Safety Impacts of Liquid Electrolyte Inclusion in Solid State Batteries .
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
The MCNP Intrinsic Source Constructor (MISC) facilitates the construction of MCNP source definition cards for radioactive materials. Given a material nuclide specification, either weight or atom fractions of those nuclides, and either a weight or atom density of the material, MISC will construct the source spectrum distribution of a specified particle type. MISC also calculates the absolute number of particles emitted per second per unit mass or volume. Furthermore, if decay chain information is available in the data sets selected by the user, the initial isotopes specified by the user can be approximately decayed to the resulting isotopes after a specified amount of time.
The Hanford Site, in southeast Washington State, is preparing to disposition approximately 56,000,000 gallons (56 Mgal) of radioactive and chemically hazardous wastes currently stored in underground tanks at the site. Tank wastes will be divided into a high-activity fraction and a low-activity fraction for subsequent treatment and disposition. A waste processing and treatment facility, the Waste Treatment and Immobilization Plant (WTP), will include the high-level waste (HLW) vitrification facility (WTP HLW Vitrification Facility) for immobilizing the high-activity fraction and a low-activity waste (LAW) vitrification facility (WTP LAW Vitrification Facility) for immobilizing the low-activity fraction. Both facilities will use vitrification technology to immobilize the Hanford tank wastes in a glass waste form.
A workshop co-hosted by Pacific Northwest National Laboratory and Seattle City Light was held at the Seattle Municipal Tower on November 8–10, 2022. Participants from research organizations, utilities, professional associations, consultants, and government organizations attended. The purpose of the workshop was to develop a vision for addressing climate extremes that include improving forecasting and characterization, infrastructure resilience modeling, and investment planning and decision support. The workshop also aimed to provide a platform for sharing approaches and information and identifying possible collaborations.
DRiFT (a Detector Response Function Toolkit) is LANL-developed software that postprocesses output from the extensively validated radiation transport code, MCNP, and generates realistic nuclear instrumentation response. DRiFT is designed to be flexible, enabling users to specify detector type and many experimental settings, as well as accommodating the addition of their own desired features. Although DRiFT development has included scintillator, gas, and semiconductor features, the focus of this release is on organic scintillator and associated capabilities. Organic scintillators are widely used in the areas of nuclear safeguards and nuclear non-proliferation efforts. DRiFT has several diagnostic and detector physics features relevant to detailed scintillator simulations including: tracking source particle information, scintillation light production, the effects of PMT quantum efficiency and gain, and digitizer settings. Users can select responses from many scintillator and PMT types supported natively by DRiFT, or add their own by following the instructions in this document. We acknowledge that DRiFT is under active development, bug reports and general questions and comments should be directed to Madison Andrews, madison@lanl.gov. This manual is divided into four parts: I) An overview of DRiFT, including how to obtain and install the executable, II) A description of the detector physics related to scintillators available, III) a description of more general DRiFT features the user may find useful, and IV) a description of the test suite and examples made available with the code release.
DRiFT (a Detector Response Function Toolkit) is LANL-developed software that post-processes output from the extensively validated radiation transport code, MCNP, and generates realistic nuclear instrumentation response. DRiFT is designed to be flexible, enabling users to specify detector type and many experimental settings, as well as accommodating the addition of their own desired features. The focus of this release is on organic scintillator, gas detector, and associated capabilities, while semiconductor features are still under development. Organic scintillators are widely used in the areas of nuclear safeguards and nuclear non-proliferation efforts. DRiFT has several diagnostic and detector physics features relevant to detailed scintillator simulations including: tracking source particle information, scintillation light production, the effects of PMT quantum efficiency and gain, and digitizer settings. Users can select responses from many scintillator and PMT types supported natively by DRiFT, or add their own by following the instructions in this document. DRiFT also has several diagnostic and detector physics features relevant to neutron gas detector simulations including: gas detector wall effects, inactive areas at the end of detector tubes, and effects of a preamplifier. We acknowledge that DRiFT is under active development, bug reports and general questions and comments should be directed to Madison Andrews, madison@lanl.gov. This manual is divided into four parts: I) An overview of DRiFT, including how to obtain and install the executable, II) A description of the detector physics related to scintillators available, III) a description of more general DRiFT features the user may find useful, and IV) a description of the test suite and examples made available with the code release.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
UMass Clean Energy Extension (CEE) and its partners have designed the Community Planning for Solar Toolkit to help municipalities in Massachusetts and throughout the Northeast proactively plan for solar PV development in their communities. The tools and processes are designed with rural and suburban communities in mind, though some of the tools may also apply to urban settings. Community Planning for Solar empowers community residents and officials to take the lead in solar development by providing communities with the resources that can help them to: (1) Identify and prioritize locations in the community for solar development; (2) Evaluate various solar financing options and provide guidance on community benefits that best match community goals and needs; (3) Assess their community's unique resources, solar development options, goals, and preferences regarding solar development; (4)Develop a Community Solar Action Plan.
In this first step in the Community Planning for Solar process, we provide guidance on forming a collaborative community Solar Planning Team and identifying initial roles, timelines, and goals.
This fact sheet is part of the Community Planning for Solar toolkit designed to help Massachusetts municipalities and others proactively plan for solar development in their communities. This fact sheet will walk you through the electricity system, and help you understand how the grid is changing as distributed generation (DG) electricity sources become more common.
This report is a solar resource and infrastructure assessment for the town of Blandford, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Blandford. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, most distribution lines providing electricity to Blandford are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. We can expect significant upgrades to these circuits, if any of the in-process projects are to proceed, which might then free up additional capacity for new projects. There is one circuit which serves a section of North Blandford Road that is not over-saturated; for the immediate future, this is the most cost-effective location for new large-scale projects to be sited. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in preferred locations. Future scenarios may also include the addition energy storage and other "non-wires alternatives."
This report is a solar resource and infrastructure assessment for the town of Wendell, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Wendell. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Wendell are over-saturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. It appears that National Grid is planning an upgrade to the Wendell Depot substation, which might then allow in-process projects are to proceed, and potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."
This report is a solar resource and infrastructure assessment for the town of Westhampton, Massachusetts. The assessment was funded through the National Renewable Energy Laboratory, Solar Energy Innovation Network (NREL SEIN) Solar in Rural Communities Program, as part of a project to develop a Community-Informed Proactive Solar Siting and Financing Model. As a first step, the project lead organization, UMass Clean Energy Extension prepared an assessment of existing infrastructure, resources, and potential solar development opportunities in participating municipalities, including Westhampton. This assessment was designed to describe relevant bylaws and infrastructure within the town, identify the types of solar facilities that could be developed, and quantify the total space available for each type of facility. In this report, we reviewed existing electricity grid infrastructure, and the potential to interconnect additional solar facilities. At the present time, both distribution lines providing electricity to Westhampton are oversaturated with authorized and proposed solar projects, and cannot accommodate additional solar projects to interconnect to the grid. Future upgrades could potentially free up additional capacity for new, large projects. Meanwhile, most three-phase lines could likely accommodate additional small-to-medium scale projects (under 200 kW), and most single-phase lines could likely accommodate additional projects under 50 kW in size. This description represents the local grid infrastructure as it is - planning for future scenarios of development could include recommendations for areas of grid infrastructure improvement to allow siting of distributed generation in locations preferred by the community. Future scenarios may also include the addition energy storage and other "non-wires alternatives."