At least 235 records · Page 13

Wireless Sensor Network for Electric Transmission Line Monitoring

Generally, federal agencies tasked to oversee power grid reliability are dependent on data from grid infrastructure owners and operators in order to obtain a basic level of situational awareness. Since there are many owners and operators involved in the day-to-day functioning of the power grid, the task of accessing, aggregating and analyzing grid information from these sources is not a trivial one. Seemingly basic tasks such as synchronizing data timestamps between many different data providers and sources can be difficult as evidenced during the post-event analysis of the August 2003 blackout. In this project we investigate the efficacy and cost effectiveness of deploying a network of wireless power line monitoring devices as a method of independently monitoring key parts of the power grid as a complement to the data which is currently available to federal agencies from grid system operators. Such a network is modeled on proprietary power line monitoring technologies and networks invented, developed and deployed by Genscape, a Louisville, Kentucky based real-time energy information provider. Genscape measures transmission line power flow using measurements of electromagnetic fields under overhead high voltage transmission power lines in the United States and Europe. Opportunities for optimization of the commercial power line monitoring technology were investigated in this project to enable lower power consumption, lower cost and improvements to measurement methodologies. These optimizations were performed in order to better enable the use of wireless transmission line monitors in large network deployments (perhaps covering several thousand power lines) for federal situational awareness needs. Power consumption and cost reduction were addressed by developing a power line monitor using a low power, low cost wireless telemetry platform known as the ''Mote''. Motes were first developed as smart sensor nodes in wireless mesh networking applications. On such a platform, it has been demonstrated in this project that wireless monitoring units can effectively deliver real-time transmission line power flow information for less than $500 per monitor. The data delivered by such a monitor has during the course of the project been integrated with a national grid situational awareness visualization platform developed by Oak Ridge National Laboratory. Novel vibration energy scavenging methods based on piezoelectric cantilevers were also developed as a proposed method to power such monitors, with a goal of further cost reduction and large-scale deployment. Scavenging methods developed during the project resulted in 50% greater power output than conventional cantilever-based vibrational energy scavenging devices typically used to power smart sensor nodes. Lastly, enhanced and new methods for electromagnetic field sensing using multi-axis magnetometers and infrared reflectometry were investigated for potential monitoring applications in situations with a high density of power lines or high levels of background 60 Hz noise in order to isolate power lines of interest from other power lines in close proximity. The goal of this project was to investigate and demonstrate the feasibility of using small form factor, highly optimized, low cost, low power, non-contact, wireless electric transmission line monitors for delivery of real-time, independent power line monitoring for the US power grid. The project was divided into three main types of activity as follows; (1) Research into expanding the range of applications for non-contact power line monitoring to enable large scale low cost sensor network deployments (Tasks 1, 2); (2) Optimization of individual sensor hardware components to reduce size, cost and power consumption and testing in a pilot field study (Tasks 3,5); and (3) Demonstration of the feasibility of using the data from the network of power line monitors via a range of custom developed alerting and data visualization applications to deliver real-time information to federal agencies and others tasked with grid reliability (Tasks 6,8).

24 POWER TRANSMISSION AND DISTRIBUTION↗

MANGO – Modal Analysis for Grid Operation: A Method for Damping Improvement through Operating Point Adjustment

Small signal stability problems are one of the major threats to grid stability and reliability in the U.S. power grid. An undamped mode can cause large-amplitude oscillations and may result in system breakups and large-scale blackouts. There have been several incidents of system-wide oscillations. Of those incidents, the most notable is the August 10, 1996 western system breakup, a result of undamped system-wide oscillations. Significant efforts have been devoted to monitoring system oscillatory behaviors from measurements in the past 20 years. The deployment of phasor measurement units (PMU) provides high-precision, time-synchronized data needed for detecting oscillation modes. Measurement-based modal analysis, also known as ModeMeter, uses real-time phasor measurements to identify system oscillation modes and their damping. Low damping indicates potential system stability issues. Modal analysis has been demonstrated with phasor measurements to have the capability of estimating system modes from both oscillation signals and ambient data. With more and more phasor measurements available and ModeMeter techniques maturing, there is yet a need for methods to bring modal analysis from monitoring to actions. The methods should be able to associate low damping with grid operating conditions, so operators or automated operation schemes can respond when low damping is observed. The work presented in this report aims to develop such a method and establish a Modal Analysis for Grid Operation (MANGO) procedure to aid grid operation decision making to increase inter-area modal damping. The procedure can provide operation suggestions (such as increasing generation or decreasing load) for mitigating inter-area oscillations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Power Infrastructure Reliability and Security (EPIRS) Reseach and Development Initiative

Power systems have become increasingly complex and face unprecedented challenges posed by population growth, climate change, national security issues, foreign energy dependence and an aging power infrastructure. Increased demand combined with increased economic and environmental constraints is forcing state, regional and national power grids to expand supply without the large safety and stability margins in generation and transmission capacity that have been the rule in the past. Deregulation, distributed generation, natural and man-made catastrophes and other causes serve to further challenge and complicate management of the electric power grid. To meet the challenges of the 21st century while also maintaining system reliability, the electric power grid must effectively integrate new and advanced technologies both in the actual equipment for energy conversion, transfer and use, and in the command, control, and communication systems by which effective and efficient operation of the system is orchestrated - in essence, the 'smart grid'. This evolution calls for advances in development, integration, analysis, and deployment approaches that ultimately seek to take into account, every step of the way, the dynamic behavior of the system, capturing critical effects due to interdependencies and interaction. This approach is necessary to better mitigate the risk of blackouts and other disruptions and to improve the flexibility and capacity of the grid. Building on prior Navy and Department of Energy investments in infrastructure and resources for electric power systems research, testing, modeling, and simulation at the Florida State University (FSU) Center for Advanced Power Systems (CAPS), this project has continued an initiative aimed at assuring reliable and secure grid operation through a more complete understanding and characterization of some of the key technologies that will be important in a modern electric system, while also fulfilling an education and outreach mission to provide future energy workforce talent and support the electric system stakeholder community. Building upon and extending portions of that research effort, this project has been focused in the following areas: (1) Building high-fidelity integrated power and controls hardware-in-the-loop research and development testbed capabilities (Figure 1). (2) Distributed Energy Resources Integration - (a) Testing Requirements and Methods for Fault Current Limiters, (b) Contributions to the Development of IEEE 1547.7, (c) Analysis of a STATCOM Application for Wind Resource Integration, (d) Development of a Grid-Interactive Inverter with Energy Storage Elements, (e) Simulation-Assisted Advancement of Microgrid Understanding and Applications; (3) Availability of High-Fidelity Dynamic Simulation Tools for Grid Disturbance Investigations; (4) HTS Material Characterization - (a) AC Loss Studies on High Temperature Superconductors, (b) Local Identification of Current-Limiting Mechanisms in Coated Conductors; (5) Cryogenic Dielectric Research; and (6) Workshops, education, and outreach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Possible Methods to Estimate Core Location in a Beyond-Design-Basis Accident at a GE BWR with a Mark I Containment Stucture

It is difficult to track to the location of a melted core in a GE BWR with Mark I containment during a beyond-design-basis accident. The Cooper Nuclear Station provided a baseline of normal material distributions and shielding configurations for the GE BWR with Mark I containment. Starting with source terms for a design-basis accident, methods and remote observation points were investigated to allow tracking of a melted core during a beyond-design-basis accident. The design of the GE BWR with Mark-I containment highlights an amazing poverty of expectations regarding a common mode failure of all reactor core cooling systems resulting in a beyond-design-basis accident from the simple loss of electric power. This design is shown in Figure 1. The station blackout accident scenario has been consistently identified as the leading contributor to calculated probabilities for core damage. While NRC-approved models and calculations provide guidance for indirect methods to assess core damage during a beyond-design-basis loss-of-coolant accident (LOCA), there appears to be no established method to track the location of the core directly should the LOCA include a degree of fuel melt. We came to the conclusion that - starting with detailed calculations which estimate the release and movement of gaseous and soluble fission products from the fuel - selected dose readings in specific rooms of the reactor building should allow the location of the core to be verified.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Alternative Approaches for Incentivizing the Frequency Responsive Reserve Ancillary Service

Frequency responsive reserve is the autonomous response of generators and demand response to deviations of system frequency, usually as a result of the instantaneous outage of a large supplier. Frequency responsive reserve arrests the frequency decline resulting in the stabilization of system frequency, and avoids the triggering of under-frequency load-shedding or the reaching of unstablefrequencies that could ultimately lead to system blackouts. It is a crucial service required to maintain a reliable and secure power system. Regions with restructured electricity markets have historically had a lack of incentives for frequency responsive reserve because generators inherently provided the response and on large interconnected systems, more than sufficient response has beenavailable. This may not be the case in future systems due to new technologies and declining response. This paper discusses the issues that can occur without proper incentives and even disincentives, and proposes alternatives to introduce incentives for resources to provide frequency responsive reserve to ensure an efficient and reliable power system.

17 WIND ENERGY↗

NREL's Energy-Saving Technology for Air Conditioning Cuts Peak Power Loads Without Using Harmful Refrigerants (Fact Sheet)

This fact sheet describes how the DEVAP air conditioner was invented, explains how the technology works, and why it won an R&D 100 Award. Desiccant-enhanced evaporative (DEVAP) air-conditioning will provide superior comfort for commercial buildings in any climate at a small fraction of the electricity costs of conventional air-conditioning equipment, releasing far less carbon dioxide and cutting costly peak electrical demand by an estimated 80%. Air conditioning currently consumes about 15% of the electricity generated in the United States and is a major contributor to peak electrical demand on hot summer days, which can lead to escalating power costs, brownouts, and rolling blackouts. DEVAP employs an innovative combination of air-cooling technologies to reduce energy use by up to 81%. DEVAP also shifts most of the energy needs to thermal energy sources, reducing annual electricity use by up to 90%. In doing so, DEVAP is estimated to cut peak electrical demand by nearly 80% in all climates. Widespread use of this cooling cycle would dramatically cut peak electrical loads throughout the country, saving billions of dollars in investments and operating costs for our nation's electrical utilities. Water is already used as a refrigerant in evaporative coolers, a common and widely used energy-saving technology for arid regions. The technology cools incoming hot, dry air by evaporating water into it. The energy absorbed by the water as it evaporates, known as the latent heat of vaporization, cools the air while humidifying it. However, evaporative coolers only function when the air is dry, and they deliver humid air that can lower the comfort level for building occupants. And even many dry climates like Phoenix, Arizona, have a humid season when evaporative cooling won't work well. DEVAP extends the applicability of evaporative cooling by first using a liquid desiccant-a water-absorbing material-to dry the air. The dry air is then passed to an indirect evaporative cooling stage, in which the incoming air is in thermal contact with a moistened surface that evaporates the water into a separate air stream. As the evaporation cools the moistened surface, it draws heat from the incoming air without adding humidity to it. A number of cooling cycles have been developed that employ indirect evaporative cooling, but DEVAP achieves a superior efficiency relative to its technological siblings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Geomagnetic Storms and Long-Term Impacts on Power Systems

Pacific Northwest National Laboratory was commissioned to study the potential impact of a severe GIC event on the western U.S.-Canada power grid (referred to as the Western Interconnection). The study identified long transmission lines (length exceeding 150 miles) that did not include series capacitors. The basic assumption for the study is that a GIC is more likely to couple to long transmission lines, and that series capacitors would block the flow of the induced DC GIC. Power system simulations were conducted to evaluate impacts to the bulk power system if transformers on either end of these lines failed. The study results indicated that the Western Interconnection was not substantially at risk to GIC because of the relatively small number of transmission lines that met this criterion. This report also provides a summary of the Hydro-Québec blackout on March 13, 1989, which was caused by a GIC. This case study delves into the failure mechanisms of that event, lessons learned, and preventive measures that have been implemented to minimize the likelihood of its reoccurrence. Finally, the report recommends that the electric power industry consider the adoption of new protective relaying approaches that will prevent severe GIC events from catastrophically damaging transformers. The resulting changes may increase the likelihood of smaller disruptions but should prevent an unlikely yet catastrophic national-level event.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SPAR Model Structural Efficiencies

The Nuclear Regulatory Commission (NRC) and the Electric Power Research Institute (EPRI) are supporting initiatives aimed at improving the quality of probabilistic risk assessments (PRAs). Included in these initiatives are the resolution of key technical issues that are have been judged to have the most significant influence on the baseline core damage frequency of the NRC’s Standardized Plant Analysis Risk (SPAR) models and licensee PRA models. Previous work addressed issues associated with support system initiating event analysis and loss of off-site power/station blackout analysis.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Resilience Measurement Index: An Indicator of Critical Infrastructure Resilience

The world faces numerous threats from both natural and man-made sources. Since the beginning of the 21 st century, in the United States alone, we have experienced several devastating events. Incidents such as the attacks on the World Trade Center in 2001, the Northeast blackout in 2003, Hurricane Katrina in 2005, and Superstorm Sandy in 2012 have had far-reaching impacts that have directly affected our society’s well-being. Although current efforts that have focused on preventing or mitigating the impact of incidents have achieved admirable results, a more comprehensive approach is needed to improve the nation’s overall resilience. An all-hazards methodology that emphasizes not only protection but also preparedness, mitigation, response, and recovery programs and capabilities is desired. Presidential Policy Directive 21 defines 16 critical infrastructure sectors that are essential to the nation’s security, public health and safety, economic vitality, and general quality of life (White House, 2013). If the operations of these critical infrastructure sectors are essential, their protection and resilience is paramount. As stated by President Obama, “Our goal is to ensure a more resilient Nation—one in which individuals, communities, and our economy can adapt to changing conditions as well as withstand and rapidly recover from disruption due to emergencies” (Department of Homeland Security, 2010a). Enhancing the resilience of critical infrastructure requires its owners/operators to determine the ability of the system to withstand specific threats, minimize or mitigate potential impacts, and to return to normal operations if degradation occurs. Thus, a resilience methodology requires the comprehensive assessment of critical infrastructure systems/assets—from threat to consequence. The methodology needs to support decision-making for risk management, disaster response, and business continuity. Considering these issues, the Infrastructure Assurance Center at Argonne National Laboratory, in partnership with the Protective Security Coordination Division of the U.S. Department of Homeland Security (DHS), has developed an index, the Resilience Measurement Index (RMI), to characterize the resilience of critical infrastructure.

Petit, F. D. P.↗

DAKOTA reliability methods applied to RAVEN/RELAP-7.

This report summarizes the result of a NEAMS project focused on the use of reliability methods within the RAVEN and RELAP-7 software framework for assessing failure probabilities as part of probabilistic risk assessment for nuclear power plants. RAVEN is a software tool under development at the Idaho National Laboratory that acts as the control logic driver and post-processing tool for the newly developed Thermal-Hydraulic code RELAP-7. Dakota is a software tool developed at Sandia National Laboratories containing optimization, sensitivity analysis, and uncertainty quantification algorithms. Reliability methods are algorithms which transform the uncertainty problem to an optimization problem to solve for the failure probability, given uncertainty on problem inputs and a failure threshold on an output response. The goal of this work is to demonstrate the use of reliability methods in Dakota with RAVEN/RELAP-7. These capabilities are demonstrated on a demonstration of a Station Blackout analysis of a simplified Pressurized Water Reactor (PWR).

Swiler, Laura Painton↗

Quantifiably secure power grid operation, management, and evolution :

This report summarizes findings and results of the Quantifiably Secure Power Grid Operation, Management, and Evolution LDRD. The focus of the LDRD was to develop decisionsupport technologies to enable rational and quantifiable risk management for two key grid operational timescales: scheduling (day-ahead) and planning (month-to-year-ahead). Risk or resiliency metrics are foundational in this effort. The 2003 Northeast Blackout investigative report stressed the criticality of enforceable metrics for system resiliency the grid s ability to satisfy demands subject to perturbation. However, we neither have well-defined risk metrics for addressing the pervasive uncertainties in a renewable energy era, nor decision-support tools for their enforcement, which severely impacts efforts to rationally improve grid security. For day-ahead unit commitment, decision-support tools must account for topological security constraints, loss-of-load (economic) costs, and supply and demand variability especially given high renewables penetration. For long-term planning, transmission and generation expansion must ensure realized demand is satisfied for various projected technological, climate, and growth scenarios. The decision-support tools investigated in this project paid particular attention to tailoriented risk metrics for explicitly addressing high-consequence events. Historically, decisionsupport tools for the grid consider expected cost minimization, largely ignoring risk and instead penalizing loss-of-load through artificial parameters. The technical focus of this work was the development of scalable solvers for enforcing risk metrics. Advanced stochastic programming solvers were developed to address generation and transmission expansion and unit commitment, minimizing cost subject to pre-specified risk thresholds. Particular attention was paid to renewables where security critically depends on production and demand prediction accuracy. To address this concern, powerful filtering techniques for spatio-temporal measurement assimilation were used to develop short-term predictive stochastic models. To achieve uncertaintytolerant solutions, very large numbers of scenarios must be simultaneously considered. One focus of this work was investigating ways of reasonably reducing this number.

Gray, Genetha Anne.↗

RELAP-7: Demonstrating the integration of two-phase flow components for an ideal BWR loop

The RELAP-7 code is the next generation nuclear reactor system safety analysis code being developed at the Idaho National Laboratory. RELAP-7 will become the main reactor systems toolkit for the Risk-Informed Safety Margin Characterization Pathway of the Light Water Reactor Sustainability (LWRS) Program and the next generation tool in the RELAP reactor safety/systems analysis application series (i.e., the replacement for RELAP5). The code is being developed based on Idaho National Laboratory’s modern scientific software development framework – MOOSE (the Multi-Physics Object-Oriented Simulation Environment). During Fiscal-Year 2013, a number of physical components have been developed to support the demonstration calculations presented in this report. The case selected for demonstration of an idealized BWR loop in RELAP-7 includes the major components for the primary system of a BWR. The BWR loop has been successfully simulated to steady state with the RELAP-7 code. The next major stage of development is to demonstrate two-phase flow modeling capability through a simplified boiling water reactor station blackout analysis, which will be reported in the subsequent demonstration simulation report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fukushima Daiichi—A Case Study for BWR Instrumentation and Control Systems Performance During a Severe Accident, Rev 1

This report provides an assessment of the performance of various instrumentation and control (I&C) and monitoring systems, with a focus on the first few days of the Fukushima Daiichi accident starting on March 11, 2011. Similar to what occurred at the Three Mile Island Unit 2 (TMI-2) accident in 1979, operator responses were challenged when information on key parameters was lost, erroneous, or misleading. While numerous improvements in instrumentation capabilities have been made since the TMI-2 event, the accident at Fukushima Daiichi suggests the potential for further improvement. The objective of this research is to review the performance of the Fukushima Daiichi Units 1–3 instrumentation systems that could have helped ensure that plant operators and emergency responders had relevant, accurate, and timely knowledge of plant conditions as they managed the accident response. As was the case with TMI-2, forensic analyses of plant instrumentation failures will be a long-term effort. As an introduction to this long-term research, this report focuses on the information available in the control room during the accident and illustrates the challenges to operators in their understanding of plant conditions during the progression of the accident. I&C systems monitor the success or failure of achievement of light water reactor safety principles in which the protection of the reactor fuel, reactor coolant system, and reactor containment is accomplished. This report (1) provides an overview of the safety principles; (2) notes parameters associated with the boiling water reactor (BWR)/3 and BWR/4 protection, actuation, and monitoring systems as they relate to the achievement of these principles; (3) presents data from past research on predicted instrumentation performance during severe accidents, and (4) assesses performance of the key I&C and monitoring systems associated with BWR/3 and BWR/4 reactors like those at Fukushima Daiichi. Lessons learned or potential improvements associated with the performance of these systems in the context of severe accidents are delineated. As background information, an overview of key BWR/3- and BWR/4-Mark I reactor designs (BWR/3 and BWR/4 with a Mark I containment) reactor protection, engineered safety features actuation, and accident monitoring systems is provided. A brief description of plant safety systems used to prevent or mitigate reactor accidents is also provided. This background information provides context for the brief discussion of previous research that has been conducted on BWR severe accidents and for the discussion of the accident sequences, which led to core damage at Fukushima Daiichi Units 1–3. The progression of the accident sequences at Fukushima Daiichi Units 1–3 occurred very much as predicted in prior severe accident research conducted in the United States and internationally, given the complete station blackout that occurred when the tsunami generated by one of the most powerful earthquakes ever recorded rolled onshore.

Accident Tolerant Equipment↗

Updated Peach Bottom Model for MELCOR 1.8.6: Description and Comparisons

A MELCOR 1.8.5 model of the Peach Bottom Unit 2 or 3 has been updated for MELCOR 1.8.6. Primarily, this update involved modification of the lower head modeling. Three additional updates were also performed. First, a finer nodalization of the containment wet well was employed. Second, the pressure differential used by the logic controlling the safety relief valve actuation was modified. Finally, an additional stochastic failure mechanism for the safety relief valves was added. Simulation results from models with and without the modifications were compared. All the analysis was performed by comparing key figures of merit from simulations of a long-term station blackout scenario. This report describes the model changes and the results of the comparisons.

LTSBO↗

Energy Efficiency Country Study: Republic Of South Africa

Over the last few years, the Republic of South Africa’s Government (RSA Gov) has been actively implementing policies to move Energy Efficiency forward. The trigger to this acceleration has been a series of widespread rolling blackouts in 2008 but deeper-rooted reasons have also contributed to this necessity, such as the significant saving potential and the desire to reduce South Africa’s impact on climate change.

25 ENERGY STORAGE↗

Distributed Dynamic State Estimator, Generator Parameter Estimation and Stability Monitoring Demonstration

This is the final report for this project that was performed in the period: October1, 2009 to June 30, 2013. In this project, a fully distributed high-fidelity dynamic state estimator (DSE) that continuously tracks the real time dynamic model of a wide area system with update rates better than 60 times per second is achieved. The proposed technology is based on GPS-synchronized measurements but also utilizes data from all available Intelligent Electronic Devices in the system (numerical relays, digital fault recorders, digital meters, etc.). The distributed state estimator provides the real time model of the system not only the voltage phasors. The proposed system provides the infrastructure for a variety of applications and two very important applications (a) a high fidelity generating unit parameters estimation and (b) an energy function based transient stability monitoring of a wide area electric power system with predictive capability. Also the dynamic distributed state estimation results are stored (the storage scheme includes data and coincidental model) enabling an automatic reconstruction and “play back” of a system wide disturbance. This approach enables complete play back capability with fidelity equal to that of real time with the advantage of “playing back” at a user selected speed. The proposed technologies were developed and tested in the lab during the first 18 months of the project and then demonstrated on two actual systems, the USVI Water and Power Administration system and the New York Power Authority’s Blenheim-Gilboa pumped hydro plant in the last 18 months of the project. The four main thrusts of this project, mentioned above, are extremely important to the industry. The DSE with the achieved update rates (more than 60 times per second) provides a superior solution to the “grid visibility” question. The generator parameter identification method fills an important and practical need of the industry. The “energy function” based transient stability monitoring opens up new ways to protect the power grid, better manage disturbances, confine their impact and in general improve the reliability and security of the system. Finally, as a by-product of the proposed research project, the developed system is able to “play back” disturbances by a click of a mouse. The importance of this by-product is evident by considering the tremendous effort exerted after the August 2003 blackout to piece together all the disturbance recordings, align them and recreate the sequence of events. This project has moved the state of art from fault recording by individual devices to system wide disturbance recording with “play back” capability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Non-iterative Voltage Stability

This report demonstrates promising capabilities and performance characteristics of the proposed method using several power systems models. The new method will help to develop a new generation of highly efficient tools suitable for real-time parallel implementation. The ultimate benefit obtained will be early detection of system instability and prevention of system blackouts in real time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Battery Electric Vehicles can reduce greenhouse has emissions and make renewable energy cheaper in India

India's National Mission on Electric Mobility (NMEM) sets a countrywide goal of deploying 6 to 7 million hybrid and electric vehicles (EVs) by 2020. There are widespread concerns, both within and outside the government, that the Indian grid is not equipped to accommodate additional power demand from battery electric vehicles (BEVs). Such concerns are justified on the grounds of India's notorious power sector problems pertaining to grid instability and chronic blackouts. Studies have claimed that deploying BEVs in India will only

33 ADVANCED PROPULSION SYSTEMS↗