Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CAMPAIGN STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

230 records · Page 13

Deeply Rooted: Evaluating Plant Rooting Depth as a Means for Enhanced Soil Carbon Sequestration (Full Technical Report)

Soils store three times as much carbon (C) as the atmosphere, but are not at capacity, and enhanced soil C storage is considered an essential strategy to mitigate rising atmospheric CO 2 levels. Agricultural soils have experienced substantial C loss in the past century due to poor agricultural practices and erosion. A shift towards deep-rooting crops and low-impact soil management could potentially increase long-term sequestration of C fixed by plants and stored in their root tissues, particularly for crops that have naturally deep root systems (>1 meter). A substantial amount of the CO 2 taken up by plants is allocated to their root systems, and because C deposited in deep soil layers has a longer residence time (up to millennia, in contrast to C deposited in topsoils), C increases at depth may have better long-term C sequestration potential than topsoils. However, the accrual, turnover, and stabilization of C in subsoils is a critical knowledge gap. We investigated a deeply rooted plant, switchgrass (Panicum virgatum), as a means of increasing carbon stocks in marginal and agricultural soils. We hypothesized that deep (>30 cm) SOC stocks would be greater under bioenergy crops relative to stocks under shallow-rooted conventional crop cover. To test this hypothesis, we compared soil depth profiles beneath deeply rooted switchgrass (cultivated for 4-30 years) and paired shallowrooted annual controls. We studied 12 field sites, 3 that were collected in 2018 before the start of the project as part a Department of Energy (DOE) Sustainable Biofuels study, and 9 that we collected in 2019 on a national field sampling campaign across the eastern US. In our publication from the 2018 study, which was written in collaboration with the LLNL Soil Microbiome Scientific Focus Area (SFA), we found that C stocks increased under switchgrass, but that the increases were dependent on soil texture. In the 2019 study, we found that carbon accrual tended to occur most consistently in low C soil in the southern US, which could indicate that perennial grasses may be a viable strategy to increase SOC in marginals soils in this region. We have published two studies from the 2019 sampling campaign thus far, we measured microbial growth parameters that will aid in modeling subsoil carbon cycling, and we found that switchgrass appears to move water upward in the soil profile and could promote drought tolerance, which a phenomenon commonly performed by trees known as ‘hydraulic redistribution;’ our study is the first to show this can occur in deep-rooted grasses. Finally, we published a modeling paper in collaboration with the LLNL Soil Microbiome SFA, where we found that poorly crystalline minerals are abundant and strongly correlated with organic C in geographically limited zones with enhanced weathering rates. Our results will inform technological development in the agricultural carbon sequestration sector as well as future negative emissions policies.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Mars Surface Systems Common Capabilities and Challenges for Human Missions

This paper describes the current status of common systems and operations as they are applied to actual locations on Mars that are representative of Exploration Zones (EZ) - NASA's term for candidate locations where humans could land, live and work on the Martian surface. Given NASA's current concepts for human missions to Mars, an EZ is a collection of Regions of Interest (ROIs) located within approximately 100 kilometers of a centralized landing site. ROIs are areas that are relevant for scientific investigation and/or development/maturation of capabilities and resources necessary for a sustainable human presence. An EZ also contains a habitation site that will be used by multiple human crews during missions to explore and utilize the ROIs within the EZ. The Evolvable Mars Campaign (EMC), a description of NASA's current approach to these human Mars missions, assumes that a single EZ will be identified within which NASA will establish a substantial and durable surface infrastructure that will be used by multiple human crews. The process of identifying and eventually selecting this single EZ will likely take many years to finalized. Because of this extended EZ selection process it becomes important to evaluate the current suite of surface systems and operations being evaluated for the EMC as they are likely to perform at a variety of proposed EZ locations and for the types of operations - both scientific and development - that are proposed for these candidate EZs. It is also important to evaluate proposed EZs for their suitability to be explored or developed given the range of capabilities and constraints for the types of surface systems and operations being considered within the EMC. Four locations identified in the Mars Exploration Program Analysis Group (MEPAG)'s Human Exploration of Mars Science Analysis Group (HEM-SAG) report are used in this paper as representative of candidate EZs that will emerge from the selection process that NASA has initiated. A field station site plan is developed for each of these four HEM-SAG sites. Because of the difficulty in getting equipment and supplies to the surface of Mars, specific assessments have been conducted to identify those systems and processes that can perform in multiple, sometimes completely unrelated, situations. Examples of common systems that are assessed at all of these sites include: (a) habitation and associated logistics storage systems, (b) a centralized power plant capable of supplying power to a geographically distributed (but within the central habitation zone) set of systems, (c) mobility systems that can be used to off-load and move payloads to specific locations at the central field station location that could also be used to traverse long distances to reach some of the more remote ROIs and (d) robotic systems that can support various activities (such as system set up and maintenance) at the field station that could also be used to explore scientific ROIs and used to support site-specific ISRU (In Situ Resource Utilization) production activities.

Toups, Larry↗

Development and Application of a Novel Calorimetry Technique for the Study of Lithium-Ion Cell Thermal Runaway

Lithium-ion battery technology is widely used and is attractive due to demonstrated specific energies in the 200-300 W-hr/kg range. The excellent, mass-efficient energy storage capability of lithium-ion batteries has led to their use on many aerospace platforms. However, lithium-ion batteries can exhibit thermal runaway behavior wherein stored electrochemical energy is released rapidly as a result of thermal or mechanical failure, electrochemical abuse, internal or external short circuiting. A single cell undergoing thermal runaway within a battery has the potential to induce thermal runaway in adjacent cells if heat dissipation is not properly managed and can result in a catastrophic failure of the battery. Designing batteries that are resistant to thermal runaway propagation requires an understanding of, not only, total energy yield but also the means by which that energy is liberated from the cell. While Accelerating Rate Calorimetry and other techniques provide total thermal runaway energy yield, they do not provide the fractional breakdown of energy liberated via conduction through the cell casing from that which is vented from the cell as hot gases and effluents. Such data are needed to inform battery thermal design and analysis. To measure the total energy yield, the fraction conducted through the cell casing, and the fraction lost due to gases and effluents, NASA developed Fractional Thermal Runaway Calorimetry (FTRC). Two calorimeters have been developed and demonstrated, the Small-format- and Large-format Fractional Thermal Runaway Calorimeters (S-FTRC and L-FTRC, respectively). The technique has been successfully applied to small- and large-format cells (2.4-3.5 Ah and >100 Ah capacity, respectively) and has given new insights into Li-ion cell thermal runaway. Development of the calorimeters is discussed and results from the initial thermal runaway testing campaigns are presented.

Lithium-Ion Cell↗

The Threat of Uncertainty: Why Using Traditional Approaches for Evaluating Spacecraft Reliability are Insufficient for Future Human Mars Missions

Through the Evolvable Mars Campaign (EMC) study, the National Aeronautics and Space Administration (NASA) continues to evaluate potential approaches for sending humans beyond low Earth orbit (LEO). A key aspect of these missions is the strategy that is employed to maintain and repair the spacecraft systems, ensuring that they continue to function and support the crew. Long duration missions beyond LEO present unique and severe maintainability challenges due to a variety of factors, including: limited to no opportunities for resupply, the distance from Earth, mass and volume constraints of spacecraft, high sensitivity of transportation element designs to variation in mass, the lack of abort opportunities to Earth, limited hardware heritage information, and the operation of human-rated systems in a radiation environment with little to no experience. The current approach to maintainability, as implemented on ISS, which includes a large number of spares pre-positioned on ISS, a larger supply sitting on Earth waiting to be flown to ISS, and an on demand delivery of logistics from Earth, is not feasible for future deep space human missions. For missions beyond LEO, significant modifications to the maintainability approach will be required.Through the EMC evaluations, several key findings related to the reliability and safety of the Mars spacecraft have been made. The nature of random and induced failures presents significant issues for deep space missions. Because spare parts cannot be flown as needed for Mars missions, all required spares must be flown with the mission or pre-positioned. These spares must cover all anticipated failure modes and provide a level of overall reliability and safety that is satisfactory for human missions. This will require a large amount of mass and volume be dedicated to storage and transport of spares for the mission. Further, there is, and will continue to be, a significant amount of uncertainty regarding failure rates for spacecraft components. This uncertainty makes it much more difficult to anticipate failures and will potentially require an even larger amount of spares to provide an acceptable level of safety. Ultimately, the approach to maintenance and repair applied to ISS, focusing on the supply of spare parts, may not be tenable for deep space missions. Other approaches, such as commonality of components, simplification of systems, and in-situ manufacturing will be required.

Stromgren, Chel↗

Moon to Mars (M2M) Habitation Considerations: A Snap Shot As of January 2022

The following NASA Technical Memorandum (TM) is intended to provide a snapshot in time of NASA’s current considerations (ground rules and assumptions, functional allocations, logistics) for habitation systems for the lunar surface (non-roving) and Mars transits. As NASA continues to refine the reference designs to meet the needs of an evolving architecture, it is expected that this information will also be updated as a result. Where appropriate, relevant publicly released documents will be referenced to provide further detail. NASA’s human lunar exploration plan under the Artemis program calls for achieving the goal of sending the first woman and first person of color to the surface of the Moon in the mid- 2020s and working toward sustainable exploration by the end of the decade. Working with both commercial and international partners, NASA will establish a permanent human presence on the Moon to uncover new scientific discoveries and lay the foundation for private companies to build a lunar economy. Longer duration missions on the lunar surface and in lunar orbit will also serve as a test bed for technologies to support future Mars exploration campaigns. The agency will use what we learn on the Moon to prepare for humanity's next giant leap – sending astronauts to Mars. NASA intends to establish a sustained lunar presence with the development of the Artemis Base Camp to prove technologies and capabilities that will one day enable humans to live and work on Mars, beginning with core elements including the Lunar Terrain Vehicle (LTV), the Pressurized Rover (PR), the lunar Surface Habitat (SH), power systems, and in-situ resource utilization (ISRU) systems. For in space operations and eventual transport of humans to Mars, NASA will utilize a Mars Transit Habitat (TH). Following deployment, the TH will complete a series of longer duration missions and shakedown testing while docked at Gateway, leveraging Gateway’s habitation redundancy for safety measures. Proposed Gateway-TH missions will far exceed the longest duration cislunar human missions to date. They will be the first operational readiness tests of our long-duration deep space systems, and of the split crew (two crew on the surface, two crew in space) operations that are vital to the approach for the first human Mars mission. Both the SH and TH are major architectural elements of NASA’s Moon to Mars (M2M) approach, each with very different concepts of operation. The SH is intended for use on the lunar surface as a home for astronauts, surface operations base, science facility, hub for communications, extravehicular activity (EVA) equipment repair site, waste processing facility, and supply hub. It serves as an enabler for a sustained surface presence and preparation for partial gravity operations during Mars missions. The SH will be designed to be self-sufficient for operations on the lunar surface. The SH will independently provide several functions, including its own power generation, energy storage capability, sleep quarters, hygiene areas, work areas, and dining areas. It will be capable of communicating with surface assets, orbital assets, and directly with Earth ground stations. It is planned to operate with two crew in the habitat for ~28- day stays with crew swap-outs in which the PR crew of two trades places with the habitat crew. During the swap-out, the habitat will nominally support four crew for a short period of time. For contingency scenarios, the habitat must also be capable of supporting four crew for up to 7 days. The TH will be designed to be capable of up to ~1,200-day Mars missions with the ability to carry all food and supplies needed to support a crew of four for this duration. An assumed Mars mission profile for the TH is to carry crew and supplies for ~850-day roundtrips between Earth and Mars orbit that allows 30-day stays on the Martian surface. To test the systems for this long journey, the TH will be used to extend the duration of missions at Gateway, enabling the orbiting outpost to be used as a Mars analog. These analog missions will be accomplished by attaching the TH to Gateway and conducting lunar surface operations from the TH. The TH may also need to perform free-flying shakedown missions to test out all systems prior to leaving for Mars. The habitat provides many critical functions including: a contingency airlock, crew quarters, galley, hygiene areas, safe haven capability, and science equipment. It can receive docked items from either axial end or on a radial port.

Habitat↗

Effects of 18 O Exchange on Neutron Emission Rates of Aging 238 PuO 2 LWRHUs

The Lightweight Radioisotope Heater Unit (LWRHU) provides about 1 Watt of thermal power to critical electrical and mechanical systems in the extreme temperatures of space, maintaining the operating temperature of the spacecraft’s scientific and general operating equipment. Los Alamos National Laboratory (LANL) designed and tested the LWRHU in the 1970s through early 1980s. The first production campaign at LANL was in the early 1980s in support of the Galileo mission in which over 100 LWRHUs were manufactured. In the mid-1990s, almost 200 LWRHUs were manufactured in support of the Cassini mission. After the primary Cassini manufacturing campaign, the Department of Energy (DOE) approved the fabrication of more than 10 additional LWRHUs as spares in 1998. The LWRHU assembly contains the following components: a fuel pellet, a vented capsule, a pyrolytic graphite insulator, and a fine-weave pierced fabric (FWPF) graphite aeroshell. The fuel pellet is a hot-pressed 238 PuO 2 cylindrical pellet that is sintered to create a ceramic pellet. The pellet is encapsulated in a platinum-rhodium encapsulation. The welded fueled clad is placed inside a pyrolytic graphite thermal insulation to protect the fuel from the heat produced in reentry events. The exterior layer of the LWRHU assembly is the FWPF aeroshell. Before sintering, PuO 2 granules are heated in a furnace at temperatures greater than or equal to 700°C under an enriched 16 O atmosphere in order to reduce trace quantities of 18 O. Because 18 O undergoes an (α,n) reaction, 18 O needs to be removed as much as possible to meet radiation emission requirements set by the Jet Propulsion Laboratory (JPL) and the National Aeronautics and Space Administration (NASA), as well as other agencies. The relative abundances of the oxygen isotopes are indicated by neutron emission rate (NER) measurements. LWRHUs are vented with a sintered platinum frit vent (George 1986). During extraterrestrial operation, the vent in the cladding allows helium from the decay of plutonium to escape and relieves pressure from the system while preventing the solids from escaping (Rinehart 1996, Tate 1982 & 1985). This vent is protected during manufacture by a platinum-30 rhodium cover. The capsule vent is activated by milling a 0.025-inch diameter hole through the protective cover to a nominal depth of 0.015 inches, generally immediately before the LWRHU is loaded into the aeroshell (George 1986). Prior to long-term storage, LWRHUs are vented and thus potentially allow infiltration of 18 O from the ambient atmosphere. Although NER decreases with age due to the reduction in emitted alpha particles, it might be expected that NER reduction is mitigated by the exchange of 18 O. However, this is not necessarily the case and no trend was observed relating NER to age other than the natural decay of 238 Pu (Mulford 2021). The most probable and dominant factor for determining specific NER was manufacturing discrepancies between individual units. It is important to understand the lack of observed 16 O- 18 O exchange and to compare LWRHU pellets as much as possible.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Direct Feed Low Activity Waste Test Platform - Pretreatment Unit Operations - 18613

The Low-Activity Waste Pretreatment System (LAWPS) facility is planned to pretreat Hanford tank waste supernate by filtering solids and processing through ion exchange columns to remove cesium. Note that cesium ion exchange is not discussed in this paper. The filtration process is achieved through cross flow filtration using a stainless steel Mott filter with a 0.1-micron grade. The goal of this effort was to assess whether a batch, or dead end, filtration (DEF) device replicating the LAWPS cross flow filter could be employed to qualify each feed campaign prior to delivery to LAWPS. The objective for filtration feed qualification is to determine whether the cross flow filters deployed in LAWPS will remove solids while maintaining a de minimis flow rate of permeate. To that end, the DEF was tested with simulants and the results compared with those obtained from cross flow filtration tests. In addition, actual waste samples were retrieved from Hanford Site Tank AP-105 and were composited for testing. These composited samples were first tested with cross flow filtration to determine the filter flux under typical LAWPS conditions. The same material was subsequently tested with DEF to determine a filter flux. While the DEF correctly predicted the cross flow filter's ability to filter solids from the feed, there was limited correlation between DEF and cross flow filtration flux results. This lack of correlation suggests a fundamental difference between cross flow filtration and DEF as used in these tests. Taken in total, these results indicate that DEF is not a good candidate to provide qualification of feed for LAWPS cross flow filtration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Successful Implementation of NASA Orbital Debris Requirements for the Retirement of TDRS-1

TDRS-1 was decommissioned on October 28th 2009 following more than 26 years of operation. The Grand Old Dame of the TDRSS constellation wa s launched aboard the maiden voyage of the Space Shuttle Challenger ( STS-6) in April 1983. TDRS-1 survived a malfunction of the Inertial Upper Stage eventually utilizing its own propulsion system to success fully reach its assigned station in geosynchronous orbit. The anomalo us beginning of the TDRS-1 mission was not without lasting consequenc es as the primary reaction control system (A-side) was completely di sabled with an apparent propellant leak and the secondary system (B-s ide) suffered damage to its negative roll thruster rendering the thru ster inoperable. Following decommissioning the challenge to completin g a successful TDRS-1 end-of-mission (EOM) was the implementation of the stringent orbital debris requirements of NPR 8715.6 with a parti ally functioning spacecraft not originally designed to meet those req uirements. The TDRS-1 EOM had three key goals: 1) removal of the spac ecraft from geosynchronous orbit; 2) depletion of the remaining prope llant; and 3) passivation of all other sources of energy storage or generation. The TDRS-1 EOM approach was one of minimizing risks while accomplishing the goals above. The orbit raising portion of EOM was accomplished using deltavelocity operations already proven during pre vious stationchanging maneuvers. The propellant depletion approach wa s necessarily more aggressive as over 20 hours of burn time was requ ired to deplete the remaining fuel. A novel approach utilizing a spin ning, thrusting, passively controlled spacecraft configuration was ut ilized to achieve reasonable burn durations that met schedule constra ints. This nonstandard configuration required careful analysis of ele ctrical, thermal, and communication subsystems. The configuration wa s thoroughly simulated prior to the start of operations and carefully characterized during the initial spin period and first burn. Passiva tion was by definition a unique operation not previously performed wi thin the TDRS 1-7 constellation. Use was made of a TDRS spacecraft si mulator to verify the operational procedure to mitigate risks and pro vide crew training. TDRS-1 orbit raising maneuvers commenced on June 5th 2010 and completed on June 14th with an apogee 370 km and a peri gee 352 km above geosynchronous altitude. 127 kg of propellant were e stimated to be remaining in the tanks at the completion of orbit rais ing. TDRS-1 was placed in its spinning orientation on June 16th and the first fuel depletion burn was performed the following day. A seri es of 10 depletion burns were performed ending on June 26th when both propellant tank pressures experienced dramatic drops. Final passivat ion was performed on June 27 th deactivating electronics, removing t he batteries from the bus and solar arrays, and disabling the space-t o-ground communications equipment. The Second TDRS Ground Terminal (S TGT) continued to open loop track TDRS-1 for several days attempting command reacquisition several times a day. All attempts were unsucce ssful confirming passivation was achieved. The TDRS-1 orbit at passiv ation was an orbital debris compliant 36,319 x 36,128 km in height. W hile differing spacecraft designs may preclude mimicking the exact TD RS-1 EOM approach, the TDRS-1 campaign serves to demonstrate that pr e-NPR 8715.6 designs can be made to meet the requirements resulting i n a reduced orbit debris environment for future missions

Mirczak, Walter↗

Forensic Analysis of Faulted NSTX-U Inner Poloidal Field Coil

The failure of the NSTX-U PF1A upper coil suspended plasma operations during the project's first operational campaign after commissioning. Initial nondestructive testing and examination of the failed coil was followed by extensive nondestructive radiography. Destructive testing facilitated visual borescope/videoscope inspection through the cooling path, vacuum testing, and electrical testing of every conductor segment. One conductor cooling path visually evidenced a void through the sidewall of the cooling path in a layer-to-layer region. The identified void in the conductor cooling path was not proximal to a braze or joggle. Electrical testing indicated that the voided conductor segment was a member of a group of 14 conductor segments that evidenced low-resistance connectivity. Four braze joints and two lead segments were subjected to 400-lbf/in 2 hydrostatic pressure testing followed by helium leak testing and evidenced that there were no detectable leaks in the tested cooling path segments. The faulted region was proximal to the center of the coil pack and evidenced historical electrical pitting and molten conductor debris. Samples of the epoxy resin insulation system were extracted and analyzed with dynamic mechanical analysis and differential scanning calorimetry techniques. Epoxy resin insulation samples were subjected to immersion testing per ASTM D570. Metallurgical samples were extracted from the coil pack conductors and subjected to hardness testing and grain structure analysis. The base material testing results indicated no abnormalities. In conclusion, the coil incipient failure was determined to most likely have resulted from conductive material located between conductor and insulation layers.

25 ENERGY STORAGE↗

Evaluation of the Los Alamos Nuclear Material Packaging Risk Ranking Method

Repackaging nuclear material into robust containers to protect workers and the public has been ongoing at LANL and around the DOE complex for nearly two decades. The number of containers at LANL is around 5,000; limited resources for repackaging material has led to extended repackaging campaigns and the need to prioritize repackaging. Various methodologies have been used to prioritize the repackaging efforts and to demonstrate progress in risk reduction over time (e.g., Boerigter, 1997). The 2000-1 DNFSB recommendation recognized the limited DOE resources for repackaging, and acknowledged the need to “prioritize and schedule tasks to be undertaken with available funds according to consideration of risks.” Later, in DNFSB recommendation 2005-1, in addition to recommending that DOE develop a packaging standard, the Board recommended that “Characterization information should also be used to develop a surveillance program prioritized according to expected material and container risk (including, for example, material type, material form, and the age and type of container).” In response to requests and recommendations from the DOE and DNSFB to prioritize according to worker risk, a risk ranking method based on the potential consequence of dropping a container from 3 meters was developed in 2007 (Smith, 2007) and updated in 2014 (Hoffman, 2014). Various LANL implementation plans for repackaging were developed over the years using this methodology (Stone, 2014). Currently, this method is utilized in conjunction with an algorithm to mitigate programmatic risk to prioritize container repackaging and material processing (Prochnow, 2015). The purpose of this study is to document how the current risk ranking method works, how it is used and potential limitations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SRS Strategy for Tank 3 Salt Dissolution - Performance and Lessons Learned - 20441

The Savannah River Site (SRS) Tank Farms have 51 underground waste tanks used to store and process liquid nuclear waste materials. There are 4 different tank types, ranging in capacity from 2,840,000 to 4,920,000 L (750,000 to 1,300,000 Gal). Twenty-four of the tanks are older style and do not meet full secondary containment standards. The older style tanks are the initial focus of waste removal efforts for tank closure at SRS. Eight of these twenty-four tanks have completed waste removal and are filled with grout. Prior to salt dissolution, Tank 3 was a dry salt tank that contained 5.06 m (199.3 in) of salt and sludge waste. Additional salt waste was present on cooling coils above the salt layer up to approximately 5.59 m (220 in). Three mixing eductors were installed in Tank 3 to aid in dissolving salt waste in three tank riser access ports. A transfer pump was installed, and the transfer pump suction was located 25.4 cm (10 in) from the tank bottom. Well water was added to the tank through a downcomer until the dry bulk salt was covered with liquid. During the initial fill of Tank 3, approximately 242,000 L (64,000 Gal) of rain water were added from periodic F-Tank Farm (FTF) Catch Tank additions and approximately 17,000 L (4,500 Gal) of well water were added. Following liquid additions to cover the dry bulk salt, well water was added through the three mixing eductors in batches during each stage. Additionally, during the salt dissolution campaigns, the FTF Catch Tank was utilized to add rain water through a downcomer in the center tank riser access port as needed for volume relief in the FTF Catch Tank. Following liquid additions, the water was recirculated (internal to the tank) using the transfer pump, and a sample was pulled to confirm the target specific gravity (SpG) of the dissolved salt solution was achieved. The dissolved salt solution was then transferred to the receipt tank (Tank 7), and the mixing eductors were lowered as close to the new bulk salt layer as possible, to support subsequent dissolution campaigns. While the mixing jets were able to dissolve salt successfully in Tank 3, they did not do so in a completely uniform manner. Throughout dissolution, mounds were discovered under Riser 1, Riser 2, and the Center Riser. The mixing jets dissolved the salt around the edges of the tank well but were not as effective toward the center of the tank. FTF Catch Tank additions through the center tank riser access port downcomer were required to impact the mound under the center tank riser. FTF Catch Tank additions were sporadic as they were dependent on rainfall in the area. Additionally, all mixing jets were rarely able to be lowered to the same elevation, indicating some mounding in the bulk salt layer. Indexing of the mixing jets was also utilized to impact the salt mounds. Overall, Tank 3 salt dissolution was successful as approximately 1,476,000 L (390,000 Gal) of dissolved salt solution was transferred to Tank 7 over six stages. Slightly less than 852,000 L (225,000 Gal) of water were added to Tank 3. The original material balance prediction estimated that the bulk salt level in Tank 3 would be 3.88 m (152.8 in) after six salt dissolution stages. After six stages the actual bulk salt level was 3.38 m (133 in). This paper will discuss the salt removal strategy, each salt dissolution stage, and lessons learned for future salt dissolution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dynamic cycling enhances battery lifetime

Laboratory aging campaigns benchmark and elucidate the complex degradation behavior of lithium-ion batteries, and are critical not only for developing new battery chemistries and cell designs but also for engineering reliable battery management systems. Critically, these laboratory experiments aim to quantify and capture realistic aging mechanisms. In this study, we systematically compare dynamic discharge profiles representative of electric vehicle driving to the well-accepted constant-current profiles. Surprisingly, we discovered that dynamic discharge enhances lifetime substantially compared to constant current discharge. Specifically, for the same average current and voltage window, varying the dynamic discharge profile leads to an increase of up to 38 % in equivalent full cycles at end-of-life. Explainable machine learning reveals the importance of low-frequency current pulses as well as time-induced aging under these realistic discharge conditions. Our work quantifies the importance of evaluating new battery chemistries and designs with realistic load profiles, and highlights the opportunities to revisit our understanding of aging mechanisms at the chemistry, materials, and cell levels.

25 ENERGY STORAGE↗

Some Aeronautical Communications Experiments

Classically there has existed an asymmetry between the computing and communicating sides of aerospace systems. Over the past few decades, this asymmetry has shifted to favoring communication link technologies, meaning that advancements in available central processing units (CPUs), storage devices, and internal data buses have stagnated. Indeed, the increased emphasis placed on refining subsystem performance such as with antenna bandwidth in phased arrays, amplifier power efficiency, software defined radio (SDR) flexibility and encoding for data compression and error correction has given rise to successful debuts of multi-gigabit-per-second data return from long space-link distances. These accomplishments are easily quantifiable through link budgets and illustrate what is possible, but also reveal the deficiencies in overall communications capabilities. In particular, the ever-accelerating presence of aerospace vehicles gives rise to newer and larger classes of challenges to address the needs of 21st century systems. Furthermore remote sensing and imaging capabilities have far outpaced our ability to transmit their products to the ground, so we are increasingly dependent on pre-processing and downselection to contend with the communications bottleneck. No longer may we depend upon the constrained logistics in delivering end-to-end data delivery through manual reconfigurations, static event scheduling and execution on a per-vehicle basis, for these methods do not scale and therefore must give way to dynamic, networked approaches with an overall systems view in mind. Emerging mission requirements exhibit a trend toward multiple smaller-scale vehicles working together to perform dissimilar observations. Such operations necessitate sensor fusion across a constellation, and where data processing may be distributed throughout a fairly disconnected network whose topology changes over time in non-deterministic manners. Individual communications link performance is still very relevant to deploying an effective communications system, but now must be embedded within a greater architecture of capability to optimally utilize the bandwidth available from each link to generate an ultimate end-to-end quality of service. The deleterious effects of timing uncertainty across the arrangement presents a challenge to measurement synchronization and delivery, so a successful deployed system needs to be tolerant to the delays inherent in time-of-light between elements and digital processing latencies existing at each node. In this presentation we share the flight test results from a high performance Gbps laser communications terminal evaluated with a suite of store and forward capabilities called High-rate Delay Tolerant Networking (HDTN). The communications payload is operated over Lake Erie across a range of configurations including several convergence layers, and is evaluated to determine recovery time after link disruptions, information loss, efficiency and speed. The effectiveness of utilizing a flying laboratory to increase the Technology Readiness Level (TRL) of an integrated system in relevant environments is discussed, as well as the value of conducting aeronautics experiments to retire risk for technology infusion into space missions. Upcoming flight campaigns will be presented, including opportunities to demonstrate secure command and control, data intensive hyperspectral imaging, quantum link characterization, 4k High Definition (HD) video streaming and internetworked space-ground-aero relay operations. These experiments will pave the way for future missions which will depend upon interoperability across disparate government and privately owned networks, involve contention with uncertain and dynamic timing, and require agility to autonomously configure optimal parameters across networks of ever-increasing size and complexity to ensure data delivery. https://www1.grc.nasa.gov/space/scan/acs/tech-studies/dtn/

Daniel Raible↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗