Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Commercial Partner”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Building an Economical and Sustainable Lunar Infrastructure to Enable Human Missions

To enable return of human missions to the surface of the Moon sustainably, a new study was initiated to assess the feasibility of developing an evolvable, economical and sustainable lunar surface infrastructure using a public-private partnerships approach. This approach would establish partnerships between NASA and private industry to mutually develop lunar surface infrastructure capabilities to support robotic missions initially and later evolve to full-scale commercial infrastructure services in support of human missions. These infrastructure services may range from power systems, communication and navigation systems, thermal management systems, mobility systems, water and propellant production to life support systems for human habitats. The public-private partnerships approach for this study leverages best practices from NASA’s Commercial Orbital Transportation Services (COTS) program which introduced an innovative and economical approach for partnering with industry to develop commercial cargo transportation services to the International Space Station (ISS). In this approach, NASA and industry partners shared cost and risk throughout the development phase which led to dramatic reduction in development and operations costs of these transportation services. Following this approach, a Lunar COTS concept was conceived to develop cost-effective surface infrastructure capabilities in partnership with industry to provide economical, operational services for small-scale robotic missions. As a result, a self-contained lunar infrastructure system with power, thermal, communication and navigation elements was conceptually designed to increase capability, extend mission duration and reduce cost of small-scale robotic missions. To support human missions, this work has now been extended to analyze full-scale lunar infrastructure systems. This infrastructure system should have capabilities to support human missions from a few days to several months with minimal maintenance and replacement of parts. This infrastructure system should also maximize the use of existing lunar resources, such as, oxygen from regolith, water from ice deposits at the poles, and use of metals, such as iron and aluminum, from lunar regolith. The plan includes a buildup of these capabilities using a phased-development approach that will eventually lead to operational infrastructure services. By partnering with industry to develop and operate the infrastructure services using the COTS model, this plan should also result in significant cost savings and increased reliability. This paper will describe the Lunar COTS concept goals, objectives and approach for developing an evolvable, economical and sustainable human lunar infrastructure as well as the challenges and opportunities for development.

Zuniga, Allison↗

Best Practices Identified Through the Completion of UAS Flight Demonstrations

After several years of research into Detect and Avoid (DAA) and Command and Control (C2) systems for Unmanned Aircraft Systems (UAS), the National Aeronautics and Space Administration’s (NASA) UAS Integration into the National Airspace System project initiated a focused two-year effort along with the Federal Aviation Administration (FAA) and three industry partners to investigate remaining issues in the specification, test, certification and airspace integration to allow UAS operations in non-segregated airspace. The approach taken had the industry partners propose a flight demonstration approximating a commercial operation, while NASA helped, as needed, the partners through design and test phases and NASA observed interactions with the FAA. During this effort NASA collected best practices intended to be of value to similar UAS endeavors. These best practices can be divided into different sets, including practices that describe the relationship between business considerations to UAS design or describe several UAS development challenges. Another set includes best practices focused on navigating the UAS design and type certification processes. A third set includes best practices that relate to the design of the DAA system. Deploying DAA systems in this timeframe posed unique challenges. Commercial off-the-shelf DAA systems do not exist, necessitating custom development and, for two of the partners, the use of low-size, -weight, and -power (SWaP) sensors not completely specified for DAA. A fourth set of best practices relates to lost-link contingency planning. The final set of best practices relates to the design and testing of C2 systems and obtaining spectrum licenses. The UAS demonstrations were piloted remotely, and for all aspects of flight safety, a C2 system was required to communicate DAA and other UAS subsystem data to the remote pilot and to allow the pilot to issue commands to the vehicle. Throughout the course of this effort, the partners integrated prototype DAA and C2 systems into unmanned aircraft, tested those systems, and laid the groundwork for type certification programs that are expected to continue.

NASA↗

Building an Economical and Sustainable Lunar Infrastructure to Enable Human Lunar Missions

To enable return of human missions to the surface of the Moon sustainably, a new study was initiated to assess the feasibility of developing an evolvable, economical and sustainable lunar surface infrastructure using a public-private partnerships approach. This approach would establish partnerships between NASA and private industry to mutually develop lunar surface infrastructure capabilities to support robotic missions initially and later evolve to full-scale commercial infrastructure services in support of human missions. These infrastructure services may range from power systems, communication and navigation systems, thermal management systems, mobility systems, water and propellant production to life support systems for human habitats. The public-private partnerships approach for this study leverages best practices from NASA's Commercial Orbital Transportation Services (COTS) program which introduced a new innovative and economical approach for partnering with industry to develop commercial cargo transportation services to the International Space Station (ISS). In this approach, NASA and industry partners shared cost and risk throughout the development phase which led to dramatically reducing development and operations costs of these transportation services. Following this approach, a Lunar COTS concept was conceived to follow this model and gradually develop cost-effective surface infrastructure capabilities in partnership with industry to provide economical, operational services for small-scale robotic missions. To support human missions, this work has now been extended to analyze full-scale lunar infrastructure systems. This infrastructure system will have capabilities to support human missions from a few days to several months and will also maximize the use of existing lunar resources, such as, water from ice deposits at the lunar poles. The plan includes a gradual buildup of these capabilities using a phased-development approach that will eventually lead to operational infrastructure services. By partnering with industry to develop and operate the infrastructure services using the COTS model, this plan will also result in significant cost savings, reduced risk and increased reliability. This paper will describe the Lunar COTS concept goals, objectives and approach for developing an evolvable, economical and sustainable human lunar infrastructure as well as the challenges and opportunities for development.

Lunar Surface Systems↗

Bell Unmanned Aircraft Systems Integration and Operationalization (SIO) Demonstration: Final Report, Summary of Research

National Aeronautics and Space Administration (NASA) initiated the Unmanned Aircraft Systems Integration and Operationalization (SIO) demonstration as a partnership between NASA and Industry with the goal of accelerating routine unmanned aircraft systems (UAS) operations in the national airspace (NAS). In order to accomplish this goal, NASA partnered separately with Bell and two other industry teams each pioneering the development, integration, and testing of their UAS, with the intent to make progress towards type certification. The program culminated in flight demonstrations representing future commercial operations by each partner.

Flight Demonstration↗

Summary of Research Report Cooperative Agreement

Several areas of work related to commercialization of technology developed at NASA Ames Research Center (ARC) are discussed in this report. The areas are: (1) perform a feasibility study to develop a software commercialization center is at ARC; (2) perform preliminary work for formation of joint development of sensor technology for telemedicine applications; (3) development of a discovery interview process and staff training to assist the commercialization of technology developed at Ames, specifically aimed at working with researchers; (4) develop partners to further develop and commercialize image compression technology developed at AMES; (5) assist efforts to commercialize a software technology which imparts the ability to establish relevance-based retrieval in the handling of large repositories of information; (6) explore the development of cryocooler technology using pulse tube refrigeration; (7) assess interest in commercialization of a new method of measuring skin friction drag on wind tunnel models using liquid crystal material; (8) attempt to incorporate emerging technologies in the infrastructure of natural hazards mitigation; and (9) forming a nonprofit organization, "The Bootstrap Alliance", whose mission is to promote the use of digital technologies for collaborative problem solving. The results of these initiatives are discussed.

Source record↗

Optical Fiber Protection

F&S Inc. developed and commercialized fiber optic and microelectromechanical systems- (MEMS) based instrumentation for harsh environments encountered in the aerospace industry. The NASA SBIR programs have provided F&S the funds and the technology to develop ruggedized coatings and coating techniques that are applied during the optical fiber draw process. The F&S optical fiber fabrication facility and developed coating methods enable F&S to manufacture specialty optical fiber with custom designed refractive index profiles and protective or active coatings. F&S has demonstrated sputtered coatings using metals and ceramics and combinations of each, and has also developed techniques to apply thin coatings of specialized polyimides formulated at NASA Langley Research Center. With these capabilities, F&S has produced cost-effective, reliable instrumentation and sensors capable of withstanding temperatures up to 800? C and continues building commercial sales with corporate partners and private funding. More recently, F&S has adapted the same sensing platforms to provide the rapid detection and identification of chemical and biological agents

Source record↗

The EXIST Mission Concept Study

EXIST is a mission designed to find and study black holes (BHs) over a wide range of environments and masses, including: 1) BHs accreting from binary companions or dense molecular clouds throughout our Galaxy and the Local Group, 2) supermassive black holes (SMBHs) lying dormant in galaxies that reveal their existence by disrupting passing stars, and 3) SMBHs that are hidden from our view at lower energies due to obscuration by the gas that they accrete. 4) the birth of stellar mass BHs which is accompanied by long cosmic gamma-ray bursts (GRBs) which are seen several times a day and may be associated with the earliest stars to form in the Universe. EXIST will provide an order of magnitude increase in sensitivity and angular resolution as well as greater spectral resolution and bandwidth compared with earlier hard X-ray survey telescopes. With an onboard optical-infra red (IR) telescope, EXIST will measure the spectra and redshifts of GRBs and their utility as cosmological probes of the highest z universe and epoch of reionization. The mission would retain its primary goal of being the Black Hole Finder Probe in the Beyond Einstein Program. However, the new design for EXIST proposed to be studied here represents a significant advance from its previous incarnation as presented to BEPAC. The mission is now less than half the total mass, would be launched on the smallest EELV available (Atlas V-401) for a Medium Class mission, and most importantly includes a two-telescope complement that is ideally suited for the study of both obscured and very distant BHs. EXIST retains its very wide field hard X-ray imaging High Energy Telescope (HET) as the primary instrument, now with improved angular and spectral resolution, and in a more compact payload that allows occasional rapid slews for immediate optical/IR imaging and spectra of GRBs and AGN as well as enhanced hard X-ray spectra and timing with pointed observations. The mission would conduct a 2 year full sky survey in scanning mode, interrupted for several orbits per day by GRB follow-ups, followed by a combined pointing-scanning mission phase for optical/IR spectroscopy and redshifts for the large AGN sample found in the survey as well as GRBs and LSST transients. A Team of university, NASA, and industry investigators will conduct the study to determine the full sensitivity and capabilities of this new configuration for EXIST. It will build on the extensive studies of the prior design for the mission and the HET and will incorporate the optical/IR telescope (hereafter IRT) now fully developed by our ITT partner for the NextView Commercial Remote Sensing mission (early 2008 launch) with a focal plane to be developed at GSFC based in part on JWST/NIRSPEC designs. No new technology is needed for either the IRT or HET instruments. The study will pay close attention to full mission cost and present a design for the Decadal Survey Workshop to ensure this even more capable EXIST mission is once again part of the next Decadal Survey.

Fishman, Gerald J.↗

Determining Trajectory of Triboelectrically Charged Particles, Using Discrete Element Modeling

The Kennedy Space Center (KSC) Electrostatics and Surface Physics Laboratory is participating in an Innovative Partnership Program (IPP) project with an industry partner to modify a commercial off-the-shelf simulation software product to treat the electrodynamics of particulate systems. Discrete element modeling (DEM) is a numerical technique that can track the dynamics of particle systems. This technique, which was introduced in 1979 for analysis of rock mechanics, was recently refined to include the contact force interaction of particles with arbitrary surfaces and moving machinery. In our work, we endeavor to incorporate electrostatic forces into the DEM calculations to enhance the fidelity of the software and its applicability to (1) particle processes, such as electrophotography, that are greatly affected by electrostatic forces, (2) grain and dust transport, and (3) the study of lunar and Martian regoliths.

Source record↗

Electrical-Impedance-Based Ice-Thickness Gauges

Langley Research Center has developed electrical-impedance-based ice-thickness gauges and is seeking partners and collaborators to commercialize them. When used as parts of active monitoring and diagnostic systems, these gauges make it possible to begin deicing or to take other protective measures before ice accretes to dangerous levels. These gauges are inexpensive, small, and simple to produce. They can be adapted to use on a variety of stationary and moving structures that are subject to accumulation of ice. Examples of such structures include aircraft, cars, trucks, ships, buildings, towers, power lines (see figure), power-generating equipment, water pipes, freezer compartments, and cooling coils. A gauge of this type includes a temperature sensor and two or more pairs of electrically insulated conductors embedded in a surface on which ice could accumulate. The electrical impedances of the pairs of conductors vary with the thickness of any ice that may be present. Somewhat more specifically, when the pairs of conductors are spaced appropriately, the ratio between their impedances is indicative of the thickness of the ice. Therefore, the gauge includes embedded electronic circuits that measure the electrical impedances, plus circuits that process the combination of temperature and impedance measurements to determine whether ice is present and, if so, how thick it is. Of course, in the processing of the impedance measurements, the temperature measurements help the circuitry to distinguish between liquid water and ice. The basic design of a gauge of this type can be adapted to local conditions. For example, if there is a need to monitor ice over a wide range of thickness, then the gauge can include more than two sets of conductors having various spacings.

Weinstein, Leonard↗

Space Launch System Accelerated Booster Development Cycle

With the retirement of the Space Shuttle, NASA is seeking to reinvigorate the national space program and recapture the public s interest in human space exploration by developing missions to the Moon, near-earth asteroids, Lagrange points, Mars, and beyond. The would-be successor to the Space Shuttle, NASA s Constellation Program, planned to take humans back to the Moon by 2020, but due to budgetary constraints was cancelled in 2010 in search of a more "affordable, sustainable, and realistic" concept2. Following a number of studies, the much anticipated Space Launch System (SLS) was unveiled in September of 2011. The SLS core architecture consists of a cryogenic first stage with five Space Shuttle Main Engines (SSMEs), and a cryogenic second stage using a new J-2X engine3. The baseline configuration employs two 5-segment solid rocket boosters to achieve a 70 metric ton payload capability, but a new, more capable booster system will be required to attain the goal of 130 metric tons to orbit. To this end, NASA s Marshall Space Flight Center recently released a NASA Research Announcement (NRA) entitled "Space Launch System (SLS) Advanced Booster Engineering Demonstration and/or Risk Reduction." The increased emphasis on affordability is evident in the language used in the NRA, which is focused on risk reduction "leading to an affordable Advanced Booster that meets the evolved capabilities of SLS" and "enabling competition" to "enhance SLS affordability. The purpose of the work presented in this paper is to perform an independent assessment of the elements that make up an affordable and realistic path forward for the SLS booster system, utilizing advanced design methods and technology evaluation techniques. The goal is to identify elements that will enable a more sustainable development program by exploring the trade space of heavy lift booster systems and focusing on affordability, operability, and reliability at the system and subsystem levels5. For this study, affordability is defined as lifecycle cost, which includes design, development, test, and engineering (DDT&E), production and operational costs (P&O). For this study, the system objectives include reducing DDT&E schedule by a factor of three, showing 99.9% reliability, flying up to four times per year, serving both crew and cargo missions, and evolving to a lift capability of 130 metric tons.3 After identifying gaps in the current system s capabilities, this study seeks to identify non-traditional and innovative technologies and processes that may improve performance in these areas and assess their impacts on booster system development. The DDT&E phase may be improved by incorporating incremental development testing and integrated demonstrations to mitigate risk. To further reduce DDT&E, this study will also consider how aspects of the booster system may have commonality with other users, such as the Department of Defense, commercial applications, or international partners; by sharing some of the risk and investment, the overall development cost may be reduced. Consideration is not limited to solid and liquid rocket boosters. A set of functional performance characteristics, such as engine thrust, specific impulse (Isp), mixture ratio, and throttle range are identified and their impacts on the system are evaluated. This study also identifies how such characteristics affect overall life cycle cost, including DDT&E and fixed and variable P&O.

Arockiam, Nicole↗

Innovative Coatings Potentially Lower Facility Maintenance Costs

Through extensive testing at Stennis Space Center, Nanocepts Inc. of Lexington, Kentucky, received key validation of the effectiveness of its photocatalytic coatings. Now a NASA Dual Use Technology partner, the company s commercial coatings offer unique environmental and medical benefits, and their self-cleaning properties help limit grime buildup on buildings.

Source record↗

Flat H Redundant Frangible Joint Development

Orion and Commercial Crew Program (CCP) Partners have chosen to use frangible joints for certain separation events. The joints currently available are zero failure tolerant and will be used in mission safety applications. The goal is to further develop a NASA designed redundant frangible joint that will lower flight risk and increase reliability. FY16 testing revealed a successful design in subscale straight test specimens that gained efficiency and supports Orion load requirements. Approach / Innovation A design constraint is that the redundant joint must fit within the current Orion architecture, without the need for additional vehicle modification. This limitation required a design that changed the orientation of the expanding tube assemblies (XTAs), by rotating them 90deg from the standard joint configuration. The change is not trivial and affects the fracture mechanism and structural load paths. To address these changes, the design incorporates cantilevered arms on the break plate. The shock transmission and expansion of the XTA applies force to these arms and creates a prying motion to push the plate walls outward to the point of structural failure at the notched section. The 2014 test design revealed that parts could slip during functioning wasting valuable energy needed to separate the structure with only a single XTA functioning. Dual XTA functioning fully separated the assembly showing a discrepancy can be backed up with redundancy. Work on other fully redundant systems outside NASA is limited to a few patents that have not been subjected to functionality testing Design changes to prevent unwanted slippage (with ICA funding in 2015) showed success with a single XTA. The main goal for FY 2016 was to send the new Flat H RFJ to WSTF where single XTA test failures occurred back in 2014. The plan was to gain efficiency in this design by separating the Flat H RFJ with thicker ligaments with dimensions baselined in 2014. Other modifications included geometry changes to better disperse loads paths and to minimize air gaps. The design additionally added more structural strength to enhance the structural limits in static loads testing. The design also implemented a smoother load line through the assembly. Results / Knowledge Gained The new Flat H RFJ successfully fractured at WSTF with thicker ligaments and lower cord size. Where failure to separate occurred earlier, there is now excessive energy available for structural separation. The new challenge to provide some structural support to prevent secondary fracturing of the break plate remains to be completed. This future work is being funded by the JSC Engineering Directorate in 2017 to elevate the TRL on curved Flat H RFJs that configure with the Orion Service Panel Separation. Additional funding from JSC Engineering will provide new design testing to avoid secondary fracturing.

Brown, Chris↗

NASA's Advanced Exploration Systems Mars Transit Habitat Refinement Point of Departure Design

This paper describes the recently developed point of departure design for a long duration, reusable Mars Transit Habitat, which was established during a 2016 NASA habitat design refinement activity supporting the definition of NASA's Evolvable Mars Campaign. As part of its development of sustainable human Mars mission concepts achievable in the 2030s, the Evolvable Mars Campaign has identified desired durations and mass/dimensional limits for long duration Mars habitat designs to enable the currently assumed solar electric and chemical transportation architectures. The Advanced Exploration Systems Mars Transit Habitat Refinement Activity brought together habitat subsystem design expertise from across NASA to develop an increased fidelity, consensus design for a transit habitat within these constraints. The resulting design and data (including a mass equipment list) contained in this paper are intended to help teams across the agency and potential commercial, academic, or international partners understand: 1) the current architecture/habitat guidelines and assumptions, 2) performance targets of such a habitat (particularly in mass, volume, and power), 3) the driving technology/capability developments and architectural solutions which are necessary for achieving these targets, and 4) mass reduction opportunities and research/design needs to inform the development of future research and proposals. Data presented includes: an overview of the habitat refinement activity including motivation and process when informative; full documentation of the baseline design guidelines and assumptions; detailed mass and volume breakdowns; a moderately detailed concept of operations; a preliminary interior layout design with rationale; a list of the required capabilities necessary to enable the desired mass; and identification of any worthwhile trades/analyses which could inform future habitat design efforts. As a whole, the data in the paper show that a transit habitat meeting the 43 metric tons launch mass/trans-Mars injection burn limits specified by the Evolvable Mars Campaign is achievable near the desired timeframe with moderate strategic investments including maintainable life support systems, repurposable structures and packaging, and lightweight exercise modalities. It also identifies operational and technological options to reduce this mass to less than 41 metric tons including staging of launch structure/packaging and alternate structural materials.

Simon, Matthew↗

Nasa's Plans for Development of a Standard for Additively Manufactured Components

The current version of NASA standards for manned spaceflight hardware do not contain sufficient detail for the certification of additively manufactured components. The development of additively manufactured standards is currently in work by several standards organizations. However, NASA cannot wait on these organizations to develop such standards. NASA and its program partners in manned spaceflight (Commercial Crew, Space Launch System and the Orion Multi-Purpose Crew Vehicle) are actively developing additively manufactured components for flight as early as 2019.

Russell, Richard W.↗

VIPER – Volatiles Investigating Polar Exploration Rover: Mission Overview

VIPER is a low cost, lunar volatiles detection and measurement mission that will be delivered to the lunar south pole by one of NASA’s Commercial Lunar Payload Services partners and will characterize the nature of the volatiles in the area and extrapolate this data to create global lunar water resource maps. It will be the first mining expedition on another world while simultaneously addressing fundamental planetary science questions. Prospecting for lunar water at the poles is the next step in understanding the resource potential and addressing key theories about water emplacement and retention. It now appears that potentially economically significant amounts of water ice exists at the poles of the Moon, however, the distribution of this water is still not understood at a level sufficient to fully evaluate economic models. The water ice (and other potential volatiles), the “ore body”, needs to be understood at the scales of 10s to 100s of meters to evaluate localization, extraction and processing techniques. To accomplish this, VIPER will survey permanently-shadowed regions, semi-permanent shadowed regions, and even semi and full sunlit areas in order to have a comprehensive survey of polar region volatiles, to best inform future mission architectures. In order to characterize the volatiles, a payload suite consisting of a neutron spectrometer, mass spectrometer, near infrared spectrometer and a 1-meter drill will be hosted on the VIPER mobile lunar rover platform. Since VIPER is a relatively low cost, schedule-constrained, risk-tolerant mission, there are architectural limitations that require unique mission planning constraints to enable exploration of the lunar south pole region. These regions offer unique challenges such as uncertain terrain conditions, rock and crater hazards, lunar dust, multipath communications effects, extreme thermal environments and multiple overlapping planning constraints. Mission design/traverse planning, system design capabilities and mission operations are all highly linked through initial development phases. We will describe the current mission overview and the unique approaches taken by the VIPER project based on our programmatic framework and unique mission environment.

VIPER↗

NASA’s Moon to Mars (M2M) Transit Habitat Refinement Point of Departure Design

As NASA prepares for the next human footsteps on the lunar surface, the Agency is already looking ahead to systems that will enable a sustained human presence on the lunar surface and mission to Mars, including a lunar Surface Habitat (SH) and Mars Transit Habitat (TH). This paper describes the latest NASA government reference design for the TH and how it will support NASA's Moon to Mars human exploration architecture. First, it will serve as a test and demonstration platform in lunar orbit, demonstrating capabilities required for long-duration microgravity human spaceflight as part of the lunar-Mars analog missions. Then, the TH will serve as a major Mars exploration element to support crew habitation during their transit from the Earth’s orbit to Mars and returning safely before TH’s return to a lunar orbit. This paper will cover several considerations contributing to the latest habitat design refinement, including the TH's concept of operations, system functional definition, subsystem assumptions, notional interior layouts, a detailed mass and volume breakdown, and identify future trade studies and analyses required to close identified technology/ development/architecture gaps. In addition to a technical description of the TH, this paper describes how the current TH government reference design will achieve many of the current lunar and Mars mission goals. Additionally, there are many assumed technological advances needed to support the prescribed mission phases leading up to the crewed mission to Mars in the late 2030s. The paper will describe many of the TH systems requiring further technology development and identify architectural solutions to achieve these mass, reliability, autonomy, and crew health targets. As a whole, the data shows the government reference TH design meeting the 26.4 metric ton launch /trans-Mars injection burn control mass limit outlined within NASA’s Moon to Mars Campaign. This is achievable near the desired timeframe with moderate strategic investments including maintainable life support systems, innovative structures configuration and materials, and system/ logistics packaging. The resulting design detail and data contained in this paper are intended to help teams across NASA and potential commercial, academic, or international partners understand the current performance targets of the Transit Habitat and vehicle interface considerations imposed by the latest Moon to Mars mission scope.

Habitation Systems↗

NASA’s Moon to Mars (M2M) Transit Habitat (TH) Refinement Point of Departure (PoD) Design

As NASA prepares for the next human footsteps on the lunar surface, the Agency is already looking ahead to systems that will enable a sustained human presence on the lunar surface and mission to Mars, including a lunar Surface Habitat and Mars Transit Habitat (TH). This paper describes the latest NASA government reference design for the TH and how it will support NASA's Moon to Mars human exploration architecture. First, it will serve as a test and demonstration platform in lunar orbit, demonstrating capabilities required for long-duration microgravity human spaceflight as part of the lunar-Mars analog missions. Then, the TH will also serve as a major Mars habitation exploration element to support the crew during their transit from the lunar orbit to Mars and returning them safely to lunar orbit. This paper will cover several considerations contributing to the latest habitat design refinement, including data on the TH's concept of operations, system functional definition, subsystem assumptions, notional interior layouts, a detailed mass and volume breakdown, and trade studies and analyses required to close identified technology/ development/architecture gaps. In addition to a technical description of the TH, this paper describes how the current TH government reference design will achieve many of the current lunar and Mars mission goals. Additionally, there are many assumed technological advances needed to support the prescribed mission phases leading up to the crewed mission to Mars in the late 2030s. The paper will describe many of the TH systems requiring further technology development and identify architectural solutions to achieve these mass, reliability, autonomy, and crew health targets. As a whole, the data in the paper shows that a TH meeting the 43 metric tons launch mass/trans-Mars injection burn limits specified by the Evolvable Mars Campaign is achievable near the desired timeframe with moderate strategic investments including maintainable life support systems, re-purposable structures and packaging, and lightweight exercise modalities. It also identifies operational and technological options to reduce this mass to less than 41 metric tons, including staging of launch structure/packaging and alternate structural materials. The resulting design detail and data contained in this paper are intended to help teams across NASA and potential commercial, academic, or international partners understand the current performance targets of the Transit Habitat and vehicle interface considerations imposed by the latest Moon to Mars mission scope.

Habitation Systems↗

Artemis and Ethics Workshop Lessons Learned

As NASA lays out its Artemis activities, it expects to set precedents in spaceflight for decades to come. Artemis is a far more ambitious program than even Apollo, aimed at developing a sustained human presence on and around the lunar surface, in preparation for Mars exploration. As a result, considering ethical and social concerns in the discussion and design of Artemis is vital to ensuring the future worlds we create are ones where humanity collectively wants to live. By understanding how to reflect on these issues as NASA makes decisions related to Artemis, NASA can avoid unintended consequences stemming from cultural perceptions of human exploration of the solar system that may harm society. We recognize that a diverse range of groups need to be part of this conversation. There are many different views about the work that should happen in space. We recognize that NASA does not hold sole responsibility for determining the ethical path forward in space, as decisions made by commercial, international, and intergovernmental partners play a major role. Inclusive conversations help inform that work. Others have already argued that social scientists and engineers need to work together with inputs from stakeholders to design the future. To begin to answer this need, NASA’s Office of Technology, Policy, and Strategy (OTPS) hosted an Artemis and Ethics Workshop. This workshop was held in Washington, DC from April 12th-14th, 2023 and brought together invited experts in social science fields and NASA managers to discuss ethical, legal, and social aspects (ELSA) of Artemis and human exploration in general. The goal of the workshop was to discuss issues and build connections that NASA managers can consider across variety of ethical issues surrounding Artemis.

Katherine T McBrayer↗