Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Building inspection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Key Reliability Drivers of Liquid Propulsion Engines and A Reliability Model for Sensitivity Analysis

This paper is to address the in-flight reliability of a liquid propulsion engine system for a launch vehicle. We first establish a comprehensive list of system and sub-system reliability drivers for any liquid propulsion engine system. We then build a reliability model to parametrically analyze the impact of some reliability parameters. We present sensitivity analysis results for a selected subset of the key reliability drivers using the model. Reliability drivers identified include: number of engines for the liquid propulsion stage, single engine total reliability, engine operation duration, engine thrust size, reusability, engine de-rating or up-rating, engine-out design (including engine-out switching reliability, catastrophic fraction, preventable failure fraction, unnecessary shutdown fraction), propellant specific hazards, engine start and cutoff transient hazards, engine combustion cycles, vehicle and engine interface and interaction hazards, engine health management system, engine modification, engine ground start hold down with launch commit criteria, engine altitude start (1 in. start), Multiple altitude restart (less than 1 restart), component, subsystem and system design, manufacturing/ground operation support/pre and post flight check outs and inspection, extensiveness of the development program. We present some sensitivity analysis results for the following subset of the drivers: number of engines for the propulsion stage, single engine total reliability, engine operation duration, engine de-rating or up-rating requirements, engine-out design, catastrophic fraction, preventable failure fraction, unnecessary shutdown fraction, and engine health management system implementation (basic redlines and more advanced health management systems).

Huang, Zhao-Feng↗

Structural risk assessment and aircraft fleet maintenance

In the present analysis, deterministic flaw growth analysis is used to project the failure distributions from inspection data. Inspection data is reported for each critical point in the aircraft. The data will indicate either a crack of a specific size or no crack. The crack length may be either less than, equal to, or greater than critical size for that location. Non-critical length cracks are projected to failure using the crack growth characteristics for that location to find the life when it will be at critical length. Greater-than-critical length cracks are projected back to determine the life at failure, that is, when it was at critical length. The same process is used as in the case of a non-critical crack except that the projection goes the other direction. These points, along with the critical length cracks are used to determine the failure distribution. To be able to use data from different aircraft to build a common failure distribution, a consistent life variable must be used. Aircraft life varies with the severity of the usage; therefore the number of flight hours for a particular aircraft must be modified by its usage factor to obtain a normalized life which can be compared with that from other aircraft.

Smith, Herb, Jr.↗

Scalable in situ non-destructive evaluation of additively manufactured components using process monitoring, sensor fusion, and machine learning

Laser Powder Bed Fusion (L-PBF) Additive Manufacturing (AM) is among the metal 3D printing technologies most broadly adopted by the manufacturing industry. However, the current industry qualification paradigm for critical-application L-PBF parts relies heavily on expensive non-destructive inspection techniques, which significantly limits the use-cases of L-PBF. In situ monitoring of the process promises a less expensive alternative to ex situ testing, but existing sensor technologies and data analysis techniques struggle to detect sub-surface flaws (e.g., porosity and cracking) on production-scale L-PBF printers. In this work, an in situ NDE (INDE) system was engineered to detect subsurface flaws detected in X-Ray Computed Tomography (XCT) directly from process monitoring data. A multilayer, multimodal data input allowed the INDE system to detect numerous subsurface flaws in the size range of 200–1000µm using a novel human-in-the-loop annotation procedure. Furthermore, a framework was established for generating probability-of-detection (POD) and probability-of-false-alarm (PFA) curves compliant with NDE standards by systematically comparing instances of detected subsurface flaws to post-build XCT data. Here, we also introduce for the first time in the AM in situ sensing literature the a 90/95 – the flaw size corresponding to a 90% detection rate on the lower 95% confidence interval of the POD curve. The INDE system successfully demonstrated POD capabilities commensurate with traditional NDE methods. Traditional ML performance metrics were also shown to be inadequate for assessing the ability of the INDE system’s flaw detection performance. It is the hope of the authors that future studies will adopt the POD and PFA approach outlined here to provide better insight into the utility of process monitoring for AM.

36 MATERIALS SCIENCE↗

Ball bearing vibrations amplitude modeling and test comparisons

Bearings generate disturbances that, when combined with structural gains of a momentum wheel, contribute to induced vibration in the wheel. The frequencies generated by a ball bearing are defined by the bearing's geometry and defects. The amplitudes at these frequencies are dependent upon the actual geometry variations from perfection; therefore, a geometrically perfect bearing will produce no amplitudes at the kinematic frequencies that the design generates. Because perfect geometry can only be approached, emitted vibrations do occur. The most significant vibration is at the spin frequency and can be balanced out in the build process. Other frequencies' amplitudes, however, cannot be balanced out. Momentum wheels are usually the single largest source of vibrations in a spacecraft and can contribute to pointing inaccuracies if emitted vibrations ring the structure or are in the high-gain bandwidth of a sensitive pointing control loop. It is therefore important to be able to provide an a priori knowledge of possible amplitudes that are singular in source or are a result of interacting defects that do not reveal themselves in normal frequency prediction equations. This paper will describe the computer model that provides for the incorporation of bearing geometry errors and then develops an estimation of actual amplitudes and frequencies. Test results were correlated with the model. A momentum wheel was producing an unacceptable 74 Hz amplitude. The model was used to simulate geometry errors and proved successful in identifying a cause that was verified when the parts were inspected.

Hightower, Richard A., III↗

Hardware Development Process for Human Research Facility Applications

The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. The source of hardware requirements is the science community and HRF program. The HRF Science Working Group, consisting of SCientists from various medical disciplines, defined a basic set of equipment with functional requirements. This established the performance requirements of the hardware. HRF program requirements focus on making the hardware safe and operational in a space environment. This includes structural, thermal, human factors, and material requirements. Science and HRF program requirements are defined in a hardware requirements document which includes verification methods. Once the hardware is fabricated, requirements are verified by inspection, test, analysis, or demonstration. All data is compiled and reviewed to certify the hardware for flight. Obviously, the basis for all hardware development activities is requirement definition. Full and complete requirement definition is ideal prior to initiating the hardware development. However, this is generally not the case, but the hardware team typically has functional inputs as a guide. The first step is for engineers to conduct market research based on the functional inputs provided by scientists. CommerCially available products are evaluated against the science requirements as well as modifications needed to meet program requirements. Options are consolidated and the hardware development team reaches a hardware development decision point. Within budget and schedule constraints, the team must decide whether or not to complete the hardware as an in-house, subcontract with vendor, or commercial-off-the-shelf (COTS) development. An in-house development indicates NASA personnel or a contractor builds the hardware at a NASA site. A subcontract development is completed off-site by a commercial company. A COTS item is a vendor product available by ordering a specific part number. The team evaluates the pros and cons of each development path. For example, in-bouse developments utilize existing corporate knowledge regarding bow to build equipment for use in space. However, technical expertise would be required to fully understand the medical equipment capabilities, such as for an ultrasound system. It may require additional time and funding to gain the expertise that commercially exists. The major benefit of subcontracting a hardware development is the product is delivered as an end-item and commercial expertise is utilized. On the other hand, NASA has limited control over schedule delays. The final option of COTS or modified COTS equipment is a compromise between in-house and subcontracts. A vendor product may exist that meets all functional requirements but req uires in-house modifications for successful operation in a space environment. The HRF utilizes equipment developed using all of the paths described: inhouse, subcontract, and modified COTS.

Bauer, Liz↗

Video Analysis for Surveillance of Spacecraft Parachute Systems

The Commercial Crew Program (CCP) has established a surveillance methodology to ensure the reliability of spacecraft parachute systems. The implemented methodology relies on an interconnected framework consisting of imagery analysis, hardware inspections, and vehicle data analysis. Imagery analysis serves as a foundation for these core activities which provide a robust approach to the surveillance of spacecraft parachute systems. As the surveillance framework has been developed, the role of imagery has become more prominent, and therefore imagery requirements have changed. To complete photogrammetric analysis, careful consideration must be made to the role of imagery, required data, imagery requirements, the analysis process, and mission planning. The role of imagery will drive the required data, which will in turn drive imagery requirements. Imagery requirements are likely to drive mission planning through consideration to camera selection and placement. If onboard imagery is required, the camera and data system must be implemented prior to launch. If external imagery is required, the photography package must be implemented such that it can be positioned for a return and free of potential debris fields. For these reasons, an integrated approach must be used to build an imagery package around the required analysis with careful coordination with mission planners.

parachutes↗

Video Analysis for Surveillance of Spacecraft Parachute Systems

The Commercial Crew Program (CCP) has established a surveillance methodology to ensure the reliability of spacecraft parachute systems. The implemented methodology relies on an interconnected framework consisting of imagery analysis, hardware inspections, and vehicle data analysis. Imagery analysis serves as a foundation for these core activities which provide a robust approach to the surveillance of spacecraft parachute systems. As the surveillance framework has been developed, the role of imagery has become more prominent, and therefore imagery requirements have changed. To complete photogrammetric analysis, careful consideration must be made to the role of imagery, required data, imagery requirements, the analysis process, and mission planning. The role of imagery will drive the required data, which will in turn drive imagery requirements. Imagery requirements are likely to drive mission planning through consideration to camera selection and placement. If onboard imagery is required, the camera and data system must be implemented prior to launch. If external imagery is required, the photography package must be implemented such that it can be positioned for a return and free of potential debris fields. For these reasons, an integrated approach must be used to build an imagery package around the required analysis with careful coordination with mission planners.

parachutes↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region.

Montgomery, Patty↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.

Montgomery, Patty↗

Internet Technology on Spacecraft

The Operating Missions as Nodes on the Internet (OMNI) project has shown that Internet technology works in space missions through a demonstration using the UoSAT-12 spacecraft. An Internet Protocol (IP) stack was installed on the orbiting UoSAT-12 spacecraft and tests were run to demonstrate Internet connectivity and measure performance. This also forms the basis for demonstrating subsequent scenarios. This approach provides capabilities heretofore either too expensive or simply not feasible such as reconfiguration on orbit. The OMNI project recognized the need to reduce the risk perceived by mission managers and did this with a multi-phase strategy. In the initial phase, the concepts were implemented in a prototype system that includes space similar components communicating over the TDRS (space network) and the terrestrial Internet. The demonstration system includes a simulated spacecraft with sample instruments. Over 25 demonstrations have been given to mission and project managers, National Aeronautics and Space Administration (NASA), Department of Defense (DoD), contractor technologists and other decisions makers, This initial phase reached a high point with an OMNI demonstration given from a booth at the Johnson Space Center (JSC) Inspection Day 99 exhibition. The proof to mission managers is provided during this second phase with year 2000 accomplishments: testing the use of Internet technologies onboard an actual spacecraft. This was done with a series of tests performed using the UoSAT-12 spacecraft. This spacecraft was reconfigured on orbit at very low cost. The total period between concept and the first tests was only 6 months! On board software was modified to add an IP stack to support basic IP communications. Also added was support for ping, traceroute and network timing protocol (NTP) tests. These tests show that basic Internet functionality can be used onboard spacecraft. The performance of data was measured to show no degradation from current approaches. The cost to implement is much less than current approaches due to the availability of highly reliable and standard Internet tools. Use of standard Internet applications onboard reduces the risk of obsolescence inherent in custom protocols due to extremely wide use across all domains. These basic building blocks provide the framework for building onboard software to support direct user communication with payloads including payload control. Other benefits are payload to payload communication from dissimilar spacecraft, constellations of spacecraft, and reconfigurability on orbit. This work is funded through contract with the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC).

Rash, James↗

Ultrasonic Inspection to Quantify Failure Pathologies of Crimped Electrical Connections

Previous work has shown that ultrasonic inspection provides a means of assessing electrical crimp quality that ensures the electrical and mechanical integrity of an initial crimp before the installation process is completed. The amplitude change of a compressional ultrasonic wave propagating at right angles to the wire axis and through the junction of a crimp termination was shown to correlate with the results of destructive pull tests, which is a standard for assessing crimp wire junction quality. Of additional concern are crimps made at high speed assembly lines for wiring harnesses, which are used for critical applications, such as in aircraft. During high-speed assembly it is possible that many faulty crimps go undetected until long after assembly, and fail in service. The position and speed of the crimping jaw become factors as the high-speed crimp is formed. The work presented in this paper is designed to cover the more difficult and more subtle area of high-speed crimps by taking into account the rate change of the measurements. Building on the previous work, we present an analysis methodology, based on transmitted ultrasonic energy and timing of the first received pulse that is shown to correlate to the gauge of the crimp/ferrule combination and the position of the crimping jaw. Results demonstrating the detectability of a number of the crimp failure pathologies, such as missing strands, partially inserted wires and incomplete crimp compression, are presented. The ability of this technique to estimate crimp height, a mechanical measure of crimp quality, is discussed.

Cramer, K. Elliott↗

Battery Energy Storage System (BESS) Licensing and Permitting [Slides]

This presentation provides an overview of the licensing, permitting, and regulatory frameworks governing Battery Energy Storage Systems (BESS) across multiple international contexts. It outlines foundational permitting considerations - including safety standards, siting requirements, regulatory and environmental obligations, and interconnection processes - alongside typical pathways for installation, approval, and inspection. The presentation summarizes key technical standards such as NFPA 855 and IEEE guidelines, and emphasizes best practices for safe and effective deployment. A series of detailed case studies from South Africa, Chile, Mexico, Brazil, Costa Rica, Honduras, and the Dominican Republic illustrates how different countries structure approval authority, evaluate environmental impacts, and integrate BESS into national grid systems. The deck concludes with insights on emerging challenges, including evolving regulatory frameworks, financial viability, and the need for pricing mechanisms that accurately value storage services.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling and Simulation of the ARES UPPER STAGE Transportation, Lifting, Stacking and Mating Operations Within the Vehicle Assembly Building at KSC

This viewgraph presentation describes the modeling and simulation of the Ares Upper Stage Transportation, lifting, stacking, and mating operations within the Vehicle Assembly Building (VAB) at Kennedy Space Center (KSC). An aerial view of KSC Launch Shuttle Complex, two views of the Delmia process control layout, and an upper stage move subroutine and breakdown are shown. An overhead image of the VAB and the turning basin along with the Pegasus barge at the turning basin are also shown. This viewgraph presentation also shows the actual design and the removal of the mid-section spring tensioners, the removal of the AFT rear and forward tensioners tie downs, and removing the AFT hold down post and mount. US leaving the Pegasus Barge, the upper stage arriving at transfer aisle, upper stage receiving/inspection in transfer aisle, and an overhead view of upper stage receiving/inspection in transfer aisle are depicted. Five views of the actual connection of the cabling to the upper stage aft lifting hardware are shown. The upper stage transporter forward connector, two views of the rotation horizontal to vertical, the disconnection of the rear bolt ring cabling, the lowering of the upper stage to the inspection stand, disconnection of the rear bolt ring from the upper stage, the lifting of the upper stage and inspection of AFT fange, and the transfer of upper stage in an integrated stack are shown. Six views of the mating of the upper stage to the first stage are depicted. The preparation, inspection, and removal of the forward dome are shown. The upper stage mated on the integrated stack and crawler is also shown. This presentation concludes with A Rapid Upper Limb Assessment (RULA) utilizing male and female models for assessing risk factors to the upper extremities of human beings in an actual physical environment.

Kromis, Phillip A.↗

Do Flashing and Sealant Materials Need to be Exposed to Extreme Cycling?

In the U.S., over 50% of homes were built before 1980, when minimal building codes existed. The aging of building envelopes can significantly contribute to the air leakage, moisture intrusion, and durability of buildings leading to higher energy demands. Although the durability of building materials and envelope systems has been studied extensively, the durability of specific components like window-wall flashing and sealants remains underexplored. Current standards such as ASTM, NIST, and AAMA primarily focus on durability testing considering the high temperatures only and require sealant testing on anodized aluminum panels, leaving questions about performance in cold or fluctuating temperatures unanswered. Current ASTM and AAMA standards provide guidelines for durability testing but predominantly focus on exposure to higher temperature conditions. It remains unclear how exposure to cold temperatures, or cycles of both hot and cold conditions, affect the durability of these materials. Furthermore, AAMA standards mandate that flashing materials be tested on anodized aluminum panels, which may not reflect real-world applications. Therefore, this initial study aims to explore this concern through testing by constructing two window-wall interface prototypes and applying five different flashing and sealant materials to their joints. These samples were subjected to extreme temperatures, ranging from −34 ℃ (−30 °F) to 50 ℃ (122 °F), over a 28-day period (fourteen cycles of 24 hours), with daily visual inspections to document any signs of deterioration such as wrinkling, distortion, or warping. The study has two main objectives: (1) to determine whether flashing and sealant materials lose their durability and strength when exposed to varying climate conditions, specifically cold climates, and (2) to assess whether the interaction of these materials with different substrates (e.g., lumber, PVC, insulation) affects their durability and strength under varying climate conditions. The findings demonstrate how aging impacts the durability of window-wall systems interfaces, justifying future research that potentially could lead to the development of new testing protocols if significant defects are identified.

Palani, Hevar [ORNL] (ORCID:0000000220211994)↗

NSTAR Extended Life Test Discharge Chamber Flake Analysis

The Extended Life Test (ELT) of the NASA Solar Electric Propulsion Technology Readiness (NSTAR) ion thruster was concluded after 30,352 hours of operation. The ELT was conducted using the Deep Space 1 (DS1) back-up flight engine, a 30 cm diameter xenon ion thruster. Post-test inspection of the ELT engine revealed numerous contaminant flakes distributed over the bottom of the cylindrical section of the anode within the discharge chamber (DC). Extensive analyses were conducted to determine the source of the particles, which is critical to the understanding of degradation mechanisms of long life ion thruster operation. Analyses included: optical microscopy (OM) and particle length histograms, field emission scanning electron microscopy (FESEM) combined with energy dispersive spectroscopy (EDS), and atomic oxygen plasma exposure tests. Analyses of the particles indicate that the majority of the DC flakes consist of a layered structure, typically with either two or three layers. The flakes comprising two layers were typically found to have a molybdenum-rich (Mo-rich) layer on one side and a carbon-rich (C-rich) layer on the other side. The flakes comprising three layers were found to be sandwich-like structures with Mo-rich exterior layers and a C-rich interior layer. The presence of the C-rich layers indicates that these particles were produced by sputter deposition build-up on a surface external to the discharge chamber from ion sputter erosion of the graphite target in the test chamber. This contaminant layer became thick enough that particles spalled off, and then were electro-statically attracted into the ion thruster interior, where they were coated with Mo from internal sputter erosion of the screen grid and cathode components. Atomic oxygen tests provided evidence that the DC chamber flakes are composed of a significant fraction of carbon. Particle size histograms further indicated that the source of the particles was spalling of carbon flakes from downstream surfaces. Analyses of flakes taken from the downstream surface of the accelerator grid provided additional supportive information. The production of the downstream carbon flakes, and hence the potential problems associated with the flake particles in the ELT ion thruster engine is a facility induced effect and would not occur in the space environment.

deGroh, Kim K.↗

Thermal Cycling of Mir Cooperative Solar Array (MCSA) Test Panels

The Mir Cooperative Solar Array (MCSA) project was a joint US/Russian effort to build a photovoltaic (PV) solar array and deliver it to the Russian space station Mir. The MCSA is currently being used to increase the electrical power on Mir and provide PV array performance data in support of Phase 1 of the International Space Station (ISS), which will use arrays based on the same solar cells used in the MCSA. The US supplied the photovoltaic power modules (PPMs) and provided technical and programmatic oversight while Russia provided the array support structures and deployment mechanism and built and tested the array. In order to ensure that there would be no problems with the interface between US and Russian hardware, an accelerated thermal life cycle test was performed at NASA Lewis Research Center on two representative samples of the MCSA. Over an eight-month period (August 1994 - March 1995), two 15-cell MCSA solar array 'mini' panel test articles were simultaneously put through 24,000 thermal cycles (+80 C to -100 C), equivalent to four years on-orbit. The test objectives, facility, procedure and results are described in this paper. Post-test inspection and evaluation revealed no significant degradation in the structural integrity of the test articles and no electrical degradation, not including one cell damaged early as an artifact of the test and removed from consideration. The interesting nature of the performance degradation caused by this one cell, which only occurred at elevated temperatures, is discussed. As a result of this test, changes were made to improve some aspects of the solar cell coupon-to-support frame interface on the flight unit. It was concluded from the results that the integration of the US solar cell modules with the Russian support structure would be able to withstand at least 24,000 thermal cycles (4 years on-orbit).

Hoffman, David J.↗

Investigating Laser Beam Welding as an In-Space Joining Technique via Thermal Vacuum and Microgravity and Vacuum Experiments

In-space joining technologies are crucial for stimulating an in-space economy and for enabling sustained space exploration by in-space manufacturing and repair of metallic structures. Compared to brazing or soldering, in-space welding (ISW) can provide highly hermetic, strong, and complex joints, potentially without introducing additional material. However, the influence of extreme temperatures, reduced pressure, and reduced gravity on ISW is not yet fully elucidated. Several efforts at NASA are investigating laser beam welding (LBW) as a joining and repair method in both thermal vacuum (TVAC) and combined vacuum & reduced gravity environments. NASA Marshall Space Flight Center (MSFC) shepherded several ISW projects in its past, including the 1973 electron beam welding on Skylab, the 1989 low-power LBW on parabolic flights, and the unflown 1990s-era In-Space Welding Experiment. Recent parabolic flights and 3 degree-of-freedom ground testing build upon this heritage. A collaboration with the Ohio State University using NASA Langley Research Center (LaRC) hardware retrofitted for LBW achieved the first high-powered laser welds under vacuum and low gravity and developed a workforce capable developing such experimental hardware. A ground testing campaign at the MSFC Flat Floor simulated fit-up and welding representative of ISW in 3 degrees of freedom to emulate microgravity effects on inertial systems. One ongoing effort is a NASA Early Career Initiative project – Lunar Assembly and Servicing by Autonomous Robotics (LASAR). Ruggedized LBW components were developed by an external partner for use in TVAC. A TVAC-rated robotic arm was procured by MSFC and used in the first known robotic laser weld where all components save the laser generator were under vacuum. NASA Johnson Space Center (JSC) is advancing supervised autonomy of ISW. NASA LaRC continues to adapt their unique snowflake joint geometry, suitable for connecting segments in trusses and other structures, to LBW. Upcoming TVAC campaigns will focus on testing extreme temperatures, proving out autonomous operations, and demonstrating weld repair. Weld inspection will occur via a non-contact nondestructive evaluation (NDE) technique – electromagnetic acoustic transduction (EMAT). Another ongoing effort based at MSFC is the DISCMAN -- DIsk-Shaped Configurable and Modular vAcuum uNit – which seeks to development a compact, modular payload that can provide a vacuum environment while in a reduced gravity condition. This payload could support multiple in-space manufacturing developmental efforts, with the first demonstration technology being LBW. Currently, the design is targeting operations in the pressurized volume of a space station, but the payload could readily be adapted to other flight platforms such as parabolic or even suborbital vehicles. LASAR elucidates the effects of temperature and vacuum on LBW while DISCMAN probes those of vacuum and gravity. Through these complementary efforts, NASA is addressing the primary challenges of ISW across the space environment while simultaneously developing and maturing technologies including robotic systems and inspection methodologies for future practical implementation on the Moon and beyond. This approach is timely, as upcoming missions requiring sustained human presence in space will depend on reliable ISW capabilities to create robust metallic joints currently unproven in the space environment and to perform repairs in situ .

hypogravity↗

An Analysis of Extended Reality Mockups for Use in Verification: Phase 2

NASA commercial providers are increasing their use of Virtual Reality (VR) and Hybrid Reality (HR) technologies in their system development process. The use of these technologies, collectively referred to as Extended Reality (XR) technologies, has been limited to the development phase, but there have been requests to integrate VR and HR mockups into verifications. Verifications require, at minimum, a high-fidelity mockup for activities involving human participation (tests, demonstrations, inspections). HR technology shares many of the strengths but may not share some of the critical shortcomings of VR. Specifically, HR allows for integrating physical objects, such as a suit, which may be critical to evaluating a system. Adopting HR technology still has many of the same challenges as VR. Namely, there is little to no data about the validity of evaluations conducted with HR mockups, an established process, or criteria for evaluating the appropriateness of HR mockups. Because verifications are final and only need to happen once, HR mockups must be adequately vetted before being approved for use in verifications. Further hindering the adoption of these technologies is the lack of consensus on what constitutes a high-fidelity XR mockup. Even for physical mockups, there are guidelines and common criteria, but nothing has been formalized. Discussion about when an XR mockup can be used would be greatly helped by clearly defining what a high-fidelity XR mockup is and how it might be measured. The team will engage with relevant stakeholders to learn more about the benefits and challenges of adopting hybrid reality mockups for verification. The team will build upon work from Phase 1 by maturing a framework to guide decisions for evaluating XR mockups for use in verifications. The team will also conduct experimental studies to evaluate advantages and tradeoffs of hybrid/mixed reality relative to physical and virtual reality mockups. Finally, data from Phase 1 and Phase 2 will be synthesized into a set of best practices for developing and validating XR mockups for verification. We will highlight the work conducted to date in Phase 2. We will present the status of the XR for Verification Framework, a summary of best practices identified thus far, and give a synopsis of future work.

verification testing↗