Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Understanding the Challenges of Financing Modular Construction: A Case Study for Prospective Multifamily Units

Compared to traditional site build, modular construction can significantly shorten construction schedules and speed income generation. Modular construction may also reduce construction costs. Yet access to commercial financing remains one of the most significant barriers to modular construction. Materials must be purchased, and production lines reconfigured for each project months ahead of fabrication. Materials alone can be 60% or more of the total cost of production. As a result, manufacturers require large upfront deposits—often 30% or more of the off-site contract. In addition, the capital-intensive nature of modular construction requires frequent progress payments for manufacturers to maintain cash flow. For those lenders willing to fund modular projects, many require the developer to share more of the risk. This may include the developer paying for line reservation fees and material deposits 3–6 months prior to production. Because these are unsecured loans, interest rates may be higher and loan amounts lower. As suppliers, modular manufacturers discourage retainage. Together, these and other factors may contribute to higher equity requirements for the developer—particularly at the beginning of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Computational Algorithms for Unit Commitment with AC Power Flows (Final Report)

Security-constrained unit commitment (SCUC) is a key component in power system operations. When AC power flow constraints are considered in the SCUC model (AC-SCUC), the problem becomes extremely difficult due to its discrete and non-convex nature, as described in “Grid Optimization Competition Challenge 3 Problem Formulation (GOCC)”. There are four main challenges: (i) Discrete decisions regarding unit online/offline status and start-up/shut-down procedures for every single unit. The number of discrete decision variables increases considerably when a system integrates multiple generators; (ii) Configuration-based combined-cycle formulations, and multi-commodity models that include ramping products, spin/non-spin products, and regulation up/down products. The combined-cycle units introduce additional discrete decision variables and auxiliary service products further complicate the model by connecting multi-commodity products’ continuous and discrete variables; (iii) SCUC models with AC power flow constraints are far more complex due to massive bilinear terms in the large-scale nonlinear power balance equations. The nonlinear power balance equations are further complicated by the discrete step control variables of shunts; (iv) N − 1 contingency analysis. The size of the model increases linearly with the number of contingencies considered, greatly increasing the size of the optimization model. Accordingly, there is an emergent need to develop a robust algorithm capable of deriving a high-quality solution in a short time and passing through contingency tests simultaneously. In this project, we explore innovative techniques to address this challenging problem by integrating advanced polyhedral theory, approximation methods, relaxation strategies, decomposition techniques, and parallel computing. Each technique approaches the problem from a different perspective, leveraging its specific strengths to tackle distinct challenges. Each individual method has demonstrated its effectiveness in the PI’s previous research. Their integration is expected to significantly reduce the computational time required to solve the proposed complex problem. Successful completion of this project has the potential to transform the industry by enhancing optimization solvers capable of handling large-scale day-ahead energy market clearing models within strict time constraints, while incorporating AC power flow constraints. This advancement will lead to reduced overall generation costs and, consequently, increased social welfare.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Zirconium Hydride Space Power Reactor design.

The Zirconium Hydride Space Power Reactor being designed and fabricated at Atomics International is intended for a wide range of potential applications. Throughout the program a series of reactor designs have been evaluated to establish the unique requirements imposed by coupling with various power conversion systems and for specific applications. Current design and development emphasis is upon a 100 kilowatt thermal reactor for application in a 5 kwe thermoelectric space power generating system, which is scheduled to be fabricated and ground tested in the mid 70s. The reactor design considerations reviewed in this paper will be discussed in the context of this 100 kwt reactor and a 300 kwt reactor previously designed for larger power demand applications.

Asquith, J. G.↗

The terminal area automated path generation problem

The automated terminal area path generation problem in the advanced Air Traffic Control System (ATC), has been studied. Definitions, input, output and the interrelationships with other ATC functions have been discussed. Alternatives in modeling the problem have been identified. Problem formulations and solution techniques are presented. In particular, the solution of a minimum effort path stretching problem (path generation on a given schedule) has been carried out using the Newton-Raphson trajectory optimization method. Discussions are presented on the effect of different delivery time, aircraft entry position, initial guess on the boundary conditions, etc. Recommendations are made on real-world implementations.

Hsin, C.-C.↗

Dynamic scheduling of runway operations

Automated ATM/C decision making is discussed. Runway scheduling and flight plan generator algorithms are considered. Terminal area geometry, ATM/C schematics, vector controller display and simulation work are reported.

Pararas, J.↗

Parallelization of the Pipelined Thomas Algorithm

In this study the following questions are addressed. Is it possible to improve the parallelization efficiency of the Thomas algorithm? How should the Thomas algorithm be formulated in order to get solved lines that are used as data for other computational tasks while processors are idle? To answer these questions, two-step pipelined algorithms (PAs) are introduced formally. It is shown that the idle processor time is invariant with respect to the order of backward and forward steps in PAs starting from one outermost processor. The advantage of PAs starting from two outermost processors is small. Versions of the pipelined Thomas algorithms considered here fall into the category of PAs. These results show that the parallelization efficiency of the Thomas algorithm cannot be improved directly. However, the processor idle time can be used if some data has been computed by the time processors become idle. To achieve this goal the Immediate Backward pipelined Thomas Algorithm (IB-PTA) is developed in this article. The backward step is computed immediately after the forward step has been completed for the first portion of lines. This enables the completion of the Thomas algorithm for some of these lines before processors become idle. An algorithm for generating a static processor schedule recursively is developed. This schedule is used to switch between forward and backward computations and to control communications between processors. The advantage of the IB-PTA over the basic PTA is the presence of solved lines, which are available for other computations, by the time processors become idle.

Povitsky, A.↗

The HST/STIS Next Generation Spectral Library

During Cycles 10, 12, and 13, we obtained STIS G230LB, G430L, and G750L spectra of 378 bright stars covering a wide range in abundance, effective temperature, and luminosity. This HST/STIS Next Generation Spectral Library was scheduled to reach its goal of 600 targets by the end of Cycle 13 when STIS came to an untimely end. Even at 2/3 complete, the library significantly improves the sampling of stellar atmosphere parameter space compared to most other spectral libraries by including the near-UV and significant numbers of metal poor and super-solar abundance stars. Numerous calibration challenges have been encountered, some expected, some not; these arise from the use of the E1 aperture location, non-standard wavelength calibration, and, most significantly, the serious contamination of the near-UV spectra by red light. Maximizing the utility of the library depends directly on overcoming or at least minimizing these problems, especially correcting the UV spectra.

Gregg, M. D.↗

A Simulation Testbed for Airborne Merging and Spacing

The key innovation in this effort is the development of a simulation testbed for airborne merging and spacing (AM&S). We focus on concepts related to airports with Super Dense Operations where new airport runway configurations (e.g. parallel runways), sequencing, merging, and spacing are some of the concepts considered. We focus on modeling and simulating a complementary airborne and ground system for AM&S to increase efficiency and capacity of these high density terminal areas. From a ground systems perspective, a scheduling decision support tool generates arrival sequences and spacing requirements that are fed to the AM&S system operating on the flight deck. We enhanced NASA's Airspace Concept Evaluation Systems (ACES) software to model and simulate AM&S concepts and algorithms.

Santos, Michel↗

Human Systems Integration in Practice: Constellation Lessons Learned

NASA's Constellation program provided a unique testbed for Human Systems Integration (HSI) as a fundamental element of the Systems Engineering process. Constellation was the first major program to have HSI mandated by NASA's Human Rating document. Proper HSI is critical to the success of any project that relies on humans to function as operators, maintainers, or controllers of a system. HSI improves mission, system and human performance, significantly reduces lifecycle costs, lowers risk and minimizes re-design. Successful HSI begins with sufficient project schedule dedicated to the generation of human systems requirements, but is by no means solely a requirements management process. A top-down systems engineering process that recognizes throughout the organization, human factors as a technical discipline equal to traditional engineering disciplines with authority for the overall system. This partners with a bottoms-up mechanism for human-centered design and technical issue resolution. The Constellation Human Systems Integration Group (HSIG) was a part of the Systems Engineering and Integration (SE&I) organization within the program office, and existed alongside similar groups such as Flight Performance, Environments & Constraints, and Integrated Loads, Structures and Mechanisms. While the HSIG successfully managed, via influence leadership, a down-and-in Community of Practice to facilitate technical integration and issue resolution, it lacked parallel top-down authority to drive integrated design. This presentation will discuss how HSI was applied to Constellation, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers. This presentation will discuss how Human Systems Integration (HSI) was applied to NASA's Constellation program, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers on how to accomplish this critical function.

Zumbado, Jennifer Rochlis↗

Orion GNC Mitigation Efforts for Van Allen Radiation

The Orion Crew Module (CM) is NASA's next generation manned space vehicle, scheduled to return humans to lunar orbit in the coming decade. The Orion avionics and GN&C architectures have progressed through a number of project phases and are nearing completion of a major milestone. The first unmanned test mission, dubbed "Exploration Flight Test One" (EFT-1) is scheduled to launch from NASA Kennedy Space Center late next year and provides the first integrated test of all the vehicle systems, avionics and software. The EFT-1 mission will be an unmanned test flight that includes a high speed re-entry from an elliptical orbit, which will be launched on an expendable launch vehicle (ELV). The ELV will place CM and the ELV upper stage into a low Earth orbit (LEO) for one revolution. After the first LEO, the ELV upper stage will re-ignite and place the combined upper stage/CM into an elliptical orbit whose perigee results in a high energy entry to test CM response in a relatively high velocity, high heating environment. While not producing entry velocities as high as those experienced in returning from a lunar orbit, the trajectory was chosen to provide higher stresses on the thermal protection and guided entry systems, as compared against a lower energy LEO entry. However the required entry geometry with constraints on inclination and landing site result in a trajectory that lingers for many hours in the Van Allen radiation belts. This exposes the vehicle and avionics to much higher levels of high energy proton radiation than a typical LEO or lunar trajectory would encounter. As a result, Van Allen radiation poses a significant risk to the Orion avionics system, and particularly the Flight Control Module (FCM) computers that house the GN&C flight software. The measures taken by the Orion GN&C, Flight Software and Avionics teams to mitigate the risks associated with the Van Allen radiation on EFT-1 are covered in the paper. Background on the Orion avionics subsystem is provided, as well as an overview of the GN&C software architecture. The measures taken to handle radiation induced failure of the one or both of the FCM's are presented, and finally simulation and actual hardware-in-the-loop (HWIL) results are shown confirming the validity of the implementation. The paper presents an overview of the Orion avionics architecture describing the GNC sensors, onboard data network as well as the flight control computers and their planned restart capabilities. GN&C sensors include two Orion Inertial Measurement Units (OIMU's), a Vision Processing Unit (VPU) to process camera images, three barometric altimeters and a single GPS receiver. All of the sensors communicate to one of two Power and Data Units (PDU's). The PDU's multiplex analog and serial data from the sensors and write the data to the Orion Data Network (ODN). The OIMU s write measurement messages directly as onto the ODN, but they are routed through PDU network switches.

King, Ellis T.↗

Orion GN and C Mitigation Efforts for Van Allen Radiation

The Orion Crew Module (CM) is NASA's next generation manned space vehicle, scheduled to return humans to lunar orbit in the coming decade. The Orion avionics and GN&C architectures have progressed through a number of project phases and are nearing completion of a major milestone. The first unmanned test mission, dubbed "Exploration Flight Test One" (EFT-1) is scheduled to launch from NASA Kennedy Space Center late next year and provides the first integrated test of all the vehicle systems, avionics and software.

King, Ellis T.↗

GOES-R Dual Isolation

The Geostationary Operational Environmental Satellite-R Series (GOES-R) is the first of the next generation geostationary weather satellites, scheduled for delivery in late 2015. GOES-R represents a quantum increase in Earth and solar weather observation capabilities, with 4 times the resolution, 5 times the observation rate, and 3 times the number of spectral bands for Earth observations. With the improved resolution, comes the instrument suite's increased sensitive to disturbances over a broad spectrum 0-512 Hz. Sources of disturbance include reaction wheels, thruster firings for station keeping and momentum management, gimbal motion, and internal instrument disturbances. To minimize the impact of these disturbances, the baseline design includes an Earth Pointed Platform (EPP), a stiff optical bench to which the two nadir pointed instruments are collocated together with the Guidance Navigation & Control (GN&C) star trackers and Inertial Measurement Units (IMUs). The EPP is passively isolated from the spacecraft bus with Honeywell D-Strut isolators providing attenuation for frequencies above approximately 5 Hz in all six degrees-of-freedom. A change in Reaction Wheel Assembly (RWA) vendors occurred very late in the program. To reduce the risk of RWA disturbances impacting performance, a secondary passive isolation system manufactured by Moog CSA Engineering was incorporated under each of the six 160 Nms RWAs, tuned to provide attenuation at frequencies above approximately 50 Hz. Integrated wheel and isolator testing was performed on a Kistler table at NASA Goddard Space Flight Center. High fidelity simulations were conducted to evaluate jitter performance for four topologies: 1) hard mounted no isolation, 2) EPP isolation only, 2) RWA isolation only, and 4) dual isolation. Simulation results demonstrate excellent performance relative to the pointing stability requirements, with dual isolated Line of Sight (LOS) jitter less than 1 micron rad.

GN&C Engineering↗

Performance Evaluation of the Approaches and Algorithms for Hamburg Airport Operations

The German Aerospace Center (DLR) and the National Aeronautics and Space Administration (NASA) have been independently developing and testing their own concepts and tools for airport surface traffic management. Although these concepts and tools have been tested individually for European and US airports, they have never been compared or analyzed side-by-side. This paper presents the collaborative research devoted to the evaluation and analysis of two different surface management concepts. Hamburg Airport was used as a common test bed airport for the study. First, two independent simulations using the same traffic scenario were conducted: one by the DLR team using the Controller Assistance for Departure Optimization (CADEO) and the Taxi Routing for Aircraft: Creation and Controlling (TRACC) in a real-time simulation environment, and one by the NASA team based on the Spot and Runway Departure Advisor (SARDA) in a fast-time simulation environment. A set of common performance metrics was defined. The simulation results showed that both approaches produced operational benefits in efficiency, such as reducing taxi times, while maintaining runway throughput. Both approaches generated the gate pushback schedule to meet the runway schedule, such that the runway utilization was maximized. The conflict-free taxi guidance by TRACC helped avoid taxi conflicts and reduced taxiing stops, but the taxi benefit needed be assessed together with runway throughput to analyze the overall performance objective.

air traffic management↗

Performance Evaluation of the Approaches and Algorithms using Hamburg Airport Operations

The German Aerospace Center (DLR) and the National Aeronautics and Space Administration (NASA) have been independently developing and testing their own concepts and tools for airport surface traffic management. Although these concepts and tools have been tested individually for European and US airports, they have never been compared or analyzed side-by-side. This paper presents the collaborative research devoted to the evaluation and analysis of two different surface management concepts. Hamburg Airport was used as a common test bed airport for the study. First, two independent simulations using the same traffic scenario were conducted: one by the DLR team using the Controller Assistance for Departure Optimization (CADEO) and the Taxi Routing for Aircraft58; Creation and Controlling (TRACC) in a real-time simulation environment, and one by the NASA team based on the Spot and Runway Departure Advisor (SARDA) in a fast-time simulation environment. A set of common performance metrics was defined. The simulation results showed that both approaches produced operational benefits in efficiency, such as reducing taxi times, while maintaining runway throughput. Both approaches generated the gate pushback schedule to meet the runway schedule, such that the runway utilization was maximized. The conflict-free taxi guidance by TRACC helped avoid taxi conflicts and reduced taxiing stops, but the taxi benefit needed be assessed together with runway throughput to analyze the overall performance objective.

Airport surface operations↗

Performance Evaluation of the Approaches and Algorithms Using Hamburg Airport Operations

The German Aerospace Center (DLR) and the National Aeronautics and Space Administration (NASA) have been independently developing and testing their own concepts and tools for airport surface traffic management. Although these concepts and tools have been tested individually for European and US airports, they have never been compared or analyzed side-by-side. This paper presents the collaborative research devoted to the evaluation and analysis of two different surface management concepts. Hamburg Airport was used as a common test bed airport for the study. First, two independent simulations using the same traffic scenario were conducted; one by the DLR team using the Controller Assistance for Departure Optimization (CADEO) and the Taxi Routing for Aircraft: Creation and Controlling (TRACC) in a real-time simulation environment, and one by the NASA team based on the Spot and Runway Departure Advisor (SARDA) in a fast-time simulation environment. A set of common performance metrics was defined. The simulation results showed that both approaches produced operational benefits in efficiency, such as reducing taxi times, while maintaining runway throughput. Both approaches generated the gate pushback schedule to meet the runway schedule, such that the runway utilization was maximized. The conflict-free taxi guidance by TRACC helped avoid taxi conflicts and reduced taxiing stops, but the taxi benefit needed be assessed together with runway throughput to analyze the overall performance objective.

nasa-dlr research collaboration↗

Improvements to Integrated Tradespace Analysis of Communications Architectures (ITACA) Network Loading Analysis Tool

NASA's SCENIC project aims to simplify and reduce the cost of space mission planning by replicating the analysis capabilities of commercially licensed software which are integrated with relevant analysis parameters specific to SCaN assets and SCaN supported user missions. SCENIC differs from current tools that perform similar analyses in that it 1) does not require any licensing fees, 2) will provide an all-in-one package for various analysis capabilities that normally requires add-ons or multiple tools to complete. As part of SCENIC's capabilities, the ITACA network loading analysis tool will be responsible for assessing the loading on a given network architecture and generating a network service schedule. ITACA will allow users to evaluate the quality of service of a given network architecture and determine whether or not the architecture will satisfy the mission's requirements. ITACA is currently under development, and the following improvements were made during the fall of 2017: optimization of runtime, augmentation of network asset pre-service configuration time, augmentation of Brent's method of root finding, augmentation of network asset FOV restrictions, augmentation of mission lifetimes, and the integration of a SCaN link budget calculation tool. The improvements resulted in (a) 25% reduction in runtime, (b) more accurate contact window predictions when compared to STK(Registered Trademark) contact window predictions, and (c) increased fidelity through the use of specific SCaN asset parameters.

analysis↗

The Power of Pausing: Advancing Understanding of Thermalization in Experimental Quantum Annealers

We investigate alternative annealing schedules on the current generation of quantum annealing hardware (the D-Wave 2000Q), which includes the use of forward and reverse annealing with an- intermediate pause. This work provides new insights into the inner workings of these devices (and quantum devices in general), particular into how thermal effects govern the system dynamics. We show that a pause mid-way through the anneal can cause a dramatic change in the output distribution, and we provide evidence suggesting thermalization is indeed occurring during such a pause. We demonstrate that upon pausing the system in a narrow region shortly after the minimum gap, the probability of successfully finding the ground state of the problem Hamiltonian can be increased by several orders of magnitude. We relate this effect to relaxation (i.e. thermalization) after diabatic and thermal excitations that occur in the region near to the minimum gap. For a set of large-scale problems of up to 500 qubits, we demonstrate that the distribution returned from the annealer very closely matches a (classical) Boltzmann distribution of the problem Hamiltonian, albeit one with a temperature at least 1.5 times higher than the (effective) temperature of the device. Moreover, we show that larger problems are more likely to thermalize to a classical Boltzmann distribution.

Marshall, Jeffrey↗