Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Bed”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

Fluidized-Bed Reactor With Zone Heating

Deposition of silicon on wall suppressed. In new fluidized bed, silicon seed particles heated in uppermost zone of reactor. Hot particles gradually mix with lower particles and descend through fluidized bed. Lower wall of vessel kept relatively cool. Because silane enters at bottom and circulates through reactor pyrolized to silicon at high temperatures, silicon deposited on particles in preference wall. Design of fluidized bed for production of silicon greatly reduces tendency of silicon to deposit on wall of reaction vessel.

Iya, Sridhar K.↗

NASA/MSFC nozzle test bed

As part of an effort to improve the state-of-the-art in nozzle technology, a solid propulsion test bed facility is being designed and will be located at Marshall Space Flight Center. The test bed will consist of a plasma arc facility and several small scale rocket motor test facilities ranging in size from the ballistic environmental generator motor with a 1/2 in. diameter throat to the MNASA motor with a 9 and 1/2 in. diameter throat capability. The test bed system will be used primarily to study materials behavior from the standpoint of char, erosion, and thermal stress phenomena.

Crose, James G.↗

Oxygen/hydrogen technology test bed status update

An overview is provided of the Hydrogen/Oxygen Technology Test Bed program. The status of the program, the program direction, plans for testing, and plans for technology implementation within the program are delineated. Test Bed goals and objectives are defined and the current status of the Test Bed engine is provided. A test facility status and a summary of the test facility capabilities are given.

Richards, J. S.↗

Energy absorption, lean body mass, and total body fat changes during 5 weeks of continuous bed rest

The nature of the body composition changes due to inactivity was examined together with the question of whether these changes are secondary to changes in energy absorption. Volunteers were 15 healthy males who lived on a metabolic research ward under close staff supervision for 11 weeks. Subjects were ambulatory during the first six weeks and remained in continuous bed rest for the last five weeks of the study. Six male volunteers (age 24-61 years) were selected for body composition measurements. Nine different male volunteers (age 21-50 years) were selected for energy absorption measurements. The volunteers were fed weighed conventional foods on a constant 7-d rotation menu. The average daily caloric content was 2,592 kcal. Comparing the five weeks of continuous bed rest with the previous six weeks of ambulation, it was observed that there was no change in energy absorption or total body weight during bed rest, but a significant decrease in lean body mass and a significant increase in total body fat (p less than 0.05).

Krebs, Jean M.↗

Development and testing of a source subsystem for the supporting development PMAD DC test bed

The supporting Development Power Management and Distribution (PMAD) DC Test Bed is described. Its benefits to the Space Station Freedom Electrical Power System design are discussed along with a short description of how the PMAD DC Test Bed was systematically integrated. The Source Subsystem of the PMAD DC Test Bed consisting of a Sequential Shunt Unit (SSU) and a Battery Charge/Discharge Unit (BCDU) is introduced. The SSU is described in detail and component level test data is presented. Next, the BCDU's operation and design is given along with component level test data. The Source Subsystem is then presented and early data given to demonstrate an effective subsystem design.

Button, Robert M.↗

A simulation-based test bed for data-association algorithms

A modular All-Source System-evaluation Test bed (ASSET) designed and developed for aiding in the testing and evaluation of advanced data-acquisition algorithms is described, with focus placed on the problem of integrating surveillance information in supporting command decision making. The evaluation procedure employed is based on a measure of the distance between a baseline representation and the representation produced by the association algorithm at some time instant. Choices for the baseline representation are presented, and scores are defined between these baselines and an algorithm representation. The test-bed architecture implementing the evaluation procedure is described, and sample outputs from performing algorithm evaluations in the test bed are outlined.

Brown, Donald E.↗

The SSM/PMAD automated test bed project

The Space Station Module/Power Management and Distribution (SSM/PMAD) autonomous subsystem project was initiated in 1984. The project's goal has been to design and develop an autonomous, user-supportive PMAD test bed simulating the SSF Hab/Lab module(s). An eighteen kilowatt SSM/PMAD test bed model with a high degree of automated operation has been developed. This advanced automation test bed contains three expert/knowledge based systems that interact with one another and with other more conventional software residing in up to eight distributed 386-based microcomputers to perform the necessary tasks of real-time and near real-time load scheduling, dynamic load prioritizing, and fault detection, isolation, and recovery (FDIR).

Lollar, Louis F.↗

Stability Testing and Analysis of a PMAD DC Test Bed for the Space Station Freedom

The Power Management and Distribution (PMAD) DC Test Bed at the NASA Lewis Research Center is introduced. Its usefulness to the Space Station Freedom Electrical Power (EPS) development and design are discussed in context of verifying system stability. Stability criteria developed by Middlebrook and Cuk are discussed as they apply to constant power DC to DC converters exhibiting negative input impedance at low frequencies. The utility-type Secondary Subsystem is presented and each component is described. The instrumentation used to measure input and output impedance under load is defined. Test results obtained from input and output impedance measurements of test bed components are presented. It is shown that the PMAD DC Test Bed Secondary Subsystem meets the Middlebrook stability criterion for certain loading conditions.

Button, Robert M.↗

Load converter interactions with the secondary system in the Space Station Freedom power management and distribution DC test bed

The NASA LeRC in Cleveland, Ohio, is responsible for the design, development, and assembly of the Space Station Freedom (SSF) Electrical Power System (EPS). In order to identify and understand system level issues during the SSF Program design and development phases, a system Power Management and Distribution (PMAD) DC test bed was assembled. Some of the objectives of this test bed facility are the evaluation of, system efficiency, power quality, system stability, and system protection and reconfiguration schemes. In order to provide a realistic operating scenario, dc Load Converter Units are used in the PMAD dc test bed to characterize the user interface with the power system. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. This final regulation is required on the actual space station because the majority of user loads will require voltage levels different from the secondary bus voltage. This paper describes the testing of load converters in an end to end system environment (from solar array to loads) where their interactions and compatibility with other system components are considered. Some of the system effects of interest that are presented include load converters transient behavior interactions with protective current limiting switchgear, load converters ripple effects, and the effects of load converter constant power behavior with protective features such as foldback.

Lebron, Ramon C.↗

Development and testing of a source subsystem for the supporting development PMAD DC test bed

The supporting Development Power Management and Distribution (PMAD) DC test bed is described. Its benefits to the Space Station Freedom Electrical Power System design are discussed along with a short description of how the PMAD DC test bed was systematically integrated. The source subsystem of the PMAD DC test bed, consisting of a Sequential Shunt Unit (SSU) and a Battery Charge/Discharge Unit (BCDU), is introduced. The SSU is described in detail and component-level test data is presented. Next, the BCDU's operation and design are given along with component-level test data. The Source Subsystem is then presented and early data given to demonstrate an effective subsystem design.

Button, Robert M.↗

Effect Of Leg Exercise On Vascular Volumes During Bed Rest

Report describes experiments on effects of no-exercise regimen and of two leg-exercise regimens on volumes of plasma, volumes of red blood cells, densities of bodies, and water balances of 19 men (32 to 42 years old) confined to minus 6 degrees-head-down bed rest for 30 days. Purpose of study to determine whether either or both exercise regimens maintain plasma volume and to relate levels of hypovolemia to body fluid balances. Results showed during bed rest, plasma volume maintained in isotomic group but not in other two groups, and no significant differences in body densities, body weights, or water balances among three groups. Concludes isotonic-exercise regimen better than isokinetic-exercise regimen for maintaining plasma volume during prolonged exposure to bed rest.

Greenleaf, J. E.↗

Early Archean spherule beds of possible impact origin from Barberton, South Africa: A detailed mineralogical and geochemical study

The Barberton Greenstone belt is a 3.5- to 3.2-Ga-old formation situated in the Swaziland Supergroup near Barberton, northeast Transvaal, South Africa. The belt includes a lower, predominantly volcanic sequence, and an upper sedimentary sequence (e.g., the Fig Tree Group). Within this upper sedimentary sequence, Lowe and Byerly identified a series of different beds of spherules with diameters of around 0.5-2 mm. Lowe and Byerly and Lowe et al. have interpreted these spherules to be condensates of rock vapor produced by large meteorite impacts in the early Archean. We have collected a series of samples from drill cores from the Mt. Morgan and Princeton sections near Barberton, as well as samples taken from underground exposures in the Sheba and Agnes mines. These samples seem much better preserved than the surface samples described by Lowe and Byerly and Lowe et al. Over a scale of just under 30 cm, several well-defined spherule beds are visible, interspaced with shales and/or layers of banded iron formation. Some spherules have clearly been deposited on top of a sedimentary unit because the shale layer shows indentions from the overlying spherules. Although fresher than the surface samples (e.g., spherule bed S-2), there is abundant evidence for extensive alteration, presumably by hydrothermal processes. In some sections of the cores sulfide mineralization is common. For our mineralogical and petrographical studies we have prepared detailed thin sections of all core and underground samples (as well as some surface samples from the S-2 layer for comparison). For geochemical work, layers with thicknesses in the order of 1-5 mm were separated from selected core and underground samples. The chemical analyses are being performed using neutron activation analysis in order to obtain data for about 35 trace elements in each sample. Major elements are being determined by XRF and plasma spectrometry. To clarify the history of the sulfide mineralization, sulfur isotopic compositions are being determined.

Koeberl, Christian↗

Regional changes in muscle mass following 17 weeks of bed rest

This work reports on the muscle loss and recovery after 17 wk of continuous bed rest and 8 wk of reambulation in eight normal male volunteers. Muscle changes were assessed by urinary levels of 3-methylhistidine (3-MeH), nitrogen balance, dual-photon absorptiometry (DPA), magnetic resonance imaging (MRI), and isokinetic muscle performance. The total body lean tissue loss during bed rest calculated from nitrogen balance was 3.9 +/- 2.1 kg. Although the total loss is minimal, DPA scans showed that nearly all of the lean tissue loss occurred in the lower limbs. Similarly, MRI muscle volume measurements showed greater percent loss in the limbs relative to the back muscles. MRI, DPA, and nitrogen balance suggest that muscle atrophy continued throughout bed rest with rapid recovery after reambulaton. Isokinetic muscle strength decreased significantly in the thigh and calf with no loss in the arms and with rapid recovery during reambulation.

Leblanc, Adrian D.↗

Load converter interactions with the secondary system in the Space Station Freedom power management and distribution dc test bed

The NASA LeRC in Cleveland, Ohio, is responsible for the design, development, and assembly of the Space Station Freedom (SSF) Electrical Power System (EPS). In order to identify and understand system level issues during the SSF program design and development phases, a system Power Management and Distribution (PMAD) dc test bed was assembled. Some of the objectives of this test bed facility are the evaluation of, system efficiency, power quality, system stability, and system protection and reconfiguration schemes. In order to provide a realistic operating scenario, dc Load Converter Units are used in the PMAD dc test bed to characterize the user interface with the power system. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. This final regulation is required on the actual space station because the majority of user loads will require voltage levels different from the secondary bus voltage. This paper describes the testing of load converters in an end to end system environment (from solar array to loads) where their interactions and compatibility with other system components are considered. Some of the system effects of interest that are presented include load converters transient behavior interactions with protective current limiting switchgear, load converters ripple effects, and the effects of load converter constant power behavior with protective features such as foldback.

Lebron, Ramon C.↗

Stability testing and analysis of a PMAD dc test bed for the Space Station Freedom

The Power Management and Distribution (PMAD) dc Test Bed at the NASA Lewis Research Center is introduced. Its usefulness to the Space Station Freedom Electrical Power (EPS) development and design are discussed in context of verifying system stability. Stability criteria developed by Middlebrook and Cuk are discussed as they apply to constant power dc to dc converters exhibiting negative input impedance at low frequencies. The utility-type Secondary Subsystem is presented and each component is described. The instrumentation used to measure input and output impedance under load is defined. Test results obtained from input and output impedance measurements of test bed components are presented. It is shown that the PMAD dc Test Bed Secondary Subsystem meets the Middlebrook stability criterion for certain loading conditions.

Button, Robert M.↗

Regenerative Life Support Systems Test Bed performance - Lettuce crop characterization

Two crops of lettuce (Lactuca sativa cv. Waldmann's Green) were grown in the Regenerative Life Support Systems (RLSS) Test Bed at NASA's Johnson Space Center. The RLSS Test Bed is an atmospherically closed, controlled environment facility for the evaluation of regenerative life support systems using higher plants. The chamber encloses 10.6 m 2 of growth area under cool-white fluorescent lamps. Lettuce was double seeded in 480 pots, each containing about 250 cm 3 of calcined-clay substrate. Each pot was irrigated with half-strength Hoagland's nutrient solution at an average total applied amount of 2.5 and 1.8 liters pot -1 , respectively, over each of the two 30-day crop tests. Average environmental and cultural conditions during both tests were 23°C air temperature, 72% relative humidity, 1000 ppm carbon dioxide (CO 2 ), 16h light/8h dark photoperiod, and 356 μmol m -2 s -1 photosynthetic photon flux. After 30 days from seeding, average yield (g pot -1 ) for the first and second crop tests were 72 and 49 edible (shoot) fresh mass, 3.65 and 2.56 edible dry mass, and 0.44 and 0.45 inedible (root) dry mass, respectively. Averaging over both crop tests, the test bed met the requirements of 2.1 person-days of oxygen production, 2.4 person days of CO 2 removal and 129 person days of potential potable water production. The satisfactory growth of both crops demonstrates the potential of lettuce for air revitalization and water production in a controlled ecological life support system. Differences in crop performance resulting from engineering system effects provides evidence of the resilience of biological systems.

Life support systems↗

Granular instability in fluidized beds: A small-over-large instability

For different particle diameters arranged in a gas fluidized bed, a new gravitational instability is predicted. The first order stability analysis yields conditions for growth of the most unstable wavenumber both as a function of particle diameter and dimensionless Bond number. Gravity acts to distribute the greater fluid mass associated with smaller particles, while surface tension stabilizes the entire bed against accelerations. The phenomenon, called the 'Small-over-Large' (SL) instability, evolves somewhat akin to a Rayleigh-Taylor mechanism and in addition to fundamental interest, carries implications for predicting solute redistribution and gravitational alignments in particle beds and chemical separation columns.

Noever, David A.↗

Effect of prolonged LBNP and saline ingestion on plasma volume and orthostatic responses during bed rest

Orthostatic intolerance remains a significant problem following space flight despite frequent use of the saline fluid-loading countermeasure and volitional use of an anti-gravity suite during reentry and landing. The purpose of this project is to examine the plasma volume (PV), endocrine, and orthostatic responses of bedrested subjects following 2-hr and 4-hr treatments of lower body negative pressure (LBNP) and saline ingestion. Ten healthy men were randomly assigned into 2 groups. Group A underwent a 4-hr LBNP/saline treatment on best rest day 5 and the 2-hr treatment on day 11. Group B underwent the 2-hr treatment on day 6 and the 4-hr treatment on day 10. Blood volume was determined before and after bed rest using radiolabelling. Changes in PV between measurements were calculated from changes in hematocrit and estimated red cell volume. Urinary excretion of anti-diuretic hormone (ADH) and aldosterone (ALD) were measured each day during the study. Orthostatic responses were measured using a ramp LBNP protocol before bed rest, before each treatment, and 24 hours after each treatment. Both 2-hr and 4-hr treatments resulted in a restoration of PV to pre-bed rest levels which persisted at least 24 hours. This increase in PV was associated with significant increases in urinary excretion of ADH and ALD. Twenty-four hours after the 4-hr treatment, the heart rate and pulse pressure response to LBNP were significantly lower and stroke volumes during LBNP were increased. Twenty-four hours after the 2-hr treatment, there was no evidence of improvement in orthostatic responses. These results suggest that a countermeasure which simply restores PV during space flight may not be sufficient for restoring orthostatic responses.

Fortney, Suzanne M.↗