NASA NTRS1998
The paper describes the unique pneumatic test requirements for the acoustic and shock separation testing of the Second Stage for the new Delta III Rocket at the Goddard Space Flight Center in Greenbelt, Maryland. The testing was conducted in the 45,000 cu ft (25-feet wide by 30-feet deep by 50-foot high) Acoustic Facility. The acoustic testing required that the liquid oxygen (LOX) and liquid hydrogen (LH2) tanks be filled with enough liquid nitrogen (LN2) to simulate launch fuel masses during testing. The challenge for this test dealt with designing, procuring, and fabricating the pneumatic supply systems for quick assembly while maintaining the purity requirements and minimizing costs. The pneumatic systems were designed to fill and drain the both LOX and LH2 tanks as well as to operate the fill/drain and vent valves for each of the tanks. The test criteria for the pneumatic sub-systems consisted of function, cleanliness, availability, and cost. The first criteria, function, required the tanks to be filled and drained in an efficient manner while preventing them from seeing pressures greater than 9 psig which would add a pressure cycle to the tank. An LN2 tanker, borrowed from another NASA facility, served as the pre-cool and drain tanker. Pre-cooling the tanks allowed for more efficient and cost effective transfer from the LN2 delivery tankers. Helium gas, supplied from a high purity tube trailer, was used to pressurize the vapor space above the LN2 pushing it into the drain tanker. The tube trailer also supplied high pressure helium to the vehicle for valve control and component purges. Cleanliness was maintained by proper component selection, end-use particle filtration, and any on-site cleaning determined necessary by testing. In order to meet the availability/cost juggling act, products designed for LOX delivery systems were procured to ensure system compatibility while off the shelf valves and tubing designed for the semiconductor industry were procured for the gas systems.