Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DEMOLITION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Robotic Measurement of Holdup Deposit Volume in Gaseous Diffusion Piping to Quantify U-235 Content - 18375

During D and D of old gaseous diffusion uranium enrichment facilities, radiometric assay of U-235 holdup in pipes is a costly, time consuming, and labor-intensive process. Subject to human interpretation using approximate modeling, radiometric assay introduces significant challenges. Taking advantage of routine demolition activities in which D and D cuts pipes open, robotic in-pipe assay is explored. The novel method introduced here generates models of the internal pipe and deposit surface geometries that are used to derive volumetric quantities. The pipe surface is sensed using a non-contact inductive proximity sensor and the deposit surface is sensed using an optical laser triangulation sensor. These sensors are mounted on a spinning disk and driven down the pipe to construct a helical point cloud of discrete measurements. Surfaces are fit to each of the two point clouds to create a watertight volume that represents the holdup. This provides the location and volume per foot of pipe that is used to compare against criticality incredible (CI) thresholds during evaluation. The robotic system collects data autonomously, deploying and returning to the same pipe opening from which it is launched. This provides redundant measurements of the pipe and deposit surfaces as well as odometry used in localization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achieving the Vision: An Update on Cleanup, Closure, and Reindustrialization of the East Tennessee Technology Park - 18401

URS-CH2M Oak Ridge LLC (UCOR) is responsible for cleanup of the U.S. Department of Energy's (DOE) East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. Formerly known as the K-25 site, the facility enriched uranium for major defense nd energy programs for more than 40 years. The site's industrial processes - largely the gaseous diffusion method used for enriching uranium - left behind radioactive, chemical and industrial contaminants in soils and structures. Cleanup of the environmental legacies enables DOE's goal for converting ETTP into a private sector industrial park. Return of the restored site to the community will attract new industries to the region, creating jobs and growing the economy. The central elements to achieve DOE's vision for the site are 1) Cleanup, 2) Closure, and 3) Reindustrialization. Cleanup entails completion of all demolition activities and remedial actions consistent with the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) agreements. Closure leaves facilities and infrastructure in a condition that enables transfer of the site to non-federal entities and reduces DOE's long-term stewardship costs. Closure activities include: - Infrastructure stabilization (site utilities, roads, stormwater, etc.); - Disposal or transfer of government property; - Relocation of most DOE contractors and support functions offsite; - Transfer of the majority of the site property to non-federal entities for redevelopment. Reindustrialization enables DOE's vision for the site as a multi-use private sector industrial park, reducing DOE's costs and enhancing the local economy. Transfer to the private sector will be accomplished through the Community Reuse Organization of East Tennessee (CROET), which will serve as the Park Manager. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addressing Excess Contaminated Facilities and Mercury Cleanup At the Department of Energy's Oak Ridge Reservation - 18408

The U.S. Department of Energy's Oak Ridge Office of Environmental Management (OREM) and its prime cleanup contractor, URS | CH2M Oak Ridge LLC (UCOR) are executing an aggressive program of cleanup and risk reduction in excess contaminated facilities on the Oak Ridge Reservation (ORR). Across the complex, DOE has designated more than 2,300 of its facilities 'excess'. Excess means 'nonoperational' and refers to a facility for which DOE no longer has a mission need. Many of these facilities pose high risk to workers and/or the environment. Delayed cleanup increases risk as well as cost. OREM and UCOR initiated a Working Group on Excess Facilities to identify and prioritize activities that are needed to enhance worker safety, minimize further degradation of the facilities, and reduce the environmental risk. Six Excess Contaminated Facilities projects on the ORR were identified as priorities. Three of the projects are located at ORNL - the Building 7500 Homogenous Reactor Experiment, the Building 3026 Radioisotope Development Laboratory and Buildings 3028/3029 Isotope Facilities. At Y-12, priority excess facilities include the Column Exchange Equipment (COLEX), the Alpha-4 Lithium Enrichment Facility and the Biology Complex Research Facilities. Work on these projects is aimed at stabilization of degraded higher risk facilities, characterization of conditions and hazards, removal of hazardous materials and placement of the facility in the lowest risk condition possible pending demolition. At the same time, DOE and UCOR are preparing to undertake a comprehensive program to remediate the presence of mercury in the water stemming from historical operations at the Y-12 National Security Complex. Over decades of operations, mercury migrated into the environment. Deteriorating conditions of large post-operation mercury-use buildings may be contributing to additional releases. Mercury cleanup is a high priority for Y-12 and the Oak Ridge Reservation. UCOR is completing the final design on a new Mercury Treatment Facility with construction expected to begin in late 2017. When constructed the treatment facility will reduce the amount of mercury in local waters, lower environmental contamination levels and serve as a guard against future releases. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Management Waste Management Facility Operations Team Commitment to Safety - 18546

The Environmental Management Waste Management Facility (EMWMF) is an above-grade waste disposal facility that is owned by DOE and operated by URS | CH2M Oak Ridge LLC (UCOR), a contractor to DOE's Oak Ridge Office of Environmental Management. The EMWMF landfill is located on the Oak Ridge Reservation (ORR) and has a 2.18 M cubic yard capacity. EMWMF is a key component of the cost-effective ORR cleanup program and accepts remediation waste from across the ORR. Multiple low-level and low-level mixed CERCLA waste streams are disposed at EMWMF, mostly as direct-dumped demolition and remediation debris. EMWMF receives and disposes of a myriad of contaminated waste streams and waste types, including massive structural steel from some of the largest buildings ever constructed, contaminated soils from legacy disposal areas, containers that must be grouted under negative pressure, and special waste that must be tightly controlled. Support activities include managing several million gallons of landfill wastewater per year and driving around 20,000 miles per year to transport leachate to a treatment facility. Even with the wide range of waste accepted and the diversity of support activities, EMWMF Operations has maintained an impressive safety record of no lost workday cases in nearly 16 years of continuous operation and was recently awarded the National Safety Council's Superior Safety Performance Award. This safety record is a testament to the commitment to safety by both workers and management. Several factors are key to the EMWMF Operations safety record. UCOR senior management established safety as a priority and allocates proper funding and resources. EMWMF Operations management embraces safety as an integral part of the work and also 'walks the talk'-emphasizing safety over productivity and showing personal commitment to safety. A stable workforce promotes a culture where safety is valued and helps train new personnel in this culture. The UCOR integrated safety management approach to work control is fully embraced, where worker feedback is highly valued and used to better identify and control job hazards. Finally, job supervisors actively encourage input. Worker concerns, suggestions, and observations are encouraged and positively addressed. As a result, the entire Operations Team is committed to identifying and mitigating hazards. This team commitment to safety results in a culture where safety is not only valued, but is expected. Safety concerns are identified and addressed proactively, and communication is encouraged. This strong safety culture and outstanding safety record have also proven to be good business, with the facility available to receive waste 99.6% of available work hours and outstanding turnaround times on waste shipments. The EMWMF Operations team commitment to safety can be used in other environments to develop an engaged, safety-conscious workforce. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotic Crane System for the Deconstruction of Chernobyl Unit 4 - 18583

The Chernobyl Nuclear Power Plant (ChNPP) Unit 4 accident occurred on April 26, 1986 leaving a severely damaged reactor building and a highly radioactive area. To minimize the long-term radiological impact to personnel and the environment, Unit 4 was immediately enclosed by a structure named the Object Shelter (OS). To transform the OS into an ecologically safe system, the Shelter Implementation Plan (SIP) was developed in 1997. The most significant SIP tasks was the design and construction of the New Safe Confinement (NSC). The NSC is a 36,000 tonne arch enclosure that includes a suite of process equipment to address the ruins of Unit 4 while assuring the safety of workers, public, and the environment. The NSC has a span of 257 meters, length of 164 meters, and height of 110 meters and is designed for a 100 years life. The New Safe Confinement was slid from its erection area to directly over Unit 4 (a distance of 327 meters) in November 2016. One of the major mechanical handling systems installed in the NSC is the Main Cranes System (MCS), designed and fabricated by PaR Systems (USA). The planned deconstruction activities require the handling of shielded waste disposal casks containing fuel as well as transporting extremely large structural elements -remotely controlled using video surveillance equipment. The lifting activities required the cranes to be tele-robotically controlled to prevent inadvertent collisions, expedite repetitive and high accuracy functions, protect the equipment and structures within the NSC as well as increase the overall effectiveness of the MCS. In addition, due to the elevated radiation levels, remote deconstruction activities will need to be performed. The MCS has design provisions included for a tele-robotically controlled manipulator and a suite of tooling to be used for multiple activities including concrete coring, cutting, debris collection and other heavy demolition activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Telerobotic Control of Dexterous Dual-Arm Robots for D and D Operations - 18622

Robotic systems hold the potential to significantly reduce exposure of workers to hazardous environments such as in the deactivation and decommissioning (D and D) of nuclear facilities. Our goal is to enable an operator with minimal training to easily control a remote dual-arm robot to perform demolition tasks with hand tools. We propose a system that combines semi-autonomous coordination of the robot's arms with an intuitive operator interface based on virtual reality (VR) technology. A limb coordination system enables independent control of the robot arms, as well as coupled motion required to hold and manipulate rigid bodies such as reciprocating saws, angle grinders and crow bars. Using a VR head mounted display and stereo video from the robot for situational awareness and tracked VR hand controllers to command robot arm movement, an operator will be able to walk up to the control console, pick up the controllers, engage the manipulators, fly the grippers, grasp a tool with one or both robot arms and easily move them in unison to perform tasks. We present preliminary results using simulation and a physical dual-arm platform based on the Johns Hopkins University Applied Physics Laboratory's Modular Prosthetic Limb, an anthropomorphic device that provides hyper-dexterous human-like manipulation capabilities. Anticipated benefits of the robotic system for D and D operations include improved situational awareness, increased mission complexity, and reduced operator training time, workload, and task execution times. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Cap Design Expands Capacity of DOE Environmental Management Waste Management Facility (EMWMF) Oak Ridge, Tennessee - 19185

UCOR, an AECOM-led partnership with Jacobs, manages the cleanup of the 2,200-acre East Tennessee Technology Park (ETTP) for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The ETTP site was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. Onsite waste disposal is a key component of DoE's cleanup strategy. Less expensive onsite disposal allows remaining funding to be used to accelerate cleanup activities. The initial cover design was intended to be revised and updated as the Environmental Management Waste Management Facility (EMWMF) neared closure. However, accelerating review and modification of the design resulted in additional waste disposal volume that will extend the life of the EMWMF. Two design modifications were implemented: 1) reducing the final cover thickness from 14 ft to 11 ft while maintaining protectiveness, and 2) changing the height of the landfill by reducing the width of the top deck. These two design changes resulted in an additional 130,000 cubic yards of landfill capacity for Oak Ridge Reservation (ORR) demolition and remediation waste and extended the expected life of the EMWMF by approximately 2 years. The addition of more inexpensive onsite waste disposal capacity will continue to facilitate cost-effective cleanup activities at the ORR. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design of an Evapotranspiration Surface Barrier for the Subsurface Disposal Area at INL - 19220

At the INL Site, the US DOE is planning to construct one of its largest CERCLA landfill covers. An evapotranspiration surface barrier that will be approximately 65 ha (160 acres) will cover the 39-ha (97-acre) Subsurface Disposal Area at the INL to isolate legacy mixed waste disposed of prior to 1988, low-level radioactive waste disposed of after 1988, and debris from demolition of structures being used to process some of the legacy mixed waste. The evapotranspiration surface barrier will limit percolation to less than 1 cm (0.39 in.) per year under typical precipitation conditions; provide a minimum 3-m (10-ft)-thick cover over all waste to minimize the potential for plant, animal, and inadvertent human intrusion; support growth of native vegetation; and visually blend in with the surrounding desert landscape. A robust design will allow the evapotranspiration surface barrier to resist erosion and perform for a minimum of 1,000 years. The 1-cm (0.39-in.)-per-year and 1,000-year performance objectives were established by a CERCLA record of decision and its implementing remedial design work plan, and these performance objectives are consistent with a performance assessment conducted under US DOE Order 435.1, 'Radioactive Waste Management.' (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 120B: DOE Portsmouth Paducah Project Office (PPPO) Update

This panel focused on the Portsmouth/Paducah Project Office (PPPO) of the US DOE Office of Environmental Management, Lexington, Kentucky, the US DOE Featured Site for Thursday. It showcased recent progress, challenges and planned efforts in radioactive waste management, waste disposition, environmental remediation and D and D at the Portsmouth (Ohio) and Paducah (KY) Gaseous Diffusion Plant Sites, as well as the Depleted Uranium Hexafluoride (DUF6) Conversion Project with facilities at both sites Presentations proposed include: 1 - Portsmouth/Paducah Project Office (PPPO) (Joel Bradburne, US DOE Portsmouth/Paducah Project Office (USA)); 2 - Portsmouth (Jeff Bettinger, US DOE Portsmouth/Paducah Project Office (USA)); 3 - Paducah (Jennifer Woodard, US DOE Portsmouth/Paducah Project Office (USA)); 4 - Depleted Uranium Hexafluoride Conversion Project (Reinhard Knerr, US DOE Portsmouth/Paducah Project Office (USA)); 5 - Portsmouth Deactivation and Demolition Project (Bob Smith, Fluor-BWXT Portsmouth (USA)); 6 - Paducah Deactivation and Remediation Project (Jeff Bradford, Four Rivers Nuclear Partnership - FRNP (USA)); 7 - Seven Lines-One Project (Zack Smith, SNC Lavalin (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canadian Nuclear Laboratories: An Asset Management Journey - 19438

In this paper, Canadian Nuclear Laboratories (CNL) outlines key tools, strategies and lessons learned from development of their Asset Management Program. Canadian Nuclear Laboratories is a 60-year old site in the midst of a C$1.2B redevelopment that includes construction of six new facilities and demolition of over 120 buildings and structures. The presentation outlines CNL's progress in creating an efficient and effective asset management program that leverages and optimizes current good practices while creating a consistent, disciplined and information-based approach for the maintenance and management of assets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 47: Decommissioning, Issues and Possibilities/Opportunities

This panel focused on decommissioning projects in the US and abroad. This interactive discussion between the audience and panelists included - 1) logistics (from cradle to grave); 2) organizational aspects of decommissioning; 3) regulatory aspects and issues; 4) definition of the back-end with regard to packages and Waste Acceptance Criteria (WAC); and 5) identification and management of difficult-to-handle decontamination and demolition (D and D) waste (e.g. damaged fuel, legacy/forgotten waste inside Nuclear Power Plants, etc.). Panelist with presentations: JCNPP Lessons Learned (Manuel Ondaro del Pino)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 2: Hot Topics in US DOE Environmental Management

The well-attended Panel Session was chaired by Martin Schneider. The four panelists did not provide presentations. Rather the session was a discussion focusing on pressing issues facing US DOE Environmental Management (EM) sites and how the program is moving forward. The session began by momentarily reflecting on a success: the three Tank Waste Treatment Facilities will soon be coming online. These three facilities will treat as much waste in two years as was treated in the past 30 years. That is a significant milestone in progress. Also, safety enhancements at WIPP are a big success. The panelists noted that there will be challenges with the victories of the startup of the Waste Treatment Facilities. Treating tank waste is the last EM mission and will help with the relationships with the stakeholders, regulators and Congress. One of the biggest challenges will be moving back to full operation mode. Although the operation will increase productivity of reducing/managing the tank waste, it will decrease life cycle cost and lessen years of cleanup. The challenge will be having people understand that EM will be operating 24/7 and that maintenance will be key in keeping the operations. EM will be working together with the regulators to show tangible progress that will be effective and efficient. By working together, they can find opportunities/technologies for streamlining and accelerating cleanup. Recent changes to the regulatory framework between DOE-EM Los Alamos Field Office and New Mexico Environmental Department have helped cleanup in Los Alamos. Every year EM and the agencies review progress and come to agreements on the next work priorities. At Savannah River Site, the Federal Facility Agreement among EM, South Carolina Department of Health and Environmental Control, and Environmental Protection Agency (EPA) has developed a small core team that work are shared by together in resolving issues that come up. The discussion moved on to how progress can be made by sharing lessons learned among the contractors. An example of how these learned lessons can be shared is that key representatives from projects across the EM sites participate in various forums to review/contribute to the work planned. Other opportunities can be by temporary assignments of DOE staff to gain experience and by monthly EM Headquarters report that provide the lessons learned across the EM sites. The panelists discussed how skyline changes are the best examples of tangible progress. Decontamination and Demolition (D and D) of structures are the easiest tangible progress that can be seen. Whereas tank waste cleanup is the hardest to see. Disposal of waste onsite versus offsite is another challenge, and timely discussions are necessary to get to the best value to the government.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Removal: Success and Partnership with T Plant - 20510

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) has safely and efficiently managed the removal of highly radioactive sludge from the 105-K West Reactor fuel storage basin (105- KW Basin) near the Columbia River. In mid-September 2019, sludge retrieval was completed after 21 storage containers were safely loaded with highly radioactive sludge and transported approximately 13 miles from the 105-KW Basin to T Plant, located in the 200 West Area on the Central Plateau of the Hanford Site. Sludge removal represents the last major source term reduction necessary before the K West Reactor and fuel storage basin can transition to closure activities in preparation for final deactivation and demolition. The technical complexity of the sludge retrieval process, coupled with the challenging physical and radiological characteristics of the waste, necessitated a methodical and deliberate approach using unique design and operational solutions to safely conduct the work. This challenge was further complicated by the need to plan and conduct the work in two separate facilities, each subject to the controls and requirements of its own nuclear facility safety basis. The project overcame these challenges through creating an integrated team that actively engaged, communicated and coordinated each phase of the project to ensure successful completion. This paper will cover how these key elements of the Sludge Removal Project led to its success: - Integrating project planning and management; - Lessons learned from design and construction; - Preparing for a successful campaign (lessons learned from testing and start-up); - Lessons learned from operating in two separate facilities, transporting sludge containers on the Hanford Site and ensuring compliance with a range of regulatory and safety basis requirements. The establishment of an integrated group spanning two facilities and multiple organizations created a team capable of overcoming the challenges necessary to successfully plan and execute the sludge retrieval mission. Sharing lessons learned from this successful project can enhance the ability of teams across the DOE complex to successfully plan and execute complex projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Virtual and Augmented Realities to Support Development, Training, Deployment, and Operations of Remote Systems - 20516

Throughout the U.S. Department of Energy complex, there is a need to deploy new, unique equipment and systems for cleanup activities, waste processing, infrastructure repair, and decommissioning and demolition in radioactive and hazardous environments. The new equipment often consists of custom systems created by integrating and modifying commercial technologies. In addition, the systems are deployed in unique environments due to limited access, waste properties, and the presence of previously installed equipment or infrastructure that has been left in place. The deployment of custom systems that are 'turnkey' ready for first-time installation and application has its risks. Use of test platforms and mockups for cold (i.e., non-radioactive) testing is one method to mitigate that risk: however, full-scale test mockups for operations such as waste retrieval and tank inspection can be expensive and must be modified to incorporate the uniqueness of each application. An alternative to full-scale mockups is to use three-dimensional (3D) virtual environments and virtual reality (VR) technology to develop interactive virtual test beds. These can be used throughout the down-selection, development, system integration, operational planning, operator training, and mission execution phases of a task. Virtual test beds are readily reconfigured, can be used for multiple tasks, support multiple users in parallel, and can accommodate enhancements and changes not originally planned or conceived in the initial design. Virtual test beds also provide a platform for developing and testing augmented reality (AR) tools for improving operator efficiency. A VR experience has been generated for waste retrieval from a Hanford waste tank to present the potential applications of a virtual test bed. Features of the VR experience are presented, potential applications of VR and AR for remote applications are discussed, and development areas for improving future application are considered. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energetics Applications for the Oil and Gas Industry

Here, early motivation and use of energetic materials in the Western World by Alfred Nobel was intended to facilitate mining, construction, and demolition activities. The motivation for the work was the recognized need for a safer energetic material as an alternate to unstabilized nitroglycerine. The invention of dynamite by Nobel was widely adopted in the civilian world and brought a fortune to Nobel, resulting in the formation of the annual Nobel Prize awards, recognizing significant achievements across many fields of endeavour. Nonetheless, further development of energetics was primarily motivated by and funded for military purposes, rather than civilian usage. And indeed much investment has been given to the development and characterization of military energetics and their application. An example application is the precision shaped charge, primarily developed as a means of focusing energy in a narrow metallic jet for deep penetration of heavy armor. However, the largest costumer today and for many years for shaped charges is not the military, but rather the oil and gas industry, which has adapted the military technology for perforation of oil and gas wells. While there are similar aspects to desired penetration capabilities in both applications, there are enough differences to warrant energetics R & D focused on oil and gas industry needs.

02 PETROLEUM↗

Application of the Diminishing Returns Concept in the Hydroecologic Restoration of Riverscapes

Principles for optimizing the number and placement of ecological restoration actions on rivers and coasts would be useful in project engineering design and program planning. This study demonstrated that the yield of inundated floodplain habitat area from dike breaching conforms to a diminishing returns model. The aggregate effects of establishing hydrologic connections between a tidally influenced main stem river and the floodplain were experimentally examined using a hydrodynamic model. Restoration clusters of size 1, 4, 8, and more, replicated and randomized within the landscape, yielded average wetted floodplain area conforming with an exponential rise to maximum curve2(0.99)r=. Analysis of the average incremental change in floodplain inundation produced per breach showed that opening 25 % of the channels crossing the dike provided the maximum return on investment as measured by wetted area. Midstream breaches yielded 60 % and upstream breaches 2 % of the wetted area produced by downstream breaches. Dike-breach restoration programs therefore can be optimized by strategic determination of the spatial configuration and number of demolitions, though biological factors such as the accessibility of floodplain habitat and total length of channels connected also need to be considered. These findings have implications for cost-benefit analyses in restoration program planning.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Optimizing biomass feedstock blends with respect to cost, supply, and quality for catalyzed and uncatalyzed fast pyrolysis applications

Here, biomass cost, quality and quantity are important parameters to consider when choosing feedstocks and locations for biorefineries. Biomass cost is dependent upon type, location, quantities available in a given area and logistics costs as well the quality needed for the biorefinery. Biomass quality depends upon type, growth conditions, weather, harvesting methods, storage conditions as well as any preprocessing methods used to improve quality. Biomass quantity depends heavily on location as well as growth conditions, weather, harvesting methods and storage conditions. This study examines how all three of these parameters affect the biomass mixture that is needed in a biomass depot or biorefinery to achieve the lowest cost with the highest quality and at the quantities needed for biorefinery operation. Four biomass depots were proposed in South Carolina that would each process the predominant type of biomass available in that area and each produce 200,000 tons of feedstock per year. These depots would then feed a centrally located 800,000 ton biorefinery that would convert the feedstocks to pyrolysis oil using either catalyzed or uncatalyzed fast pyrolysis. The four depots each needed to produce different blends of biomass based upon the quantities available to them but still meet the minimum quality requirements for the biorefinery. Costs were minimized by using waste biomass resources such as construction and demolition waste, logging residues and forest residuals. Depending upon the quality specification required by the biorefinery, it was necessary to utilize preprocessing methods such as air classification and acid leaching to upgrade biomass quality. In the case of uncatalyzed fast pyrolysis, all four depots could produce biomass blends that were lower cost than the the preferred pyrolysis feedstock, clean pine, and meet quality and quantity specifications. For catalyzed fast pyrolysis, three of the four depots were able to produce blends that met both quality and quantity specifications at minimum cost. The fourth depot would not be able to produce a blend meeting specifications without increasing the supply radius for the depot.

09 BIOMASS FUELS↗

Carbonation and CO{sub 2} uptake of concrete

This study developed a reliable procedure to assess the carbon dioxide (CO{sub 2}) uptake of concrete by carbonation during the service life of a structure and by the recycling of concrete after demolition. To generalize the amount of absorbable CO{sub 2} per unit volume of concrete, the molar concentration of carbonatable constituents in hardened cement paste was simplified as a function of the unit content of cement, and the degree of hydration of the cement paste was formulated as a function of the water-to-cement ratio. The contribution of the relative humidity, type of finishing material for the concrete surface, and the substitution level of supplementary cementitious materials to the CO{sub 2} diffusion coefficient in concrete was reflected using various correction factors. The following parameters varying with the recycling scenario were also considered: the carbonatable surface area of concrete crusher-runs and underground phenomena of the decreased CO{sub 2} diffusion coefficient and increased CO{sub 2} concentration. Based on the developed procedure, a case study was conducted for an apartment building with a principal wall system and an office building with a Rahmen system, with the aim of examining the CO{sub 2} uptake of each structural element under different exposure environments during the service life and recycling of the building. As input data necessary for the case study, data collected from actual surveys conducted in 2012 in South Korea were used, which included data on the surrounding environments, lifecycle inventory database, life expectancy of structures, and recycling activity scenario. Ultimately, the CO{sub 2} uptake of concrete during a 100-year lifecycle (life expectancy of 40 years and recycling span of 60 years) was estimated to be 15.5%–17% of the CO{sub 2} emissions from concrete production, which roughly corresponds to 18%–21% of the CO{sub 2} emissions from the production of ordinary Portland cement. - Highlights: • CO{sub 2} uptake assessment approach owing to the concrete carbonation is developed. • An equation to directly determine the absorbable CO{sub 2} amount in concrete is proposed. • The carbonatable surface area of concrete crusher-runs for CO{sub 2} uptake is ascertained. • This study provides typical data for uptake and emission of CO{sub 2} in concrete building.

54 ENVIRONMENTAL SCIENCES↗