Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Functional priors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Hardware Development Process for Human Research Facility Applications

The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. The source of hardware requirements is the science community and HRF program. The HRF Science Working Group, consisting of SCientists from various medical disciplines, defined a basic set of equipment with functional requirements. This established the performance requirements of the hardware. HRF program requirements focus on making the hardware safe and operational in a space environment. This includes structural, thermal, human factors, and material requirements. Science and HRF program requirements are defined in a hardware requirements document which includes verification methods. Once the hardware is fabricated, requirements are verified by inspection, test, analysis, or demonstration. All data is compiled and reviewed to certify the hardware for flight. Obviously, the basis for all hardware development activities is requirement definition. Full and complete requirement definition is ideal prior to initiating the hardware development. However, this is generally not the case, but the hardware team typically has functional inputs as a guide. The first step is for engineers to conduct market research based on the functional inputs provided by scientists. CommerCially available products are evaluated against the science requirements as well as modifications needed to meet program requirements. Options are consolidated and the hardware development team reaches a hardware development decision point. Within budget and schedule constraints, the team must decide whether or not to complete the hardware as an in-house, subcontract with vendor, or commercial-off-the-shelf (COTS) development. An in-house development indicates NASA personnel or a contractor builds the hardware at a NASA site. A subcontract development is completed off-site by a commercial company. A COTS item is a vendor product available by ordering a specific part number. The team evaluates the pros and cons of each development path. For example, in-bouse developments utilize existing corporate knowledge regarding bow to build equipment for use in space. However, technical expertise would be required to fully understand the medical equipment capabilities, such as for an ultrasound system. It may require additional time and funding to gain the expertise that commercially exists. The major benefit of subcontracting a hardware development is the product is delivered as an end-item and commercial expertise is utilized. On the other hand, NASA has limited control over schedule delays. The final option of COTS or modified COTS equipment is a compromise between in-house and subcontracts. A vendor product may exist that meets all functional requirements but req uires in-house modifications for successful operation in a space environment. The HRF utilizes equipment developed using all of the paths described: inhouse, subcontract, and modified COTS.

Bauer, Liz↗

IUS/TUG orbital operations and mission support study. Volume 3: Space tug operations

A study was conducted to develop space tug operational concepts and baseline operations plan, and to provide cost estimates for space tug operations. Background data and study results are presented along with a transition phase analysis (the transition from interim upper state to tug operations). A summary is given of the tug operational and interface requirements with emphasis on the on-orbit checkout requirements, external interface operational requirements, safety requirements, and system operational interface requirements. Other topics discussed include reference missions baselined for the tug and details for the mission functional flows and timelines derived for the tug mission, tug subsystems, tug on-orbit operations prior to the tug first burn, spacecraft deployment and retrieval by the tug, operations centers, mission planning, potential problem areas, and cost data.

Source record↗

The Pioneer Projects - Economical exploration of the solar system

The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of various organizational elements of the project are described. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

Spahr, J. R.↗

Navigating the Viking landers

On July 20, 1976, Viking Lander 1 became the first unmanned spacecraft to land and operate successfully on the planet Mars. This was followed by a second successful landing on September 3, 1976. This paper gives a detailed description of the autonomous on-board navigation process to perform the guidance, control, and entry navigation functions. Also, the functions performed on the ground to generate and validate the guidance commands sent to the spacecraft prior to descent are described. In-flight measures of navigation system performance are compared against a-priori error estimates to show that the descents were completely nominal in all respects. The final landing errors were 25 km and 10 km for Missions 1 and 2, respectively.

Euler, E. A.↗

Reliability Sensitivity Analysis and Design Optimization of Composite Structures Based on Response Surface Methodology

This report discusses the development and application of two alternative strategies in the form of global and sequential local response surface (RS) techniques for the solution of reliability-based optimization (RBO) problems. The problem of a thin-walled composite circular cylinder under axial buckling instability is used as a demonstrative example. In this case, the global technique uses a single second-order RS model to estimate the axial buckling load over the entire feasible design space (FDS) whereas the local technique uses multiple first-order RS models with each applied to a small subregion of FDS. Alternative methods for the calculation of unknown coefficients in each RS model are explored prior to the solution of the optimization problem. The example RBO problem is formulated as a function of 23 uncorrelated random variables that include material properties, thickness and orientation angle of each ply, cylinder diameter and length, as well as the applied load. The mean values of the 8 ply thicknesses are treated as independent design variables. While the coefficients of variation of all random variables are held fixed, the standard deviations of ply thicknesses can vary during the optimization process as a result of changes in the design variables. The structural reliability analysis is based on the first-order reliability method with reliability index treated as the design constraint. In addition to the probabilistic sensitivity analysis of reliability index, the results of the RBO problem are presented for different combinations of cylinder length and diameter and laminate ply patterns. The two strategies are found to produce similar results in terms of accuracy with the sequential local RS technique having a considerably better computational efficiency.

Rais-Rohani, Masoud↗

Equipment for On-Wafer Testing From 220 to 325 GHz

A system of electronic instrumentation, constituting the equivalent of a two-port vector network analyzer, has been developed for use in on-wafer measurement of key electrical characteristics of semiconductor devices at frequencies from 220 to 325 GHz. A prior system designed according to similar principles was reported in Equipment for On-Wafer Testing at Frequencies Up to 220 GHz (NPO-20760), NASA Tech Briefs, Vol. 25, No. 11 (November 2001), page 42. As one would expect, a major source of difficulty in progressing to the present higher-frequency-range system was the need for greater mechanical precision as wavelengths shorten into the millimeter range, approaching the scale of mechanical tolerances of prior systems. The system (see figure) includes both commercial off-the-shelf and custom equipment. As in the system of the cited prior article, the equipment includes test sets that are extended versions of commercial network analyzers that function in a lower frequency range. The extension to the higher frequency range is accomplished by use of custom frequency-extension modules that contain frequency multipliers and harmonic mixers. On-wafer measurement is made possible by waveguide wafer probes that were custom designed and built for this wavelength range, plus an on-wafer calibration substrate designed for use with these probes. In this case, the calibration substrate was specially fabricated by laser milling. The system was used to make the first on-wafer measurements of a semiconductor device in the frequency range from 220 to 320 GHz. Some of the measurement results showed that the device had gain.

Samoska, Lorene↗

L-Band Digital Aeronautical Communications System Engineering - Concepts of Use, Systems Performance, Requirements, and Architectures

This NASA Contractor Report summarizes and documents the work performed to develop concepts of use (ConUse) and high-level system requirements and architecture for the proposed L-band (960 to 1164 MHz) terrestrial en route communications system. This work was completed as a follow-on to the technology assessment conducted by NASA Glenn Research Center and ITT for the Future Communications Study (FCS). ITT assessed air-to-ground (A/G) communications concepts of use and operations presented in relevant NAS-level, international, and NAS-system-level documents to derive the appropriate ConUse relevant to potential A/G communications applications and services for domestic continental airspace. ITT also leveraged prior concepts of use developed during the earlier phases of the FCS. A middle-out functional architecture was adopted by merging the functional system requirements identified in the bottom-up assessment of existing requirements with those derived as a result of the top-down analysis of ConUse and higher level functional requirements. Initial end-to-end system performance requirements were derived to define system capabilities based on the functional requirements and on NAS-SR-1000 and the Operational Performance Assessment conducted as part of the COCR. A high-level notional architecture of the L-DACS supporting A/G communication was derived from the functional architecture and requirements.

Zelkin, Natalie↗

Post Flight Reconditioning for US Astronauts Returning from the International Space Station

Prior to spaceflight, each astronaut undergoes medical requirement testing to establish a preflight baseline for physiologic functions. Astronauts returning from the International Space Station can experience deficits in all or some of the following areas: aerobic capacity, muscular strength, power, endurance, stamina, bone, balance, agility, coordination, orthostatic tolerances, proprioception, neurovestibular function and flexibility. These losses occur from living in microgravity and are consistent with deficits seen in terrestrial, de-conditioning individuals. Since 2001, the Astronaut Strength, Conditioning and Rehabilitation (ASCR) specialists have administered a reconditioning program, focusing on all deficits, which improves the physical condition of all returning astronauts. In most cases, astronauts have reached or surpassed their preflight physical condition. Purpose: This presentation will describe and explain the postflight reconditioning program for returning astronauts. Methods: The postflight reconditioning program is designed to stress the body systems that affect the following: aerobic capacity, muscular strength, power, endurance, stamina, bone, balance, agility, coordination, orthostatic tolerances, proprioception, neurovestibular function and flexibility. Postflight reconditioning begins on landing day, is scheduled for two hours per day, 7 days a week for 45 days and is tailored to the specific needs of the astronaut. Initially the program focuses on basic ambulation, cardiovascular endurance, strength, balance, flexibility and proprioception. The program advances through 45 days and specific attention is given to each astronaut s overall condition, testing results, medical status, and assigned duties after their mission. Conclusion: Astronauts will experience noticeable deficits in their physical condition after living in microgravity for an extended length of time. After completing postflight reconditioning, it is shown that astronauts have regained, and in most cases improved upon, their preflight baseline condition.

Nieschwitz, Bruce↗

Improved Whole-Blood-Staining Device

Dramatic improvements have been made in NASA s Whole Blood Staining Device (WBSD) since it was last described in "Whole-Blood-Staining Device," NASA Tech Briefs, Vol. 23, No. 10 (October 1999), page 64. The new system has a longer shelf life, a simpler and more effective operational procedure, improved interface with instrumentation, and shorter processing time. More specifically, the improvements have targeted bag and locking clip materials, sampling ports, and air pocket prevention. The WBSD stains whole blood collected during spaceflight for subsequent flow cytometric analysis. In short, the main device stains white blood cells by use of monoclonal antibodies conjugated to various fluorochromes, followed by lysing and fixing of the cells by use of a commercial reagent that has been diluted according to NASA safety standards. This system is compact, robust, and does not require electric power, precise mixing, or precise incubation times. Figure 1 depicts the present improved version for staining applications, which is a poly(tetrafluoroethylene) bag with a Luer-lock port and plastic locking clips. An InterLink (or equivalent) intravenous- injection port screws into the Luer-lock port. The inflatable/collapsible nature of the bag facilitates loading and helps to minimize the amount of air trapped in the fully loaded bag. Some additional uses have been identified for the device beyond whole blood staining. The WBSD has been configured for functional assays that require culture of live cells by housing sterile culture media, mitogens, and fixatives prior to use [Figure 2(a)]. Simple injection of whole blood allows cell-stimulation culture to be performed in reduced gravity conditions, and product stabilization prior to storage, while protecting astronauts from liquid biohazardous materials. Also, the improved WBSD has reconstituted powdered injectable antibiotics by mixing them with diluent liquids [Figure 2(b)]. Although such mixing can readily be performed on Earth by shaking in glass vials, it cannot readily be performed this way in outer space without entraining air bubbles. The present device can be preloaded with the powder and diluent(s) in separate compartments. The powder and diluent( s) can be mixed, without introducing air bubbles, by removing the clip(s), then shaking. This use of the device could also be advantageous in terrestrial applications because it maintains the isolation of the constituents until the time of use.

Sams, Clarence F.↗

Structural Analysis of Test Flight Vehicles for Application of Multifunctional Energy Storage System

Under the NASA Aeronautics Research Mission Directorate (ARMD) Convergent Aeronautical Solutions (CAS) project, NASA Glenn Research Center has been leading Multifunctional Structures for High Energy Lightweight Load-bearing Storage (M-SHELLS) research efforts. The technology of integrating load-carrying structures with electrical energy storage capacity has the potential to reduce the overall weight of future electric aircraft. The proposed project goals were to develop M-SHELLS in the form of honeycomb coupons and subcomponents, integrate them into the structure, and conduct low-risk flight-tests onboard a remotely piloted small aircraft. Experimental M-SHELLS energy-storing coupons were fabricated and tested in the laboratory for their electrical and mechanical properties. In this report, finite element model development and structural analyses of two small test aircraft candidates are presented. The finite element analysis of the initial two-spar wing is described for strain, deflection, and weight estimation. After a test aircraft Tempest was acquired, a load-deflection test of the wing was conducted. A finite element model of the Tempest was then developed based on the test aircraft dimensions and construction detail. The component weight analyses from the finite element model and test measurements were correlated. Structural analysis results with multifunctional energy storage panels in the fuselage of the test vehicle are presented. Although the flight test was cancelled because of programmatic reasons and time constraints, the structural analysis results indicate that the mid-fuselage floor composite panel could provide structural integrity with minimal weight penalty while supplying electrical energy. To explore potential future applications of the multifunctional structure, analyses of the NASA X-57 Maxwell electric aircraft and a NASA N+3 Technology Conventional Configuration (N3CC) fuselage are presented. Secondary aluminum structures in the fuselage sub-floor and cargo area were partially replaced with reinforced five-layer composite panels with M-SHELLS honeycomb core. The N3CC fuselage weight reduction associated with each design without risking structural integrity are described. The structural analysis and weight estimation with the application of composite M-SHELLS panels to the N3CC fuselage indicate a 3.2% reduction in the fuselage structural weight, prior to accounting for the additional weight of core material required to complete the energy storage functionality.

Mukhopadhyay, Vivek↗

Structural Analysis of Test Flight Vehicles with Multifunctional Energy Storage

Under the NASA Aeronautics Research Mission Directorate (ARMD) Convergent Aeronautical Solutions (CAS) project, NASA Glenn Research Center has been leading Multifunctional Structures for High Energy Lightweight Load-bearing Storage (M-SHELLS) research efforts. The technology of integrating load-carrying structures with electrical energy storage capacity has the potential to reduce the overall weight of future electric aircraft. The proposed project goals were to develop M-SHELLS in the form of honeycomb coupons and subcomponents, integrate them into the structure, and conduct low-risk flight tests onboard a remotely piloted small aircraft. Experimental M-SHELLS energy-storing coupons were fabricated and tested in the laboratory for their electrical and mechanical properties. In this paper, finite element model development and structural analyses of two small test aircraft candidates are presented. The finite element analysis of the initial two-spar wing is described for strain, deflection, and weight estimation. After a test aircraft Tempest was acquired, a load- deflection test of the wing was conducted. A finite element model of the Tempest was then developed based on the test aircraft dimensions and construction detail. The component weight analysis from the finite element model and test measurements were correlated. Structural analysis results with multifunctional energy storage panels in the fuselage of the test vehicle are presented. Although the flight test was cancelled because of programmatic reasons and time constraints, the structural analysis results indicate that the mid-fuselage floor composite panel could provide structural integrity with minimal weight penalty while supplying electrical energy. To explore potential future applications of the multifunctional structure, analyses of the NASA X-57 Maxwell electric aircraft and a NASA N+3 Technology Conventional Configuration (N3CC) fuselage are presented. Secondary aluminum structure in the fuselage sub-floor and cargo area were partially replaced with reinforced five-layer composite panels with M-SHELLS honeycomb core. The N3CC fuselage weight reduction associated with each design without risking structural integrity are described. The structural analysis and weight estimation with the application of composite M-SHELLS panels to the N3CC fuselage indicate a 3.2% reduction in the fuselage structural weight, prior to accounting for the additional weight of core material required to complete the energy storage functionality.

Mukhopadhyay, Vivek↗

Validation of Fitness for Duty Standards Using Pre- and Post-Flight Capsule Egress and Suited Functional Performance Tasks in Simulated Reduced Gravity (Pilot Egress Fitness)

As NASA prepares for exploration missions, it will be critical to understand and build upon known crew capabilities. Specifically, we need to know the functional capacities of crew at different stages of a mission and characterize these profiles so that the appropriate vehicle requirements and mission concepts of operations (ConOps) can be developed. One of the most complex phases of any missions is when there is a transition between gravity environments. For instance, both physiological adaptation to microgravity and subsequent re-entry into a gravity environment result in reduced functional capacity, even with rigorous adherence to inflight countermeasures. Quantification of the astronauts’ post-landing functional performance is necessary to design ConOps for exploration missions. Specifically, these two high-risk tasks may have to be performed soon after gravity transitions: •Unassisted capsule egress task after return to Earth •Planetary extravehicular activity (EVA) soon after landing on Mars or the Moon This study has been broken down into two phases. A pilot phase to assess the overall feasibility and demonstrate the capability to do these tasks shortly after landing and the full Egress Fitness study, which will be part of the CIPHER complement. This study uses a functional task approach to characterize performance of these high-risk tasks in long-duration ISS crewmembers before flight and shortly after return to Earth. Prior to any testing, each astronaut subject completes a suit fit check to ensure adequate sizing and mobility to be able to complete the EVA tasks. Pilot Egress Fitness pre-flight and post-flight testing includes an Earth based emergency egress out of a functional capsule mockup, and a short Mars gravity EVA simulation including suit donning, hatch egress, ladder descent, task board cable operations, baggage transfer over sand/rocky regolith, alignment with a rear entry port, and suit egress. Pre-flight testing can occur almost anytime pre-flight, but post-flight scheduling is much more critical with the capsule egress test occurring 1-4 hours after landing and the planetary EVA approximately 18-36 hours after landing. Data collected for both tasks includes task completion time, photo, and video. The EVA portion also includes collection of metabolic and heart rate. Pilot Egress Fitness study has completed baseline pre-flight testing on 3 astronaut subjects. Post-flight testing of the first two subjects will be completed in November 2021 and the final subject around March 2022. Results and lessons learned from this pilot study will inform the full Egress Fitness study, which will incorporate additional pre-flight sessions, longer EVA tasks, and post-flight testing on R+1, 4, and 7 to characterize the timeframe of recovery

J R Norcross↗

An EXPRESS Rack Overview and Support for Microgravity Research on the International Space Station (ISS)

The EXpedite the PRocessing of Experiments to Space Station or EXPRESS Rack System has provided accommodations and facilitated operations for microgravity-based research payloads for over 6 years on the International Space Station (ISS). The EXPRESS Rack accepts Space Shuttle middeck type lockers and International Subrack Interface Standard (ISIS) drawers, providing a modular-type interface on the ISS. The EXPRESS Rack provides 28Vdc power, Ethernet and RS-422 data interfaces, thermal conditioning, vacuum exhaust, and Nitrogen supply for payload use. The EXPRESS Rack system also includes payload checkout capability with a flight rack or flight rack emulator prior to launch, providing a high degree of confidence in successful operations once an-orbit. In addition, EXPRESS trainer racks are provided to support crew training of both rack systems and subrack operations. Standard hardware and software interfaces provided by the EXPRESS Rack simplify the integration processes for ISS payload development. The EXPRESS Rack is designed to accommodate multidiscipline research, allowing for the independent operation of each subrack payload within a single rack. On-orbit operations began for the EXPRESS Rack Project on April 24, 2001, with one rack operating continuously to support high-priority payloads. The other on-orbit EXPRESS Racks operate based on payload need and resource availability. Over 50 multi-discipline payloads have now been supported on-orbit by the EXPRESS Rack Program. Sustaining engineering, logistics, and maintenance functions are in place to maintain hardware, operations and provide software upgrades. Additional EXPRESS Racks are planned for launch prior to ISS completion in support of long-term operations and the planned transition of the U.S. Segment to a National Laboratory.

Pelfrey, Joseph J.↗

The Second European Service Module (ESM-2) Evolutions, Production and Challenges

This paper presents an overview of the Second European Service Module (ESM-2), the second in a series of European Service Modules produced as part of the Barter agreement between NASA and ESA for the Orion Program. The European Industrial consortium is led by the ESA prime contractor Airbus Defence and Space in Bremen. ESA and Airbus signed the ESM-2 contract on 16 February 2017, for this key element of the Orion Exploration Mission 2 (EM-2). EM-2 is the first crewed mission for Orion and will take astronauts farther into the solar system than humanity has ever travelled. EM-2 will also be a historic mission for Europe, as the ESM-2 will be the first European spacecraft to be part of a human transportation system carrying humans beyond low Earth orbit. ESM-2 is mainly a recurring production following ESM-1. Nevertheless, there are a number of important changes being implemented, for example, to incorporate upgrades to further enhance safety and reliability. The challenging delivery schedule for ESM-2 has driven the need to commence manufacturing prior to completion of the qualification on ESM-1. In addition, some requirement deviations and non-compliances approved for ESM-1 have resulted in modifications for ESM-2. In order to manage the competing constraints effectively, the ESM-2 Team has put in place a number of novel approaches to manage schedule, risk, and technical changes. Airbus has set up multi-functional teams according to an approach known as "Major Spacecraft Deliveries" consisting of quality assurance, engineering and procurement. The risk of starting manufacturing prior to qualification is managed through a special risk share agreement. This agreement necessitates rigorous risk reviews across the board for all manufacturing, assembly, integration and test milestones. The ESM-2 changes are managed by Configuration Management, but Airbus has also introduced the Technical Baseline Matrix to provide a transparent top-level overview of the changes from ESM-1 to ESM-2. The tool provides the basis for ESM-2 design and development needs, decisions, as well as the input for the Orion EM-2 Critical Design Review (CDR). The main technical evolutions, status of the production and the novel management approaches for ESM-2 are presented and discussed in the paper.

Orion European Service Module Programme↗

An Overview of the Mars Reconnaissance Orbiter (MRO) Science Mission

The Mars Reconnaissance Orbiter (MRO) is the latest addition to the suite of missions on or orbiting Mars as part of the NASA Mars Exploration Program. Launched on 12 August 2005, the orbiter successfully entered Mars orbit on 10 March 2006 and finished aerobraking on 30 August 2006. Now in its near-polar, near-circular, low-altitude (approximately 300 km), 3 p.m. orbit, the spacecraft is operating its payload of six scientific instruments throughout a one-Mars-year Primary Science Phase (PSP) of global mapping, regional survey, and targeted observations. Eight scientific investigations were chosen for MRO, two of which use either the spacecraft accelerometers or tracking of the spacecraft telecom signal to acquire data needed for analysis. Six instruments, including three imaging systems, a visible-near infrared spectrometer, a shallow-probing subsurface radar, and a thermal-infrared profiler, were selected to complement and extend the capabilities of current working spacecraft at Mars. Whether observing the atmosphere, surface, or subsurface, the MRO instruments are designed to achieve significantly higher resolution while maintaining coverage comparable to the current best observations. The requirements to return higher-resolution data, to target routinely from a low-altitude orbit, and to operate a complex suite of instruments were major challenges successfully met in the design and build of the spacecraft, as well as by the mission design. Calibration activities during the seven-month cruise to Mars and limited payload operations during a three-day checkout prior to the start of aerobraking demonstrated, where possible, that the spacecraft and payload still had the functions critical to the science mission. Two critical events, the deployment of the SHARAD radar antenna and the opening of the CRISM telescope cover, were successfully accomplished in September 2006. Normal data collection began 7 November 2006 after solar conjunction. As part of its science mission, MRO will also aid identification and characterization of the most promising sites for future landed missions, both in terms of safety and in terms of the scientific potential for future discovery. Ultimately, MRO data will advance our understanding of how Mars has evolved and by which processes that change occurs, all within a framework of identifying the presence, extent, and role of water in shaping the planet s climate over time.

astronomical instruments↗

Long Duration Wear Test of the NASA HERMeS Hall Thruster

The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5-kW Hall thruster is the subject of extensive technology maturation by NASA GRC and JPL in preparation for development into a flight propulsion system. As part of this on-going effort, a series of three wear tests have been conducted to identify erosion phenomena and the accompanying failure modes as well as to validate service-life models for magnetically-shielded thrusters. This paper presents an overview and summary of the results obtained over the first 1715 hours of the third wear test, which has the overall goal of serving as a pathfinder to identify and correct design or facility issues prior to the flight qualification campaign. Overall, negligible changes in performance and stability are observed as a function of operating time as well as relative to previous wear tests. Erosion of the inner and outer front pole covers is shown to vary by 76-300 percent as a function of discharge voltage and by up to 40 percent as a function of magnetic field strength. Shifting the cathode position upstream relative to the pole covers is shown to reduce keeper erosion rates by 84 percent, which supports this approach for mitigating the elevated keeper wear observed during previous wear tests.

Frieman, Jason D.↗

Long Duration Wear Test of the NASA HERMeS Hall Thruster

The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5-kW Hall thruster is the subject of extensive technology maturation by NASA GRC (Glenn Research Center) and JPL (Jet Propulsion Laboratory) in preparation for development into a flight propulsion system. As part of this on-going effort, a series of three wear tests have been conducted to identify erosion phenomena and the accompanying failure modes as well as to validate service-life models for magnetically-shielded thrusters. This paper presents an overview and summary of the results obtained over the first 1715 hours of the third wear test, which has the overall goal of serving as a pathfinder to identify and correct design or facility issues prior to the flight qualification campaign. Overall, negligible changes in performance and stability are observed as a function of operating time as well as relative to previous wear tests. Erosion of the inner and outer front pole covers is shown to vary by 76-300 percent as a function of discharge voltage and by up to 40 percent as a function of magnetic field strength. Shifting the cathode position upstream relative to the pole covers is shown to reduce keeper erosion rates by 84 percent, which supports this approach for mitigating the elevated keeper wear observed during previous wear tests.

Frieman, Jason D.↗

Long Duration Wear Test of the NASA HERMeS Hall Thruster

The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5-kW Hall thruster is the subject of extensive technology maturation by NASA GRC and JPL in preparation for development into a flight propulsion system. As part of this on-going effort, a series of three wear tests have been conducted to identify erosion phenomena and the accompanying failure modes as well as to validate service-life models for magnetically-shielded thrusters. This paper presents an overview and summary of the results obtained over the first 1715 hours of the third wear test, which has the overall goal of serving as a pathfinder to identify and correct design or facility issues prior to the flight qualification campaign. Overall, negligible changes in performance and stability are observed as a function of operating time as well as relative to previous wear tests. Erosion of the inner and outer front pole covers is shown to vary by 76-300 percent as a function of discharge voltage and by up to 40 percent as a function of magnetic field strength. Shifting the cathode position upstream relative to the pole covers is shown to reduce keeper erosion rates by 84 percent, which supports this approach for mitigating the elevated keeper wear observed during previous wear tests.

Frieman, Jason D.↗