Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Ground Processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Land altimetry using satellite data from the GEOSAT sea altimeter

Several techniques are proposed or assessed from the GEOSAT sea altimeter, and changes are recommended in future RADAR altimeters. The first technique tried was to cross-correlate each waveform with the preceding one. Then the position giving the maximum correlation was taken as the correct placement of the new waveform in its data window. The resulting altitude profile was slightly more variable than that of the on-board tracker over flat rock (Salar de Uyuni), so apparently successive waveforms are too dissimilar to correlate. When cross-correlation failed, compensation was made for averaging. Raw waveforms are averaged in groups of 100 and it is these average waveforms which are available for ground processing. But while the 100 are being received, the window position is moved in time, at different constant rates for the first 50 and last 50. Assuming an unchanging waveform and a single window rate for the 100, first and last waveforms were obtained. Averaging their half-height arrival times gave an altitude profile similar to the median and centroid methods. The variability of this altitude profile suggests that even raw waveforms in a group of 100 may be too dissimilar to correlate. In other techniques, the pulse was judged to have arrived when one of these criteria was met: the wave amplitude meets a certain absolute threshold; wave amplitude meets a certain relative threshold; certain fraction of the area of the waveform has passed; and centroid of the waveform has passed. All methods gave altitude profiles at least as variable as the on-board tracker, and all were biased at least 0.5 meter to low altitudes, except the threshold detector. The threshold detector can be filtered spatially to resemble the on-board tracker, and perhaps it could be implemented without feedback. For operating over land, these changes are recommended in future altimeters: The window should not move while raw waveforms are being averaged; some of the raw waveforms should be telemetered to earth for study, placing the waveform in the window should allow for shape variety; and some form of threshold detector might be used to find the signal and place it.

Luft, Philip E.↗

The Galileo Orbiter - Command and telemetry subsystems on their way to Jupiter

An overview is given of the Galileo command and telemetry subsystems, which exemplify the rigid time-synchronized systems required by TDM (time division multiplexing). The spacecraft clock is examined, along with some of the rationale for the development of the clock structure and timing to give a sense of the design imperatives for rigidly synchronized systems. Additional subjects include the structure of the science and engineering frames, emphasizing the subcommutated structure of the engineering frame and its relationship to the spacecraft clock; ground processing for and basic uses of the telemetry; the various message types used to transmit commands to the spacecraft; and the generation processes for the command message types.

Erickson, James K.↗

Results of a study on polarization mix selection for the NSCAT scatterometer

The NASA scatterometer (NSCAT) is an instrument designed to measure the radar backscatter of the ocean's surface for estimating the near-surface wind velocity. A given resolution element is observed from several different azimuth angles. From these measurements the near-surface vector wind over the ocean may be inferred using a geophysical model function relating the normalized radar backscatter coefficient (sigma0) to the near-surface wind. The results of a study to select a polarization mix for NSCAT using an end-to-end simulation of the NSCAT scatterometer and ground processing of the sigma0 measurements into unambiguous wind fields using a median-filter-based ambiguity-removal algorithm are presented. The system simulation was used to compare the wind measurement accuracy and ambiguity removal skill over a set of realistic mesoscale wind fields for various polarization mixes. Considerations in the analysis and simulation are discussed, and a recommended polarization mix is given.

Long, David G.↗

Pegasus first mission - Flight results

On April 5, 1990, after release from a B-52 aircraft at 43,198 ft, the three-stage Pegasus solid-propellant rocket successfully completed its maiden flight by injecting its 423-lb payload into a 273 x 370-nmi 94-deg-inclination orbit. The first flight successfully achieved all mission objectives, validating Pegasus's unique air-launched concept, the vehicle's design, and its straightforward ground processing, integration and test methods.

Mosier, Marty↗

NASA radar altimeter for the Topex/Poseidon Project

The Topex/Poseidon Project is a joint U.S. and French mission to develop and operate an earth-orbiting satellite with sensors capable of making accurate measurements of sea level. The NASA Radar Altimeter (NRA), a fifth-generation U.S. altimeter, will provide the primary measurement for the Topex/Poseidon altimetric mission. This paper presents the requirements, altimeter fundamentals, design description, integration and test program, primary elements of ground processing, and assessment for the dual-frequency NRA.

Zieger, Alfred R.↗

Spaceborne radar measurement of wind velocity over the ocean - An overview of the NSCAT scatterometer system

Scatterometry and scatterometer design issues are reviewed. The design of the NASA Scatterometer (NSCAT) to be flown on the Japanese ADEOS mission is presented. Building on Seasat experience, the NSCAT system includes several enhancements, such as three antenna azimuths in each of two swaths, and an onboard digital Doppler processor to allow backscatter measurements to be colocated everywhere within the orbit. These enhancements will greatly increase the quality of the NSCAT wind data. The ground processing of data is discussed, and scatterometers of the next decade are briefly described.

Naderi, F. M.↗

Operationally Efficient Propulsion System Study (OEPSS) data book. Volume 1: Generic ground operations data

This study was initiated to identify operations problems and cost drivers for current propulsion systems and to identify technology and design approaches to increase the operational efficiency and reduce operations costs for future propulsion systems. To provide readily usable data for the Advance Launch System (ALS) program, the results of the Operationally Efficient Propulsion System Study (OEPSS) were organized into a series of OEPSS Data Books as follows: Volume 1, Generic Ground Operations Data; Volume 2, Ground Operations Problems; Volume 3, Operations Technology; Volume 4, OEPSS Design Concepts; and Volume 5, OEPSS Final Review Briefing, which summarizes the activities and results of the study. This volume presents ground processing data for a generic LOX/LH2 booster and core propulsion system based on current STS experience. The data presented includes: top logic diagram, process flow, activities bar-chart, loaded timelines, manpower requirements in terms of duration, headcount and skill mix per operations and maintenance instruction (OMI), and critical path tasks and durations.

Byrd, Raymond J.↗

Constraint-based scheduling

The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

Zweben, Monte↗

Constraint-based scheduling

The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

Zweben, Monte↗

Iterative repair for scheduling and rescheduling

An iterative repair search method is described called constraint based simulated annealing. Simulated annealing is a hill climbing search technique capable of escaping local minima. The utility of the constraint based framework is shown by comparing search performance with and without the constraint framework on a suite of randomly generated problems. Results are also shown of applying the technique to the NASA Space Shuttle ground processing problem. These experiments show that the search methods scales to complex, real world problems and reflects interesting anytime behavior.

Zweben, Monte↗

Retrievable payload carrier: Next generation Long Duration Exposure Facility

This paper describes the Retrievable Payload Carrier (RPC), which is a multi-experiment, free flyer spacecraft being privately developed to make in-space experimentation more accessible and economically feasible for research and development organizations. The carrier concept was derived from NASA's highly successful and flight proven Long Duration Exposure Facility (LDEF). The LDEF capabilities have been enhanced to meet new customer requirements. This reusable payload carrier is planned for launch and retrieval by the space shuttle on a regular basis. The RPC's flexible design will facilitate manifesting of the shuttle cargo bay space. The vehicle is designed so that either the entire vehicle or only individual experiments can be removed and replaced. A fully operational RPC program consists of: (1) a carrier spacecraft; (2) a ground control station; (3) a ground processing facility; and (4) the personnel required to support both the development and operational phases of the program.

Perry, Arthur T.↗

Human Exploration Initiative

The planning and development of elements of the Human Exploration Initiative (HEI) program are described including mission designs, launch vehicles, and program phasing. Attention is given to the objective of the lunar and Martian projects as well as to the phased exploration strategy involving the Space Station Freedom, the lunar surface, and ultimately permanently manned bases on the moon and Mars. Mission profiles are illustrated for piloted and cargo missions, and the development of earth-to-orbit launch vehicles is reviewed emphasizing the uses of the Shuttle-C and the heavy-lift launch vehicle. Launch-site operations flow concepts are described for the lunar and lunar/Mars phases, and the baseline ground-processing scenarios are shown to define the preliminary facility requirements. The overview demonstrates the areas of development required for achieving the goals of the HEI program.

Goldsby, William D.↗

Overview of National Launch System with emphasis on cargo transfer vehicle

As a result of the Augustine Committee's recommendation to the National Space Council, NASA and the DOD have embarked on a joint program to provide a new capability for transporting payloads into space. Vehicles within the National Launch System (NLS) family are to be robust designs allowing more streamlined ground processing with corresponding reductions in operations cost. A primary NASA objective is access to space and the space station independent of the Space Shuttle. This requires the program to provide more than a simple payload-to-orbit capability. This capability is provided in large part by the cargo transfer vehicle.

Buchanan, Harry↗

Architecture assessment of HLLV candidates

Results of an architecture study of four Heavy Lift Launch Vehicles (HLLV) families are summarized, with attention given to civil, commercial, military and Space Exploration Initiative (SEI) applications. The Mars Exploration architecture is used as the SEI model baseline, and the architecture of each vehicle family is analyzed with respect to ground processing, launch operations, on-orbit operations, mission performance, and cost. For lunar missions, a 70-t earth-to-orbit (ETO) vehicle is shown to have definite cost advantages, with only small operational disadvantages, if the lunar program is small or medium in size. For Mars, a comparison of 150-t and 250-t ETO vehicles shows that little operational advantage is gained by going to the 250-t size.

Thompson, Walter E.↗

Scheduling and rescheduling with iterative repair

This paper describes the GERRY scheduling and rescheduling system being applied to coordinate Space Shuttle Ground Processing. The system uses constraint-based iterative repair, a technique that starts with a complete but possibly flawed schedule and iteratively improves it by using constraint knowledge within repair heuristics. In this paper we explore the tradeoff between the informedness and the computational cost of several repair heuristics. We show empirically that some knowledge can greatly improve the convergence speed of a repair-based system, but that too much knowledge, such as the knowledge embodied within the MIN-CONFLICTS lookahead heuristic, can overwhelm a system and result in degraded performance.

Zweben, Monte↗

Rescheduling with iterative repair

This paper presents a new approach to rescheduling called constraint-based iterative repair. This approach gives our system the ability to satisfy domain constraints, address optimization concerns, minimize perturbation to the original schedule, produce modified schedules, quickly, and exhibits 'anytime' behavior. The system begins with an initial, flawed schedule and then iteratively repairs constraint violations until a conflict-free schedule is produced. In an empirical demonstration, we vary the importance of minimizing perturbation and report how fast the system is able to resolve conflicts in a given time bound. We also show the anytime characteristics of the system. These experiments were performed within the domain of Space Shuttle ground processing.

Zweben, Monte↗

Rescheduling with iterative repair

This paper presents a new approach to rescheduling called constraint-based iterative repair. This approach gives our system the ability to satisfy domain constraints, address optimization concerns, minimize perturbation to the original schedule, and produce modified schedules quickly. The system begins with an initial, flawed schedule and then iteratively repairs constraint violations until a conflict-free schedule is produced. In an empirical demonstration, we vary the importance of minimizing perturbation and report how fast the system is able to resolve conflicts in a given time bound. These experiments were performed within the domain of Space Shuttle ground processing.

Zweben, Monte↗

GEOTAIL Spacecraft historical data report

The purpose of this GEOTAIL Historical Report is to document ground processing operations information gathered on the GEOTAIL mission during processing activities at the Cape Canaveral Air Force Station (CCAFS). It is hoped that this report may aid management analysis, improve integration processing and forecasting of processing trends, and reduce real-time schedule changes. The GEOTAIL payload is the third Delta 2 Expendable Launch Vehicle (ELV) mission to document historical data. Comparisons of planned versus as-run schedule information are displayed. Information will generally fall into the following categories: (1) payload stay times (payload processing facility/hazardous processing facility/launch complex-17A); (2) payload processing times (planned, actual); (3) schedule delays; (4) integrated test times (experiments/launch vehicle); (5) unique customer support requirements; (6) modifications performed at facilities; (7) other appropriate information (Appendices A & B); and (8) lessons learned (reference Appendix C).

Boersig, George R.↗