measured data demonstrate that the robust Yule-Walker (RYW) algorithm significantly outperforms its conventional counterpart and is better able to provide system operators with accurate information about the system's stability margin.

Follum, James D.↗