Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Critical Function”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Advanced Supported Liquid Membranes for CO2 Control in Extravehicular Activity Applications

Developing a new, robust, portable life support system (PLSS) is currently a high priority for NASA in order to support longer and safer extravehicular activity (EVA) missions. One of the critical PLSS functions is maintaining the carbon dioxide (CO2) concentration in the suit at acceptable levels. Although the Metal Oxide (MetOx) canister has worked well, it has a finite CO2 adsorption capacity. Consequently, the unit would have to be larger and heavier to extend EVA times. Therefore, new CO2 control technologies must be developed to meet mission objectives without increasing the size of the PLSS. Although recent work has centered on sorbents that can be regenerated during the EVA, this strategy increases the system complexity and power consumption. A simpler approach is to use a membrane that selectively vents CO2 to space. A membrane has many advantages over current technology: it is a continuous system with no theoretical capacity limit, it requires no consumables, and it requires no hardware for switching beds between absorption and regeneration. Unfortunately, conventional gas separation membranes do not have adequate selectivity for use in the PLSS. However, the required performance could be obtained with a supported liquid membrane (SLM), which consists of a micro porous material filled with a liquid that selectively reacts with CO2 over oxygen (O2). In a current Phase II SBIR project, Reaction Systems has developed a new reactive liquid, which has effectively zero vapor pressure making it an ideal candidate for use in an SLM. The SLM function has been demonstrated with representative pressures of CO2, O2, and water (H2O). In addition to being effective for CO2 control, the SLM also vents moisture to space. Therefore, this project has demonstrated the feasibility of using an SLM to control CO2 in an EVA application.

Wickham, David T.↗

Continued Advancement of Supported Liquid Membranes for Carbon Dioxide Control in Extravehicular Activity Applications

The development of a new, robust, portable life support system (PLSS) is a high priority for NASA in order to support longer and safer extravehicular activity (EVA) missions. One of the critical PLSS functions is maintaining the carbon dioxide (CO2) concentration in the suit at acceptable levels. Although the Metal Oxide (MetOx) canister has historically performed very well, it has a finite CO2 adsorption capacity. Therefore, the size and weight of the unit would have to be increased to extend EVA times. Consequently, new CO2 control technologies must be developed in order to meet mission objectives without increasing the size of the PLSS. Recent work has centered on sorbents that can be regenerated during the EVA; however, this strategy increases the system complexity and power consumption. A much simpler approach is to employ a membrane that vents CO2 to space and retains oxygen (O2). A membrane has many advantages over current technology: it is a continuous system with no limit on capacity, it requires no consumables, and it does not need any hardware to switch beds between absorption and regeneration. Unfortunately, conventional gas separation membranes do not have the needed selectivity for use in the PLSS. However, the required performance could be obtained with a supported liquid membrane (SLM), which consists of a microporous material filled with a liquid that selectively reacts with CO2 over O2. In a recently completed Phase II SBIR project, Reaction Systems, Inc. achieved the required CO2 permeance and selectivity with an SLM in a flat sheet configuration. This paper describes work to convert the SLM into a more compact form and to scale it up to handle more representative process flow rates.

Wickham, David T.↗

Continued Advancement of Supported Liquid Membranes for Carbon Dioxide Control in Extravehicular Activity Applications

The Development of a new, robust, portable life support system (PLSS) is currently a high NASA priority in order to support longer and safer extravehicular activity (EVA) missions that will be necessary as space travel extends to near-Earth asteroids and eventually Mars. One of the critical PLSS functions is maintaining the carbon dioxide (CO2) concentration in the suit at acceptable levels. The Metal Oxide (MetOx) canister has a finite CO2 adsorption capacity and therefore in order to extend mission times, the unit would have to be larger and heavier, which is undesirable; therefore new CO2 control technologies must be developed. While recent work has centered on the use of alternating sorbent beds that can be regenerated during the EVA, this strategy increases the system complexity and power consumption. A simpler approach is to use a membrane that vents CO2 to space but retains oxygen(O2). A membrane has many advantages over current technology: it is a continuous system with no theoretical capacity limit, it requires no consumables, and it requires no hardware for switching beds between absorption and regeneration. Conventional gas separation membranes do not have adequate selectivity for use in the PLSS, but the required performance could be obtained with a supported liquid membrane (SLM), which consists of a microporous film filled with a liquid that selectively reacts with CO2 over oxygen (O2). In a recently completed Phase II Small Business Innovative Research project, Reaction Systems developed a new reactive liquid that has effectively zero vapor pressure, making it an ideal candidate for use in an SLM. Results obtained with the SLM in a flat sheet configuration with representative pressures of CO2, O2, and water (H2O) have shown that the CO2 permeation rate and CO2/O2 selectivity requirements have been met. In addition, the SLM vents moisture to space very effectively. The SLM has also been prepared and tested in a hollow fiber form, which will be necessary to meet size requirements in the PLSS. In initial tests, the required CO2 permeance values have been obtained, while the current CO2/O2 selectivity values are somewhat lower than needed. However, the performance of the SLM is a strong function of the method used to impregnate the sorbent in the hollow fiber walls and rapid progress is being made in that area.

Wickham, David T.↗

Reflections on Centaur Upper Stage Integration by the NASA Lewis (Glenn) Research Center

The NASA Glenn (then Lewis) Research Center (GRC) led several expendable launch vehicle (ELV) projects from 1963 to 1998, most notably the Centaur upper stage. These major, comprehensive projects included system management, system development, integration (both payload and stage), and launch operations. The integration role that GRC pioneered was truly unique and highly successful. Its philosophy, scope, and content were not just invaluable to the missions and vehicles it supported, but also had significant Agency-wide benefits. An overview of the NASA Lewis Research Center (now the NASA Glenn Research Center) philosophy on ELV integration is provided, focusing on Atlas/Centaur, Titan/Centaur, and Shuttle/Centaur vehicles and programs. The necessity of having a stable, highly technically competent in-house staff is discussed. Significant depth of technical penetration of contractor work is another critical component. Functioning as a cohesive team was more than a concept: GRC senior management, NASA Headquarters, contractors, payload users, and all staff worked together. The scope, content, and history of launch vehicle integration at GRC are broadly discussed. Payload integration is compared to stage development integration in terms of engineering and organization. Finally, the transition from buying launch vehicles to buying launch services is discussed, and thoughts on future possibilities of employing the successful GRC experience in integrating ELV systems like Centaur are explored.

Centaur↗

Low-Temperature Production of Cosmic Grains Analogs From Gas-Phase Molecular Precursors with the NASA Ames' COSmIC Facility

Complex carbon molecules and ions are ubiquitous in space and form the building blocks of carbonaceous cosmic dust grains, ultimately contributing to the formation of planets. Here, we report the first experimental investigations of the low temperature chemical pathways leading to the production of cosmic grain analogs from gas phase molecular precursors in order to better understand the evolution of cosmic carbon. The experiments were performed using the COsmic SImulation Chamber (COSmIC) to generate and characterize grains formed from gas phase precursors under controlled conditions representative of astrophysical environments [1]. Using COSmIC, it is possible to investigate the evolution of cosmic carbon from the formation of neutral and ionized gas phase hydrocarbons and PAHs [2], to carbon grains [3, 4]. This is achieved by using a discharge nozzle to (1) produce an adiabatic jet expansion and cool down Ar-hydrocarbon/PAH gas mixtures to astrophysically relevant temperature (150 K) before inducing chemistry by generating a plasma discharge in the stream of the expansion. This plasma-induced chemistry results in the formation of complex molecules and solid particles, analogs of cosmic grains. Solid grains are produced in-situ in the plasma expansion, carried by the accelerated gas in the expansion, and collected on substrates placed a few centimeters downstream of the electrodes. The results of a preliminary solid phase ex-situ analysis of cosmic grain analogs produced at low temperature in COSmIC from gas mixtures including molecular precursors of cosmic carbon grains, i.e., such as CH4 and C2H2 found in circumstellar ejecta of late C stars [3] as well as PAHs ubiquitously detected in IR emission bands seen in galactic and extragalactic environments [4] will be discussed. Scanning Electron Microscopy imaging was used to provide insight on the morphology and growth structure of the grains produced in COSmIC, and to investigate how the precursors used to produce the grains affect these parameters [3]. Laser desorption mass spectrometry was used to identify the molecules making up the main structures within the condensed grains [4]. NIR to FIR optical properties are characterized to provide critical information (functional groups, optical constants) to the scientific community, for use in radiative transfer models in particular, and to help decipher and enhance the return data from space observations.

F. Salama↗

Ground Segment Operations Concept for the Orion Artemis-2 Optical Communications System

The ACCESS Project (formerly Space Network) will implement an optical communications ground segment to support the Orion Artemis II Optical Communications (O2O) demonstration as part of the next manned human spaceflight mission to the moon, Artemis II. O2O implements laser communication (lasercomm) technology for operational use on the Orion series of spacecraft, as a development test objective (DTO), in order to demonstrate the feasibility and operational utility of lasercomm for human spaceflight missions. O2O consists of three segments: Space Segment, Ground Segment, and Operations Segment. The Space Segment consists of the Space Terminal Element and the Orion spacecraft. The Space Terminal Element effort is managed by the GSFC Laser-Enhanced Mission Communications Navigation and Operational Services (LEMNOS) project in collaboration with MIT Lincoln Laboratory. The Ground Segment consists of an optical ground terminal (GT) at the White Sands Complex (WSC), which is being developed in collaboration with MIT Lincoln Laboratory, the Ground Segment Operations and Analysis (GSOA) element and Ground Data Element (GDE), and a second optical GT in the Optical Communications Telescope Laboratory (OCTL) at the JPL Table Mountain Facility. The Operations Segment consists of the Artemis II Mission Control Center (MCC), the Lasercomm Space Terminal Console (LSTC), and the Lasercomm Link Planning & Analysis Center (LPAC), all located at the Johnson Space Center (JSC). O2O utilizes pulse-position modulation (PPM) direct-to-earth services resulting in an 80 Mbps downlink data rate from lunar orbit. The O2O concept of operations is to provide optical services for a minimum of 1 hour per day for each day of the Artemis II mission. O2O will utilize a 10-20 Mbps uplink data rate and 40-260 Mbps downlink data rate, depending on the Artemis II mission phase. The ACCESS project will also provide a centralized mission data interface for user data distribution and storage to the MCC and perform planning and scheduling of services in coordination with the Operations Segment for the O2O Ground Segment. The O2O Ground Segment will support the following O2O mission phases: Pre-Mission Planning; Daily Operations Planning; Event Execution; and Post-Pass Reporting. O2O will be used to exchange data files between Orion and the MCC and to distribute real-time video through the optical downlink service to the MCC; which would not be possible without the high-bandwidth link that O2O will provide to Orion. In this paper, I will discuss the O2O Ground Segment development approach and how it will support these critical O2O functions: plan and schedule the contact; acquire and track the optical link; flow information bidirectionally; distribute information; and control and accommodate the system.

optical communications↗

DAA Use Case for Auto Cargo m:N Operations

A detect and avoid use-case was developed to highlight detect and avoid issues associated with m:N operations in the auto cargo domain. This work is being done in conjunction with industry partners and developed for the Operational Scenario and Environmental Description (OSED) for RTCA SC-228. The detect and avoid function is critical, required technology for unmanned aircraft to operation in the national airspace. RTCA SC-228 has published MOPS (phase 1 & 2) detailing the requirements and methods of compliance. This work will help address additional operational aspects of how/when DAA will be employed by unmanned systems. Specifically, this work focuses on “auto cargo” operations. Auto cargo, in this context, refers to regularly scheduled cargo-size aircraft that are flown remotely. The Remote Pilot In Command (RPIC), in this case, is responsible for multiple aircraft, flown simultaneously. The use-case details the use of DAA in this context, the potential issues and gaps that exist.

multi-vehicle control↗

Artemis Internal Science Team: Mission Planning Update

As eloquently outlined in the Artemis III Science Definition Team (A3SDT) Report, the definitive statement of science priorities for the first crewed landing of the Artemis program, the return of astronauts to the surface of the Moon is expected to yield paradigm-shifting scientific advances across a wide array of scientific disciplines while facilitating the creation of a thriving cislunar economy. To help establish a cohesive management for the Artemis campaign, the NASA Science Mission Directorate (SMD) and the Exploration Systems Development Mission Directorate (ESDMD) have established an Artemis Internal Science Team to complement future competed surface geology and payload science teams while executing critical programmatic functions at the point of hardware element interface decisions. Here, we describe aspects of Artemis III mission planning, specifically the current progress towards selection of candidate exploration regions for the Artemis III mission.

Artemis↗

Characterizing the Risk: Review of Sensorimotor Evidence and Research Roadmap

BACKGROUND: NASA’s Artemis program will take astronauts back to the lunar surface for the first time in almost 50 years. Despite the successes of the previous Apollo program, the Artemis missions will differ in duration, vehicle characteristics, and landing tasks that may exacerbate the risks to crew health/safety and mission objectives. NASA’s Human Research Program identifies the risk of altered sensorimotor/vestibular function impacting critical mission tasks as one of the top priority risks to lunar exploration missions. This session will review the existing evidence and remaining gaps in knowledge for the sensorimotor risk. DESCRIPTION: Alterations in sensorimotor processing during spaceflight can lead to motion sickness, spatial disorientation, and decrements in postural control, locomotion, and fine motor control during and following gravity-transitions. The risk of impairment is greatest during and soon after gravity-transitions, when performance decrements may have high operational impacts (e.g., manual landings, immediate egress following landing, and early extravehicular activities (EVAs)). Recent studies have specifically improved the risk characterization of changes in perception, motion sickness, postural and locomotor control, manual control, and fine-motor coordination. However, given the difficulty in obtaining measurements during and soon after gravity-transitions, evidence for initial decrements immediately following gravity-transitions remains limited. The most significant gaps in the risk include manual control ability around gravity-transitions, the incidence and severity of motion sickness during landings, and the ability to perform egress/EVAs soon after gravity-transition. To address these gaps, current research roadmaps leverage both spaceflight studies and ground-based analogs for risk characterization and countermeasure development/validation. DISCUSSION: This panel will further describe the current sensorimotor research strategies with an emphasis on the operational scenarios of manual control, crew egress, and EVA. The goal of this research is to accommodate the needs of the crew and facilitate human capabilities to ensure lunar mission success. This work will prepare NASA for successful Artemis missions and enable the next giant leap, the exploration of Mars.

Timothy Ryan Macaulay↗

An Optimization Approach to Support Science Decision Making for Lunar Surface Exploration

Introduction: Scientific exploration is one of the three pillars of NASA’s Moon2Mars architecture, with crew surface extra vehicular activities (EVA) serving a critical enabling function. Development of surface EVA operational planning and execution, specifically integrating science and flight control teams (FCT), is currently being explored through analog scenarios. This integration, exercised, for example, through the Joint EVA and Hu-man Surface Mobility Test Team (JETT), allows for science input on EVA activities in near real-time through a Science Evaluation Room (SER), or Arte-mis science backroom, which integrates with the broader FCT through the Science Officer. The SER works within the FCT to support dynamic EVA planning in response to changes in operational constraints as well as science opportunities and re-prioritization, increasing the mission science return and accelerating the accomplishment of the Moon2Mars science objectives. The SER works within the FCT to provide recommendations to traverse execution in near real-time. One challenge is the requirement to deliver SER inputs to the FCT on operationally relevant timelines. Failure to do so may result in suboptimal execution of science exploration EVAs or even loss of key science objectives. To close this gap, we present a network optimization tool to allow the SER to provide rapid input to the FCT in response to changes in operational constraints or science opportunities. Inputs are predicated on approved science objectives, and clear rationale must be provided to the FCT for any requested change. Accordingly, this tool incorporates the Science Traceability Matrix (STM), SER prioritization scheme, and station characterization and action planning with operational constraints such as duration, traverse speed, and distance to maximize science objectives based on SER priorities, consistent with FCT operational requirements. Method: As a proof of concept, we used an existing linear programing software package used to simulate optimal routes through cellular metabolism. We built a Demonstrative Model with three STM objectives and four stations on a region of the Moon. The objectives were given an arbitrary prioritization and mapped to the stations through four possible crew actions. (Figs. 1 and 2). This station to STM mapping is consistent with the method used by the JETT5 Science Team to develop analog surface EVA science planning. We used a grid system with the landing site at the origin and the four stations placed across the positive x,y quadrant. Actions were assigned to each station and the accomplishment of those actions resulted in a numerical “reward” based on the ability of that action to achieve science objectives. The aggregate reward from each individual STM objective contributes to a global score (Science Yield), weighted by its priority. Operational constraints included a requirement to start and end at the landing site, 5 minutes each for initial station characterization and “clean up,” and variable total EVA time, traverse rate (fixed to 0.5 meters per second in our example), and time to perform each action (10, 5, 7, and 15 min for actions 1, 2, 3, and 4, respectively). Additional constraints and variables will be added in the future (e.g., sample mass, number of stations, traverse route constraints, illumination). Optimization. We converted the connections (arcs) between these stations (nodes) into a mixed integer linear programming optimization problem (arcs = constraints, nodes = variables) with the objective to maximize Science Yield. For any action, the Science Yield is equal to the relevance of that action to an STM objective [3, 2, and 1 point(s) for High, Med., and Low relevance, respectively], multiplied by the STM Objective Priority [3, 2, and 1 point(s) for High, Med., and Low priority, respectively]. This resulted in a model that computes the optimal station and action combination to maximize the Science Yield. These weightings can be adjusted by the SER as desired. Results: We explored three test cases for the Demonstrative Model. First, we set the maximum EVA duration to 120 minutes and computed the optimal route (Fig. 3A). The model suggested per-forming Actions 1 and 2 at Station P01, followed by Actions 1 and 2 at Station P02, and finally Actions 1 and 3 at Station P04 before returning to the Landing Site. Second, we adjusted the STM Objective Priori-ty order and computed the new optimal route (Fig. 3B). Under this situation, the model suggested per-forming all Actions at Station P02 followed by all Actions at Station P03. The previous test cases were relevant to SER planning activities. Next, we explored providing mid-EVA replanning input to the FCT. Scenario: While executing the Route in Fig. 3A the crew finishes at Station P01 and FCT decides that the EVA needs to finish in 45 minutes back at the Landing Site. FCT asks SER to recommend changes to the plan to accommodate this operation-al change. Using the model and incorporating these new constraints (start at Station P01, max. time of 45 min), the model suggested performing Actions 2 and 4 at Station P03 (Fig. 4), requiring 41 minutes to complete and return to the Landing Site. Interestingly, Station 3 was not part of the original route. Using the model, we determined the EVA would need 66 minutes, instead of 45, in order for the original Station P04 to yield a larger Science Yield than Station P03. The parametrization and simulation was per-formed in less than a minute, demonstrating the operational relevance of the approach. Future Efforts: The results from the Demonstrative Model suggest this tool can accelerate SER decision making on operationally relevant timelines. Use in analog activities, such as JETT5 or follow-ons, which have over a dozen stations for a crew to explore and over a dozen actions per station, will provide needed validation of the utility of this tool for planning EVAs, replanning mid-EVA, or planning follow-on EVAs based on previous results. Further integration with FCT execution monitoring tools may provide additional efficiency gains, al-lowing rapid and iterative exploration of operation-al and science decision space by the FCT and SER.

Science Operations↗

Assessing the Feasibility of Using Various Earth Observations to Monitor Environmental Trends Associated with River Flow Impediments Near Energy Intake Structures

Grassing events, characterized by the release of river vegetation in large quantities, are often responsible for major flow impediments surrounding industrial water intake structures. These sudden flow impediments halt critical municipal functions, such as cooling at energy generating facilities, leading to widespread energy disruptions for surrounding communities. Because the origin and cause of grassing events in rivers are largely unknown, employees at these facilities can only reactively respond after they occur by pausing energy generation to manually remove the accumulation of aquatic vegetation. In 2023, the Dresden Generating Station, in collaboration with the United States Geological Survey, began looking into using remote sensing methodologies to locate floating aquatic vegetation surrounding their intake structure located along the Kankakee River in northern Illinois. This project contributed to this effort by conducting a case study that compared the performance, practicality, and feasibility of using various Earth observations (Landsat 9 OLI-2, Landsat 8 OLI, Sentinel-2 MSI, and DOVE PlanetScope) and vegetation indices (NDVI, EVI, SAVI, and GCI) to monitor aquatic vegetation in the Kankakee River. Additionally, this study incorporated several environmental metrics to identify potential triggers for grassing events. Results from this project found that while Landsat sensors provide a lower spatial resolution than commercial satellite Earth observations, areas of aquatic vegetation were similarly identified; therefore, it may not be necessary to acquire expensive, high-resolution datasets for continued monitoring. Finally, preliminary correlation analyses showed a potential negative relationship between the river discharge and the presence of aquatic vegetation (-0.875 correlation coefficient), suggesting that periods of low flow could lead to large releases in aquatic vegetation.

Marisa Smedsrud↗

Improving Project Management with Simulation and Completion Distribution Functions

Despite the critical importance of project completion timeliness, management practices in place today remain inadequate for addressing the persistent problem of project completion tardiness. A major culprit in late projects is uncertainty, which most, if not all, projects are inherently subject to. This uncertainty resides in the estimates for activity durations, the occurrence of unplanned and unforeseen events, and the availability of critical resources. In response to this problem, this research developed a comprehensive simulation based methodology for conducting quantitative project completion time risk analysis. It is called the Project Assessment by Simulation Technique (PAST). This new tool enables project stakeholders to visualize uncertainty or risk, i.e. the likelihood of their project completing late and the magnitude of the lateness, by providing them with a completion time distribution function of their projects. Discrete event simulation is used within PAST to determine the completion distribution function for the project of interest. The simulation is populated with both deterministic and stochastic elements. The deterministic inputs include planned project activities, precedence requirements, and resource requirements. The stochastic inputs include activity duration growth distributions, probabilities for events that can impact the project, and other dynamic constraints that may be placed upon project activities and milestones. These stochastic inputs are based upon past data from similar projects. The time for an entity to complete the simulation network, subject to both the deterministic and stochastic factors, represents the time to complete the project. Repeating the simulation hundreds or thousands of times allows one to create the project completion distribution function. The Project Assessment by Simulation Technique was demonstrated to be effective for the on-going NASA project to assemble the International Space Station. Approximately $500 million per month is being spent on this project, which is scheduled to complete by 2010. NASA project stakeholders participated in determining and managing completion distribution functions produced from PAST. The first result was that project stakeholders improved project completion risk awareness. Secondly, using PAST, mitigation options were analyzed to improve project completion performance and reduce total project cost.

Cates, Grant R.↗

ISS Radiator Face Sheet Anomaly Investigation and Return to Function

Maintaining sufficient heat rejection on the International Space Station (ISS) is critical to the function of the Low-Earth Orbit station. The External Active Thermal Control System (EATCS) rejects the excess heat generated by the US On-Orbit Segment (USOS) modules. The system uses single-phase liquid ammonia to collect the heat and reject it to six radiators (three on the Starboard side, three on the Port side). Each radiator is made up of eight panels. In September 2008, imagery of the Starboard radiators was conducted and showed one of the panels’ face sheets had peeled up from the internal honeycomb core structure. Out of an abundance of caution, the radiator was isolated from the rest of the EATCS and the ammonia was vented to space. Since the radiator was vented, periodic imagery of all radiator panels was taken to monitor any changes in the face sheet and inspect for other radiator anomalies. In January 2025, after years of trending and inspections, the radiator was reintegrated into the system to increase heat rejection capabilities. This paper will document the multi-year investigation that took place to determine root cause and mitigations implemented to reduce risk to the system. A summary of the data since the investigation will show rationale for reintegrating the radiator even with the damaged panel. The goal of the paper is to document the investigation for historical purposes and provide future programs with findings discovered during the investigation.

Aaron Rodriguez↗

ISS Radiator Face Sheet Anomaly Investigation and Return to Function

Maintaining sufficient heat rejection on the International Space Station (ISS) is critical to the function of the Low-Earth Orbit station. The External Active Thermal Control System (EATCS) rejects the excess heat generated by the US On-Orbit Segment (USOS) modules. The system uses single-phase liquid ammonia to collect the heat and reject it to six radiators (three on the Starboard side, three on the Port side). Each radiator is made up of eight panels. In September 2008, imagery of the Starboard radiators was conducted and showed one of the panels’ face sheets had peeled up from the internal honeycomb core structure. Out of an abundance of caution, the radiator was isolated from the rest of the EATCS and the ammonia was vented to space. Since the radiator was vented, periodic imagery of all radiator panels was taken to monitor any changes in the face sheet and inspect for other radiator anomalies. In January 2025, after years of trending and inspections, the radiator was reintegrated into the system to increase heat rejection capabilities. This paper will document the multi-year investigation that took place to determine root cause and mitigations implemented to reduce risk to the system. A summary of the data since the investigation will show rationale for reintegrating the radiator even with the damaged panel. The goal of the paper is to document the investigation for historical purposes and provide future programs with findings discovered during the investigation.

Aaron Rodriguez↗

Overview of Micrometeoroid and Orbital Debris Analysis Process for Mars Sample Return Earth Entry System

Introduction: Micrometeoroid and orbital debris (MMOD) risk analyses for the Mars Sample Return (MSR) Earth Entry System (EES) have been significantly more rigorous than previously flown missions because of its categorization as a Class V restricted return mission. This means the returned samples present significant concern for biogenic contamination. These analyses seek to determine if a micrometeoroid or orbital debris strike would result in loss of containment assurance and are summarized in the flowchart in Fig. 1. Methodology: The mission is considered in two MMOD phases: a pre-release phase where the EES is protected by a Micrometeoroid Protection System (MMPS) and a post-release phase called “free-flight” where the EES is exposed directly to the MMOD environment. These phases correspond to interplanetary cruise and imminent re-entry, respectively. To inform the MMPS design, a 30-shot high velocity impact testing (HVIT) series on candidate configurations at NASA White Sands Test Facility was completed in the summer of 2022. Sample post-shot images are shown in Fig 2 [1]. These data are used to baseline the MMPS design and to tune the hydrocode simulations. ALE3D, CTH, and SPHC are the hydrocodes that simulate physics of high-speed impacts [2]. Results generated with these populate a penetration depth versus energy space beyond the testable velocity regime of HVIT (~7 km/s). The penetration depth versus energy space data are used to define a critical projectile diameter function called a Ballistic Limit Equation (BLE), where the projectile “criticality” is determined by zone dependent failure criteria defined a-priori [3]. For example, the nose of the heatshield has a failure criterion of 50% TPS penetration, assigned because the landing loads are concentrated on that region and no substructure damage is permitted. The BLEs for each vehicle material zone are input into the BUMPER 3 code, along with the vehicle surface mesh and the corresponding space environment model, to calculate a probability of penetration or number of penetrations. The environment models, MEM3 for MM and ORDEM 3.2 for OD, simulate the meteoroid environment from 0.2 to 2 au based on the Grün flux equation, and the debris environment up to 40,000 km altitude from Earth surface, respectively [4,5]. Presentation Focus: The presentation or poster will present the results to-date focusing on the full risk analysis process flow seen in Fig. 1. Details on the derivation of the failure criteria will be discussed, along with HVIT results and how these influenced the MMPS configuration baseline decision. Further, results of hydrocode simulations will be presented and the tuning to HVIT outputs will be described. Finally, the strategies that direct the BLE formulation will be reviewed, specifically, for the EES elements that are most exposed to the MMOD environment.

mmod↗

Study of a flight monitor for jet engine disk cracks using the critical length criterion of fracture mechanics

A disk crack detector is discussed which is intended to operate while in flight. The crack detector monitors the disk rim for radial surface cracks emanating from the blade root interface. An eddy current type sensor with a remotely located capacitance-resistance bridge and signal analyzer is able to detect reliably a simulated crack 1/8 in. long. The sensor was tested at rim velocities of 600 fps and at 1000 F. Fracture mechanics is used to calculate the critical crack length. Knowledge of the crack growth rate permits the calculation of the number of stress cycles remaining for the detected crack to grow to critical size. A plot is presented of the remaining life as a function of the critical crack length and the operating stress. It is shown that for a disk of Inconel 718 a through-the-thickness crack operating under a rim stress of 50 kpsi has a critical length of 0.7-in. and a remaining life of 130 flights.

Barranger, J. P.↗

A critical analysis of air shower structure functions and size spectrum measurements with the NBU air shower array

A total of 11,000 showers in the size range 10 to the 4 to 10 to the 6 particles so far detected by the NBU air shower array has been analyzed using five different structure functions. A comparison of structure functions in terms: (1) of shower size; and (2) electron density at various core distances has been discussed to indicate the present status of structure functions in air shower analysis.

Chaudhuri, N.↗