Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “November 2011”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

2011 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant from November 1, 2010, through October 31, 2011. The report contains the following information: (1) Site description; (2) Facility and system description; (3) Permit required monitoring data and loading rates; (4) Status of special compliance conditions and activities; and (5) Discussion of the facility's environmental impacts. During the 2011 permit year, approximately 1.22 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Area Sewage Treatment plant.

99 GENERAL AND MISCELLANEOUS↗

2011 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site's Advanced Test Reactor Complex Cold Waste Pond

This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (LA 000161 01, Modification B), for the wastewater land application site at the Idaho National Laboratory Site's Advanced Test Reactor Complex Cold Waste Pond from November 1, 2010 through October 31, 2011. The report contains the following information: Facility and system description Permit required effluent monitoring data and loading rates Groundwater monitoring data Status of compliance activities Noncompliance and other issues Discussion of the facility's environmental impacts During the 2011 permit year, approximately 166 million gallons of wastewater were discharged to the Cold Waste Pond. This is well below the maximum annual permit limit of 375 million gallons. As shown by the groundwater sampling data, sulfate and total dissolved solids concentrations are highest near the Cold Waste Pond and decrease rapidly as the distance from the Cold Waste Pond increases. Although concentrations of sulfate and total dissolved solids are elevated near the Cold Waste Pond, both parameters were below the Ground Water Quality Rule Secondary Constituent Standards in the down gradient monitoring wells.

2011 Annual Industrial Wastewater Reuse Report↗

2011 Annual Industrial Wastewater Reuse Report for the Idaho National Laboratory Site's Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond

This report describes conditions, as required by the state of Idaho Industrial Wastewater Reuse Permit (LA-000160-01), for the wastewater reuse site at the Idaho National Laboratory Site's Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond from November 1, 2010 through October 31, 2011. The report contains the following information: (1) Facility and system description; (2) Permit required effluent monitoring data and loading rates; (3) Groundwater monitoring data; (4) Status of special compliance conditions; and (5) Discussion of the facility's environmental impacts. During the 2011 reporting year, an estimated 6.99 million gallons of wastewater were discharged to the Industrial Waste Ditch and Pond which is well below the permit limit of 13 million gallons per year. Using the dissolved iron data, the concentrations of all permit-required analytes in the samples from the down gradient monitoring wells were below the Ground Water Quality Rule Primary and Secondary Constituent Standards.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Erratum: SDO-AIA Observation of Kelvin-helmholtz Instability in the Solar Corona

The first SDOAIA observation of the KelvinHelmholtz instability in the solar corona in the 2010 April 8 event was reported by Ofman Thompson (2010, 2011). Foullon et al. (2011), which was published prior to Ofman Thompson (2011), claimed the detection of the KelvinHelmholtz instability in a later event (2010 November 3), and should have been cited in Ofman Thompson (2011).

Kelvin-helmholtz instability↗

Vlasov simulation in multiple spatial dimensions

A long-standing challenge encountered in modeling plasma dynamics is achieving practical Vlasov equation simulation in multiple spatial dimensions over large length and time scales. While direct multi-dimension Vlasov simulation methods using adaptive mesh methods [M. Gutnic et al., Comput. Phys. Commun. 164, 214 (2004)] have recently shown promising results in two dimensions (2D) [J. W. Banks et al., Phys. Plasmas 18, 052102 (2011); B. I. Cohen et al., November 10, 2010, http://meetings.aps.org/link/BAPS.2010.DPP.NP9.142], in this paper, we present an alternative, the Vlasov multi dimensional (VMD) model, that is specifically designed to take advantage of solution properties in regimes when plasma waves are confined to a narrow cone, as may be the case for stimulated Raman scatter in large optic f laser beams. Perpendicular grid spacing large compared to a Debye length is then possible without instability or loss of accuracy, enabling an order 10 decrease in required computational resources compared to standard particle in cell (PIC) methods in 2D, with another reduction of that order in 3D. Further advantage compared to PIC methods accrues in regimes where particle noise is an issue. VMD and PIC results in a 2D model of localized Langmuir waves are in qualitative agreement.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Survival of Endangered Snake River Sockeye Salmon Smolts from Three Idaho Lakes: Relationships with Parr Size at Release, Parr Growth Rate, Smolt Size, Discharge, and Travel Time

Abstract In 1991, Snake River sockeye salmon Oncorhynchus nerka were listed as endangered. The Sawtooth Valley Project was initiated to conserve and rebuild sockeye salmon populations that historically spawned and reared in five Sawtooth Valley lakes designated as critical habitat in central Idaho. We evaluated smolt survival of sockeye salmon that were stocked as parr into Redfish, Pettit, and Alturas lakes. Smolt travel time, residuals of Salmon River discharge and smolt travel time, and specific growth rate of parr explained 58% of the variation in smolt survival in a multiple-regression model. Smolt survival was inversely related to smolt travel time, and travel time was negatively correlated with mean May discharge in the Salmon River at Salmon, Idaho. We were particularly interested in the relationships between smolt survival and parr size at release, smolt size at migration, and parr growth rate. Smolt survival from nursery lakes to Lower Granite Dam was negatively correlated with mean parr size at release and mean smolt size at emigration. Smaller parr and smolts survived better. Smolt survival to the dam was correlated with parr growth rates in the three lakes combined; the relationship was nonlinear. Smolt survival increased as specific growth rate increased up to 0.06% per day, but further increases in growth rate were associated with reductions in survival. Absolute growth rates of parr were negatively related to parr weight at release. Smaller individuals grew faster than larger individuals, apparently as a result of size-dependent metabolic demand and prey availability. The relationships between smolt survival and parr size, smolt size, and parr growth rate differed among lakes. These data suggest that successful migrants must at least maintain weight during the winter preceding migration and that the stocking of smaller parr with lower metabolic demand may be preferable to stocking larger parr when forage is limited. Received November 18, 2010; accepted June 1, 2011

Griswold, Robert G.↗

Closure Report for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks Nevada National Security Site, Nevada with ROTCs 1-2, Revision 0

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 539: Areas 25 and 26 Railroad Tracks, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 539 are located within Areas 25 and 26 of the Nevada National Security Site. Corrective Action Unit 539 comprises the following CASs: • 25-99-21, Area 25 Railroad Tracks • 26-99-05, Area 26 Railroad Tracks The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 539 were met. To achieve this, the following actions were performed: • Reviewed documentation on historical and current site conditions, including the concentration and extent of contamination. • Conducted radiological walkover surveys of railroad tracks in both Areas 25 and 26. • Collected ballast and soil samples and calculated internal dose estimates for radiological releases. • Collected in situ thermoluminescent dosimeter measurements and calculated external dose estimates for radiological releases. • Removed lead bricks as potential source material (PSM) and collected verification samples. • Implemented corrective actions as necessary to protect human health and the environment. • Properly disposed of corrective action and investigation wastes. • Implemented an FFACO use restriction (UR) for radiological contamination at CAS 25-99-21. The approved UR form and map are provided in Appendix F and will be filed in the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Facility Information Management System; the FFACO database; and the NNSA/NSO CAU/CAS files. From November 29, 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: • At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. • At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed low-level radioactive waste. Wastes were disposed of in the appropriate onsite landfills. The NNSA/NSO provides the following recommendations: • Clean closure is required at CAS 26-99-05. • Closure in place is required at CAS 25-99-21. • A UR is required at CAS 25-99-21. • A Notice of Completion to the NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 539. • Corrective Action Unit 539 should be moved from Appendix III to Appendix IV of the FFACO.

54 ENVIRONMENTAL SCIENCES↗

Report for Batch Leach Analyses on Sediments at 100-HR-3 Operable Unit, Boreholes C7620, C7621, C7622, C7623, C7626, C7627, C7628, C7629, C7630, and C7866.

This is a data report for sediment samples analyzed for CHPRC. Between November 4, 2010 and April 25, 2011 sediment samples were received from 100-HR-3 Operable Unit for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL.

58 GEOSCIENCES↗

Report for Batch Leach Analyses on Sediments at 100-HR-3 Operable Unit, Boreholes C7620, C7621, C7622, C7623, C7626, C7627, C7628, C7629, C7630, and C7866

This is a revision to a previously released report. This revision contains additional analytical results for the sample with HEIS number B2H4X7. Between November 4, 2010 and October 26, 2011 sediment samples were received from 100-HR-3 Operable Unit for geochemical studies. The analyses for this project were performed at the 331 building located in the 300 Area of the Hanford Site. The analyses were performed according to Pacific Northwest National Laboratory (PNNL) approved procedures and/or nationally recognized test procedures. The data sets include the sample identification numbers, analytical results, estimated quantification limits (EQL), and quality control data. The preparatory and analytical quality control requirements, calibration requirements, acceptance criteria, and failure actions are defined in the on-line QA plan 'Conducting Analytical Work in Support of Regulatory Programs' (CAW). This QA plan implements the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD) for PNNL. Samples were received with a chain of custody (COC) and were analyzed according to the sample identification numbers supplied by the client. All Samples were refrigerated upon receipt until prepared for analysis. All samples were received with custody seals intact unless noted in the Case Narrative. Holding time is defined as the time from sample preparation to the time of analyses. The prescribed holding times were met for all analytes unless noted in the Case Narrative. All reported analytical results meet the requirements of the CAW or client specified SOW unless noted in the case narrative. Due to the requirements of the statement of work and sampling events in the field, the 28 day and the 48 hr requirements cannot be met. The statement of work requires samples to be selected at the completion of the borehole. It is not always possible to complete a borehole and have the samples shipped to the laboratory within the hold time requirements. Duplicate RPD for Uranium 238 (38.9%) was above the acceptance limit (35) in 1E05003-DUP1 for ICPMS-Tc-U-WE The sample result is less than 10 times the detection limits. Duplicate recoveries are not applicable to this analyte. Duplicate RPD for Silver 107 (68.2%) was above the acceptance limit (35) in 2C06004-DUP1 for ICPMS-RCRA-AE The sample result is less than 10 times the detection limits. Duplicate recoveries are not applicable to this analyte. Matrix Spike Recovery for Chromium, Hexavalent (48.8%) was outside acceptance limits (75-125) in 1E23001-MS1 for Hexavalent Chromium/Soil. Potential Matrix interference. Sample results associated with this batch are below the EQL. There should be no impact to the data as reported. Matrix Spike Recovery for Chromium, Hexavalent (50.2%) was outside acceptance limits (75-125) in 2B22010-MS1 for Hexavalent Chromium/Soil. Potential Matrix interference. Sample results associated with this batch are below the EQL. There should be no impact to the data as reported.

54 ENVIRONMENTAL SCIENCES↗

Prelaunch Characterization and Performance of JPSS-3 VIIRS Reflective Solar Bands

The Joint Polar Satellite System 3 (JPSS-3) Visible Infrared Imaging Radiometer Suite (VIIRS) instrument is the fourth in a series (S-NPP VIIRS launched in October 2011, JPSS-1 VIIRS launched in November 2017, and JPSS-2 VIIRS currently undergoing spacecraft integration) of highly advanced polar-orbiting environmental satellites. JPSS-3 VIIRS underwent a comprehensive sensor-level Thermal Vacuum (TV) testing at the Raytheon Technologies El Segundo facility in the fall of 2020. While the test program provided characterization for many spatial, spectral, and radiometric aspects of the VIIRS sensor performance, this paper focuses on the radiometric performance of the 14 reflective solar bands (RSB) that cover the wavelength range from 0.41 to 2.3 μm. Key calibration parameters, such as the instrument gain, signal-to-noise ratio (SNR), dynamic range and radiometric uniformity, were derived in a TV environment for both the primary and redundant electronics at three instrument temperature plateaus: cold, nominal, and hot. This paper shows that all the JPSS-3 VIIRS RSB detectors have been well characterized, with the key performance metrics being comparable to those of the previous VIIRS instruments. Comparison of radiometric performance to sensor requirements, as well as a summary of key sensor testing and performance issues, will also be presented.

JPSS-3↗

SNPP and NOAA-20 VIIRS On-Orbit Geolocation Trending and Improvements

Two Visible Infrared Imaging Radiometer Suite (VIIRS) sensors have been in operations for more than 8.5 and 2.5 years since they were launched in October 2011 on SNPP satellite and in November 2017 on NOAA-20 satellite, respectively. These are two satellites in the Join Polar Satellite System (JPSS) constellation, of which Suomi National Polar-orbiting Partnership (SNPP) is a risk reduction satellite and NOAA-20 is the first of four JPSS satellites(JPSS-1 became NOAA-20 after launch). Accurate geolocation is a critical element in data calibration for accurate retrieval of global biogeophysical parameters. In this paper, we describe the latest trends in the continuously improved geolocation accuracy in VIIRS Collection-1 (C1) and C2 re-processing. We implemented a VIIRS instrument geometric model update (VIGMU)for both sensors that correct for geolocation error oscilations in the scan direction. We borrowed code from Moderate Resolution Imaging Spectroradiometer (MODIS) geolocation software to correct for time-dependent pointing variations, that are particularly acute in NOAA-20 VIIRS, and some pointing anomalies in SNPP VIIRS. We developed a Kalman Filter using gyrodata to correct for attitude errors due to the degradation of the star trackers performance from the SNPP satellite. We also present an improved ground control point matching (CPM) tool, in which the ground control point (GCP) chips library is refreshed using recently launched Landsat-8 images.

SNPP↗

2D Seismic Reflection Data across Central Illinois

In a continuing collaboration with the Midwest Geologic Sequestration Consortium (MGSC) on the Evaluation of the Carbon Sequestration Potential of the Cambro-Ordovician Strata of the Illinois and Michigan Basins project, Schlumberger Carbon Services and WesternGeco acquired two-dimensional (2D) seismic data in the Illinois Basin. This work included the design, acquisition and processing of approximately 125 miles of (2D) seismic reflection surveys running west to east in the central Illinois Basin. Schlumberger Carbon Services and WesternGeco oversaw the management of the field operations (including a pre-shoot planning, mobilization, acquisition and de-mobilization of the field personnel and equipment), procurement of the necessary permits to conduct the survey, post-shoot closure, processing of the raw data, and provided expert consultation as needed in the interpretation of the delivered product. Three 2D seismic lines were acquired across central Illinois during November and December 2010 and January 2011. Traversing the Illinois Basin, this 2D seismic survey was designed to image the stratigraphy of the Cambro-Ordovician sections and also to discern the basement topography. Prior to this survey, there were no regionally extensive 2D seismic data spanning this section of the Illinois Basin. Between the NW side of Morgan County and northwestern border of Douglas County, these seismic lines ran through very rural portions of the state. Starting in Morgan County, Line 101 was the longest at 93 miles in length and ended NE of Decatur, Illinois. Line 501 ran W-E from the Illinois Basin – Decatur Project (IBDP) site to northwestern Douglas County and was 25 miles in length. Line 601 was the shortest and ran N-S past the IBDP site and connected lines 101 and 501. All three lines are correlated to well logs at the IBDP site. Originally processed in 2011, the 2D seismic profiles exhibited a degradation of signal quality below ~400 millisecond (ms) which made interpretation of the Mt. Simon and Knox sections difficult. The data quality also gradually decreased moving westward across the state. To meet evolving project objectives, in 2012 the seismic data was re-processed using different techniques to enhance the signal quality thereby rendering a more coherent seismic profile for interpreters. It is believed that the seismic degradation could be caused by shallow natural gas deposits and Quaternary sediments (which include abandoned river and stream channels, former ponds, and swamps with peat deposits) that may have complicated or changed the seismic wavelet. Where previously limited by seismic coverage, the seismic profiles have provided valuable subsurface information across central Illinois. Some of the interpretations based on this survey included, but are not limited to: - Stratigraphy generally gently dips to the east from Morgan to Douglas County. - The Knox Supergroup roughly maintains its thickness. There is little evidence for faulting in the Knox. However, at least one resolvable fault penetrates the entire Knox section. - The Eau Claire Formation, the primary seal for the Mt. Simon Sandstone, appears to be continuous across the entire seismic profile. - The Mt. Simon Sandstone thins towards the western edge of the basin. As a result, the highly porous lowermost Mt. Simon section is absent in the western part of the state. - Overall basement dip is from west to east. - Basement topography shows evidence of basement highs with on-lapping patterns by Mt. Simon sediments. - There is evidence of faults within the lower Mt. Simon Sandstone and basement rock that are contemporaneous with Mt. Simon Sandstone deposition. These faults are not active and do not penetrate the Eau Claire Shale. It is believed that these faults are associated with a possible failed rifting event 750 to 560 million years ago during the breakup of the supercontinent Rodinia.

Smith, Valerie↗

Snowflake Settling Speed Experiment Field Campaign Report

The goal of the Snowflake Settling Speed Experiment was to study the impacts of ambient turbulence on the average hydrometeor settling speed. The existing U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) third Mobile Facility (AMF3) deployed at Oliktok Point (OLI) on the North Slope of Alaska includes detailed measurements of air turbulence and ground-based measurements from the multi-angle snowflake camera (MASC) of hydrometeor size, type, orientation, and fallspeed. The existing MASC is surrounded by a double wind fence, which enables measurement of the terminal velocity in still air but limits the ability to study the correlation between ambient turbulence and hydrometeor fallspeed. The scientific objective of this campaign was to assess the impact of turbulence on hydrometeor fallspeed by placing a second MASC next to the DOE MASC and without a wind fence. The goal was to assess if the two instrument measured different fallspeeds as a function of ambient turbulence and winds that could be used to assess the impact of winds on MASC measurements and on hydrometeor settling speeds. The instrument used was the original University of Utah prototype built in 2011, and it was successfully deployed in November 2017. It appeared to run successfully for two weeks but then failed. Subsequent attempts by DOE Atmospheric System Research (ASR) personnel at OLI and later at Fairbanks did not find the cause of the failure and eventually the instrument was shipped back to Utah in July 2018.

North Slope of Alaska, Oliktok Point, multi-angle ↗

Design and Status of the NGNP Fuel Experiment AGR-3/4 Irradiated in the Advanced Test Reactor

The United States Department of Energy’s Next Generation Nuclear Plant (NGNP) Advanced Gas Reactor (AGR) Fuel Development and Qualification Program will be irradiating up to seven separate low enriched uranium (LEU) tri-isotopic (TRISO) particle fuel (in compact form) experiments in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory (INL). These irradiations and fuel development are being accomplished to support development of the next generation reactors in the United States, and will be irradiated over the next several years to demonstrate and qualify new TRISO coated particle fuel for use in high temperature gas reactors. The goals of the irradiation experiments are to provide irradiation performance data to support fuel process development, to qualify fuel for normal operating conditions, to support development and validation of fuel performance and fission product transport models and codes, and to provide irradiated fuel and materials for post irradiation examination (PIE) and safety testing. The experiments, which will each consist of at least six separate capsules, will be irradiated in an inert sweep gas atmosphere with individual on-line temperature monitoring and control of each capsule. The sweep gas will also have on-line fission product monitoring on its effluent to track performance of the fuel in each individual capsule during irradiation. The first experiment (designated AGR-1) started irradiation in December 2006 and was completed in November 2009. The second experiment (AGR-2) started irradiation in June 2010 and is currently scheduled to be completed in April 2013. The third and fourth experiments have been combined into a single experiment designated AGR-3/4, which started its irradiation in December 2011 and is currently scheduled to be completed in November 2013. Since the purpose of this experiment is to provide data on fission product migration and retention in the NGNP reactor, the design of this experiment is significantly different from the first two experiments, though the control and monitoring systems are very similar. The purpose and design of this experiment will be discussed followed by its progress and status to date.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Identification of Novel, Replicable Genetic Risk Loci for Suicidal Thoughts and Behaviors Among US Military Veterans

Importance: Suicide is a leading cause of death; however, the molecular genetic basis of suicidal thoughts and behaviors (SITB) remains unknown. Objective: To identify novel, replicable genomic risk loci for SITB. Design, Setting, and Participants: This genome-wide association study included 633 778 US military veterans with and without SITB, as identified through electronic health records. GWAS was performed separately by ancestry, controlling for sex, age, and genetic substructure. Cross-ancestry risk loci were identified through meta-analysis. Study enrollment began in 2011 and is ongoing. Data were analyzed from November 2021 to August 2022. Main Outcome and Measures: SITB. Results: A total of 633 778 US military veterans were included in the analysis (57 152 [9%] female; 121 118 [19.1%] African ancestry, 8285 [1.3%] Asian ancestry, 452 767 [71.4%] European ancestry, and 51 608 [8.1%] Hispanic ancestry), including 121 211 individuals with SITB (19.1%). Meta-analysis identified more than 200 GWS (P < 5 × 10 -8 ) cross-ancestry risk single-nucleotide variants for SITB concentrated in 7 regions on chromosomes 2, 6, 9, 11, 14, 16, and 18. Top single-nucleotide variants were largely intronic in nature; 5 were independently replicated in ISGC, including rs6557168 in ESR1, rs12808482 in DRD2, rs77641763 in EXD3, rs10671545 in DCC, and rs36006172 in TRAF3. Associations for FBXL19 and AC018880.2 were not replicated. Gene-based analyses implicated 24 additional GWS cross-ancestry risk genes, including FURIN, TSNARE1, and the NCAM1-TTC12-ANKK1-DRD2 gene cluster. Cross-ancestry enrichment analyses revealed significant enrichment for expression in brain and pituitary tissue, synapse and ubiquitination processes, amphetamine addiction, parathyroid hormone synthesis, axon guidance, and dopaminergic pathways. Seven other unique European ancestry–specific GWS loci were identified, 2 of which (POM121L2 and METTL15/LINC02758) were replicated. Two additional GWS ancestry-specific loci were identified within the African ancestry (PET112/GATB) and Hispanic ancestry (intergenic locus on chromosome 4) subsets, both of which were replicated. Further, no GWS loci were identified within the Asian ancestry subset; however, significant enrichment was observed for axon guidance, cyclic adenosine monophosphate signaling, focal adhesion, glutamatergic synapse, and oxytocin signaling pathways across all ancestries. Within the European ancestry subset, genetic correlations (r > 0.75) were observed between the SITB phenotype and a suicide attempt-only phenotype, depression, and posttraumatic stress disorder. Additionally, polygenic risk score analyses revealed that the Million Veteran Program polygenic risk score had nominally significant main effects in 2 independent samples of veterans of European and African ancestry.

60 APPLIED LIFE SCIENCES↗

Injection of large transverse emittance EBIS beams in booster

During the commissioning of EBIS beams in Booster in November 2010 and in April, May and June 2011, it was found that the transverse emittances of the EBIS beams just upstream of Booster were much larger than expected. Beam emittances of 11{pi} mm milliradians had been expected, but numbers 3 to 4 times larger were measured. Here and throughout this note the beam emittance, {pi}{epsilon}{sub 0}, is taken to be the area of the smallest ellipse that contains 95% of the beam. We call this smallest ellipse the beam ellipse. If the beam distribution is gaussian, the rms emittance of the distribution is very nearly one sixth the area of the beam ellipse. The normalized rms emittance is the rms emittance times the relativistic factor {beta}{gamma} = 0.06564. This amounts to 0.12{pi} mm milliradians for the 11{pi} mm milliradian beam ellipse. In [1] we modeled the injection and turn-by-turn evolution of an 11{pi} mm milliradian beam ellipse in the horizontal plane in Booster. It was shown that with the present injection system, up to 4 turns of this beam could be injected and stored in Booster without loss. In the present note we extend this analysis to the injection of larger emittance beams. We consider only the emittance in the horizontal plane. Emittance in the vertical plane and the effects of dispersion are treated in [2].

43 PARTICLE ACCELERATORS↗

Injection of Large Transverse Emittance EBIS Beams in Booster

During the commissioning of EBIS beams in Booster in November 2010 and in April, May and June 2011, it was found that the transverse emittances of the EBIS beams just upstream of Booster were much larger than expected. Beam emittances of 11π mm milliradians had been expected, but numbers 3 to 4 times larger were measured. Here and throughout this note the beam emittance, πϵ 0 , is taken to be the area of the smallest ellipse that contains 95% of the beam. We call this smallest ellipse the beam ellipse. If the beam distribution is gaussian, the rms emittance of the distribution is very nearly one sixth the area of the beam ellipse. The normalized rms emittance is the rms emittance times the relativistic factor βγ = 0.06564. This amounts to 0.12π mm milliradians for the 11π mm milliradian beam ellipse. In we modeled the injection and turn-by-turn evolution of an 11π mm milliradian beam ellipse in the horizontal plane in Booster. It was shown that with the present injection system, up to 4 turns of this beam could be injected and stored in Booster without loss. In the present note we extend this analysis to the injection of larger emittance beams. We consider only the emittance in the horizontal plane. Emittance in the vertical plane and the effects of dispersion are treated in.

43 PARTICLE ACCELERATORS↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi - November 2025 Meeting Notes

Fifteen years have passed since the March 11, 2011, the Great East Japan Earthquake (GEJE) triggered a tsunami that inundated the Fukushima Daiichi Nuclear Power Station (Daiichi or 1F) and led to severe accidents in multiple units at the plant. During these fifteen years since these events, Daiichi forensics examinations and evaluations have revealed many insights for enhancing the safety of nuclear power plants worldwide. However, uncertainties remain regarding the events after the GEJE. Additional Daiichi forensics information is required to inform future Decontamination and Decommissioning (D&D) activi- ties conducted by the plant owner, Tokyo Electric Power Company Holdings, Incorporated (TEPCO Hold- ings). This forensics information also has important implications for the safety and operation of U.S. commercial nuclear power plants. A collaborative U.S. and Japanese effort, which includes approximately 50 experts in reactor safety and plant operations, was initiated in 2014 by the Department of Energy Office of Nuclear Energy (U.S. DOE-NE) to identify Daiichi examination needs and evaluate recent Daiichi examination data to address these needs. This collaborative effort, which is beneficial to the U.S. and Japan, continues as Japan moves forward with D&D activities.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗