Hanford site asbestos management lessons learned - 15183

The U.S. Department of Energy (DOE) is responsible for the environmental cleanup of the Hanford Site central plateau. As part of this responsibility, DOE contractors conduct deactivation, decommissioning, decontamination, and demolition (D4) of retired/inactive facilities, including very large chemical processing facilities. To date, DOE contractors have demolished hundreds of facilities, reducing baseline site maintenance costs and reducing the environmental threats and hazards that the degrading buildings present. Many of these Hanford facilities include asbestos-containing materials (as well as other hazardous components), which must be managed in compliance with applicable regulations and standards. In most cases, the facilities are demolished as Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) removal or remedial actions. In an effort to streamline cleanup operations and to utilize site cleanup funding more efficiently, while still being protective of personnel and the environment, agreements were reached between the US Environmental Protection Agency (EPA) Hanford Project Office, the Washington Department of Ecology (Ecology), the Benton Clean Air Agency (BCAA) and the US Department of Energy Richland Operations Office (DOE-RL) on approaches to be utilized for demolition. One of these approaches would involve leaving cement asbestos board siding (e.g. transite), an EPA National Emissions Standards for Hazardous Air Pollutants (NESHAP) Category II non-friable asbestos-containing material, in place during demolition using heavy equipment, employing a set of controls that would maintain protection of personnel and the environment. This agreement was documented in a number of formal communications, including Notices of Intent issued as required by the asbestos NESHAP regulation, letters between the various agencies, CERCLA work plans, and the approved contractor baselines. A large number of buildings were demolished with transite siding in place, using the agreed upon controls and approaches. Personnel breathing zone and work area perimeter monitoring verified that the controls employed were protective in that there were no exceedances of permissible exposure limits during or after the demolition operations. EPA later reconsidered their previous concurrence with demolishing transite materials in place and issued a joint letter with Ecology revoking concurrence on any of the aforementioned CERCLA decision documents and associated work plans. DOE and their contractors took action to comply with the approach to demolition preferred by EPA for future demolitions, and initiated a series of actions to modify asbestos management practices in their operations accordingly. This paper will discuss both the actions taken to address EPA concerns with sites where transite materials were left in place for demolition and actions taken to ensure that the central plateau D4 program complies with the 40 CFR 61 Subpart M, National Emission Standard for Asbestos, (Asbestos NESHAP) methods for asbestos management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Los Alamos National Laboratory, Performance Improvement Strategy, Fiscal Years 2012-2016

This document presents the Los Alamos National Laboratory (LANL) Multiyear Strategy for Performance Improvement for FY12-FY16 in accordance with Clause H-3 Contractor Multiyear Strategy for Performance Improvement of the National Nuclear Security Administration (NNSA) Contract No. DE-AC52-06NA2S396. "The Contractor shall develop a multiyear strategy that details (1) its planned efforts and expected accomplishments by year, to continuously improve its management and performance at the Laboratory, and (2) the planned efforts and contributions of its Parent Organization. The multiyear strategy shall also address planned efforts to (1) enhance Contractor communications, cooperation and integration with the NNSA Weapon Complex, with emphasis on Lawrence Livermore National Laboratory (LLNL); and, (2) contribute to overall NNSA Weapon Complex improvements in performance. The listing of the Contractor's planned efforts and expected accomplishments from its Offer in response to Solicitation No. DE-RP52-05NA25396 for FY06 (June 1, 2006 - September 30, 2006, partial year) and FY07 shall be addressed in the initial multiyear strategy. Subsequent annual updates shall be submitted to the Contracting Officer no later than May 15th of each year. Performance measures for these planned efforts and expected accomplishments may be considered for inclusion in the Contract's Performance Evaluation Plan."

99 GENERAL AND MISCELLANEOUS↗

Independent Verification Survey Summary and Results for Sub-Slab Soils Associated with the Former Building K-33, Oak Ridge, Tennessee (Final Report)

At DOE’s request, ORAU conducted confirmatory surveys of the K-33 sub-slab soil during the period of August 2011 through May 2012. The survey activities included visual inspections and measurement and sampling activities. LSRS was forthcoming with information relating to surface scan results. Scans performed by the contractor were of adequate coverage and overall data appear to represent actual site conditions. However, the LSRS technicians failed to identify several areas of elevated direct gamma radiation. Most of the samples taken by ORAU at locations of elevated instrument response were above the remediation concentration for one or more radionuclides of concern (ROC). The contractor was, however, quick to perform additional remediation of areas identified to have contamination above the guidelines. Further investigation by ORAU was not requested once additional remediation was completed. It is presumed the remediation contractor’s future PCCR will present detailed and conclusive evidence that K-33 sub-slab soils either comply or do not comply with record of decision (ROD) criteria. However, ORAU concludes, based on both independent verification (IV) data and data provided by LSRS, that the remediation contractor followed appropriate and applicable procedures and that the associated data adequately represent site conditions.

54 ENVIRONMENTAL SCIENCES↗

Performance Improvement Strategy FY14-18: Create Our Future Strengthen the Core

This document presents the Los Alamos National Laboratory (LANL) Multiyear Strategy for Performance Improvement for FY14–FY18 in accordance with Clause H-3 Contractor Multiyear Strategy for Performance Improvement of the National Nuclear Security Administration (NNSA) Contract No. DE-AC52-06NA25396. “The Contractor shall develop a multiyear strategy that details (1) its planned efforts and expected accomplishments by year, to continuously improve its management and performance at the Laboratory, and (2) the planned efforts and contributions of its Parent Organization. “The multiyear strategy shall also address planned efforts to (1) enhance Contractor communications, cooperation and integration with the NNSA Weapons Complex, with emphasis on Lawrence Livermore National Laboratory; and, (2) contribute to overall NNSA Weapons Complex improvements in performance. The listing of the Contractor’s planned efforts and expected accomplishments from its offer in response to Solicitation No. DE-RP52-05NA25396 for FY2006 (June 1, 2006 – September 30, 2006, partial year) and FY2007 shall be addressed in the initial multiyear strategy. Subsequent annual updates shall be submitted to the Contracting Officer no later than May 15th of each year. Performance measures for these planned efforts and expected accomplishments may be considered for inclusion in the Contract’s Performance Evaluation Plan.”

99 GENERAL AND MISCELLANEOUS↗

EnergyFit Nevada (formerly known as the Nevada Retrofit Initiative) final report and technical evaluation

The EnergyFit Nevada (EFN) Better Buildings Neighborhood Program (BBNP, and referred to in this document as the EFN program) currently encourages Nevada residents to make whole-house energy-efficient improvements by providing rebates, financing, and access to a network of qualified home improvement contractors. The BBNP funding, consisting of 34 Energy Efficiency Conservation Block Grants (EECBG) and seven State Energy Program (SEP) grants, was awarded for a three-year period to the State of Nevada in 2010 and used for initial program design and implementation. By the end of first quarter in 2014, the program had achieved upgrades in 553 homes, with an average energy reduction of 32% per home. Other achievements included: Completed 893 residential energy audits and installed upgrades in 0.05% of all Nevada single-family homes1 Achieved an overall conversation rate of 38.1%2 7,089,089 kWh of modeled energy savings3 Total annual homeowner energy savings of approximately $525,7523 Efficiency upgrades completed on 1,100,484 square feet of homes3 $139,992 granted in loans to homeowners for energy-efficiency upgrades 29,285 hours of labor and $3,864,272 worth of work conducted by Nevada auditors and contractors4 40 contractors trained in Nevada 37 contractors with Building Performance Institute (BPI) certification in Nevada 19 contractors actively participating in the EFN program in Nevada 1 Calculated using 2012 U.S. Census data reporting 1,182,870 homes in Nevada. 2 Conversion rate through March 31, 2014, for all Nevada Retrofit Initiative (NRI)-funded projects, calculated using the EFN tracking database. 3 OptiMiser energy modeling, based on current utility rates. 4 This is the sum of $3,596,561 in retrofit invoice value and $247,711 in audit invoice value.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Measure Guideline: Guidance on Taped Insulating Sheathing Drainage Planes

This guide provides information and recommendations to the following groups: insulation contractors; general contractors; builders; home remodelers; mechanical contractors; and homeowners, as a guide to the work that needs to be done. The order of work completed during home construction and retrofit improvements is important. Health and safety issues must be addressed first and are more important than durability issues. And durability issues are more important than saving energy. Not all techniques can apply to all houses. Special conditions will require special action. Some builders or homeowners will wish to do more than the important but basic retrofit strategies outlined by this guide. The following are best practice and product recommendations from the interviewed contractors and homebuilders who collectively have a vast amount of experience. Three significant items were discussed with the group which are required to make taped insulating sheathing a simple, long term, and durable drainage plane: 1. Horizontal joints should be limited or eliminated wherever possible; 2. Where a horizontal joint exists use superior materials; 3. Frequent installation inspection and regular trade training are required to maintain proper installation. Section 5 of this measure guideline contains the detailed construction procedure for the three recommended methods to effectively seal the joints in exterior insulating sheathing to create a simple, long term, and durable drainage plane.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DOE Deep Energy Retrofit Cost Survey

A survey was conducted by the Lawrence Berkeley National Laboratory on deep energy retrofit (DER) market drivers, opportunities, and challenges. The survey was part a research study sponsored by the U.S. Department of Energy to gather information on the costs of DER from home performance contractors and stakeholders. Cost data was gathered from DER projects that use a comprehensive, whole-home approach to drastically reduce energy use and improve performance. DER projects often aim at reducing energy use by 50% or more. In addition, these projects can improve home comfort and potentially benefiting occupant health. Yet, market adoption of DER has been limited. Major limiting factors include complex projects, high costs, perceived risks, extensive disruption, and unfamiliar work scopes to some contractors. In order to better understand what motivates and deters DER projects in today’s market, a survey was conducted to gather this information, and to learn about promising approaches and technologies from the industry perspective. Past surveys on homeowners and home energy performance professionals have studied the motivations and barriers of energy efficiency retrofits. Two surveys of home energy performance professionals were conducted in recent years. The Resources for the Future (RFF) Home Energy Audit and Retrofit Survey was conducted in 2011 by recruiting energy auditors and retrofit installers through members of Efficiency First and Building Performance Institute (BPI) accredited contractors. The survey asked about the business and services that respondents provide, how often homeowners follow their recommendations to retrofit their homes, and the respondents’ opinion on barriers faced by the industry. The survey found that not enough homeowners know about energy audits, but more importantly, it is the high cost of retrofits compared to low energy prices that is responsible for few energy audits and retrofits being completed. The RESNET Deep Retrofit Industry Stakeholder Survey was conducted shortly after launching of the EnergySmart Home Performance Team program. The EnergySmart Team program involves a formal agreement among allied contractors who are engaged in high performance retrofits. Using this allied team approach, teams can pool their expertise and provide each other with customer referrals. The survey asked EnergySmart Team members and outside stakeholders on questions about market and technical barriers in performing home energy retrofits. Survey respondents identified lack of consumer awareness and lack of affordable financing for consumers as the leading market barriers to home energy retrofits. In their written comments, many survey respondents also echoed that the high costs of retrofit compared to low energy prices is a market barrier. Respondents found “certain housing characteristics that prevent effective retrofit” and “energy analysis software inaccuracy or limitations” are the two leading technical barriers. Their choices for technical barriers were reflective of the energy rater/auditor role played by the majority (78%) of the survey respondents. In comparison to past surveys, this work aimed to gather inputs from a broader segment of the home performance industry to identify the opportunities and barriers faced by DERs from all perspectives. The survey asks for project costs to help breakdown the high costs of DERs. This survey is also motivated by a need to better understand the role of DERs in reducing energy use by the residential sectors and meeting climate goals. The survey is designed towards obtaining more substantive inputs from survey respondents by encouraging written comments, rather than setting the goal to reach a large number of respondents. We took this approach because DER is currently still a niche market, so it is more valuable to gather in-depth inputs from individuals who are performing this work rather than getting to the masses.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Audit Report The Procurement of Safety Class/Safety-Significant Items at the Savannah River Site

The Department of Energy operates several nuclear facilities at its Savannah River Site, and several additional facilities are under construction. This includes the National Nuclear Security Administration's Tritium Extraction Facility (TEF) which is designated to help maintain the reliability of the U.S. nuclear stockpile. The Mixed Oxide Fuel Fabrication Facility (MOX Facility) is being constructed to manufacture commercial nuclear reactor fuel assemblies from weapon-grade plutonium oxide and depleted uranium. The Interim Salt Processing (ISP) project, managed by the Office of Environmental Management, will treat radioactive waste. The Department has committed to procuring products and services for nuclear-related activities that meet or exceed recognized quality assurance standards. Such standards help to ensure the safety and performance of these facilities. To that end, it issued Departmental Order 414.1C, Quality Assurance (QA Order). The QA Order requires the application of Quality Assurance Requirements for Nuclear Facility Applications (NQA-1) for nuclear-related activities. The NQA-1 standard provides requirements and guidelines for the establishment and execution of quality assurance programs during the siting, design, construction, operation, and decommissioning of nuclear facilities. These requirements, promulgated by the American Society of Mechanical Engineers, must be applied to 'safety-class' and 'safety-significant' structures, systems and components (SSCs). Safety-class SSCs are defined as those necessary to prevent exposure off site and to protect the public. Safety-significant SSCs are those whose failure could irreversibly impact worker safety such as a fatality, serious injury, or significant radiological or chemical exposure. Due to the importance of protecting the public, workers, and environment, we initiated an audit to determine whether the Department of Energy procured safety-class and safety-significant SSCs that met NQA-1 standards at the Savannah River Site. Our review disclosed that the Department had procured and installed safety-class and safety-significant SSCs that did not meet NQA-1 quality standards. Specifically, we identified multiple instances in which critical components did not meet required quality and safety standards. For example: (1) Three structural components were procured and installed by the prime contractor at Savannah River during construction of the MOX Facility that did not meet the technical specifications for items relied on for safety. These substandard items necessitated costly and time consuming remedial action to, among other things, ensure that nonconforming materials and equipment would function within safety margins; (2) In six instances, items used in the construction of TEF failed to satisfy quality standards. In one of these situations, operating procedures had to be modified to ensure that the problem item did not compromise safety; and (3) Finally, at the ISP, one component that did not meet quality standards was procured. The failure of the item could have resulted in a spill of up to 15,000 gallons of high-level radioactive waste. Based on an extensive examination of relevant internal controls and procurement practices, we concluded that these failures were attributable to inadequate attention to quality assurance at Savannah River. Simply put, Departmental controls were not adequate to prevent and/or detect quality assurance problems. For example, Federal and prime contractor officials did not expressly require that subcontractors or lower-tiered vendors comply with quality assurance requirements. Additionally, management did not effectively communicate quality assurance concerns between the several Departmental program elements operating at Savannah River. The procurement and installation of these nonconforming components resulted in cost increases. For example, as of October 2008, the MOX Facility had incurred costs of more than $680,000 due to problems associated with the procurement of $11 million of nonconforming safety-class reinforcing steel. In general, the internal control weaknesses we discovered could have permitted, without detection, the procurement and installation of safety critical components that did not meet quality assurance standards. In a worst case scenario, undetected, nonconforming components could fail and injure workers or the public. In certain instances, the Department took steps to ensure that the prime contractors at Savannah River began action to remediate nonconforming components and to strengthen policies and procedures. Additionally, the Department took actions to ensure that critical components necessary for projects worked as designed by requiring that the prime contractor place personnel at manufacturers' locations. Further, the Department had suspended work with certain other manufacturers due to quality assurance problems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Audit Report "Department of Energy Efforts to Manage Information Technology Resources in an Energy-Efficient and Environmentally Responsible Manner"

The American Recovery and Reinvestment Act of 2009 emphasizes energy efficiency and conservation as critical to the Nation's economic vitality; its goal of reducing dependence on foreign energy sources; and, related efforts to improve the environment. The Act highlights the significant use of various forms of energy in the Federal sector and promotes efforts to improve the energy efficiency of Federal operations. One specific area of interest is the increasing demand for Federal sector computing resources and the corresponding increase in energy use, with both cost and environmental implications. The U.S. Environmental Protection Agency reported that, without aggressive conservation measures, data center energy consumption alone is expected to double over the next five years. In our report on Management of the Department's Data Centers at Contractor Sites (DOE/IG-0803, October 2008) we concluded that the Department of Energy had not always improved the efficiency of its contractor data centers even when such modifications were possible and practical. Despite its recognized energy conservation leadership role, the Department had not always taken advantage of opportunities to reduce energy consumption associated with its information technology resources. Nor, had it ensured that resources were managed in a way that minimized impact on the environment. In particular: (1) The seven Federal and contractor sites included in our review had not fully reduced energy consumption through implementation of power management settings on their desktop and laptop computers; and, as a consequence, spent $1.6 million more on energy costs than necessary in Fiscal Year 2008; (2) None of the sites reviewed had taken advantage of opportunities to reduce energy consumption, enhance cyber security, and reduce costs available through the use of techniques, such as 'thin-client computing' in their unclassified environments; and, (3) Sites had not always taken the necessary steps to reduce energy consumption and resource usage of their data centers, such as identifying and monitoring the amount of energy used at their facilities. We concluded that Headquarters programs offices (which are part of the Department of Energy's Common Operating Environment) as well as field sites had not developed and/or implemented policies and procedures necessary to ensure that information technology equipment and supporting infrastructure was operated in an energy-efficient manner and in a way that minimized impact on the environment. For example, although required by the Department, sites had not enabled computer equipment power management features designed to reduce energy consumption. In addition, officials within Headquarters programs and at the sites reviewed had not effectively monitored performance or taken steps to fully evaluate available reductions in energy usage at their facilities. Without improvements, the Department will not be able to take advantage of opportunities to reduce energy consumption and realize cost savings of nearly $23 million over the next five years at just the seven sites reviewed. We noted that the potential for reduced energy consumption at these sites alone was equivalent to the annual power requirements of over 2,400 homes or, alternatively, removing about 3,000 cars from the road each year. Many of the available energy reduction strategies, such as fully utilizing energy-efficient settings on the many computers used by the Department and its contractors, are 'low hanging fruit' in that they will provide immediate tangible energy savings at little or no cost. Others, such as a shift to thin-client computing, an environment that transfers the processing capabilities from an individual's desk to a shared server environment, will require some level of investment which can, based on available literature, be successfully recovered through reduced acquisition and support costs. In our judgment, given its highly visible leadership in energy issues, aggressive action should be taken to make the Department's information technology operations as energy efficient as possible so that it can serve as a role model for both the Federal and private sector. To its credit, the Department had increased the number of energy-efficient computers purchased in recent years. In addition, the Office of the Chief Information Officer implemented an automated computer shutdown program at Headquarters that was estimated to save up to nearly $400,000 per year. Furthermore, we found that certain sites had initiated actions to review a potential transition to unclassified thin-client computing; however, implementation had not yet been completed. These are positive steps, but additional action is required, and our report contains several recommendations to this end.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Audit Report, "Fire Protection Deficiencies at Los Alamos National Laboratory"

The Department of Energy's Los Alamos National Laboratory (Los Alamos) maintains some of the Nation's most important national security assets, including nuclear materials. Many of Los Alamos' facilities are located in close proximity to one another, are occupied by large numbers of contract and Federal employees, and support activities ranging from nuclear weapons design to science-related activities. Safeguarding against fires, regardless of origin, is essential to protecting employees, surrounding communities, and national security assets. On June 1, 2006, Los Alamos National Security, LLC (LANS), became the managing and operating contractor for Los Alamos, under contract with the Department's National Nuclear Security Administration (NNSA). In preparation for assuming its management responsibilities at Los Alamos, LANS conducted walk-downs of the Laboratory's facilities to identify pre-existing deficiencies that could give rise to liability, obligation, loss or damage. The walk-downs, which identified 812 pre-existing fire protection deficiencies, were conducted by subject matter professionals, including fire protection experts. While the Los Alamos Site Office has overall responsibility for the effectiveness of the fire protection program, LANS, as the Laboratory's operating contractor, has a major, day-to-day role in minimizing fire-related risks. The issue of fire protection at Los Alamos is more than theoretical. In May 2000, the 'Cerro Grande' fire burned about 43,000 acres, including 7,700 acres of Laboratory property. Due to the risk posed by fire to the Laboratory's facilities, workforce, and surrounding communities, we initiated this audit to determine whether pre-existing fire protection deficiencies had been addressed. Our review disclosed that LANS had not resolved many of the fire protection deficiencies that had been identified in early 2006: (1) Of the 296 pre-existing deficiencies we selected for audit, 174 (59 percent) had not been corrected; and, (2) A substantial portion of the uncorrected deficiencies, 86 (49 percent) were considered by the walk-down teams to be significant enough to warrant compensatory actions until the deficiency was corrected or was tracked to closure through implementation of corrective actions. Further, we found that 32 of the significant deficiencies had been closed by the previous Los Alamos contractor, prior to LANS assuming responsibility for operation of the Laboratory, even though the deficiencies had not been corrected. A fire protection expert provided technical support during the audit. As an example of uncorrected problems, LANS had not resolved, by performing periodic tests, a deficiency identified in 2006 regarding a kitchen hood fire suppression system in a facility located within the Los Alamos Neutron Science Center. Such systems are required to be tested twice a year by the National Fire Protection Association standard, a standard that had been adopted by Department of Energy under DOE Order 420.1B. Yet, in 2006, the LANS walk-down team recognized that this system had not been inspected since May 2004 and noted that deficient suppression systems could result in significantly high levels of property damage and loss. After we brought this issue to management's attention on February 6, 2009, LANS officials stated that the Laboratory would correct this deficiency. As with the problems involving the fire suppression system, we observed that LANS had not always corrected life safety deficiencies involving building exits at one of its primary facilities. This included providing a secondary emergency exit for a building with occupants on multiple floor levels. LANS had removed personnel from the third floor and improved the sprinkler system of the facility, but it had still not provided a secondary exit for personnel on the second floor by the time we completed our review. NNSA has since stated that this fire protection issue will be completely addressed by relocating personnel from the second floor. Perhaps most serious, our testing revealed that a number of deficiencies were formally closed even though actual corrective action had not been completed. Notably, we observed that action had not been taken to resolve a recommendation to replace a fire alarm panel found to be unreliable. After the walk-down was conducted but prior to contract transition, the former contractor closed the recommendation in its action tracking database even though the panel had not been replaced. The walk-down team had categorized the fire alarm system as requiring replacement since it had been modified many times, was old and obsolete, and had very limited available spare parts. In fact, the walk-down team concluded that the panel 'must be considered to be unreliable and should have a very high priority for replacement'.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Fiscal Year 2010 Well Plugging and Abandonment Reconfiguration Program Description Addendum

This work plan describes an addendum to the program for plugging and abandonment (P&A) or reconfiguration of groundwater monitoring wells at the Waste Isolation Pilot Plant (WIPP) facility for fiscal year 2010. The addendum adds work scope to the previously developed program plan (DOE/WIPP 08-3376). Over the years a number of wells have been installed to monitor temporal and spatial changes in groundwater elevation and chemistry. Many of the wells used for this purpose were cased with carbon steel pipe that has deteriorated to varying degrees. For some wells, the integrity has failed and they must be either reconfigured or completely plugged, according to regulatory requirements, to prevent possible commingling of water from different water bearing formations. Others are nearing the end of their useful life and/or are no longer needed for monitoring. This work plan presents the field activities and objectives, requisite documentation, project organization, and project team roles and responsibilities. Work described in this plan will be performed by a New Mexico well drilling contractor holding a valid and current well driller license. The term "Contractor" refers to the licensed well driller and /or registered drill rig supervisor assigned by the well drilling contractor, who will be directed by the WIPP Subcontract Technical Representative (STR) or designee at the drilling site. This Contractor will arrange lower-tier subcontracts, to include geophysics, tool rental, and waste containers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electrical, Electronic, and Electromechanical (EEE) parts management and control requirements for NASA space flight programs

This document establishes electrical, electronic, and electromechanical (EEE) parts management and control requirements for contractors providing and maintaining space flight and mission-essential or critical ground support equipment for NASA space flight programs. Although the text is worded 'the contractor shall,' the requirements are also to be used by NASA Headquarters and field installations for developing program/project parts management and control requirements for in-house and contracted efforts. This document places increased emphasis on parts programs to ensure that reliability and quality are considered through adequate consideration of the selection, control, and application of parts. It is the intent of this document to identify disciplines that can be implemented to obtain reliable parts which meet mission needs. The parts management and control requirements described in this document are to be selectively applied, based on equipment class and mission needs. Individual equipment needs should be evaluated to determine the extent to which each requirement should be implemented on a procurement. Utilization of this document does not preclude the usage of other documents. The entire process of developing and implementing requirements is referred to as 'tailoring' the program for a specific project. Some factors that should be considered in this tailoring process include program phase, equipment category and criticality, equipment complexity, and mission requirements. Parts management and control requirements advocated by this document directly support the concept of 'reliability by design' and are an integral part of system reliability and maintainability. Achieving the required availability and mission success objectives during operation depends on the attention given reliability and maintainability in the design phase. Consequently, it is intended that the requirements described in this document are consistent with those of NASA publications, 'Reliability Program Requirements for Aeronautical and Space System Contractors,' NHB 5300.4(1A-l); 'Maintainability Program Requirements for Space Systems,' NHB 5300.4(1E); and 'Quality Program Provisions for Aeronautical and Space System Contractors,' NHB 5300.4(1B).

Source record↗

Panel to review EOSDIS plans

Formed in Jan. 1992, the Panel to Review EOSDIS Plans was charged with advising NASA on its plans for developing the Earth Observing System (EOS) Data and Information System (EOSDIS). Specifically, the panel was asked to do the following: assess the validity of the engineering and technical underpinnings of the EOSDIS; assess its potential value to scientific users; suggest how technical risk can be minimized; and assess whether current plans are sufficiently resilient to be adaptable to changing technology and requirements such as budget environments, data volumes, new users, and new databases. The panel completed an interim report (Addendum A) and transmitted it to NASA and other interested parties in the government on 9 Apr. 1992. Because of a delay in NASA's plans to select the contractor for EOSDIS, the panel was not able to complete its review of the program according to the original government request. With the issuance of a letter report (Addendum B) on 28 Sep. 1992, the panel became inactive until such time as NASA could release the details of the contractor's proposed architecture, schedule, and costs for developing EOSDIS. In early 1993, NASA awarded the contract for the EOSDIS Core System (ECS). On 20 Apr. 1993, NASA asked the panel to reconvene to do the following: ( 1) complete its review of NASA's approach to the EOSDIS architecture and implementation; (2) appraise NASA's responses to the panel's previous recommendations; and (3) review the planning for EOSDIS in the context of NASA's role in the Global Change Data and Information System (GCDIS) implementation plan. To respond to the NASA charge, the panel met three times in 1993 including sessions with NASA officials and the EOSDIS contractor. In addition, several of the panel members visited individual Distributed Active Archive Centers (DAAC's) to obtain additional views of EOSDIS. The panel has now obtained substantial information on the EOSDIS budget, contractor work program, and current baseline architecture that was not previously available, due to procurement restrictions. This report presents the panel's findings and recommendations based on this additional information.

Source record↗

The advantages of cost plus award fee contracts

A Cost Plus Award Fee contract is the best procurement vehicle for the high-tech, one-of-a-kind, development projects that constitute most of NASA'S projects. The use of this type of contract requires more government and contractor effort than any other forms of contracts. An award fee contract is described as an arrangement whereby the government periodically awards a fee consistent with the cost, schedule and technical performance that is achieved by a contractor during a preset period with preset award fee pools. It's the only contracting method where both the government and contractor goals are closely linked. It also has a built-in mechanism to conveniently alter and emphasize program events in order to current external and internal situations. The award fee process also demands good communication between government and contractor participants.

Keathley, William C.↗

NASA Technology Evaluation for Environmental Risk Mitigation Remediation Technology Collaboration Development

NASA is committed to finding solutions to agency cleanup problems that are better, cheaper, and more effective than the status quo. Unfortunately, some potential solutions involve innovative technologies for which NASA remediation managers may not have a high level of understanding or confidence. Since 2004, NASA's Stennis Space Center (SSC) in Mississippi has been pumping groundwater contaminated with trichloroethylene (TCE) and other halogenated volatile organic compounds (HVOC) from their cleanup location designated "Area G" through extraction wells to an aboveground treatment system. Over time, however, the effectiveness of this treatment strategy has diminished and an alternative approach is needed. In 2012, professionals from NASA's Principal Center for Technology Evaluation for Environmental Risk Mitigation (TEERM) introduced SSC managers to an innovative technology for enhancing the performance of SSC's existing pump and treat system. The technology, generally referred to as in situ chemical oxidation (ISCO), involves slowly and continuously injecting a strong but safe chemical oxidant into the groundwater. Treatment is enhanced by a "surfactant-type effect" which causes residual contamination from saturated soil to be released into the dissolved-phase where it can be readily oxidized. Any dissolved-phase contamination that was not oxidized can be collected by the extraction well network and treated aboveground. SSC was not familiar with the technology so to increase their confidence, TEERM identified a contractor who was willing to demonstrate their product and process at a significantly reduced price. An initial, small-scale demonstration of ISCO began at sse in March 2012 and completed in August 2012. This successful demonstration was followed by three larger-scale ISCO demonstrations between August and December 2012. The contractor's innovative Continuous Injection System (CIS) incorporated "green" and sustainable technologies and practices. A slow injection rate was maintained autonomously by the CIS, eliminating the need for multiple mobilizations of personnel and powered equipment. The CIS was calibrated to deliver only as much reagent as the formation would accept without "short circuiting", minimizing material waste. Public utility water pressure was used to mix, dilute, and inject the reagent. NASA personnel were trained to operate and maintain the system and remote monitoring and injection control capabilities were developed, further reducing the need for contractor mobilizations to the site. An integrated solar photovoltaic panel was used to power the control valves and web monitoring telemetry. SSC provided hydrogen peroxide for the process using their existing supplier for the aboveground pump and treat systems. The only consumable required from the contractor was their proprietary activator to catalyze SSC's peroxide.

Romeo, James↗

Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

Steven R Hirshorn↗

Building America Case Study: Measure Guideline: Guidance on Taped Insulating Sheathing Drainage Planes (Fact Sheet)

This guide provides information and recommendations to the following groups: Insulation contractors, General contractors, Builders, Home remodelers, Mechanical contractors, and Homeowners as a guide to the work that needs to be done. The order of work completed during home construction and retrofit improvements is important. Health and safety issues must be addressed first and are more important than durability issues. And durability issues are more important than saving energy. Not all techniques can apply to all houses. Special conditions will require special action. Some builders or homeowners will wish to do more than the important but basic retrofit strategies outlined by this guide. The following are best practice and product recommendations from the interviewed contractors and home builders who collectively have a vast amount of experience. Three significant items were discussed with the group which are required to make taped insulating sheathing a simple, long term, and durable drainage plane: 4. Horizontal joints should be limited or eliminated wherever possible 5. Where a horizontal joint exists use superior materials 6. Frequent installation inspection and regular trade training are required to maintain proper installation Section 5 of this measure guideline contains the detailed construction procedure for the three recommended methods to effectively seal the joints in exterior insulating sheathing to create a simple, long term, and durable drainage plane.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Building America Case Study: Evaluation of Residential Integrated Space/Water Heat Systems, Illinois and New York (Fact Sheet)

This multi-unit field demonstration of combined space and water heating (combi) systems was conducted to help document combi system installation and performance issues that needed to be addressed through research. The objective of the project was to put commercialized forced-air tankless combi units into the field through local contractors that were trained by manufacturers and GTI staff under the auspices of utility-implemented Emerging Technology Programs. With support from PARR, NYSERDA and other partners, the project documented system performance and installations in Chicago and New York. Combi systems were found to save nearly 200 therms in cold climates at efficiencies between about 80% and 94%. Combi systems using third-party air handler units specially designed for condensing combi system operation performed better than the packaged integrated combi systems available for the project. Moreover, combi systems tended to perform poorly when the tankless water heaters operating at high turn-down ratios. Field tests for this study exposed installation deficiencies due to contractor unfamiliarity with the products and the complexity of field engineering and system tweaking to achieve high efficiencies. Widespread contractor education must be a key component to market expansion of combi systems. Installed costs for combi systems need to come down about 5% to 10% to satisfy total resource calculations for utility-administered energy efficiency programs. Greater sales volumes and contractor familiarity can drive costs down. More research is needed to determine how well heating systems such as traditional furnace/water heater, combis, and heat pumps compare in similar as-installed scenarios, but under controlled conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗