Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BUSINESS VALUE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

The Evolution of Team-X: 25 Years of Concurrent Engineering Design Experience

Established in 1995 in response to NASA’s “Faster, Better, Cheaper” era, Team-X was born from a need to perform rapid space mission design for principal investigator-led competed proposals. The success and sustainability of Team-X over the 25 years that have followed is directly attributable to the Team-X business model and its evolution over time. While dozens of organizations and institutions have emulated the Team-X design process, there are nuances to the Team-X business model that are unique to JPL, and explain why it is different than other concurrent design teams. One of the key components of a business model is the customer segments that are served. Team-X was founded to conduct the Pre-Phase A work necessary to formulate a portfolio of multiple planetary mission concepts, but has since expanded to include the capability to conduct studies for Earth science, astrophysics, and heliophysics missions as well as Human Exploration and Operations missions and space technology development. Team-X delivers value to its clients both in terms of speed and cost. Team-X has also added value by creating teams to enable the development of Instrument and SmallSat Concepts. Value has further been enhanced through a revision of its process for reviews and the addition of pre-design architecting capabilities. Other aspects of the Team-X infrastructure, in addition to study process, have enabled it to succeed for over a quarter century. From our most important resource, the people, our tools, especially for cost estimating, as well as our increasing capable IT infrastructure have contributed to our capability to meet the demands of our clients. The Team-X business model and its evolution over time, position it well for success in the decades to come.

Murphy, Jonathan↗

BETO 2021 Peer Review - 1.3.2.001 - Algae Biomass Composition

Addressing critical improvements in biomass productivity and associated biochemical composition is a priority for the economic and sustainable commercial development of biofuels and bioproducts from algae. Capitalizing on pathways that integrate engineering approaches with fundamental biochemistry of photosynthetic organisms will lead to a better understanding of the complex nexus of algae growth rates, productivity and composition. This project focuses on identifying the critical factors for economic development of fuel and bioproduct technologies. Algal compositional characteristics form the foundation of robust economic and business models. This project supports that foundation by developing and validating accurate compositional methods and disseminating them to the greater community. Simultaneously, we build a deep understanding of the dynamic biochemical composition and carbon allocation for biomass value and conversion yields. A co-product portfolio developed under this project demonstrated a 30% increase in intrinsic value. Additionally, an integrated pipeline of molecular diversity mapping for product discovery with quantitative demonstration across species was deployed over the BETO algae program. The advances made here are highly relevant to BETO's multi-year program targets of reducing costs and integrating dynamic biomass composition with conversion processes to provide options for bioproducts, all leveraging the molecular diversity of algae.

algal compositional characteristics↗

Scaling Demand Flexibility: Building on 30 Years of Energy Efficiency Success

With electricity consumption across the United States (US) and Canada anticipated to grow, energy efficiency program administrators have a key role to play in helping to ensure energy affordability and reliability in support of the broader economic systems utilities and grid support. Connected, demand side load balancing solutions, such as load shifting heating, ventilation and air conditioning (HVAC) systems and managed charging for electric vehicles (EVs), can dynamically manage energy, allowing for more volumetric electricity consumption without incurring the expense of upgraded transmission and distribution capabilities. When combined, or aggregated, many small loads can be managed to have meaningful impact on energy demand on the grid. Utilities and their partners have an opportunity to leverage decades of experience and the infrastructure needed to assess, design, implement, and measure programs to scale up the adoption of equipment with built-in load flexibility capabilities. Current efforts among a wide variety of electricity system service providers, utilities, standards agencies, regulators, national labs and private industry stakeholders aim to identify common standards, metrics, and methodologies for valuing grid services offered by demand side equipment. By combining those efforts with decades of proven energy efficiency resources, utilities are poised to effectuate a scaling up of equipment with energy management capabilities installed in homes and businesses across the US and Canada. This paper will provide an overview of how utilities are approaching this era of load growth and new peak demands across the United States and Canada. It will highlight the specific strategies that program administrators are employing to advance market transformation for grid-enabled products and devices that have the greatest potential to reduce energy use and increase load flexibility.

Grant, Peter↗

Effect of Component Failures on Economics of Distributed Photovoltaic Systems

This report describes an applied research program to assess the realistic costs of grid connected photovoltaic (PV) installations. A Board of Advisors was assembled that included management from the regional electric power utilities, as well as other participants from companies that work in the electric power industry. Although the program started with the intention of addressing effective load carrying capacity (ELCC) for utility-owned photovoltaic installations, results from the literature study and recommendations from the Board of Advisors led investigators to the conclusion that obtaining effective data for this analysis would be difficult, if not impossible. The effort was then re-focused on assessing the realistic costs and economic valuations of grid-connected PV installations. The 17 kW PV installation on the University of Hartford's Lincoln Theater was used as one source of actual data. The change in objective required a more technically oriented group. The re-organized working group (changes made due to the need for more technically oriented participants) made site visits to medium-sized PV installations in Connecticut with the objective of developing sources of operating histories. An extensive literature review helped to focus efforts in several technical and economic subjects. The objective of determining the consequences of component failures on both generation and economic returns required three analyses. The first was a Monte-Carlo-based simulation model for failure occurrences and the resulting downtime. Published failure data, though limited, was used to verify the results. A second model was developed to predict the reduction in or loss of electrical generation related to the downtime due to these failures. Finally, a comprehensive economic analysis, including these failures, was developed to determine realistic net present values of installed PV arrays. Two types of societal benefits were explored, with quantitative valuations developed for both. Some societal benefits associated with financial benefits to the utility of having a distributed generation capacity that is not fossil-fuel based have been included into the economic models. Also included and quantified in the models are several benefits to society more generally: job creation and some estimates of benefits from avoiding greenhouse emissions. PV system failures result in a lowering of the economic values of a grid-connected system, but this turned out to be a surprisingly small effect on the overall economics. The most significant benefit noted resulted from including the societal benefits accrued to the utility. This provided a marked increase in the valuations of the array and made the overall value proposition a financially attractive one, in that net present values exceeded installation costs. These results indicate that the Department of Energy and state regulatory bodies should consider focusing on societal benefits that create economic value for the utility, confirm these quantitative values, and work to have them accepted by the utilities and reflected in the rate structures for power obtained from grid-connected arrays. Understanding and applying the economic benefits evident in this work can significantly improve the business case for grid-connected PV installations. This work also indicates that the societal benefits to the population are real and defensible, but not nearly as easy to justify in a business case as are the benefits that accrue directly to the utility.

14 SOLAR ENERGY↗

Managing Through Continuous Improvement: If it doesn’t challenge you, it won’t change you

The past 24 months has been one of non-stop continuous improvement – every month, every week, every day, and every hour. It has been filled with continuously re-examining and challenging business systems, work processes, and legacy culture. The journey was difficult, but well worth it. It began by examining the existing conditions in each organization and building the case for change. When we stepped back and looked at our processes, systems, tools, and performance objectively, we realized we were struggling with frequent organizational, resource, and schedule conflicts, work processes that were not well-defined or expert based, project delays were common, management methods were predominantly reactive, advanced planning was limited to the near-term, no integration in scheduling across organizations, limited to no performance metrics to measure and manage performance, and internal and external customers did not feel like we were meeting their quality and performance expectations. It was a wake-up call. Change began at the top with a change leadership with where a new vision, expectations, and commitment were established. Leaving no stone left unturned, every aspect of the business was challenged which opened up communication and exposed the gaps. This was done in a ‘safe’ environment allowing for honest and solution-oriented discussion and action. The leadership team committed to managing through continuous improvement. The organizational structure was realigned to better align scope, responsibilities, execution, and customer focus. Visibility and transparency became the norm as higher levels of leadership and supporting organizations were invited to be part of regular strategy meetings and partnership discussion, effectively opening up the dialogue. This required a tremendous amount of trust and faith in a short period of time. Health assessments were conducted on each organization with specific lines of inquiry. These self-assessments helped to identify better define the scope of the organization and where targeted improvements were needed. Frequent organizational reviews were implemented to answer three fundamental questions: 1) What is your organization paid to do (scope)?, 2) How does your organization, or you, demonstrate that you are doing the job effectively?, and 3) What are you doing to improve your performance? To answer the first question, leaders defined the scope of the organization. Leaders were required to provide a path forward, with specific actions, where performance was not at expected levels internally at first and then from the stakeholders. Where business processes were not clearly understood, process maps were developed to provide this clarity for both those performing the work and those utilizing the process – the customers. To help answer the second question, numerous automated or semi-automated real-time, dynamic performance metrics were developed and implement to help leaders gain the visibility and demonstrate performance in six areas of operational excellence: safety, security, quality, effectiveness, productivity, and sustainability. Analysis of the performance provided windows of transparency and trends of work performance, work delays, cycle times, utilization, and much more that revealed many areas of improvement that were either not visible or desired to be visible. At the same time, they provided real-time progress which generated initial performance improvements by just beginning to measure. To address the third question, where systems did not support effectiveness of an existing or new process, then systems and tools were developed and implemented to drive the right behaviors and reinforce the processes. Tools and metrics were one of the major catalysts for culture shift and change. Risk assessments were leveraged into continuous improvement strategies, plans, and schedules. Targeted initiatives were identified and performed. Change and improvement was not, and is not, without significant and common challenges including limited/fixed budgets, resource availability, data access, natural resistance to change, and numerous other reasons or excuses – we called them ‘off-ramps’ and began to close them one-by-one. The results and outputs were significant and impactful in each organization and across the business with increased productivity, efficiency, visibility, accountability, management, and performance. Stakeholder satisfaction also increased. Cost and time savings allowed to more continuous improvement efforts to be performed. The effort clearly provided clear and measurable return on investment and value. Efforts that once seemed impossible, not feasible, or not achievable were performed. Decades-long issues were solved. ‘Impossible things are simply those which so far have never been done’ said Elbert Hubbard. So what will the next year be for you and your organization? Are you satisfied with the ‘same ‘ol, same ‘ol?’ Will you fall into the complacency trap and believe that change is too difficult, too expensive, and not necessary (or any number of possible excuses) or will you make this year your year or continuous improvement (and every year thereafter…)? Remember – what you do today can improve all your tomorrows’ (Ralph Marston).

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Chattanooga Electric Power Board Case Study Distribution Automation

In 2009, the U.S. Department of Energy under the American Recovery and Reinvestment Act (ARRA) awarded a grant to the Chattanooga, Tennessee, Electric Power Board (EPB) as part of the Smart Grid Investment Grant Program. The grant had the objective “to accelerate the transformation of the nation’s electric grid by deploying smart grid technologies.” This funding award enabled EPB to expedite the original smart grid implementation schedule from an estimated 10-12 years to 2.5 years. With this funding, EPB invested heavily in distribution automation technologies including installing over 1,200 automated circuit switches and sensors on 171 circuits. For utilities considering a commitment to distribution automation, there are underlying questions such as the following: “What is the value?” and “What are the costs?” This case study attempts to answer these questions. The primary benefit of distribution automation is increased reliability or reduced power outage duration and frequency. Power outages directly impact customer economics by interfering with business functions. In the past, this economic driver has been difficult to effectively evaluate. However, as this case study demonstrates, tools and analysis techniques are now available. In this case study, the impact on customer costs associated with power outages before and after the implementation of distribution automation are compared. Two example evaluations are performed to demonstrate the benefits: 1) a savings baseline for customers under normal operations1 and 2) customer savings for a single severe weather event. Cost calculations for customer power outages are performed using the US Department of Energy (DOE) Interruption Cost Estimate (ICE) calculator2. This tool uses standard metrics associated with outages and the customers to calculate cost impact. The analysis shows that EPB customers have seen significant reliability improvements from the implementation of distribution automation. Under normal operations, the investment in distribution automation has enabled a 43.5% reduction in annual outage minutes since 2012. This has led to an estimated total savings of $26.8 million per year. Examining a single severe weather event3, the distribution automation was able to restore power to 40,579 (nearly 56%) customers within 1–2 seconds and reduce outage minutes by 29.0%. This saved customers an estimated $23.2 million over the course of the storm.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Handbook for Designing, Implementing, and Evaluating Successful Electric Utility Pilots

Since at least the late 1970s, electric utilities and their regulators have recognized the value of experimentation to motivate innovation. The industry has a long history of using pilots to help inform future decision making about electric utility rates, customer technology adoption and integration, and even changes to the utility’s regulatory or business model. Although utility pilots have become almost ubiquitous proving grounds for new rates, technologies, and alterations to the traditional utility regulatory and business model, some regulators are beginning to raise questions about what constitutes a “good” pilot. Much has been written about utility pilots over the years; however, what is missing from the literature is the identification of a comprehensive process for not only designing and evaluating a pilot, but also implementing, successful utility pilots that provide actionable outcomes upon which more informed decisions can be made. This report provides a step-by-step process that regulators, policymakers, and utilities can follow to help promote a more successful pilot, even if whatever is being tested fails to produce the intended or expected result(s). It is worth noting that this report is not intended to serve as a technical resource for those designing, implementing, and evaluating pilots. However, there are myriad references provided for those wishing to delve deeper into the technical details.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wind power manufacturing and supply chain summit USA.

The area of wind turbine component manufacturing represents a business opportunity in the wind energy industry. Modern wind turbines can provide large amounts of electricity, cleanly and reliably, at prices competitive with any other new electricity source. Over the next twenty years, the US market for wind power is expected to continue to grow, as is the domestic content of installed turbines, driving demand for American-made components. Between 2005 and 2009, components manufactured domestically grew eight-fold to reach 50 percent of the value of new wind turbines installed in the U.S. in 2009. While that growth is impressive, the industry expects domestic content to continue to grow, creating new opportunities for suppliers. In addition, ever-growing wind power markets around the world provide opportunities for new export markets.

17 WIND ENERGY↗

Savannah River Remediation Liquid Waste Operations Lifecycle Savings through a Lean Business System at the Savannah River Site - 17245

Savannah River Remediation (SRR) was contracted by the U.S. Department of Energy (DOE) to manage its liquid waste project at the Savannah River Site. The liquid waste project is a unique, high hazard nuclear waste treatment and disposal facility consisting of 51 one million-gallon underground waste tanks, a solvent extraction processing unit, a vitrification facility for the highest radioactive waste, and a grout solidification and disposal facility for lower radioactive decontaminated salt solution. Our Project mission is to treat the nuclear waste and close the associated storage and treatment facilities, of which, 8 tanks have been closed to date. The Lean philosophy took root decades ago in the manufacturing sector and started with the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health-care, and now the DOE complex. At SRR, a Lean business management system was adopted to address site inefficiencies, aging infrastructure concerns and budget constraints. With yearly escalation and flat budgets, continuous improvement is taking on a larger role - improving the work accomplished for each dollar. This paper focuses on the program results achieved to date, including the lifecycle savings identified through the Rapid Improvement Event (RIE) process. The RIE process is a Lean tool which creates a cross-functional team to analyze, develop and implement improvements for a given process. DOE-EM has recently emphasized the value of contractor's continuous improvement programs through their implementation of Plan of Action and Milestone (POAM): Goal 2 (Increase Efficiency/Improve Performance) Reduce EM Operations Cost in FY16. POAM Goal 2 was a FY 16 effort to achieve 5% cost savings across most programs. This past year's cost savings initiatives will likely become a trend as DOE and its contractors look to do more with less. In support of our own business objectives, as well as, DOE's motivation to improve efficiencies, SRR has held over one hundred formal Lean events and dozens of 5S events that have driven improvement across the Project, including tank closure and production facilities. These improvements have significantly reduced the time required to process material and achieve the overall goal of hazard reduction and tank closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-run Marginal CO2 Emission Rates Workbooks for 2020 Standard Scenarios Cambium Data

This dataset has been superseded by a new set of workbooks that can be found here: https://data.nlr.gov/submissions/183 These workbooks contain modeled estimates of long-run marginal CO2 emission rates (LRMER) for the contiguous United States. The LRMER is an estimate of the rate of emissions that would be either induced or avoided by a long-term (i.e., more than several years) change in electrical demand. It incorporates both the projected changes to the electric grid, as well as the potential for an incremental change in electrical demand to influence the structural evolution of the grid (i.e., the building and retiring of capital assets, such as generators and transmission lines). It is therefore distinct from the more-commonly-known short-run marginal, which treats grid assets as fixed. In addition to year-over-year data, the Levelized LRMER worksheet within each workbook is set up to produce a levelized long-run marginal emission rate based on user-provided inputs. These levelized LRMER values are intended for analysts to use when estimating the emissions induced (or avoided) by a long-term change in end-use electricity demand. Three future scenarios are provided in separate workbooks: A Mid-case (i.e., business-as-usual), and two scenarios with relatively higher or lower renewable energy costs. For more details on these scenarios, see the Standard Scenarios 2020 Report ( https://www.nlr.gov/docs/fy21osti/77442.pdf ). For more data underlying each scenario, see the Standard Scenarios 2020 project (Cambium data) at https://cambium.nlr.gov/ . This data was produced as part of the Cambium project. For more details about the methodology, see the Cambium Documentation: Version 2020 ( https://www.nlr.gov/docs/fy21osti/78239.pdf ). This data is planned to be updated annually. Information on the latest versions can be found at https://www.nlr.gov/analysis/cambium.html .

24 POWER TRANSMISSION AND DISTRIBUTION↗

Nuclear Thermal Energy Storage Configurations for Industrial Combined Heat and Power Supply: Conceptual Study and Engineering Designs

The industries examined in this report primarily rely on moderate-temperature heat provided by gas- or coal-fired boilers and combined heat and power (CHP) plants, delivered through standard process steam systems. High-temperature energy demands are often industry-specific and typically exceed the capabilities of high-temperature gas-cooled reactors (HTGRs). While it is technically feasible to replace process steam from fossil-based heat sources with nuclear energy, certain industries, such as methanol production and pulp and paper, face technoeconomic challenges in integrating nuclear energy without major changes or a technological shift. This is mainly due to the limited external energy demand remaining after the use of internal byproducts, waste heat recovery, and simple efficiency improvements. Achieving full decarbonization of these processes with nuclear energy would require significant technological advancements, involving experimental technology and substantial investments, making widespread adoption in existing industrial plants unlikely in the near term. This study reviews TES options in the context of enabling a flexible CHP supply while maintaining a steady nuclear heat input. Heat storage systems that interface between the reactor primary fluid and the CHP system offer superior performance and flexibility. Specifically, steam extraction downstream of the reheater with a two-tank molten-salt TES appears as the best solution regarding thermodynamic system benefits and system drawbacks. Using selected system configurations, a conceptual design of an industrial energy park was developed for industries with varying energy demands, such as steel production plants utilizing electric arc furnaces (EAFs) and chemical plants, as well as for those with constant energy demands, like petroleum refineries. This design highlights the capabilities of TES and explores its potential business cases. The study also conceptually develops the potential for integrating additional energy sources with nuclear systems through the implementation of TES. The potential of the HTGR-TES-CHP system was also evaluated considering key uncertainties such as industrial demand profiles, external grid access availability, and eligible tax credit levels, using the Holistic Energy Resource Optimization Network. Sensitivity of net present value to these uncertainties was analyzed to determine the optimal number of nuclear reactors (and CHP systems) and the suitable TES capacity. The results were interpreted from a decision-maker’s perspective, focusing on three key areas: deployment strategy (oversized units vs. undersized units with TES support), industrial process characteristics (thermal-intensive single profiles vs. electricity-intensive combined profiles), and operational goals (maximizing profits vs. minimizing natural gas (NG) consumption or external grid dependence). The optimization results indicate that the HTGR-TES-CHP system significantly reduces reliance on NG boilers for individual industrial processes by 9-60% (in NG capacity factor), with an average reduction of 38%, compared to standalone NG boiler operation case (Business As Usual [BAU]). For combined industrial processes, the reduction ranges from 37-77%, with an average of 60%. Additionally, the system greatly reduces dependence on external grids. In meeting industrial electrical demands, a 33-100% self-sufficient internal electricity supply is achieved for single industrial process, with an average of 74%, compared to the BAU scenario, where 100% of electricity is imported. For combined processes, 35-100% of internal electricity demands are met by the reactor, with an average of 73%. At last, the relative NG price levels at which the proposed HTGR-TES-CHP system can cost-effectively enter the market currently dominated by existing NG boilers were estimated. For a moderate HTGR CAPEX level ($\$$2500/kWth, $\$$6329/kWe), the analysis suggests that NG prices must be 2.5 to 7 times higher than HTGR variable operating and maintenance costs for single industrial process, and 5.5 to 9.5 times higher for a combined process scenario. Tax credit modeling shows that the Investment Tax Credit significantly reduces the price threshold needed to break even, making the system competitive with NG boilers in certain cases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Final Performance Progress Report

The Accelerator has given the DVIRC an opportunity to get involved in areas of a small and medium-sized manufacturing business that MEP centers typically do not get involved in—the areas of technology development and technical issues. Over the course of the project we’ve come to gain some valuable insights into the market challenges of SMEs, and the market challenges an MEP (such as DVIRC) faces as it seeks to work more deeply and at faster pace on the technology-related aspects of a manufacturing business. For example, while most companies can quantitatively justify investing in an ERP system or a new piece of production equipment, SMEs often struggle with formulating a return-on-investment for advanced technologies. As another example, bringing advanced technology to a company through the individuals interested in the technology (such as engineers or technicians) is not the way to go; as with many MEP services, we need to get to the CEO. And even then, there is a strong reluctance to let outsiders in to these often proprietary areas of the business. As a result of our work in this area, we are now looking more closely at how CEOs that DO invest in advanced technologies justify the investment or make the investment decision. We’ve learned about some of the internal constraints in SMEs that need to be kept in mind as projects get defined and executed—where technical personnel often hinder conversations in this arena rather than contributing value to them. We’ve gained exposure to a new suite of public and private assets that can help us with this work, such as universities and agencies such as NASA. We have also developed relationships with design/engineering companies that can help us as we move more deeply into this area of a company,. Still, defining a technical project takes a huge amount of effort and resources and, once undertaken, has a much longer time trajectory than typical MEP projects. DVIRC field staff and content experts have learned more about assessing a company’s technical assets, broadening our view of the business to go beyond what they make or what NAICS code they have…to better understand their capacity, capability, and expertise, and to learn more about THEIR customers. Knowing more about the markets they serve can often provide insight into their level of technical knowledge and sophistication. Finally, in the spirit of realizing the intent of the Accelerator we strove to align and integrate the work and activities supported by the five funding agencies to leverage each effort. To that end, we include in the Integrated Work Plan a graphic that illustrates that integration. What follows is our summary report of the project, aggregated from prior reports.

99 GENERAL AND MISCELLANEOUS↗

FY2021 Isolated Grids and Grid-Connected Turbine Reference Systems

For individuals, businesses, and communities focused on building resilient electrical grid infrastructure, wind energy can provide an affordable, accessible, and compatible distributed energy resource option that also enhances the capabilities of local grid operations. However, there are technical barriers to realizing the market value and resilience benefits of distributed wind, and there is little to no ability to quantify those benefits so that stakeholders can compare grid investment options. The central aims of this report are: (1) to drive technology transfer of the methods and technologies developed under the Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL) project and (2) increase the number of referenceable case studies available to stakeholders interested in additional value-added capabilities of wind systems beyond bulk energy supply. We achieve this aim by applying three major methods developed under MIRACL to two real-world distributed wind reference systems. The two real-world distributed wind reference systems are the isolated grid of St. Mary’s, Alaska, and the two 10.5-megawatt (MW) front-of-the-meter wind turbine deployments owned and operated by Iowa Lakes Electric Cooperative (ILEC).

17 WIND ENERGY↗

Logging Crew Attributes by Region in the Southeast USA

Urbanization, shrinking markets, and reduced forestry investment may affect harvesting efficiency in regions of the US South. To monitor these conditions, logging businesses have been tracked by surveys conducted by universities and trade associations. This project used a sampling approach coordinated with FIA utilization studies to sample logging crews based on a harvesting location. The approach was used to develop relationships among firm attributes and site attributes in six southeastern states (AL, GA, FL, NC, SC, and VA) from 2011 to 2018. The data included harvest attributes (location, harvest size and stand type) and logging firm attributes (production, crew labor, crew number, the number of machines by type, and machine age). For crew capital value, an equation was developed for this study using machine number and average machine age. The data from logging crews on 419 harvests were analyzed by region, harvest size, and stand type. Mean values for crew labor ranged from 3.1 to 7.1 workers. The average capital value per crew ranged from $\$220,000$ to $\$524,000$ per crew in the Coastal Plain with a narrower range in the Piedmont. In the Coastal Plain, higher productivity was detected for larger harvests and pine versus hardwood and mixed stands; however, in the Piedmont those trends were less obvious. Ratio of feller-bunchers, skidders and loaders were mostly 1:1:1 or 1:2:1 with 41% and 24% of samples, respectively. There were notable trends among Coastal Plain loggers regarding capital value and productivity with evidence supported by a production function. The differences in Piedmont (e.g., ownership size, market access, terrain, population density, etc.) may combine to limit daily production and labor productivity.

54 ENVIRONMENTAL SCIENCES↗

Status and Value of International Standards for Nuclear Criticality Safety

This presentation provides an update to the author's standards report provided at the ICNC-2007 meeting. It includes a discussion about the difference between, and the value of participating in, the development of international 'consensus' standards as opposed to nonconsensus standards. Standards are developed for a myriad of reasons. Generally, standards represent an agreed upon, repeatable way of doing something as defined by an individual or group of people. They come in various types. Examples include personal, family, business, industrial, commercial, and regulatory such as military, community, state, federal, and international standards. Typically, national and international 'consensus' standards are developed by individuals and organizations of diverse backgrounds representing the subject matter users and developers of a service or product and other interested parties or organizations. Within the International Organization for Standardization (ISO), Technical Committee 85 (TC85) on nuclear energy, Subcommittee 5 (SC5) on nuclear fuel technology, there is a Working Group 8 (WG8) on standardization of calculations, procedures, and practices related to criticality safety. WG8 has developed, and is developing, ISO standards within the category of nuclear criticality safety of fissionable materials outside of reactors (i.e., nonreactor fissionable material nuclear fuel cycle facilities). Since the presentation of the ICNC-2007 report, WG8 has issued three new finalized international standards and is developing two more new standards. Nearly all elements of the published WG8 ISO standards have been incorporated into IAEA nonconsensus guides and standards. The progression of consensus standards development among international partners in a collegial environment establishes a synergy of different concepts that broadens the perspectives of the members. This breadth of perspectives benefits the working group members in their considerations of consensus standards developments in their own countries. A testament to the value of the international standards efforts is that nearly all elements of the published WG8 ISO standards have been incorporated into IAEA nonconsensus guides and standards and are mainly consistent with international ISO member domestic standards.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Transforming Uinta Basin Earth Materials for Advanced Products (TUBE-MAP)

The objectives of this project were to quantify, assess, and plan to enable the transformation of Uinta Basin earth resources, such as coal, oil shale, resin, rare earth elements, and critical minerals into high value metal, mineral, and carbon-based products. The specific major goals were 1) basinal assessments and initial planning (Task 2), 2) basinal assessment for waste stream reuse with associated plan development (Task 3), 3) basinal strategies development for infrastructure, industries, and business (Task 4), 4) technology assessment, development, and field-testing plan (Task 5), 5) technology innovation center plan (Task 6), and 6) stakeholder outreach and education plan (Task 7).

01 COAL, LIGNITE, AND PEAT↗

Common Ground - Kansas Climate and Energy Project Connects with the Heartland

In 2010, Lawrence Berkeley National Laboratory (LBNL) electricity-market, policy and consumer behavior expert Merrian Fuller singled out a small environmental organization in Kansas-- the Climate and Energy Project (CEP)-- as an outstanding example of how you change behavior on energy efficiency and reduce carbon emissions through an apolitical emphasis on heartland values. In the summer of 2011, a team from LBNL, seeking to capture what Fuller had featured in her report Driving Demand for Home Energy Improvement, visited Kansas. Speaking with CEP's Nancy Jackson and Dorothy Barnett, as well as farmers, small business owners, politicians and others, the team produced this video, which shows how and why CEP has become an inspiration to other environmental organizations that are seeking to change behavior where climate-change skepticism abounds.

54 ENVIRONMENTAL SCIENCES↗

A Tale of Two Cities: Greensburg Resurrected as a National Model for Green Communities

This fact sheet provides a summary of how NREL's technical assistance in Greensburg, Kansas, helped the town rebuild green after recovering from a tornado in May 2007. To help local distributed system owners get the most value for electricity sent back to the grid, NREL drafted safety and reliability ordinances, an interconnection agreement, and net-metering policies for the city to consider. NREL and the Energy Department also assisted with wind energy resource analysis, feasibility studies, and business plans.

disaster recovery↗