Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Build System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Transportable Payload Operations Control Center reusable software: Building blocks for quality ground data systems

The Mission Operations Division (MOD) at Goddard Space Flight Center builds Mission Operations Centers which are used by Flight Operations Teams to monitor and control satellites. Reducing system life cycle costs through software reuse has always been a priority of the MOD. The MOD's Transportable Payload Operations Control Center development team established an extensive library of 14 subsystems with over 100,000 delivered source instructions of reusable, generic software components. Nine TPOCC-based control centers to date support 11 satellites and achieved an average software reuse level of more than 75 percent. This paper shares experiences of how the TPOCC building blocks were developed and how building block developer's, mission development teams, and users are all part of the process.

Mahmot, Ron↗

Design, fabrication, testing, and delivery of a solar energy collector system for residential heating and cooling

A low cost flat plate solar energy collector was designed for the heating and cooling of residential buildings. The system meets specified performance requirements, at the desired system operating levels, for a useful life of 15 to 20 years, at minimum cost and uses state-of-the-art materials and technology. The rationale for the design method was based on identifying possible material candidates for various collector components and then selecting the components which best meet the solar collector design requirements. The criteria used to eliminate certain materials were: performance and durability test results, cost analysis, and prior solar collector fabrication experience.

Holland, T. H.↗

Thanksgiving Hocus Pocus

I was managing the construction project, and I thought my biggest challenge was simply finishing the work in time for start of the holiday shopping season. The store opened three weeks before Thanksgiving. Everything looked great. Business picked up steadily as the serious spending season approached. Then, two days before Thanksgiving, disaster struck. The fire protection system was designed to prevent smoke and fire from reaching the merchandise. If a fire alarm went off anywhere in the building, the system went into a massive pressurization mode. Dampers would open and the system would pump in hundreds of cubic feet of air from outside into the store, pressurizing every square foot, preventing fire or smoke from spreading into the store. That night an unknown event tripped the alarm-and it sounded for six hours. The air conditioning system was still operational as the outside air temperatures had been warm all month. That night, however, temperatures plummeted to 20 degrees. With an alarm sounding in a building complex that covers many millions of square feet, no one paid attention to the cold air flowing into the space. Pipes froze and burst. Hundreds of gallons of water came down through the drywall, soaking merchandise, the carpet and the hardwood racks. This state of the art system, which had been designed to protect, was now responsible for unthinkable damage. You could be the among greatest project managers in world, but if you have an attitude and you give the client heartburn, unnecessary heartburn, you're not going to do more work with him. If you have a disaster like this one, and you manage to make everybody feel good and believe that you are going to take care of them, then everybody looks back on it and says, "You know what, this is a good project team; we work well together, so let's do another one."

Zazzali, Christian↗

Design, building, and testing of the post landing systems for the assured crew return vehicle

The design, building, and testing of the post landing support systems for a water landing Assured Crew Return Vehicle (ACRV) are presented. One ACRV will be permanently docked to Space Station Freedom, fulfilling NASA's commitment to Assured Crew Return Capability in the event of an accident or illness. The configuration of the ACRV is based on an Apollo Command Module (ACM) derivative. The 1990 to 91 effort concentrated on the design, building, and testing of a 1/5 scale model of the egress and stabilization systems. The objective was to determine the feasibility of: (1) stabilizing the ACM out of the range of motions which cause sea sickness; and (2) the safe and rapid removal of a sick or injured crewmember from the ACRV. The ACRV model construction is presented along with a discussion of the water test facility. The rapid egress system is also presented along with a discussion of the ACRV stabilization control systems. Results are given and discussed in detail.

Anderson, Loren A.↗

International Space Station Internal Thermal Control System Lab Module Simulator Build-Up and Validation

As part of the Sustaining Engineering program for the International Space Station (ISS), a ground simulator of the Internal Thermal Control System (ITCS) in the Lab Module was designed and built at the Marshall Space Flight Center (MSFC). To support prediction and troubleshooting, this facility is operationally and functionally similar to the flight system and flight-like components were used when available. Flight software algorithms, implemented using the LabVIEW(Registered Trademark) programming language, were used for monitoring performance and controlling operation. Validation testing of the low temperature loop was completed prior to activation of the Lab module in 2001. Assembly of the moderate temperature loop was completed in 2002 and validated in 2003. The facility has been used to address flight issues with the ITCS, successfully demonstrating the ability to add silver biocide and to adjust the pH of the coolant. Upon validation of the entire facility, it will be capable not only of checking procedures, but also of evaluating payload timelining, operational modifications, physical modifications, and other aspects affecting the thermal control system.

Paul Wieland↗

A formal approach to validation and verification for knowledge-based control systems

As control systems become more complex in response to desires for greater system flexibility, performance and reliability, the promise is held out that artificial intelligence might provide the means for building such systems. An obstacle to the use of symbolic processing constructs in this domain is the need for verification and validation (V and V) of the systems. Techniques currently in use do not seem appropriate for knowledge-based software. An outline of a formal approach to V and V for knowledge-based control systems is presented.

Castore, Glen↗

Immobile Robots: AI in the New Millennium

A new generation of sensor rich, massively distributed, autonomous systems are being developed that have the potential for profound social, environmental, and economic change. These include networked building energy systems, autonomous space probes, chemical plant control systems, satellite constellations for remote ecosystem monitoring, power grids, biosphere-like life support systems, and reconfigurable traffic systems, to highlight but a few. To achieve high performance, these immobile robots (or immobots) will need to develop sophisticated regulatory and immune systems that accurately and robustly control their complex internal functions. To accomplish this, immobots will exploit a vast nervous system of sensors to model themselves and their environment on a grand scale. They will use these models to dramatically reconfigure themselves in order to survive decades of autonomous operations. Achieving these large scale modeling and configuration tasks will require a tight coupling between the higher level coordination function provided by symbolic reasoning, and the lower level autonomic processes of adaptive estimation and control. To be economically viable they will need to be programmable purely through high level compositional models. Self modeling and self configuration, coordinating autonomic functions through symbolic reasoning, and compositional, model-based programming are the three key elements of a model-based autonomous systems architecture that is taking us into the New Millennium.

Williams, Brian C.↗

Suboceanic geodetic measurements

This paper reviews the needs for geodetic ties among sea-floor points and between such points and others on land, as well as the environmental constraints on potential systems for making such measurements. Underwater acoustic techniques provide the best opportunities, and an essential element on which to build acoustic systems - a precision-transponder system capable of making travel-time measurements over ranges of several kilometers with an accuracy of a few microseconds - is described. Finally, three particular systems are discussed. One uses direct transmission between transponders to achieve an accuracy of 1 part in 100,000 over ranges from a few meters to about a kilometer. The second, using a larger transponder network and an intermediate vehicle, can achieve similar accuracy over ranges up to about 10 km. The third is a composite acoustic global positioning system (GPS) which should be able to achieve subdecimeter accuracy over ranges of a few hundred kilometers.

Spiess, F. N.↗

Experiences Building an Object-Oriented System in C++

This paper describes tools that we built to support the construction of an object-oriented operating system in C++. The tools provide the automatic deletion of unwanted objects, first-class classes, dynamically loadable classes, and class-oriented debugging. As a consequence of our experience building Choices, we advocate these features as useful, simplifying and unifying many aspects of system programming.

Madany, Peter W.↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems and preparing to retire the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo-Saturn and Space Shuttle programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as legacy knowledge gained from nearly 50 years' experience developing space hardware. Early next decade, the Ares I will launch the new Orion Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both Ares I and Ares V are being designed to support longer future trips to Mars. The Exploration Launch Projects Office is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also discusses riskbased, management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it summarizes several notable accomplishments since October 2005, when the Exploration Launch Projects effort officially kicked off, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

Fault-tolerant computer study

A set of building block circuits is described which can be used with commercially available microprocessors and memories to implement fault tolerant distributed computer systems. Each building block circuit is intended for VLSI implementation as a single chip. Several building blocks and associated processor and memory chips form a self checking computer module with self contained input output and interfaces to redundant communications buses. Fault tolerance is achieved by connecting self checking computer modules into a redundant network in which backup buses and computer modules are provided to circumvent failures. The requirements and design methodology which led to the definition of the building block circuits are discussed.

Rennels, D. A.↗

A Global Capacity Building Vision for Societal Applications of Earth Observing Systems and Data: Key Questions and Recommendations

Capacity building using Earth observing (EO) systems and data (i.e., from orbital and nonorbital platforms) to enable societal applications includes the network of human, nonhuman, technical, nontechnical, hardware, and software dimensions that are necessary to successfully cross the valley [of death; see NRC (2001)] between science and research (port of departure) and societal application (port of arrival). In many parts of the world (especially where ground-based measurements are scarce or insufficient), applications of EO data still struggle for longevity or continuity for a variety of reasons, foremost among them being the lack of resilient capacity. An organization is said to have resilient capacity when it can retain and continue to build capacity in the face of unexpected shocks or stresses. Stresses can include intermittent power and limited Internet bandwidth, constant need for education on ever-increasing complexity of EO systems and data, communication challenges between the ports of departure and arrival (especially across time zones), and financial limitations and instability. Shocks may also include extreme events such as disasters and losing key staff with technical and institutional knowledge.

shocks↗

Re-Engineering the Mission Operations System (MOS) for the Prime and Extended Mission

One of the most challenging tasks in a space science mission is designing the Mission Operations System (MOS). Whereas the focus of the project is getting the spacecraft built and tested for launch, the mission operations engineers must build a system to carry out the science objectives. The completed MOS design is then formally assessed in the many reviews. Once a mission has completed the reviews, the Mission Operation System (MOS) design has been validated to the Functional Requirements and is ready for operations. The design was built based on heritage processes, new technology, and lessons learned from past experience. Furthermore, our operational concepts must be properly mapped to the mission design and science objectives. However, during the course of implementing the science objective in the operations phase after launch, the MOS experiences an evolutional change to adapt for actual performance characteristics. This drives the re-engineering of the MOS, because the MOS includes the flight and ground segments. Using the Spitzer mission as an example we demonstrate how the MOS design evolved for both the prime and extended mission to enhance the overall efficiency for science return. In our re-engineering process, we ensured that no requirements were violated or mission objectives compromised. In most cases, optimized performance across the MOS, including gains in science return as well as savings in the budget profile was achieved. Finally, we suggest a need to better categorize the Operations Phase (Phase E) in the NASA Life-Cycle Phases of Formulation and Implementation

Extended Mission↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems in preparation for the retirement of the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo Saturn (1961 to 1975) and Space Shuttle (1972 to 2010) programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as the vast amount of legacy knowledge gained from almost a half-century of hard-won experience in the space enterprise. Beginning early next decade, the Ares I will launch the new Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both the Ares I and Ares V systems are being designed to support longer future trips to Mars. The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also touches on risk-based management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it gives a summary of several notable accomplishments over the past year, since the Exploration Launch Projects effort officially kicked off in October 2005, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

Development of the structural technology of a large deployable antenna

The current NASA-sponsored Antenna Technology Development Program of the offset wrap-rib antenna concept is based on a ground test program of 'proof of concept' hardware whose potential on-orbit performance is based on analytical estimates. The ground demonstration hardware represents a partial 55-meter diameter reflector and feed support structure. Testing will include automated deployment, reflector surface quality evaluation and validation of analytical performance models. Test results and hardware fabrication costs will be used to refine the models that will be the basis for the preliminary design of a 100-meter diameter wrap-rib antenna system. Additionally, the design, processes, tooling, fabrication techniques, fixturing and assembly approaches used for the 'proof of concept' hardware are directly applicable to building flight systems up to 100 meters in diameter.

Wada, B. K.↗

Integrating Indigenous Traditional, Local and Scientific Knowledge for Improved Management, Policy and Decision-Making in Reindeer Husbandry in the Russian Arctic

As scientists and policy-makers from both indigenous and non-indigenous communities begin to build closer partnerships to address common sustainability issues such as the health impacts of climate change and anthropogenic activities, it becomes increasingly important to create shared information management systems which integrate all relevant factors for optimal information sharing and decision-making. This paper describes a new GIs-based system being designed to bring local and indigenous traditional knowledge together with scientific data and information, remote sensing, and information technologies to address health-related environment, weather, climate, pollution and land use change issues for improved decision/policy-making for reindeer husbandry. The system is building an easily-accessible archive of relevant current and historical, traditional, local and remotely-sensed and other data and observations for shared analysis, measuring, and monitoring parameters of interest. Protection of indigenous culturally sensitive information will be respected through appropriate data protocols. A mechanism which enables easy information sharing among all participants, which is real time and geo-referenced and which allows interconnectivity with remote sites is also being designed into the system for maximum communication among partners. A preliminary version of our system will be described for a Russian reindeer test site, which will include a combination of indigenous knowledge about local conditions and issues, remote sensing and ground-based data on such parameters as the vegetation state and distribution, snow cover, temperature, ice condition, and infrastructure.

Maynard, Nancy G.↗

Saturation: An efficient iteration strategy for symbolic state-space generation

This paper presents a novel algorithm for generating state spaces of asynchronous systems using Multi-valued Decision Diagrams. In contrast to related work, the next-state function of a system is not encoded as a single Boolean function, but as cross-products of integer functions. This permits the application of various iteration strategies to build a system's state space. In particular, this paper introduces a new elegant strategy, called saturation, and implements it in the tool SMART. On top of usually performing several orders of magnitude faster than existing BDD-based state-space generators, the algorithm's required peak memory is often close to the nal memory needed for storing the overall state spaces.

Ciardo, Gianfranco↗

Architecture options for the Manned Transportation Systems Study

The Manned Transpiration System (MTS) Study was undertaken to develop key data relative to the United States manned transportation system, and specifically, the next manned system we build. These data are being developed in the context of Earth-to-orbit architectures necessary to deliver all government payloads to low Earth orbit (LEO). Launch systems, transition between current and new systems, along with system functions (personnel and/or cargo to/from orbit) are presented. Several key considerations being debated today were used to aid our selection of Earth-to-orbit (ETO) architectures for evaluation. Other consideration s not being addressed in this initial effort that require additional study are identified Twenty-five launch systems were used to define a set of 18 architectures. These architectures are discussed in context with they key considerations being addressed in this study. Payload manufacturing ground rules are presented to provide an understanding of our approach in establishing flight rates from the MTS mission models. Furthermore, a discussion of manned system flight rates and relative personnel safety characteristics differences is presented. Comparative architecture results will not be available until May 1992.

M T Gaunce↗