Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Charger”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Electric Vehicle Infrastructure Consequence Assessment

With consumers’ growing interest in electric vehicles, extreme fast charging stations are poised to provide high-power charging to rapidly recharge light-duty passenger vehicles. High-power charging requires high-level communication between vehicle and charger to govern the charging process. The coupling of power and communication increases the potential scale of cyberattacks. Using a full Western Electricity Coordinating Council planning model, load manipulation from high-power charging infrastructure is investigated. Two cases of load manipulation are studied: (i) a discrete, widespread system event and (ii) loads modulated near the Western Interconnect’s resonant frequency. In (i) some generation trips and in (ii) oscillations are observed on the California Oregon Intertie. Neither scenario results in significant adverse effects to the grid.

33 ADVANCED PROPULSION SYSTEMS↗

Graton Rancheria Solar G.R.E.E.N. Project (Final Report)

Final Technical Report Graton Rancheria Solar GREEN Project to install approximately 1.7 megawatts (MW) of rooftop solar to provide electricity to four Tribally owned buildings on Tribal trust land located in Sonoma County. The project is the first solar photovoltaic (PV) installation by the Tribe on Tribal lands and complement previously installed clean energy projects including multiple electric vehicle chargers located at the Tribe’s economic enterprise.

14 SOLAR ENERGY↗

Modeling Future Demand for EV Charging Infrastructure [Slides]

U.S. climate goals for economy-wide net-zero greenhouse gas emissions by 2050 require rapid decarbonization of the light-duty vehicle fleet and plug-in electric vehicles (EVs) are poised to become the preferred technology for achieving this end. Considerable investments in public and private EV charging infrastructure will be needed to support widespread adoption, however, guidance is lacking on when, where, and what types of chargers will be needed. In this PLMA Load Management Dialogue session, researchers from the National Renewable Energy Laboratory (NREL) discuss findings from a recent quantitative assessment of the charging network requirements to support high penetrations of light-duty EVs by 2030. The study produced multiple detailed network growth trajectories at the national, state, and local levels that serve as a guidepost for future planning. In addition, an overview of NREL's publicly accessible EV infrastructure tools and data sets, designed to support planning and decision-making for EV infrastructure stakeholders, is provided.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EVSE Characterization, A Next-Gen Profiles Project Report

As part of the U.S. DOE EVs@Scale consortium Next-Generation Profiles project, results and analysis from the characterization of high-power conductive and wireless charging infrastructure are presented. This characterization was conducted over a wide range of DC output current and DC voltage charging for nominal test conditions and off-nominal test conditions. Test plans and procedures were developed to define the test configurations and requirements, measurement parameters, and test procedures used throughout testing. Results from a 2023 study conducted on electric vehicle supply equipment (EVSE) characterization by Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) include one 350 kW capable EVSE using a liquid-cooled combined charging system-1 (CCS-1, North American version) cable and connector and an ORNL-developed 100-kW polyphase wireless charger. Characterization results during nominal operation show the AC-to-DC power transfer efficiency for the 350kW conductive EVSE is 95.1% peak and is >92% when the AC power is at least 50 kW. The power quality of the 350 kW conductive EVSE is also measured during nominal conditions. The power factor is >0.91 for power transfer above 50 kW AC input during nominal conditions with a maximum power factor of 0.975. The AC current harmonics produced by the EVSE as measured at the AC input connection to the EVSE is <25% harmonics for power transfer greater than 50 kW and <10% harmonics for power transfer greater than 180 kW.

25 ENERGY STORAGE↗

Implementation Guide for Minimum Required Error Codes in Electric Vehicle Charging Infrastructure

With the growing adoption of Electric Vehicles (EVs), there is an increasing need for a reliable EV charging infrastructure. To help meet this need, the report “Recommendations for Minimum Required Error Codes for Electric Vehicle Charging Infrastructure,” recommends a set of minimum required error codes (MRECs) and their functional and responsibility classification. Charger manufacturers, charging station operators, EV manufacturers, and other stakeholders in the North American market are encouraged to uniformly adopt the MRECs to enhance EV charging error reporting, interpretation, and diagnostics. This document serves as a guide to enable uniform implementation of the MRECs using the Open Charge Point Protocol (OCPP).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wide Bandgap Generation (WBGen): Developing the Future Wide Bandgap Power Electronics Engineering Workforce

This Final Technical Report (FTR) summarizes the work conducted at the Center for Power Electronics Systems (CPES) under the Wide-Bandgap Generation (WBGen) fellowship and traineeship program established by the Advanced Manufacturing and Technologies Office (AMMTO) of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) at Virginia Tech, which had as main objective to train the next generation of U.S. citizen power engineers with wide-bandgap (WBG) power semiconductor expertise, with the intent to aid in fulfilling the future workforce needs in this field. The latter was deemed of strategic importance given the fast-paced growth observed—and predicted—in the demand of this technical expertise, whose practitioners have become the enablers and executioners of the electrification transformation process that not just the U.S., but the whole world, is currently undergoing as it seeks for more effective and efficient ways to use energy. As such, the WBGen program set forth to achieve its educational goals, which in addition sought to broaden the range of WBG-based power electronics by conducting research and development on high-efficiency grid apparatus and high-efficiency electrical power systems, and to also enhance the power engineering curriculum by formalizing WBG-oriented design procedures replacing existent yet now obsolete design procedures developed for Silicon (Si) based power electronics. This effort led CPES to spearhead the development of a new major within The Bradley Electrical and Computer Engineering (ECE) Department at Virginia Tech, namely Electronic Power and Energy Systems (EPES), which coalesced power electronics and power systems courses to provide undergraduate students with a strong formation in the power engineering field, while creating a pipeline of graduate students that could pursue the WBG-based curriculum and conduct research at CPES. In all, in what is considered a true success, eight of the twenty WBGen fellows that graduated program were recruited from the ECE department undergraduate cohort. The traineeship emphasized as well, from its beginning, the partnership with industry and national laboratories, which took advantage of the successful industry consortium at CPES that has historically been formed by 80–90 power and energy companies working in close collaboration with the center. This gave WBGen fellows the accessibility and possibility to conduct internships at partner facilities during the summer months, focused solely on the evaluation, testing, and adoption of WBG devices, which were many times tightly related to their respective research work and plans. In addition, WBGen fellows conducted their main research work within the confines of research programs at CPES conducted with these industry partners, providing them with a unique opportunity to develop not just their technical expertise—while advancing their knowledge, but to also learn and practice a slew of skills needed for their professional growth. As such, the fellows tackled a variety of WBG-related research topics, from device reliability and capability aspects as well as packaging and integration, encompassing the use of advanced materials and new structures, current sharing challenges, and insulation systems, to advanced gate-drivers with integrated sensors and protection mechanisms and active current- and voltage-based control, to optimized layouts seeking to maximize the switching and power processing performance of these devices, to power processing solutions adopting Gallium-Nitride (GaN) and Silicon-Carbide (SiC) power semiconductors for a variety of applications; including radiation-hardened converters for space dc distribution systems, direct three-phase ac-to-ac power converters for aerospace systems, dc-ac inverters for automotive traction drives, high-frequency isolated dc-dc battery chargers also for heavy transportation systems, and medium-voltage dc-dc and dc-ac converters for distribution systems and future power grids. The WBGen program ultimately graduated a total of 20 power engineers, all experts on WBG-based power electronics, awarding 18 M.S. and 2 PhD degrees in the process. These fellows, all U.S. citizens, allowed CPES to increase the number of citizens students to 33 % at the peak of the program, as the traineeship made possible the recruitment of talent with more attractive graduate research assistantship (GRA) contracts. Unfortunately, the present U.S. citizen enrollment at CPES has declined back to historic levels—approximately 10 %, as the regular GRA rates are not competitive enough when compared with entry-level industry jobs. In all, WBGen fellows published a total of 7 peer-reviewed journal articles, 44 papers at international technical conferences, made 42 presentations at international technical conferences, and filed 4 invention disclosures and patent applications, which have since then been granted by the U.S. Patent and Trademark Office (USPTO). Their contribution to CPES, Virginia Tech, the United States, and the world, has been significant, and continues to yield results thanks to the exemplary career that the fellows have initiated at many of the partners of the program, which include Wolfspeed, Raytheon Technologies, Infineon, Lockheed Martin, Dominion Energy, Northrop Grumman, Rivian, Aerospace Corporation, Sandia National Laboratory, National Renewable Energy Laboratory, John Hopkins University, and Virginia Tech.

14 SOLAR ENERGY↗

Customer-Focused Key Performance Indicators for Electric Vehicle Charging

To systematically improve the public charging experience, EV charging industry stakeholders need to define and measure it precisely. Many stakeholders currently measure aspects of the charging experience, but they typically employ metrics that are either operational in nature, such as charger uptime and mean time between failures, or composite customer satisfaction indices. To improve the customer experience most effectively, the industry needs metrics that define the charging experience from the perspective of the customer, not business operations. Furthermore, industry practitioners need granular metrics to know what specific aspects of the charging experience need improvement. This report defines such customer-focused metrics, called key performance indicators (KPIs).

33 ADVANCED PROPULSION SYSTEMS↗

Survey and Gap Prioritization of U.S. Electric Vehicle Charge Management Deployments

The goal of this study was to survey and characterize the scope of current technical and programmatic knowledge pertaining to EV charge management technologies and practices in the US and relevant international jurisdictions. This characterization of existing field demonstrations and knowledge derived were used to determine gaps in the SCM demonstration landscape. Addressing these gaps through research and demonstration could increase confidence in the U.S. that load management and EV charge control could achieve overarching societal benefits. A survey of charge management deployments and input from stakeholders was completed to determine the state-of-the-art of smart charge management (SCM) where SCM is defined as controlling the amount of power exchanged between chargers and EVs to meet customers' charging needs while also responding to external power demand or pricing signals to provide load management, resilience, or other benefits to the customer and electric grid. The survey was the basis of the gap analysis in this report and determines which areas are well understood, with high confidence, and which areas need further investigation. Existing examples of EV charge management are characterized here to determine aspects that are ready for widespread deployment and have been demonstrated in the field. These include demonstration studies, pilots, programs, and EV-specific tariffs. In all, 110 examples of charge management were characterized. The data sources were public literature and utility filings as well as targeted interviews. In addition, 43 interviews with stakeholders were conducted with a consistent set of questions used in each interview. This study prioritized gaps in demonstrated SCM capabilities based on 1) Urgency of the particular use-case to offset traditional grid assets, 2) Impact, extensibility, and scaling of results across the entire spectrum of 3000+ utility service territories including projected technical and market potential for a given grid service, and 3) Value of federal funding in addressing the gap, including potential to leverage and/or add scope to existing field demonstrations funded by other non-federal funding mechanisms.

33 ADVANCED PROPULSION SYSTEMS↗

Recommended Actions to Improve Adapter Safety

With the rapid advancement and acceleration in the electric vehicle (EV) industry within the United States, major automakers and EV charging companies are increasingly adopting the North American Charging Standard (NACS) connector style, now officially known as J3400. This shift is expected to enhance charging infrastructure, providing a better customer experience by making it easier for all EV drivers to access a wider network of direct-current (DC) fast chargers (DCFCs). However, the adoption of the J3400 standard presents challenges for many EVs already on the roads and some currently coming off production lines that are equipped with the Combined Charging System (CCS) connector, which this report will refer to as the North American standard, CCS1. These vehicles will need adapters to use new or existing J3400 infrastructure. During this transition, several issues have emerged. Firstly, there is a need to standardize the new connector type to ensure it is interoperable, safe, and reliable. Second, existing CCS EV drivers need a way to access the J3400 network, which will require electric vehicle supply equipment (EVSE) or sites with both connector types, driver-provided adapters to physically convert from CCS to J3400, or EVSE with retained adapters designed for use with the EVSE. Third, adapter standards will need to be written to specify how they will be designed and what evaluations will be needed to ensure safe and reliable performance. To address these challenges, adapters that support different types of charging connectors will be essential. These adapters will play a crucial role in supporting the transition and ensuring continued service for legacy EVs with CCS inlets as the J3400 standard becomes the predominant one in the United States. Consequently, the National Charging Experience (ChargeX) Consortium has investigated and performed a teardown analysis on the different adapter versions on the market. The aim is to create a failure mode and effects analysis (FMEA) on what are expected to be the most common adapter types used in this transition. In order to support this work, we executed an FMEA exercise with the main goal of identifying gaps in the existing adapters' performance and conformance to the most common safety requirements of high-power and high-voltage devices. This effort focused on adapters provided by the driver, as these may present the highest safety and reliability risks. The recommendations made here apply to both retained and driver-provided adapters.

25 ENERGY STORAGE↗

The Design and Evaluation of Zero Trust Architecture for Electric Vehicle Charging Infrastructure: EVs @ Scale Series on EV Charging Station Cybersecurity

Implementing a zero trust architecture can significantly bolster the security of electric vehicle (EV) charging infrastructure. EV charging infrastructure includes numerous networked interfaces, each of which can present potential vulnerabilities. When these vulnerabilities are exploited, they can compromise the entire system, leading to severe operational and security risks. Zero trust is a security model that operates on the principle of "never trust, always verify," which helps manage the attack surface and limit the scope of any potential compromises. Fundamentally, this model ensures that no entity, whether inside or outside the network, is trusted by default. The design principles of zero trust include continuous verification, strict deny-by-default access controls, and micro-segmentation. Continuous verification ensures that every request is thoroughly checked, regardless of its origin. Strict access controls enforce the principle of least privilege, allowing users and devices only the minimum necessary access to perform their functions. Micro-segmentation involves dividing the network into smaller, isolated segments to prevent lateral movement in case of a breach. In the context of EV charging infrastructure, zero trust can be implemented through various strategies. For example, multi-factor authentication (MFA) can be required for engineers to access the management interfaces and control systems of charging stations. Real-time monitoring and analysis of network traffic can help detect and respond to anomalies. Systems that do not need to communicate with each other can be micro-segmented to enhance security. All communications should adhere to predefined policies to be permitted. Additionally, encrypting communications can protect sensitive information exchanged between chargers and management systems. This paper presents a zero trust architecture specifically designed for EV charging infrastructure. Implementing zero trust not only mitigates risks but also builds a resilient infrastructure capable of withstanding and quickly recovering from cyber threats. The architecture addresses six defined security objectives. A comprehensive test plan is developed to assess the architecture against these objectives, and the results of the evaluation are reported. This approach is essential for maintaining the reliability and integrity of EV charging services in an increasingly interconnected and vulnerable digital landscape. This is the first in a planned series of papers exploring the implementation of zero trust in EV charging infrastructure. Each paper will delve into different aspects and applications of zero trust, highlighting how various work processes and requirements can lead to distinct architectural designs. These architectures will be tailored to address specific security challenges and operational needs within the EV charging ecosystem, ensuring a robust and adaptable security framework.

33 ADVANCED PROPULSION SYSTEMS↗

Improving the Freight Productivity of a Heavy-Duty, Battery Electric Truck by Intelligent Energy Management

This project aimed to enhance the range and reduce the operating costs of battery electric Class 8 trucks traveling over 250 miles daily. This was achieved through the development and implementation of an intelligent-Energy Management System (i-EMS) that leverages vehicle and operations data, physics-aware machine learning algorithms, and vehicle-to-cloud (V2C) connectivity. The project hypothesized that advanced machine learning algorithms and real-time data analytics could significantly improve the energy efficiency and range of these trucks. Key objectives included developing a physics-aware machine learning algorithm, implementing an i-EMS with V2C connectivity and physics-aware spatial data analytics (PSDA), and validating the system’s effectiveness with fleet partners HEB Companies and Murphy Logistics. Extensive data collection from vehicle operations, including vehicle characteristics, road conditions, and payload, was conducted. A machine learning algorithm was developed to predict energy consumption and enable proactive decision-making. The i-EMS was implemented on two Volvo VNR BEVs, with operators receiving charging and routing recommendations. Charging stations were installed at depot locations in Texas and Minnesota, with an additional on-route charger in Minnesota. Significant findings included a 14% range improvement for Murphy Logistics on a highway-driving eco-route and a 22% range improvement for HEB Companies on a city-driving eco-route. The i-EMS utilized rule-based methods and physics-based algorithms to predict and reduce energy consumption, with real-time monitoring and analysis through V2C connectivity enabling proactive decision-making. The project demonstrated the feasibility and economic viability of battery electric Class 8 trucks for long-haul operations, showcasing the potential of physics-aware machine learning in optimizing energy management. The successful implementation of the i-EMS in real-world scenarios validates its practical application and effectiveness, paving the way for the widespread adoption of battery electric vehicles in the freight transportation industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Electric Medium- and Heavy-Duty Vehicle Charging Infrastructure Attributes and Development

Although more established for light-duty vehicles (LDVs), advancements in electric vehicle (EV) charging technology are being made in the medium- and heavy-duty (MD/HD) sector. Progress is also being made with the electrification of MD/HD vehicles, including transit buses, school buses, MD trucks, and HD trucks. The diverse set of operational requirements and duty cycles for each vocation, as well as the range in the size of fleets, present unique charging and infrastructure requirements. This report focuses on charging requirements for MD/HD vehicles and synergies with LDV infrastructure. This analysis leans toward the qualitative rather than quantitative because relevant model inputs are in development and will not be established for a few years, as EV deployments are more mature in the LDV sectors than MD/HD. The report begins with an overview of MD/HD vehicle classes and types of charging, including depot and residential charging, among others (Section 2). Section 3 analyzes the home bases (overnight dwell locations) of existing MD/HD vehicles, with an emphasis on depot and residential home bases, and discusses implications for charging infrastructure. Section 4 discusses the key characteristics for determining if, when, and where MD/HD vehicles can leverage LDV charging infrastructure rather than requiring dedicated chargers. These considerations include electricity demand, connectors, physical space requirements, payment considerations, and impacts on the grid. Section 5 summarizes shared characteristics for MD/HD vehicles that are appropriate for near-term electrification and includes a summary of the outlook of the electric MD/HD vehicle market. The conclusion (Section 6) summarizes the report's findings and outlines areas for future research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Supply Equipment (EVSE) Study for Vernon County, Wisconsin [Slides]

Viroqua is a town in Wisconsin with a population of approximately 4,500. The Vernon County Energy district is a local nonprofit in Viroqua that provides energy education, individualized energy consulting and coaching to residents and businesses. They have a very good relationship with our county government and wish to support their efforts. The Vernon County government is currently working on a comprehensive plan and would like to include planning for electric vehicle (EV) charging infrastructure in the plan. They are seeking guidance on logical phases for implementation and identifying the best locations for Level 2 and Level 3 EV chargers. NREL provided technical input on strategic planning for electric vehicle (EV) adoption and electric vehicle supply equipment (EVSE) expansion in Vernon County through the Clean Energy to Communities (C2C) Expert Match technical assistance program. NREL provided strategic planning support for EV expansion planning in Vernon County and siting considerations for locating EVSE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

PV Inverter Systems Enabled by Monolithically Integrated SiC based Four Quadrant Power Switch (4-QPS) [BiDFET]

The purpose of this project was to develop a new breed of Power Conversion Systems (PCS) for PV integration that is enabled by the newly developed 4-Quadrant Single Die SiC Power Semiconductor Switches (4-QPS) or also referred to as “Bidirectional FET (BIDFET)”. This work includes semiconductor die development, advanced packaging, converter design, development, and testing of 4-QPS enabled hardware prototypes at 1 kW (for single phase residential application) and 10 kW (for three phase commercial application). The BiDirectional Field-Effect Transistor (BiDFET) can enable circuit topologies requiring four-quadrant switches, that were earlier designed using discrete combinations of MOSFETs, IGBTs, GaN HEMTs, and PiN diodes. The monolithic nature of the BiDFET allows lower device count, smaller switch volume, lower inductance, and simpler packaging, and hence more reliable and commercially viable implementation in power electronics converters. The matrix converter topologies, now feasible using BiDFETs, can eliminate the bulky and unreliable dc link capacitors or inductors required for conventional voltage-source or current-source converters in ac–ac and ac–dc applications. The 1.2 kV BiDFET has the potential to disrupt all the applications utilizing 1.2 kV switches, including electric vehicle (EV) drivetrain, bidirectional EV chargers, industrial motor drives, solid-state transformers, datacenter power supplies, elevator drives, dc microgrids, energy storage grid integration, solid-state breakers, etc.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Standardized Protocol for Real-Time APIs as Required by Title 23 CFR 680.116(c)

Improving the ability of drivers to easily locate working and available chargers is key to improving the public charging experience. Electric vehicle charging providers who are recipients of federal funds through the National Electric Vehicle Infrastructure (NEVI) Formula Program, Charging and Fueling Infrastructure (CFI) Discretionary Grant Program, and other funding programs as identified under Title 23 of the U.S. Code must deploy and maintain an application programming interface (API) to access information about charging stations they operate.1 This includes information about individual charging ports, pricing, and availability in accordance with the Federal Highway Administration’s National Electric Vehicle Infrastructure Standards and Requirements, 23 CFR 680.116(c), herein referred to as the minimum standards (Federal Highway Administration 2023). Specifically outlined in the minimum standards, states and other designated recipients are required to ensure that charging station information including location, connector type, power level, real-time status, and real-time price to charge are available free of charge to third-party software developers through an API. These requirements are intended to enable effective communication with consumers about available charging stations and help consumers make informed decisions about trip planning, including when and where to charge. This document provides a standardized protocol for how to structure data, data update frequency, and practices for making the data required to be shared via API usable for improving public transparency and the customer experience. These are recommendations only and do not modify the Federal Highway Administration’s minimum standards in any way.

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging Analytics and Reporting Tool (EV-ChART): Data Format and Preparation Guidance (V.5.0)

The Joint Office of Energy and Transportation maintains the Electric Vehicle Charging Analytics and Reporting Tool (EV-ChART), which provides a centralized hub for submitting electric vehicle (EV) charging infrastructure data directed by the Federal Highway Administration (23 CFR 680.112(a)-(c)). EV-ChART provides a streamlined data submission process and an integrated set of analytic tools, connects to other data sources, and empowers data sharing and access across stakeholders, including the public. Any data shared publicly will be aggregated and anonymized to stay in accordance with 23 CFR 680. This EV-ChART Data Format and Preparation Guidance provides a comprehensive overview of the data reporting requirements as authorized under 23 CFR 680.112(a)-(c)). The guidance is intended to be used alongside the EV-ChART Data Input Template, which defines the tabular data structure that these data submissions must follow. Per 23 CFR 680.112(a)-(c), the annual and quarterly data submissions are required of all National Electric Vehicle Infrastructure (NEVI) Formula Program projects, as well as projects for the construction of publicly accessible EV chargers that are funded with funds made available under Title 23, United States Code, including any EV charging infrastructure project funded with federal funds that is treated as a project on a federal-aid highway. One-time data submissions are required of both the NEVI Formula Program projects and grants awarded under 23 U.S.C. 151(f) for projects that are for EV charging stations located along and designed to serve the users of designated Alternative Fuel Corridors (AFCs). Other information and data required in 23 CFR 680, such as 23 CFR 680.112(d), 23 CFR 680.116(c), and 23 CFR 680.106(a), are not discussed in this guidance.

33 ADVANCED PROPULSION SYSTEMS↗