Geotechnical Analysis Report for July 2007-June 2008

This Geotechnical Analysis Report (GAR) presents and interprets geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2007, to June 30, 2008. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and hole observations. Chapter 8 summarizes the results of geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists references.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geotechnical Analysis Report for July 2008-June 2009

This Geotechnical Analysis Report (GAR) presents and interprets geotechnical data from the underground excavations at the Waste Isolation Pilot Plant (WIPP). The data, which are obtained as part of a regular monitoring program, are used to characterize conditions, to compare actual performance to the design assumptions, and to evaluate and forecast the performance of the underground excavations. GARs have been available to the public since 1983. During the Site and Preliminary Design Validation (SPDV) Program, the architect/engineer for the project produced these reports quarterly to document the geomechanical performance during and immediately after early excavations of the underground facility. Since completion of the construction phase of the project in 1987, the management and operating contractor for the facility has prepared these reports annually. This report describes the performance and condition of selected areas from July 1, 2008, to June 30, 2009. It is divided into nine chapters. Chapter 1 provides background information on WIPP, its mission, and the purpose and scope of the geomechanical monitoring program. Chapter 2 describes the local and regional geology of the WIPP site. Chapters 3 and 4 describe the geomechanical instrumentation in the shafts and shaft stations, present the data collected by that instrumentation, and provide interpretation of these data. Chapters 5 and 6 present the results of geomechanical monitoring in the two main portions of the WIPP underground (the access drifts and the waste disposal area). Chapter 7 discusses the results of the Geoscience Program, which include fracture mapping and hole observations. Chapter 8 summarizes the results of geomechanical monitoring and compares the current excavation performance to the design requirements. Chapter 9 lists references.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Curation of Federally Owned Archeological Collections at NASA Langley Research Center

As a Federal agency, NASA has a moral and legal obligation to the public to manage the archeological heritage resources under its control. Archeological sites are unique, nonrenewable resources that must be preserved so that future generations may experience and interpret the material remains of the past. These sites are protected by a wide array of federal regulations. These regulations are intended to ensure that our nation's cultural heritage is preserved for the study and enjoyment of future generations. Once a site has been excavated, all that remains of it are the artifacts and associated records which, taken together, allow researchers to reconstruct the past. With the contextual information provided by associated records such as field notes, maps and photographs, archeological collections can provide important information about life in the past. An integral component of the federal archeology program is the curation of these databases so that qualified scholars will have access to them in years to come. Standards for the maintenance of archeological collections have been codified by various professional organizations and by the federal government. These guidelines focus on providing secure, climate-controlled archival storage conditions for the collections and an adequate study area in which researchers can examine the artifacts and documents. In the 1970's and early 1980's, a group of NASA employees formed the LRC Historical and Archeological Society (LRCHAS) in order to pursue studies of the colonial plantations that ha been displaced by Langley Research Center (LaRC). They collected data on family histories and land ownership as well as conducting archeological surveys and excavations at two important 17th-20th century plantation sites in LaRC, Cloverdale and Chesterville. The excavations produced a wealth of information in the form of artifacts, photographs, maps and other documents. Unfortunately, interest on the part of the LRCHAS membership waned before a report was written, and since 1982 the artifacts have moldered in a flimsy trailer with no climate controls, which had once served as a field laboratory but which threatened to become a tomb for the collection. A recent analysis of Langley's cultural resources by Gray & Pape, Inc. recommended that the collection be organized, cataloged, and placed in a proper curation facility in accordance with Federal regulations. The project for the LARSS program was to research curation standards, organize the collection, catalog it, and prepare it for transfer to a facility which could provide adequate long-term curation conditions for the artifacts and documents. The first phase was to organize the artifacts, which were lying about the lab in various stages of cleaning, analysis, and conservation. Once all of the artifacts from the various excavation units and levels had been regrouped, they were cleaned and/or repackaged in archivally-stable materials. A basic catalog was prepared which will provide interested parties with a rough idea of what we have and where it can be found. Another aspect of the project was to organize the records left by the LRCHAS. Bundles of papers, photographs, and field data found in every corner and drawer of the laboratory trailer were put into order and, where appropriate, copies were made on acid-free Permabond paper for long term storage. Finally, the entire collection and most of the lab equipment was transferred into a secure, climate controlled room which will serve as an archive and study space for qualified scholars interested in exploring LaRC's rich historical heritage.

Eastman, John Arnold↗

Impact Cratering Calculations

Understanding the physical processes of impact cratering on planetary surfaces and atmospheres as well as collisions of finite-size self-gravitating objects is vitally important to planetary science. The observation has often been made that craters are the most ubiquitous landform on the solid planets and the satellites. The density of craters is used to date surfaces on planets and satellites. For large ringed basin craters (e.g. Chicxulub), the issue of identification of exactly what 'diameter' transient crater is associated with this structure is exemplified by the arguments of Sharpton et al. (1993) versus those of Hildebrand et al. (1995). The size of a transient crater, such as the K/T extinction crater at Yucatan, Mexico, which is thought to be the source of SO,-induced sulfuric acid aerosol that globally acidified surface waters as the result of massive vaporization of CASO, in the target rock, is addressed by our present project. The impact process excavates samples of planetary interiors. The degree to which this occurs (e.g. how deeply does excavation occur for a given crater diameter) has been of interest, both with regard to exposing mantle rocks in crater floors, as well as launching samples into space which become part of the terrestrial meteorite collection (e.g. lunar meteorites, SNC's from Mars). Only in the case of the Earth can we test calculations in the laboratory and field. Previous calculations predict, independent of diameter, that the depth of excavation, normalized by crater diameter, is d(sub ex)/D = 0.085 (O'Keefe and Ahrens, 1993). For Comet Shoemaker-Levy 9 (SL9) fragments impacting Jupiter, predicted excavation depths of different gas-rich layers in the atmosphere, were much larger. The trajectory and fate of highly shocked material from a large impact on the Earth, such as the K/T bolide is of interest. Melosh et al. (1990) proposed that the condensed material from the impact upon reentering the Earth's atmosphere induced. radiative heating, and producing global firestorms. The observed reentry splash of the SL-9 impact-induced plumes that reimpact Jupiter (Boslough et al., 1994) supported Melosh's K/T model. The fate of early primitive planetary atmospheres during the latter stages of planetary accretion, resulting from impactors in the 100 to 103 km diameter require modeling, e.g. Newman et al. (1997). Ahrens (1990; 1993) and Chen and Ahrens (1997) found that upon delivery of most of the impact energy to the solid planet, very large ground motions arise, which couple sufficient kinetic energy to the atmosphere to cause substantial atmospheric escape. The trade-off of this model with that of Cameron (1997) who suggests that atmospheric blow-off occurs as a result of the massive impact-induced heating of the atmosphere and Pepin (1997) who uses this heating event to model differential hydrodynamic loss of lighter atmospheric gases, requires further research.

Ahrens, Thomas J.↗

Lateral and Vertical Heterogeneity of Thorium in the Procellarum KREEP Terrane: As Reflected in the Ejecta Deposits of Post-Imbrium Craters

The Procellarum KREEP Terrane displays the highest concentrations of Th on the Moon. However, locations of elevated Th in this region appear to be random. As observed in the 5 deg per pixel equal-area Th data, and made more evident in the preliminary 2 deg data, Th is enhanced around the craters Aristillus, Aristarchus, Kepler, Mairan, the Apennine Bench formation, and the Fra Mauro region, while noticeably and unexpectedly lower in other locations (e.g., Archimedes, Copernicus, Eratosthenes, and Plato). We have examined the composition of the materials present in these regions with the goal of understanding the patchy nature to the distribution of Th and ultimately to decipher the geologic processes that have concentrated the Th. At present time, the published resolution of the Lunar Prospector Th gamma-ray data is low (5 deg per pixel), but this will soon be superceded by significantly higher-resolution data (2 deg per pixel). Even at this improved resolution, however, it is difficult to resolve the units that are the major source of Th. In an attempt to circumvent this problem, we employ the higher-resolution Clementine multispectral data for those regions mentioned above. We use the UV-VIS-derived compositional information and the spectral properties of craters, and their ejecta as drill holes through the mare-basalt surface to investigate the thickness and composition of underlying material. With this information we attempt to piece together the stratigraphy and geologic history of the Imbrium-Procellanim region. We processed the five-band multispectral data from the Clementine Mission (415, 750,900,950, and 1000nm) using ISIS software and calibration parameters developed by the USGS, Flagstaff, Arizona. Final image mosaics are in equal-area sinusoidal projection, and have a resolution of 250 m/pixel. Using the method of we produced maps of FeO and Ti02 composition. Here we examine the Th, FeO, and Ti02 composition and spectral properties of the craters discussed above and their ejecta, with the goal of describing the materials they excavate. One interpretation for the origin of the high-Th material is that subsurface KREEPy materials have been excavated by impact craters. The material excavated may be either volcanic KREEP (e,g., Apennine Bench Formation), KREEPy impact-melt breccia formed by the Imbrium impact (e.g., Fra Mauro Formation), or other KREEP-rich crustal material. Determining which type of material is responsible for the elevated Th and its extent is important to understanding the premare and possibly the prebasin stratigraphy of the Imbrium-Procellarum Region. Merging the 5 deg. Th data with the shaded relief map, we observe that the highest Th concentrations are not related to pre-Imbrium upper crustal materials. The Apennines, Alpes, and Caucasus Mountains represent the pre-Imbrian highlands material and do not express concentrations of Th, FeO, and TiO2 as high as the most Th-fich materials exposed within the Procellarum KREEP Terrane. We observe that, in general, these massifs contain 10-14 wt% FeO and 4-7 ppm Th. Determining whether the Th signal is from KREEP basalts or KREEPy impact-melt breccias cannot be done with the Clementine data because the two rock types are compositionally and mineralogically too similar (e.g., the Th-rich, mafic impact-melt breccias in the Apollo sample collection are dominated by a KREEP-basalt like component. Mapping-the distribution and sizes of craters and whether they display elevated Th concentrations or not, should reveal the depth and thickness of the KREEP-rich materials, and whether they are ubiquitous (i.e., impact-melt breccia) or more randomly distributed; this might be taken as an indicator of localized KREEP-basalt flows. Within the southeastern region of the Imbrium basin, there are two Th hot spots. The first is associated with the crater Aristillus, and the latter with the Apennine Bench Formation. Adjacent to these two hot spots are craters with a lower Th signature: Archimedes and Autolycus. We observe in the ejecta of Aristillus, a region of significantly lower FeO (10-14 wt%) relative to the surrounding mare basalt. The crater Autolycus, 50 km to the south, did not excavate similar low-FeO material. We suggest that the lower-FeO material in the ejecta of Aristillus corresponds to Th-rich material; the FeO content observed in Aristillus ejecta is comparable to that of KREEP basalt or mafic impact melt breccia (10-12 wt% FeO). We determine that this low FeO, Th-rich material is volcanic KREEP, as opposed to Imbrium impact melt, on the basis that the low-Fe material is exposed more prominently in ejecta in the northern portion of Aristillus. Our assumption is that if the layer underlying Aristillus was continuous, a more widespread and uniform low-Fe signature wouldbe observed in the ejecta deposit. Archimedes, 110 km southwest of Aristillus, impacted the northern portion of the Apennine Bench prior to the eruption of KREEP basalt. Archimedes rim material is not as enriched in Th as the Apennine Bench, and there are differences between the two in FeO concentration and in their continuum slope. Archimedes exhibits a much steeperor "redder" continuum slope than the Apennine Bench. This steepslope suggests the presence of glassy material. The glassy material is concentrated around an unnamed crater on the southern rim of Archimedes (4.5W, 28.2N) and along the northern rim of Archimedes. We suggest two possibilities, or a combination of the two, to explain the low-Th signal from Archimedes: (1) The Apennine Bench prior to KREEP basalt eruption was lower in Th (4-7 ppm, e.g., similar to the Apennine massifs) and KREEP basalts are absent in the rim of Archimedes; or (2) the glassy (possibly pyroclastic) material layering the rim of the Archimedes, dilutes any high-Th material present with low-Th material. (Additional information is contained in the original)

Gillis, J. J.↗

Impact into Coarse Grained Spheres

Several experimental studies [1,2,3] indicate that differences in the grain size of the target relative to the projectile could influence the cratering process. Impacts into coarse sand grains of size comparable to the projectile show some discrepancies with existing relationships for crater growth [e.g. 4]. Similarly, targets of ne grained, uniform in diameter glass spheres show differences in crater depth, transient crater diameter, and volume of ejecta excavated as a function of grain size [2,3]. The purpose of this work is to continue investigating how the relative grain size may influence early time coupling between a projectile and target, with implications for subsequent ejecta excavation and crater growth. In previous efforts we used numerical techniques to focus on the propagation of shock waves in coarse, granular media emphasizing the influence of relative grain size on crater growth, ejecta production, cratering efficiency, target strength, and crater shape [5,6,7]. In this study, we use experimental techniques - in part as a reality check for the numerical studies - to report on how coarse grained targets might influence ejecta excavation and crater shape. This body of work possesses important implications for ejecta excavation and cratering efficiency on asteroids that may possess rubble pile-like structures, and on planets that may possess either pre-fractured surfaces or large-scale heterogeneities in shock impedance.

Barnouin-Jha, O. S.↗

Regolith Advanced Surface Systems Operations Robot (RASSOR)

Regolith is abundant on extra-terrestrial surfaces and is the source of many resources such as oxygen, hydrogen, titanium, aluminum, iron, silica and other valuable materials, which can be used to make rocket propellant, consumables for life support, radiation protection barrier shields, landing pads, blast protection berms, roads, habitats and other structures and devices. Recent data from the Moon also indicates that there are substantial deposits of water ice in permanently shadowed crater regions and possibly under an over burden of regolith. The key to being able to use this regolith and acquire the resources, is being able to manipulate it with robotic excavation and hauling machinery that can survive and operate in these very extreme extra-terrestrial surface environments. In addition, the reduced gravity on the Moon, Mars, comets and asteroids poses a significant challenge in that the necessary reaction force for digging cannot be provided by the robot's weight as is typically done on Earth. Space transportation is expensive and limited in capacity, so small, lightweight payloads are desirable, which means large traditional excavation machines are not a viable option. A novel, compact and lightweight excavation robot prototype for manipulating, excavating, acquiring, hauling and dumping regolith on extra-terrestrial surfaces has been developed and tested. Lessons learned and test results will be presented including digging in a variety of lunar regolith simulant conditions including frozen regolith mixed with water ice.

Mueller, Robert P.↗

Development of Compact, Modular Lunar Heat Flow Probes

Geothermal heat flow measurements are a high priority for the future lunar geophysical network missions recommended by the latest Decadal Survey and previously the International Lunar Network. Because the lander for such a mission will be relatively small, the heat flow instrumentation must be a low-mass and low-power system. The instrument needs to measure both thermal gradient and thermal conductivity of the regolith penetrated. It also needs to be capable of excavating a deep enough hole (approx. 3 m) to avoid the effect of potential long-term changes of the surface thermal environment. The recently developed pneumatic excavation system can largely meet the low-power, low-mass, and the depth requirements. The system utilizes a stem which winds out of a pneumatically driven reel and pushes its conical tip into the regolith. Simultaneously, gas jets, emitted from the cone tip, loosen and blow away the soil. The thermal sensors consist of resistance temperature detectors (RTDs) embedded on the stem and an insitu thermal conductivity probe attached to the cone tip. The thermal conductivity probe consists of a short 'needle' (2.4-mm diam. and 15- to 20-mm length) that contains a platinum RTD wrapped in a coil of heater wire. During a deployment, when the penetrating cone reaches a desired depth, it stops blowing gas, and the stem pushes the needle into the yet-to-be excavated, undisturbed bottom soil. Then, it begins heating and monitors the temperature. Thermal conductivity of the soil can determined from the rate of temperature increase with time. When the measurement is complete, the system resumes excavation until it reaches the next targeted depth.

Lunar↗

Rock Abundance on the Lunar Mare on Surfaces of Different Age: Implications for Regolith Evolution and Thickness

The growth of lunar regolith over time affects surface rock abundance, because larger, less frequent impacts are needed to penetrate thicker regolith developed on older surfaces and excavate rocks. On younger surfaces with thinner regolith, smaller, more frequent impacts are sufficient to excavate rocks. We quantify the correlation between observed rock abundances and age on the lunar surface by comparing Diviner rock abundance data to the surface ages of inter-crater parts on the maria. Our observations show the expected negative correlation between age and rock abundance. The commonality of non-zero rock abundance values on ancient surfaces, combined with a simple Monte Carlo model of the rock excavation process, suggest that rocks re-excavated from the regolith volume contribute to the presently observed rock population on the lunar surface. The half-life of meter-scale surface rocks most consistent with our observations is 80±20 Myr.

Sashank Vanga↗

Waste Disposition Methodology at the Portsmouth Gaseous Diffusion Plant - 16469

Cost-effective and sustainable remedial design is a prudent and required approach for dealing with legacy wastes at the U.S. Department of Energy (DOE) sites. The concept of using contaminated soils as engineered fill for waste disposal facilities is a sustainable remediation process that warrants investigation. Options for cost-effective site-wide remediation were evaluated by DOE and its site contractor, including completion of evaluations for excavation of certain closed landfills and the excavation of contaminated soil in areas of known groundwater plumes to be used as engineered fill for the operation of an On-Site Waste Disposal Facility (OSWDF) at Portsmouth. The evaluations concluded that excavating select landfills and significant volumes of soil associated with the groundwater plumes considering Portsmouth site specific geology would mitigate the project lifecycle risk. As a result of this evaluation, the excavation of the landfills and soils associated with the groundwater plumes is being incorporated into the project's lifecycle baseline. On-site independent Headquarters review of this sustainable design approach and evaluation was performed in 2013 by the U.S. Army Corps of Engineers. Extensive presentations, background information, and data were provided to the independent review team along with tours of the affected areas. The review team agreed with the approach, and the Final Waste Disposition Record of Decision (ROD) for the OSWDF at the Portsmouth Site issued in June 2015, provides for the use of contaminated fill as an option provided that additional regulatory authorization/approval is obtained to use contaminated fill. Stakeholder and regulatory support is evidenced by the issuance of resolutions advocating this sustainable approach. The Commissioners of each of the four surrounding counties and the Portsmouth Site Specific Advisory Board have issued resolutions advocating this approach. They, along with other local leaders and Ohio's congressional delegation, are continuing to pursue implementation of this approach that they believe will enhance the attractiveness of the site for future re-industrialization. This approach at the Portsmouth Gaseous Diffusion Plant (PORTS) in Piketon, Ohio, is estimated to save more than $200 million over the lifecycle of the decontamination and decommissioning (D and D) project. This strategy has merit not only at Portsmouth, but perhaps other sites within the U.S. Department of Energy's Office of Environmental (EM) Management - and beyond. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Technology to Retrieve Waste Below the 324 Building at the Hanford Site - 19622

The Waste Technology Engineering Laboratory (324 Building) is a Category 2 Nuclear Facility at Hanford. The 324 Building Disposition Project is responsible for the removal and remedial actions under CERCLA. Additionally, there are RCRA Dangerous Waste Management Units which the CERCLA actions are presumed to satisfy. The Radiochemical Engineering Complex (REC) is a group of four hot cells (A, B, C and D Cells) with an interconnecting airlock inside of the 324 Building. Underneath the REC B-Cell are contaminated soils that have an estimated 12,793 R/Hr dose rate and remediation is under CERCLA 300-FF-2 Operable Unit. The current action consists of debris removal from the floor of B-Cell, B-Cell floor removal, and excavation of the soils beneath the floor to a depth of up to twelve feet with four Remote Excavator Arms (REA). This paper provides insight into the preparation and performance of high tolerance core drilling into a hot cell complex. Installation of the REA Through Support (REA TS) mechanism through the 4'-6' concrete shield walls is a complex series of tasks with demanding tolerances at each of four locations around the perimeter of B-Cell. The use of training mock ups was included in the completion of this work. The REA TS is two 11 inch diameter high strength steel sleeves that have expandable collars at each end allowing the interstitial space between the outside of the sleeve and inside of the core drill to be grouted to form a substantial structural connection, and a 10 inch pipe with hydraulic hoses to power the REA. There are three cores required for each REA location. The REAs themselves are customized excavator arms, mounted on support columns to be used in the excavation and transfer of the contaminated soil into storage facilities. The tasks for the installation of the REA TSs are: 1) Characterization of B-Cell Cubicles. 2) Embedded Pipe Fill. 3) Interference Removal. a. Internal Walls, b. External Walls. 4) Core Drilling. 5) Go/No-Go gauge, and video inspection. 6) Installation of REA Through Support Assembly. The 324 Building REC Hot Cells have internal, external, and embedded utilities throughout the shield walls in conflict with the REA TS locations. Some of the embedded utilities have connection points inside of the B-Cell Cubicles. There were two separate issues at the conflicted locations. The first issue was the core drill cooling water would flow along the embedded utility potentially spreading legacy chemical and radiological contamination to areas of the facility that was unwanted. The second issue was that the REA TS required a substantial structural connection to the B-Cell wall, the cored diameter is larger than the REA TS and these interstitial areas required a full grouted connection. The embedded utilities posed a hazard that if unfilled, the interstitial grout would flow into the embedded utility and destabilize the required grouted structural connection. The B-Cell Cubicles had not been opened in over 10 years. A mockup was completed to install a glovebag over the cubicle opening and then to verify functionality and port requirements. The embedded utility pipe connections in the cubicles were then opened inside a glovebag to verify the correct connection points, connection method for future embedded pipe fill material delivery system, radiological characterization, and air flow to show that the embedded utility pipes were not blocked and would not pressurize. The embedded pipe fill material and grout system was mocked up and run several times to verify methodology and functionality. The B-Cell Cubicles were then reentered and the embedded utility pipe fill was completed using a hand pump. External interferences at the core drill locations were removed using standard interference removal techniques. Internal interferences at the core drill locations were removed using a remote cutting tool that was controlled through the use of the B-Cell crane, remote cameras and remote lighting. The core drilling was mocked up two separate times, the project's purpose built 'Mock Up Facility' was core drilled to verify tolerances and methodology prior to subcontract award, the core drill subcontractor built a 'dummy wall' to train and practice on achieving the demanding tolerances, coordinated alignments between the cores, short term and long term dose shielding techniques, and contamination control techniques. A core drill template, and additional anchoring techniques were used to maximize accuracy and precision of the REA TS core drills. A 'Go/No-Go' gauge was built and installed at each of the four REA TS locations to verify that the core drill met tolerances. The core drill locations were visually inspected using a boroscope. The REA TS installation was mocked up at the projects 'Mock Up Facility' beginning with basic hazard controls, then with intermediate hazard controls, and finally with full occupational safety, industrial hygiene, and radiological controls. The REA TSs were installed and grouted into place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life cycle Management of 324 Project High-Activity, Mixed/Low-Level Radioactive Waste - 20506

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) manages the 324 Building and is preparing to remotely excavate and disposition the radioactive soil beneath the building to allow further deactivation of the building. The 324 Building is a non-reactor Category 2 Nuclear Facility located in the 300 Area of the Hanford Site. Records indicate that in October 1986, approximately 516 liters of a concentrated liquid waste stream containing cesium-137 ({sup 137}Cs) and strontium-90 ({sup 90}Sr) spilled onto the floor of a hot cell, B-Cell, in the 324 Building. The spill contained an estimated 1.3 million curies (Ci) of radioactivity. A breach in the sump of B-Cell was discovered in November 2009 during characterization of the soil under the building. Exposure rates in excess of 10,000 R/hr were detected through a system of access pipes installed under the hot cell, and an estimated 1.557 E+05 Ci of {sup 137}Cs and 6.842 E+04 Ci of {sup 90}Sr are in the soil beneath B-Cell. The magnitude of the soil contamination below B-Cell represents one of the most challenging remediation activities in the DOE complex. The objective of CHPRC's 324 Project is to remotely excavate and disposition the highly contaminated soil under the hot cell so building deactivation and stabilization activities can resume. Depending on the volume and radioactivity of contaminated soil under B-Cell, the material will be dispositioned either at the Hanford Site's Environmental Restoration Disposal Facility (ERDF) or in grout monoliths that will be created in the hot cells (A, C and D) next to B-Cell during future building demolition activities. The current project scope includes installing structural supports under the walls of B-Cell and using remotely operated equipment to remove debris from the hot cell, remove debris mixed with grout on the floor, saw through and remove the cell floor and liner, and excavate contaminated soil under B-Cell to a depth of up to 3.66 meters (12 feet). Addition or removal of debris in A-Cell may be required to support B-Cell cleanout and excavation activities. The base approach is to disposition debris and soil bins in the Radiochemical Engineering Cell (REC) monoliths, and subsequently disposition the monoliths during building demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance and cost of fuel cells for off-road heavy-duty vehicles

Hydrogen fuel cell-powered off-road vehicles can replace hydrocarbon-powered off-road vehicles to reduce carbon dioxide and criteria pollutant emissions in the agriculture, construction, and mining industries. Vehicle manufacturers and customers recognize health and environmental benefits of emissions reductions but are ultimately compelled by the total cost of ownership of their vehicles. In this study, we conduct a technoeconomic evaluation for three hallmark off-road vehicles, tractors, wheel loaders, and excavators, comparing vehicles with hydrogen fuel cell + battery hybrid powertrains to traditional diesel powertrains. Stakeholder-valued performance metrics include fuel cell engine power, engine durability, hydrogen consumption rate, hydrogen storage system volume, and energy-regenerative drivetrain efficiency. The total cost of ownership includes capital, operating and maintenance, fuel, and fuel storage costs. State-of-the-art fuel cell powered wheel loaders and excavators are currently cost competitive with diesel platforms. If targeted improvements to cost, performance, and durability improvements of fuel cell stacks and storage systems are achieved, fuel cell systems would be cost competitive for tractors and significantly lower total cost of ownership options for wheel loaders and excavators.

33 ADVANCED PROPULSION SYSTEMS↗

Alternatives Analysis for Selecting ET #3 Site

Engineered trenches (ETs) are considered to be a cost-effective method for disposing Low Level Waste (LLW). Based on waste forecasts from waste generators, the last engineered trench in operation (ET No.2) is anticipated to close in FY14, requiring development of a new ET. Solid Waste requested that SRNL develop an assessment report that reviews four disposal options for this new ET (ET No.3) and determine which option would provide the 'best' Performance Assessment (PA) disposal limits for LLW (Appendix A). Those four options (see option footprint locations in Figure 1-1) are: (1) Disposal at grade on TRU Pads 7-13 where soil would be mounded over waste packages; (2) Excavation at a slightly modified SLIT No.13 location - near the Used Equipment Storage Area; (3) Excavation at a modified SLIT No.12 location - near the 643-26E Naval Reactor Component Disposal Area; and (4) Excavation east of TRU Pad No.26 that replaces northeast portions of four slit trench (ST) disposal units in the eastern set of STs. The assessment consisted of both quantitative and qualitative analyses. The quantitative analysis captured key aspects that were readily quantifiable and had predictable impacts on limits and doses. A simplified modeling strategy stemming from current Special Analysis (SA) practices was employed. Both inventory capacity for a specific nuclide (a quasi-inventory limit) and overall performance for specified inventory mixtures (doses resulting from historical inventories) were considered. The qualitative analysis evaluated other key aspects based on engineering judgment in the form of pros and cons.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Excavationless Exterior Foundation Insulation Exploratory Study

Building science research supports installing exterior (soil side) foundation insulation as the optimal method to enhance the hygrothermal performance of new homes. With exterior foundation insulation, water management strategies are maximized while insulating the basement space and ensuring a more even temperature at the foundation wall. Controlling for bulk water, vapor, and wall temperature differential reduces the risk of rot and mold formation to insulation and building materials, thereby improving opportunities for structural integrity, indoor air quality, comfort, and energy efficiency. The intent of this study by the NorthernSTAR Building America Partnership team is to search for combinations of existing technologies that could enable a minimally invasive, cost-competitive, easily deployable method of upgrading soil-side foundation insulation in existing buildings. Currently, insulating foundation walls on the exterior side involves exposing the foundation wall using an excavator. Following excavation, these walls can be waterproofed, and are typically insulated with board foam in a process similar to new construction. This process is expensive and highly disruptive to the landscape and the homeowner. Also, barriers such as porches and sidewalks prevent trenching. An ideal approach would involve excavating a very narrow trench directly next to the foundation wall. Full-height foundation wall insulation might be desired, so the trenching technology should be able to dig to a depth of 7 or 8 ft. Because houses often have hardscape obstructions that are expensive to demolish and remove, the ideal technology would be capable of digging under at least some obstructions that would remain in place.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Overview of NASA's Break the Ice Lunar Challenge

The goal of NASA’s Artemis program is to return to the Moon and put in place a sustainable infrastructure that will enable permanent presence on the Moon. In-Situ Resource Utilization (ISRU) is critical in making the permanent presence on the Moon possible. One of the most important of these resources is water. On the Moon, water is trapped in icy regolith at the lunar poles, including inside permanently dark and cold craters. Excavating icy regolith and extracting water from it needs development of technologies that can operate reliably in the extreme lunar environmental conditions. Prize competitions are a well-known way of accelerating the development of new technologies and have been successfully used throughout the history. NASA’s Centennial Challenges Program(CCP) has been developing and executing prize competitions for past 15 years. Several of these competitions resulted in breakthrough technologies for in-space and terrestrial applications. In 2019, NASA Space Technology Mission Directorate (STMD) tasked CCP to develop a challenge to address the technology gaps in the areas of Lunar Excavation, Manufacturing, and Construction. This paper provides the background, status and ongoing plans by CCP in developing “Break the Ice Lunar Challenge”. The challenge is scheduled to open for registration in late 2020. This challenge will enable the development of excavation technologies that can operate in the extreme conditions on the Moon.

centennial challenges↗

Interim Measure Report Revision 0: Un-Numbered Operational Areas PRL 229

This report documents the Interim Measure (IM) completed at Un-Numbered Operational Areas (UNOA) potential release location (PRL) 229, at Kennedy Space Center (KSC), Florida. This document has been prepared for the National Aeronautics and Space Administration (NASA), in accordance with HydroGeoLogic, Inc.’s (HGL) Contract 80KSC019D0012, Task Order 80KSC019F0224. The purpose of this IM report is to document the field results of the 2022 IM conducted between December 13, 2021, and February 11, 2022, and to present the recommendations based on the IM findings. IM activities were completed at the UNOA PRL 229 to remove railroad ties and benzo(a)pyrene equivalent (BAPE)/total recoverable petroleum hydrocarbons (TRPH)-affected soil in accordance with the IM Work Plan (IMWP) (Jacobs/CORE, 2019a). The objectives of the IM were to mitigate human health risks by reducing site contaminants to the residential soil cleanup target level (SCTL) based on the 95 percent upper confidence limit on the mean. A second objective was to reduce low molecular weight and high molecular weight polynuclear aromatic hydrocarbon (PAH) concentrations below ecological screening values for terrestrial receptors. Prior to excavation operations, railroad ties from all areas were consolidated. In total, 50.67 tons of railroad ties were transported from the site to JED Landfill in St. Cloud, Florida. The cumulative excavation footprint spanned an area of 9,710 square ft. In total, 908.54 tons of soil was transported from the site to JED Landfill. To backfill the excavation area, 880 cubic yards of clean fill was trucked to the site from S&LMaterials, Inc. borrow pit in Christmas, Florida. Following completion of backfill, the site restoration activities included grading the disturbed areas to match the existing elevations and vegetation planting by the site restoration subcontractor. The IM implementation activities were presented to the KSC Remediation Team during its meeting on May 3, 2022. The Remediation Team reached consensus on the completion of the IM reducing the area affected by BAPE/TRPH above the State of Florida residential soil cleanup target levels.

PAHs↗

LANDO: Developing Autonomous Payload Offloading Capabilities for Lunar Surface Operations

Introduction: The Lightweight Surface Manipulation System (LSMS) AutoNomy capabilities Development for surface Operations and construction (LANDO) project is an Early Career Initiative selected for funding by NASA Space Technology Mission Directorate. LANDO is developing a general-purpose autonomy framework applicable to serial and tension-actuated manipulation agents, that will be validated using an existing prototype of the LSMS-L35 (35-kg wrist lift capacity on the lunar surface [Fig. 1], sized for a Commercial Lunar Pay-load Services (CLPS) mission). The autonomous LSMS-L35 will be used to demonstrate autonomous payload handling capabilities for Lunar and other planetary surfaces, directly addressing STMD capability gaps in autonomous excavation and construction operations, advanced robotics and spacecraft autonomy technologies, and technologies supporting emerging space industries including the In-Space Servicing, Assembly and Manufacturing national strategy. LSMS: The LSMS is a tension actuated robotic agent that is scalable (reach and lifting capacity in different gravity environments), versatile (types of surface operations), and reusable. Compared to serial arms, the LSMS provides significantly higher structural efficiency and mechanical advantage, enabling a greater payload lift capacity at a lower system mass. The LSMS is envisioned to be a crucial part of the excavation and construction portfolio, capable of supporting a variety of activities on the lunar surface. Autonomous payload handling is one of the first activities the LSMS can support that develops capabilities that are extensible to other surface operations. Payload handling is required to: remove payloads from a lander; place payloads on mobile agents for transport from a lander to construction site/assembly point; emplace payloads in their operational configuration, and aggregate components to create an asset. As an example of this critical gap, manifested CLPS missions do not currently have a ubiquitous payload offloading capability; payloads (excluding rovers) are designed to remain on the lander. Why Autonomy? Autonomous robotic systems capable of carrying out excavation and construction operations are a fundamental and critical capability required for realizing the NASA Artemis program vision to “emplace and build the infrastructure, systems, and robotic missions that can enable a sustained lunar surface presence.” While teleoperation is still feasible for lunar surface operations, increased latency at Mars will require validated supervised autonomous technologies capable of operating with minimal human involvement (human-on-the-loop) unless an unexpected event occurs requiring human intervention. Autonomy reduces operator burden, allows operations to continue during uncrewed periods, in-creases the safety of operations by automatically detecting and handling faults, and allows operating in high latency environments. Development Activities: LANDO is extending critical autonomous operations to the manipulation domain and creating an integrated system, based on reusable software modules, that is capable of planning and executing payload handling and autonomous surface operations without requiring hu-man intervention beyond a supervisory role. The priority features under development are 1) autonomously offload payloads from a tilted lander deck without buckling the LSMS; 2) sensing whether a payload is safe to lift and handle; and 3) integrate with Astrobotic’s CLPS lander. The poster presentation will highlight current development activities over the past year on LSMS-L35 prototype hard-ware design, and autonomy software.

in-space assembly↗