Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DAMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Self-Lubricating Bushing Testing for John Day Dam Ka plan Turbine Replacement

The goal of this testing program is to find suitable self-lubricated alternatives to replace the in use oil lubricated grooved-bronze bushing in Kaplan runner hubs that are currently being utilized at John Day Dam operated by the U.S. Army Corps of Engineers (USACE). Scaled bushing testing utilizing a Pacific Northwest National Laboratory designed, fabricated, and operated Bushing Test Stand under the direction and funding from USACE determined that self-lubricated bushings tested appear capable of outperforming the current oil-lubricated bronze bushings. Performance tests are focused on durability which includes cyclic load bearing properties and articulations under various loading scenarios. This testing was performed at nominally 1/5 th scale. A scaling sensitivity analysis determined that scaled testing results apply to prototypic size. This report shows the direct comparison between the current baseline bronze bushing to self-lubricated bushings from various manufacturers. Bushing data like coefficient of friction and bushing material loss (associated with bushing wear) was determined. Self-lubricated bushings tested include products manufactured specifically for hydropower applications by the following companies: Trelleborg, Kamatics, Anonymous, and Tenneco/Deva.

42 ENGINEERING↗

Lower Snake River Dams Contribution to Grid Services

Hydroelectric generation and water storage have long been components of the clean energy mix, providing both reliable steady output and operational flexibility. As variable renewable energy sources such as wind and solar increasingly replace traditional generation, the role of all flexible resources—including hydropower—in balancing supply and demand continues to evolve. This study examined the contribution of the Lower Snake River (LSR) Dam plants to Bonneville Power Administration grid services in maintaining power system reliability within the Western Interconnection. By analyzing publicly available data, the study evaluated various reliability services through performance metrics including energy capacity, balancing and ramping, voltage and reactive power support, frequency response, and transmission impact. Results indicated that the LSR plants deliver services as expected based on their size, contributing to the balancing process, ramping capabilities, and operational reserves, particularly during peak load conditions and weather events, while also providing measurable frequency and voltage support to the grid.

13 HYDRO ENERGY↗

Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008

This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

13 HYDRO ENERGY↗

Evaluation of Fish Passage Conditions for Juvenile Salmonids Using Sensor Fish at Detroit Dam, Oregon

Fish passage conditions through two spillways at Detroit Dam on the North Santiam River in Oregon were evaluated by Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers (USACE), Portland District, using Sensor Fish devices. The objective of the study was to describe and compare passage exposure conditions through Spillbay 3 and Spillbay 6 at 1.5- and 3.5-ft gate openings, identifying potential fish injury regions of the routes. The study was performed in July 2009, concurrent with HI-Z balloon-tag studies by Normandeau Associates, Inc. Sensor Fish and live fish were deployed at elevations approximately 3 ft above structure at depths determined using a computational fluid dynamics model. Data collected were analyzed to estimate 1) exposure conditions, particularly exposure to severe collision and shear events by passage route sub-regions; 2) differences in passage conditions between passage routes; and 3) relationships to live-fish injury and mortality data estimates.

13 HYDRO ENERGY↗

Quantum Key Distribution for Critical Infrastructures: Towards Cyber-Physical Security for Hydropower and Dams

Hydropower facilities are often remotely monitored or controlled from a centralized remote control room. Additionally, major component manufacturers monitor the performance of installed components, increasingly via public communication infrastructures. While these communications enable efficiencies and increased reliability, they also expand the cyber-attack surface. Communications may use the internet to remote control a facility’s control systems, or it may involve sending control commands over a network from a control room to a machine. The content could be encrypted and decrypted using a public key to protect the communicated information. These cryptographic encoding and decoding schemes become vulnerable as more advances are made in computer technologies, such as quantum computing. In contrast, quantum key distribution (QKD) and other quantum cryptographic protocols are not based upon a computational problem, and offer an alternative to symmetric cryptography in some scenarios. Although the underlying mechanism of quantum cryptogrpahic protocols such as QKD ensure that any attempt by an adversary to observe the quantum part of the protocol will result in a detectable signature as an increased error rate, potentially even preventing key generation, it serves as a warning for further investigation. In QKD, when the error rate is low enough and enough photons have been detected, a shared private key can be generated known only to the sender and receiver. We describe how this novel technology and its several modalities could benefit the critical infrastructures of dams or hydropower facilities. The presented discussions may be viewed as a precursor to a quantum cybersecurity roadmap for the identification of relevant threats and mitigation.

97 MATHEMATICS AND COMPUTING↗

Considerations in Managing the Fill Rate of the Grand Ethiopian Renaissance Dam Reservoir Using a System Dynamics Approach.

The purpose of this study is to evaluate simulated fill rate scenarios for the Grand Ethiopian Renaissance Dam while taking into account plausible climate change outcomes for the Nile River Basin. The region lacks a comprehensive equitable water resource management strategy, which creates regional security concerns and future possible conflicts. We employ climate estimates from 33 general circulation models within a system dynamics model as a step in moving toward a feasible regional water resource management strategy. We find that annual reservoir fill rates of 8-15% are capable of building hydroelectric capacity in Ethiopia while concurrently ensuring a minimum level of stream flow disruption into Egypt before 2039. Insofar as climate change estimates suggest a modest average increase in stream flow into the Aswan, climate changes through 2039 are unlikely to affect the fill rate policies. However, larger fill rates will have a more detrimental effect on stream flow into the Aswan, particularly beyond a policy of 15%. While this study demonstrates that a technical solution for reservoir fill rates is feasible, the corresponding policy challenge is political. Implementation of water resource management strategies in the Nile River Basin specifically and Africa generally will necessitate a national and regional willingness to cooperate.

system dynamics↗

Evaluation of Juvenile Salmon Passage and Survival Through a Fish Weir and Other Routes at Foster Dam, Oregon, USA

Downstream passage for juvenile Chinook salmon (Oncorhynchus tshawytscha) and steelhead (O. mykiss) through the fish weir at Foster Dam, Oregon, was evaluated to assess the weir’s efficacy as a long-term passage solution. Radio telemetry was used to estimate survival, passage, and effectiveness for the fish weir, spillway, and turbines. Survival of Chinook salmon through the fish weir varied by season and reservoir elevation (66–87%), passage proportions were low (8–20%), and fish weir effectiveness was low to moderate (0.5–2.0). Steelhead survival was lower (57–77%) but passed the fish weir in higher proportions (77%) and weir effectiveness was consistently high (3.0–5.5). Our results indicate the existing fish weir will not be a suitable long-term passage solution for all species. However, because of the high passage proportions and effectiveness observed for steelhead, further development of the surface flow concept appears to be promising for safely passing downstream-migrating fishes.

Hughes, James S.↗

Understanding Future Safety of Dams in a Changing Climate

The safety of critical water infrastructures such as dams that are upstream of population centers and aging is gaining attention due to rapid change to landscape, climate and society. In general, Probable Maximum Precipitation (PMP) is used in the design to ensure public safety of such critical water infrastructures. We demonstrate an approach where PMP can be derived from combining traditional engineering practice and modern climate science. Using the US Pacific Northwest as an example, PMP was computed from an ensemble of earth system models and verified against historical values already used in the design of the aging water infrastructures. Our engineering-climate science approach indicates that PMP in the PNW is likely to increase by 2099 significantly compared to current estimates under a climate change scenario (RCP 8.5), mandating the need for a reevaluation of safety and resilience of these critical infrastructure now rather than later, at least in the US Pacific Northwest.

Chen, Xiaodong↗

Sensor Fish Characterization of Fish Passage Conditions through John Day Dam Spillbay 20 with a Modified Flow Deflector

Fish passage conditions over a modified deflector in Spillbay 20 at John Day Dam were evaluated by Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers (USACE), Portland District, using Sensor Fish devices. The objectives of the study were to describe and compare passage exposure conditions at two spill discharges, 2.4 and 4.0 thousand cubic feet per second (kcfs), identifying potential fish injury regions within the routes, and to evaluate a low-tailwater condition at the 2.4-kcfs discharge. The study was performed in April 2010 concurrent with HI-Z balloon-tag studies by Normandeau Associates, Inc. Sensor Fish data were analyzed to estimate 1) exposure conditions, particularly exposure to severe collision and shear events; 2) differences in passage conditions between treatments; and 3) relationships to live-fish injury and mortality data estimates. Nearly all Sensor Fish significant events were classified as collisions; the most severe occurred at the gate, on the spillbay chute, or at the deflector transition. Collisions in the gate region were observed only during the 2.4-kcfs discharge, when the tainter gate was open 1.2 ft. One shear event was observed during the evaluation, occurring at the deflector transition during passage at the 2.4-kcfs discharge at low tailwater. Flow quality, computed using the Sensor Fish turbulence index, was best for passage at the low-flow low-tailwater condition as well. The worst flow quality was observed for the 4.0-kcfs test condition. Contrasting the passage exposure conditions, the 2.4-kcfs low-tailwater treatment would be most deleterious to fish survival and well-being.

54 ENVIRONMENTAL SCIENCES↗

Computational Fluid Dynamics Modeling of the John Day Dam Tailrace

US Army Corps of Engineers-Portland District required that a two-dimensional (2D) depth-averaged and a three-dimensional (3D) free-surface numerical models to be developed and validated for the John Day tailrace. These models were used to assess potential impact of a select group of structural and operational alternatives to tailrace flows aimed at improving fish survival at John Day Dam. The 2D model was used for the initial assessment of the alternatives in conjunction with a reduced-scale physical model of the John Day Project. A finer resolution 3D model was used to more accurately model the details of flow in the stilling basin and near-project tailrace hydraulics. Three-dimensional model results were used as input to the Pacific Northwest National Laboratory particle tracking software, and particle paths and times to pass a downstream cross section were used to assess the relative differences in travel times resulting from project operations and structural scenarios for multiple total river flows. Streamlines and neutrally-buoyant particles were seeded in all turbine and spill bays with flows. For a Total River of 250 kcfs running with the Fish Passage Plan spill pattern and a spillwall, the mean residence times for all particles were little changed; however the tails of the distribution were truncated for both spillway and powerhouse release points, and, for the powerhouse releases, reduced the residence time for 75% of the particles to pass a downstream cross section from 45.5 minutes to 41.3 minutes. For a total river of 125 kcfs configured with the operations from the Fish Passage Plan for the temporary spillway weirs and for a proposed spillwall, the neutrally-buoyant particle tracking data showed that the river with a spillwall in place had the overall mean residence time increase; however, the residence time for 75% of the powerhouse-released particles to pass a downstream cross section was reduced from 102.4 min to 89 minutes.

54 ENVIRONMENTAL SCIENCES↗

Optimization of Hydroacoustic Equipment Deployment at Foster Dam (2013)

The goal of the study was to optimize performance of the fixed-location hydroacoustic systems at Foster Dam (FOS) by determining deployment and data acquisition methods that minimized structural, electrical, and acoustic interference. Optimization of the hydroacoustic systems will establish methodology for sampling by active acoustic methods during this year-long evaluation of juvenile salmonid passage at FOS.

Hughes, James S.↗

Preliminary Three-Dimensional Simulation of Sediment and Cesium Transport in the Ogi Dam Reservoir using FLESCOT – Task 6, Subtask 2

After the accident at the Fukushima Daiichi Nuclear Power Plant in March 2011, the Japan Atomic Energy Agency and the Pacific Northwest National Laboratory initiated a collaborative project on environmental restoration. In October 2013, the collaborative team started a task of three-dimensional modeling of sediment and cesium transport in the Fukushima environment using the FLESCOT (Flow, Energy, Salinity, Sediment Contaminant Transport) code. As the first trial, we applied it to the Ogi Dam Reservoir that is one of the reservoirs in the Japan Atomic Energy Agency’s (JAEA’s) investigation project.

Onishi, Yasuo↗

Acquisition of Kerr Dam and Establishment of a Wholesale Power Generation Corporation to Operate It: Hiring of Power market Coordinator and Staff Engineer (Final Report)

This project aimed at supporting one key component of a major multi-step undertaking on the part of the CSKT: the acquisition of the Kerr Hydroelectric project and its subsequent operation as a wholesale power generation facility. This project provided support to kick-start the development of the organizational structure to acquire and operate the facility by acquiring critical expertise necessary for the acquisition by funding in part two key personnel for the first two years of the four-year organizational development process. These individuals provided the Tribes with expert knowledge in the highly specialized areas of resource balancing, power marketing, and hydro-engineering; essential prerequisites to the Tribes' ability to build an organization for the operation of the Kerr Project and to securing financial backing for the acquisition. Goals achieved: • Establishing an efficient and economic conveyance process, and transition plans • Establishing an efficient and effective Tribal wholesale power generation corporation to manage the plant, balance the resources, and market the power from the Kerr Project. The success of this project, which is essential to the Tribes' acquisition of the Kerr Hydroelectric facility, helps to address poverty and unemployment among Tribal members by generating a number of highly skilled and specialized, high-paying Tribal member jobs and providing a stream of income from power sales that will be used for Tribal economic development. Objectives achieved: The project supported the position of Power Plant Operations and Maintenance engineer and power marketing coordinator positions. These are key, in part, to the Tribes' successful acquisition and operation of the facility because they will enable to the Tribes to gain the very specialized expertise required to operate a large wholesale power generation facility. Specific objectives include: Objective 1: Hire a power marketing coordinator to develop and coordinate the appropriate power marketing strategy for the sale of power generated by the operation of Kerr Dam. Objective 2: Hire a staff engineer.

13 HYDRO ENERGY↗

Financial analysis of experimental releases conducted at Glen Canyon Dam during Water Year 2013

This report examines the financial implications of experimental flows conducted at the Glen Canyon Dam (GCD) in water year 2013. It is the fifth report in a series examining the financial implications of experimental flows conducted since the Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). A report released in January 2011 examined water years 1997 to 2005 (Veselka et al. 2011), a report released in August 2011 examined water years 2006 to 2010 (Poch et al. 2011), a report released June 2012 examined water year 2011 (Poch et al. 2012), and a report released April 2013 examined water year 2012 (Poch et al. 2013).

13 HYDRO ENERGY↗

Financial Analysis of Experimental Releases Conducted at Glen Canyon Dam during Water Year 2013

This report examines the financial implications of experimental flows conducted at the Glen Canyon Dam (GCD) in water year 2013. It is the fifth report in a series examining the financial implications of experimental flows conducted since the Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). A report released in January 2011 examined water years 1997 to 2005 (Veselka et al. 2011), a report released in August 2011 examined water years 2006 to 2010 (Poch et al. 2011), a report released June 2012 examined water year 2011 (Poch et al. 2012), and a report released April 2013 examined water year 2012 (Poch et al. 2013).

54 ENVIRONMENTAL SCIENCES↗