Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LANSCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

MARSAME Radiological Release Report for Metal Items from Technical Area 53, Set 26

Environmental Protection and Compliance, Environmental Stewardship Group (EPC-ES) has evaluated the survey results for metal items from the Los Alamos Neutron Science Center (LANSCE) at Technical Area 53 (TA-53) and found that the metal items described in Table 1 of this report (identified by Radiation Protection [RP] Tracking Numbers) meet the criteria for unrestricted release under Department of Energy (DOE) Order 458.1 Chg 4, Radiation Protection of the Public and the Environment (DOE 2020) and can be recycled. This conclusion is based on the known history of the metal items and radiation survey data. None of the items in this report are located within radiological areas. Therefore, the items are considered unencumbered and are not subject to the moratorium suspension on metal recycling from DOE facilities. Additionally, Los Alamos National Laboratory (LANL) has determined that there is no practical opportunity for internal DOE reuse of this metal. Process knowledge indicates that these metal items were unlikely to ever be in direct contact with the beam and thus are unlikely to have become activated. Surface contamination measurements (both total and removable) showed either no detectable radioactivity or activity levels within the range of background. All measurements for volumetric contamination were indistinguishable from background based on calculated decision limits. Additionally, all gamma isotopic surveys conducted for defense-in depth showed no identifiable gamma radiation from beam activation.

54 ENVIRONMENTAL SCIENCES↗

Cubical moderators for the Neutron Target Demonstator (NTD)

Neutron capture cross sections of unstable isotopes are important for neutron induced nucleosynthesis as well as for technological applications. The traditional time-of-flight method reaches its limits once the necessary detection of the reaction products is hampered by the size (mass) of the sample. Several factors may limit the sample mass: The decay properties of radioactive isotopes interfere with the signals from the neutron capture or neutron-induced fission reactions; The limited range of charged reaction products requires a thin sample. In both cases, an increased neutron fluence at the sample position with ever improved neutron sources overcomes the lack of reaction rate. Reference proposed a combination of a radioactive beam facility, an ion storage ring and a spallation neutron source surrounded by neutron moderator. This idea is part of the LANSCE strategy to stay a worldwide leader for neutron induced research. Figure 1 shows a sketch of the proposed future setup.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Nuclear Computational Low Energy Initiative (NUCLEI)

The NUCLEI project, as defined by the scope of work, developed, implemented and run codes for large-scale computations of many topics in low-energy nuclear physics. Physics studied include the properties of nuclei and nuclear decays, nuclear structure and reactions, and the properties of nuclear matter. The computational techniques used include Quantum Monte Carlo, Configuration Interaction, Coupled Cluster, and Density Functional methods. The research program emphasized areas of high interest to current and possible future DOE nuclear physics facilities, including ATLAS and FRIB (nuclear structure and reactions, and nuclear astrophysics), TJNAF (neutron distributions in nuclei, few body systems, and electroweak processes), NIF (thermonuclear reactions), MAJORANA and FNPB (neutrinoless double-beta decay and physics beyond the Standard Model), and LANSCE (fission studies).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

LAMP RFQ vane tip macro-based 3D modeling

This report covers the workflow and the demonstration of modeling the radiofrequency quadrupole (RFQ) vane tip geometry in 3D, for the Front End Upgrade of the LANSCE Modernization Project (LAMP). The goal is to develop an automated procedure to generate the 3D model of the LAMP RFQ vane tip geometry, so as to eliminate the need to manually enter the design parameters for each RFQ cell, when building the 3D model. With the developed procedure, the LAMP RFQ design optimization work can be significantly more efficient.

43 PARTICLE ACCELERATORS↗

Start-to-end simulation for LAMP front-end scoping studies

We present a design of a new front end in support of the LANSCE Modernization Project (LAMP). This is an updated front-end design that can largely meet LAMP threshold needs. The first half of this report details each section of the front end, including a summary of the physics design and function. The second half simulates several beam formats from the initial source all the way through the final DTL section (i.e. start-to-end simulations). Details and assumptions are described. The following table summarizes the key results for the different beam formats from this study.

43 PARTICLE ACCELERATORS↗

LAMP-PSR Scoping Studies Report

This report summarizes work performed from July – September 2023, performing an initial evaluation for the LANSCE Proton Storage Ring upgrade option “B.” The studies identified potential pathsforward, performing initial beam dynamics studies, and surveying various technology options different aspects of the upgrade. Taken together, the studies provide an “early look” at the feasibility, challenges and alternative methods for pursuing Option “B,” and give guidance towards more detailed design concept development needed as work progresses. Generally speaking, no major obstacles were identified in pursuing the Option “B” PSR upgrade path in terms of the machine physics or overall system architecture. Several areas of concern have been identified; we note that these primarily center on technology choice and must be addressed regardless of the upgrade path selected, and none of the concerns are considered insurmountable.

43 PARTICLE ACCELERATORS↗

Carbon Block Density

Within the framework of the Neutron Target Demonstrator about 1 m 3 of reactor grade graphite is available at LANSCE. In order to evaluate its suitability as a moderator, knowledge about the exact density is important, since it strongly affects the average time neutrons spend in the volume. The graphite is available in different shapes. A brief analysis was done on three different carbon blocks to determine the density of the material as well as the uncertainty in that measurement.

36 MATERIALS SCIENCE↗

Updated background simulations for DANCE, FP-14

With the installation of the Mark-IV target at LANSCE in 2022 significant changes of the beam-related backgrounds at DANCE are observed. The impact on the count rate at DANCE was discussed and simulated in an earlier report [4]. We report here on simulations, which follow the same general idea as in [4].

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

LAMP Technical Readiness Evaluation Report

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risk to the project. These recent design modifications include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (ie choppers, kickers, and bunchers). • An additional H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional RFQ design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project KPPs. • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages. The scope of the evaluation was limited to the project Work Breakdown Structure (WBS) elements as defined for the RFQ Injector and Drift Tube Linac (DTL) systems only. Integration of Instrumentation and Controls (I&C) and Safety Systems was not considered, although specific technologies as related to the RFQ and DTL systems were included. Other elements of the project such as Shielding, System Design, Technical Management, and additional facility integration needed to enable off-line testing and pre-installation commissioning were also not evaluated. Each technical subsystem element was evaluated for technical readiness, however, not all were found to meet the criteria for a CTE. Three subsystem elements were determined to meet the CTE criteria. Their associated TRLs are summarized in the table below. These subsystem elements of the project have the lowest technical readiness due to either being new, novel or modified, requiring additional R&D before being capable of meeting the project Key Performance Parameters (KPPs) and subsystem requirements, or present technology exists but has not yet been demonstrated in a relevant environment. All other subsystems were determined to have a TRL of 8, indicating that actual operating systems exist having similar performance requirements as needed for LAMP. Details of the technical readiness evaluation for each subsystem is given in the following sections of this report.

43 PARTICLE ACCELERATORS↗

LEBT Buncher / Feed Forward / Frequency Generation: System Design Document (SDD)

The LAMP Low Energy Beam Transport (LEBT) transfers a continuous beam at 100 keV from the ion source to RFQ in LEBT. A LEBT buncher imposes an energy tilt to initiate velocy bunching in the chopped beam pulse about 25 ns long to form a short MPEG bunch. One possible option for the LEBT buncher based on a two-gap LC-circuit driven structure was considered, which is similar to the existing LANSCE low-frequncy buncher (LFB). Another possible option is a non-resonant element driven by a pulse-forming-network that provides a single pulse at the repetition frequency of MPEG beam, with a period of 1.8 µs. The LEBT operation is synchronized with the accelerator timing system.

43 PARTICLE ACCELERATORS↗

Preliminary Look at the LBEG & MPEG Beam Transmissions between HPSim and Operation Data

This report summarizes recent work on estimating the transmission of LANSCE H- beams from the end of the present DTL to both the PSR stripper foil (LBEG) and WNR target 4 (MPEG). The LBEG beam might be considered a more typical LINAC beam and lends itself to continuous monitoring of transmission through the various stages of the accelerator. For the MPEG, however, the widely-spaced micropulses and lack of the requisite sensitivity current monitors throughout the accelerator make these measurements extremely difficult and more uncertain. Therefore, to assist in estimating the MPEG beam transmission, beam-dynamics simulations using HPSim were employed. These beam transmission estimates from the end of the Drift Tube Linac (DTL) to Target 4 (MPEG) and the PSR stripper foil (LBEG) are vital to determine the charge requirements for LAMP’s front end. In this technote, we demonstrate three major efforts in determining the transmission: (1) Convert the WNR beamline lattice from TRANSPORT to HPSim for use in the simulation; (2) Simulate the optimization process in the Central Control Room (CCR) that brings down the losses by up to a factor of 4000 between the end of the initial physics-based tuneup phase and production beam operation; (3) Analyze operational data to deduce measured transmissions. Table 1 shows the estimated losses with HPSim and operational analysis. Finally, a better measurement and other improvements to refine the results are also proposed.

43 PARTICLE ACCELERATORS↗

Low-energy H- beam injectors for particle accelerators: upgrade requirements, challenges and future plans [Slides]

High brightness, negative hydrogen ion sources are used extensively in large, accelerator-based, user facilities operating worldwide. Negative hydrogen beams have become the preferred means of filling circular accelerators and storage rings as well as enabling efficient extraction from cyclotrons. Much larger beams of H- ions are also utilized for neutral beams injection into fusion machines and will be discussed in a separate companion presentation. Some of the accelerator facilities include the US Spallation Neutron Source (SNS), Japan Proton Accelerator Research Complex (J-PARC), Rutherford Appleton Laboratory (RAL-ISIS), Los Alamos Neutron Science Center (LANSCE), Fermi National Accelerator Laboratory (FNAL), Brookhaven National Laboratory (BNL), the CERN LHC injector, the Chinese Spallation Neutron Source (CSNS) as well as numerous installations of D-Pace (licenced by TRIUMF) ion sources used mainly with cyclotrons. Many facilities are currently working on various improvement / upgrade projects, both in the near and long term, which are driving further development of their ion source and LEBT (Low Energy Beam Transport) and, in some cases, their overall front end injector system. This report will first provide a simple description of each facilities existing ion source and LEBT and summarize the operational parameters which are currently being routinely injected into their accelerators. Next, the parametric goals of each of the facilities upgrade projects are specified as well as development efforts currently underway to meet these requirement and improvement goals. It is hoped that that this work will not only capture the current state-of-the-art of worldwide H- beam injectors and clarify the research goals and efforts of the community in general but will also encourage further inter laboratory collaborations.

43 PARTICLE ACCELERATORS↗

Dipole Bend Magnets: Design Considerations

This analysis provides a design of a dipole bend magnet for a beamline, stepping through various considerations while assembling a design. This report can be used as a basis of a bending dipole magnet applicable to LANSCE, a scalable point design for other applications, or as a systematic process for developing a magnet design from scratch. The goal is more to answer, 'Is it reasonable?' than to address correction factors. In this specific case, the dipole should provide 3 kG within a 6.35-cm (2.5") gap across an area provided by 25×15-cm pole pieces. This provides roughly 17° and 21° deflection for proton at 3.0 and 2.1 MeV, respectively.

43 PARTICLE ACCELERATORS↗

Temperature of a tungsten spallation target

We discuss the heat load inside a neutron spallation target made of tungsten hit by an 800 MeV proton beam. This problem is important for the Neutron Target project, where a spallation target will be surrounded by an extended graphite or beryllium cube to create a neutron target. The idea of a free-neutron target enables the measurement of neutron-induced reactions in inverse kinematics. This idea is part of the LANSCE strategy to stay a worldwide leader for neutron-induced research.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Record of Decision: H - LEBT Design Modifications

The LAMP Conceptual Design (LCD) is described in the LAMP Conceptual Design Report. The proposed new configuration of the LAMP H - LEBT encompasses multiple changes to the LCD. The new configuration makes use of a single H - source to supply beam to all LANSCE user stations except IPF; this eliminates one of the H - sources in the LCD, and the associated pulsed merger magnet the use of two such sources required. The source current from the sole H - source is gated on a macropulse-by-macropulse basis using techniques demonstrated at SNS (Spallation Neutron Source), specifically, changes to the RF plasma drive power. A pulsed electrode system is used to match the beam into the LEBT transport line, variable on a macropulse-by-macropulse basis to match the source beam current.

43 PARTICLE ACCELERATORS↗

High-Power Amplifier Considerations for testing the LAMP RFQ and first DTL Cavity

As part of the LANSCE Accelerator Modernization Pro ject (LAMP), critical portions of the proposed accelerator will be tested as proof of concept and aid in planning the installation of LAMP at Los Alamos Neutron Science Cen ter. As part of this demonstration, the radio frequency quadrupole (RFQ) and the first drift-tube linac (DTL) cav ity will be tested with beam. For this purpose, high-power RF amplifiers are being designed to meet the testing de mands. This is a description of the requirements of these amplifiers and how the design is intended to meet them.

42 ENGINEERING↗

LAMP Technical Readiness Evaluation Report: LAMP-ENG-RPT-003 (Revision 2)

An internal preliminary evaluation of Critical Technology Elements (CTEs) for the LANSCE Modernization Project (LAMP) was completed in 2023. This included determining corresponding Technical Readiness Levels (TRLs) for all subsystems using the criteria of DOE G 413.3-4A, Technical Readiness Assessment Guide. This revised report includes a summary of the recent design modifications required to meet the project Key Performance Requirements (KPPs), some of which may reduce technical risks to the project. These recent design modifications are based on the LAMP Conceptual Design which is the design evaluated in this document and include: • Further optimization of the low-energy and medium-energy beam transport regions (LEBT and MEBT, respectively), including relocation of various functional elements (i.e. choppers, kickers, and bunchers). • An additional 100-keV H - ion source to separate ion-source function based on beam delivery requirements. • A high-repetition-rate pulsed kicker magnet to select/merge the two H - ion beams into a common low-energy beam transport. • Modification and further optimization to a more conventional 3-MeV Radio Frequency Quadrupole (RFQ) design. Performance of the RFQ has been optimized to deliver the required three types of beams while meeting the project Key Performance Parameters (KPPs). • The addition of a second chopper in the medium-energy beam transport (MEBT) line to reduce the required pulser voltages.

43 PARTICLE ACCELERATORS↗