Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CLOSURES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Fluid simulation of tokamak ion temperature gradient turbulence with zonal flow closure model

Nonlinear fluid simulation of turbulence driven by ion temperature gradient modes in the tokamak fluxtube configuration is performed by combining two different closure models. One model is a gyrofluid model by Beer and Hammett [Phys. Plasmas 3, 4046 (1996)], and the other is a closure model to reproduce the kinetic zonal flow response [Sugama et al., Phys. Plasmas 14, 022502 (2007)]. By including the zonal flow closure, generation of zonal flows, significant reduction in energy transport, reproduction of the gyrokinetic transport level, and nonlinear upshift on the critical value of gradient scale length are observed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Moment-Fourier approach to ion parallel fluid closures and transport for a toroidally confined plasma

A general method of solving the drift kinetic equation is developed for an axisymmetric magnetic field. Expanding a distribution function in general moments, a set of ordinary differential equations is obtained. Successively expanding the moments and magnetic-field involved quantities in Fourier series, a set of linear algebraic equations is obtained. The set of full (Maxwellian and non-Maxwellian) moment equations is solved to express the first-order density, temperature, and flow velocity in terms of radial gradients of the zeroth-order pressure and temperature. Closure relations that connect parallel heat flux density and viscosity to the radial gradients and parallel gradients of temperature and flow velocity are also obtained by solving the non-Maxwellian moment equations. The closure relations combined with the linearized fluid equations reproduce the same solution obtained directly from the full moment equations. Furthermore, the method can be generalized to derive closures and transport for an electron-ion plasma and a multi-ion plasma in a general magnetic field.

neoclassical transport↗

New shell closure for neutron-rich Sn isotopes

The variation of E(2{sub 1}{sup +}) of {sup 134-140}Sn calculated with empirical SMPN interaction has striking similarity with that of experimental E(2{sub 1}{sup +}) of even-even {sup 18-22}O and {sup 42-48}Ca, showing clearly that N=84-88 spectra exhibit the effect of gradually filling up the nu(2f{sub 7/2}) orbital, which finally culminates in a new shell closure at N=90. Realistic two-body interaction CWG does not show this feature. Spin-tensor decomposition of SMPN and CWG interactions and variations of their components with valence neutron number reveals that the origin of the shell closure at {sup 140}Sn lies in the three-body effects. Calculations with CWG3M, which is obtained by including a simple three-body monopole term in the CWG interaction, predict decreasing E(2{sub 1}{sup +}) for {sup 136,138}Sn and a shell closure at {sup 140}Sn.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Closure Report for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 562, Waste Systems, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 562 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Permanent Closure of MFC Biodiesel Underground Storage Tank 99ANL00013

This closure package documents the site assessment and permanent closure of the Materials and Fuels Complex biodiesel underground storage tank 99ANL00013 in accordance with the regulatory requirements established in 40 CFR 280.71, “Technical Standards and Corrective Action Requirements for Owners and Operators of Underground Storage Tanks: Out-of-Service UST Systems and Closure.”

02 PETROLEUM↗

Closure Report for Corrective Action Unit 366: Area 11 Plutonium Valley Dispersion Sites, Nevada National Security Site, Nevada

This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 366, Area 11 Plutonium Valley Dispersion Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 366 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

Room D was an in-situ, isothermal, underground experiment conducted at the Waste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under-predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under-predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RELAP-7 Closure Correlations

The RELAP-7 code is the next generation nuclear reactor system safety analysis code being developed at the Idaho National Laboratory (INL). The code is based on the INL’s modern scientific software development framework, MOOSE (Multi-Physics Object Oriented Simulation Environment). The overall design goal of RELAP-7 is to take advantage of the previous thirty years of advancements in computer architecture, software design, numerical integration methods, and physical models. The end result will be a reactor systems analysis capability that retains and improves upon RELAP5’s and TRACE’s capabilities and extends their analysis capabilities for all reactor system simulation scenarios. The RELAP-7 code utilizes the well-posed 7-equation two-phase flow model for compressible two-phase flow. Closure models used in the TRACE code has been reviewed and selected to reflect the progress made during the past decades and provide a basis for the colure correlations implemented in the RELAP-7 code. This document provides a summary on the closure correlations that are currently implemented in the RELAP-7 code. The closure correlations include sub-grid models that describe interactions between the fluids and the flow channel, and interactions between the two phases.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Closure Report for the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

Because of significantly reduced wastewater discharges to the Central Facilities Area Sewage Treatment Plant, wastewater has not been land applied since 2011. The future need to land apply wastewater was evaluated. Based on the current wastewater flows into the Central Facilities Area Sewage Treatment Plant, expected future missions at Central Facilities Area, and the discovery in 2014 that Lagoon 3 was leaking at an unacceptable rate, it was determined that the Central Facilities Area Sewage Treatment Plant is significantly oversized and that Lagoons 1 and 2 could be converted to total evaporation lagoons. Therefore, the decision was made to remove the existing sludge in Lagoon 3 and transfer it to Lagoon 2 for additional treatment, decommission Lagoon 3 and the land application area, and terminate the wastewater reuse permit. A closure plan was submitted and approved by the Idaho Department of Environmental Quality in 2016. This report describes the closure activities that were performed. Closure activities included: • Characterizing the soil/liner in Lagoon 3 to determine whether further characterization and/or remediation will be required under the Comprehensive Environmental Response, Compensation, and Liability Act. • Based on the results from the soil/liner sampling, determining whether additional sampling will be required for the land application area. • Removing the sludge in Lagoon 3 and placing it in Lagoon 2. • Puncturing the Lagoon 3 soil/liner to prevent ponding of storm water and becoming a source for vectors. • Installing a permanent cap on the inlet piping to Lagoon 3. Samples were collected on November 10, 2016, and were submitted for analysis to an off-site laboratory. Data validation and evaluation were performed by Portage, INC. Sample results confirmed that there is no hazard to human health and the environment and that Lagoon 3 and the land application area could be closed. In August 2017, sludge was removed from Lagoon 3 and placed in Lagoon 2, the soil/liner was punctured in 4 places, and caps were installed on the primary and bypass inlet lines.

99 GENERAL AND MISCELLANEOUS↗

Closure Plan for the Idaho National Laboratory Site's Materials and Fuels Complex Industrial Waste Ditch

The Materials and Fuels Complex industrial waste system currently consists of the Industrial Waste Pond and Industrial Waste Ditch, associated piping, lift station, and flow meter. The Industrial Waste Pond and Industrial Waste Ditch, are land application sites permitted under Idaho Department of Environmental Quality Reuse Permit I-160-02, Modification 1. The Reuse Permit allows for 17 million gallons of industrial wastewater to be discharged to the land application sites. For Reuse Permit year 2017, approximately 7.569 million gallons were discharged to the land application sites, of which 1.649 million gallons were discharged to the Industrial Waste Ditch. A project (MFC West Campus Utility Corridor project) is proposed to begin in the summer of 2018. The project will install a new utility corridor along the west and north sides of the Materials and Fuels Complex. As part of the design, it is proposed to reroute the wastewater currently discharged to the Industrial Waste Ditch into an underground pipe that would connect into the existing Industrial Waste Pipeline. The Industrial Waste Ditch pipe would enter the existing Industrial Waste Pipeline upstream of the existing flow meter and sampling location. This would allow for the combined wastewater streams to be monitored for flow and sampled for parameters required by the Reuse Permit. In accordance with the Reuse Permit, this closure plan is being submitted to the Idaho Department of Environmental Quality for review and approval. Once the closure plan is approved, the Reuse Permit will be modified to remove the Industrial Waste Ditch from the permit. The closure plan includes: • Brief background of the Materials and Fuels Complex. • Reuse Permit history. • Site characteristics. • Description of the Industrial Wastewater System. • History of discharges to the Industrial Waste Ditch. • Summary of the Comprehensive Environmental Response, Compensation, and Liability Act characterization, evaluation, and remediation of the Industrial Waste Ditch. • Contaminant concentrations in the effluent discharged to the Industrial Waste Ditch. • Contaminant concentrations in cross gradient, downgradient, and background monitoring wells. Based on the Comprehensive Environmental Response, Compensation, and Liability Act characterization and remediation of the Industrial Waste Ditch, low volumes and contaminant concentrations in the effluent subsequently discharged to the Industrial Waste Ditch, and contaminant concentrations at or near background levels in the monitoring wells, it is recommended that the Industrial Waste Ditch should be closed without further characterization.

99 GENERAL AND MISCELLANEOUS↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2018 (Revision 0)

This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. The locations of the sites are shown in Figure ES-1. This report covers calender year 2018. The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110; and quarterly at CAU 111. Additional inspections are conducted at CAUs 92 and 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAUs 110 and 111, soil moisture monitoring and subsidence surveys are conducted in addition to the visual inspections. At CAU 110 the site fence, gate, lock and use restriction signs are evaluated. At CAU 111, an ecological survey, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are also conducted. This report will address all monitoring item notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 6 of Permit NEV HW0101 was issued effective December 10, 2015, and remains in effect until December 10, 2020.

54 ENVIRONMENTAL SCIENCES↗

Closure and transport theory for plasmas with multiple ion species

This report summarizes a DOE-funded research project on closure and transport theory for plasmas with multiple ion species. The work developed accurate moment-based closure models across the full range of collisionality, incorporating both kinetic and collisional effects. Key contributions include high-fidelity closure relations, multi-temperature models, and transport coefficients applicable to fusion, space, and astrophysical plasmas.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Closure Report for Corrective Action Unit 366: Area 11 Plutonium Valley Dispersion Sites, Nevada National Security Site, Nevada with ROTC 1

This Closure Report presents information supporting closure of Corrective Action Unit (CAU) 366, Area 11 Plutonium Valley Dispersion Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 366 were met. CAU 366 consists of the following six Corrective Action Sites (CASs), located in Area 11 of the Nevada National Security Site: • CAS 11-08-01, Contaminated Waste Dump #1 • CAS 11-08-02, Contaminated Waste Dump #2 • CAS 11-23-01, Radioactively Contaminated Area A • CAS 11-23-02, Radioactively Contaminated Area B • CAS 11-23-03, Radioactively Contaminated Area C • CAS 11-23-04, Radioactively Contaminated Area D

54 ENVIRONMENTAL SCIENCES↗

Yucca Mountain Waste Package Closure System Robotic Welding and Inspection System

The Waste Package Closure System (WPCS), for the closure of radioactive waste in canisters for permanent storage of spent nuclear fuel (SNF) and high-level waste in the Yucca Mountain Repository was designed, fabricated, and successfully demonstrated at the Idaho National Laboratory (INL). This article focuses on the robotic hardware and tools necessary to remotely weld and inspect the closure lid welds. The system was operated remotely and designed for use in a radiation field, due to the SNF contained in the waste packages being closed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Achievements and Ongoing Challenges for advanced CFD Boiling Closure Model Development using Physical Insights from Validation-Oriented High-Fidelity Boiling Experiment

The fundamental understanding of the boiling-associated heat transfer, including sliding bubble effect, is still challenging despite the intensive research for decades in both experimental and computational boiling research communities. One of the main difficulties of boiling experiment come from the fact that direct observation of the underlying principle through experiment is very difficult due to the high complexity of the boiling phenomenon. Also, since the heat transfer characteristics associated with boiling is the result of non-linear interaction of various physical parameters coupled to each other, it is challenging to find the relationship between the parameters for modeling. This paper discusses the authors’ past and ongoing boiling research under CASL (Consortium for Advanced Simulation of Light Water Reactors) program, including the efforts to overcome the difficulties of boiling measurement and model development. In particular, we focus on describing the major achievements, lessons learnt, and ongoing challenges for the CFD boiling closure model development based on the high-fidelity subcooled flow boiling experiment at Texas A&M University (TAMU). The major research achievements discussed through this paper include (i) novel boiling measurement strategy and high-fidelity validation data production, (ii) dedicated effort to identify the critical measurement issues in boiling experiment, (iii) new physical insight into sliding bubble heat transfer mechanisms, and (iv) new boiling closure model development. Discussion is also made on the ongoing challenges for the boiling closure model development and the future research plan based on the lessons learnt.

42 ENGINEERING↗

Applying Lean Concepts to Waste Site Closure - 13137

Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗