Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Asset Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

ER Line Phase II Project Risk Assessment Report

The purpose of this risk and opportunity assessment is to report the potential cost impacts from technical and programmatic risks (TPR) and opportunities. This analysis will determine the cost contingency for these TPR impacts. The approach taken to manage risk is consistent with risk and opportunity management guidance contained in DOE Order 413.3B, Project Management for the Acquisition of Capital Assets, the DOE Guide 413.3-7, Risk Management Guide and LANL’s Project Management Procedure AP-350-204 Risk and Opportunity Management.

Engineering(42)↗

Salt Waste Processing Facility Project (SWPF) project management improvements: Working under a cost cap contract - 15523

The Salt Waste Processing Facility (SWPF), located at the Savannah River Site (SRS) in Aiken, South Carolina, is a multi-billion dollar LRW processing facility that represents the keystone for the U.S. Department of Energy (DOE)-EM clean-up mission at SRS. In June 2013, DOE and Parsons agreed to Contract Modification 0116 that definitized the remaining work to achieve Construction Complete with a target schedule and a cost cap contract structure. The SWPF project is currently 85 percent complete with construction, and approximately 10 percent complete with commissioning. To date there have been numerous lessons learned with regard to contract and project management, procurement, construction, safety and quality assurance approaches (both good practices and mistakes). These lessons learned are considered to be of significant value in improving the state of major project execution within the DOE-EM clean-up program as well as to the wider DOE complex. An overview of the current SWPF project status is provided, along with challenges associated with operating under a cost cap environment within a cost-plus contract structure. Key lessons learned will be discussed including contract management, baseline development and acceptance under DOE O 413.3, Program and Project Management for the Acquisition of Capital Assets requirements, cost and schedule control, change management and risk strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Western Aeronautical Test Range

NASA's Western Aeronautical Test Range (WATR) is a network of facilities used to support aeronautical research, science missions, exploration system concepts, and space operations. The WATR resides at NASA's Dryden Flight Research Center located at Edwards Air Force Base, California. The WATR is a part of NASA's Corporate Management of Aeronautical Facilities and funded by the Strategic Capability Asset Program (SCAP). It is managed by the Aeronautics Test Program (ATP) of the Aeronautics Research Mission Directorate (ARMD) to provide the right facility at the right time. NASA is a tenant on Edwards Air Force Base and has an agreement with the Air Force Flight Test Center to use the land and airspace controlled by the Department of Defense (DoD). The topics include: 1) The WATR supports a variety of vehicles; 2) Dryden shares airspace with the AFFTC; 3) Restricted airspace, corridors, and special use areas are available for experimental aircraft; 4) WATR Products and Services; 5) WATR Support Configuration; 6) Telemetry Tracking; 7) Time Space Positioning; 8) Video; 9) Voice Communication; 10) Mobile Operations Facilities; 11) Data Processing; 12) Mission Control Center; 13) Real-Time Data Analysis; and 14) Range Safety.

Sakahara, Robert D.↗

Testing the Feasibility of a Low-Cost Network Performance Measurement Infrastructure

Todays science collaborations depend on reliable, high performance networks, but monitoring the end-to-end performance of a network can be costly and difficult. The most accurate approaches involve using measurement equipment in many locations, which can be both expensive and difficult to manage due to immobile or complicated assets. The perfSONAR framework facilitates network measurement making management of the tests more reasonable. Traditional deployments have used over-provisioned servers, which can be expensive to deploy and maintain. As scientific network uses proliferate, there is a desire to instrument more facets of a network to better understand trends. This work explores low cost alternatives to assist with network measurement. Benefits include the ability to deploy more resources quickly, and reduced capital and operating expenditures. Finally, we present candidate platforms and a testing scenario that evaluated the relative merits of four types of small form factor equipment to deliver accurate performance measurements.

97 MATHEMATICS AND COMPUTING↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (5-Lab Demo) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, PV, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactor (SMR), control centers, and gas turbines, across five DOE national laboratories-NLR, INL, NETL, LBNL, and SNL. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance U.S. Department of Energy's (DOE) network, and controlled via a centralized energy controller hosted at NLR's ARIES facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility. SuperLab 2.0 (5-Lab Demo) showcased a major advancement in federated national laboratory collaboration, enabling real-time, cross-laboratory experimentation to coordinate geographically dispersed distributed energy resources (DERs) using various communication protocols and networks. SuperLab 2.0 (5-Lab Demo) built on previous demonstrations conducted between NLR-PNNL and NLR-INL connecting diverse assets including distant protection devices, a SMR simulator, and a high temperature electrolyzer (HTE). Previous demos were based on a single connection between two labs with minimal coordination challenges. The 5-Lab demo with a centralized controller, distributed testbeds across different geographical locations, and use of protocols-based communication represents a scenario closer to real-world grid operations that coordinate resources across a region to meet system needs. This experiment studied how local DER controllers interact with a centralized energy controller during normal and abnormal events to maintain reliability. The SuperLab team across the five labs implemented a notional power system model equivalent of transmission and distribution lines, represented by the data networks interconnecting the labs. Each lab continuously exchanged local parameters (such as P and Q) from its Hardware-In-Loop (CHIL) and Power Hardware-In-Loop (PHIL) assets through centralized energy controller at NLR, enabling real-time interaction and coordination across sites. By leveraging ESnet as the communication backbone, the team successfully operated the distributed assets as a unified power system, with each bus represented by a different laboratory. This setup mirrors how assets interact in real-world power systems across dispersed locations with various protocols and latencies. At each lab site, assets were operated using their own local controllers which were coordinated through an overarching operation and control layer of centralized energy controller, equivalent to how an energy management system (EMS) orchestrates assets across a regional or national grid. SuperLab's federated connectivity utilized a Digital Real-Time Simulators (DRTS)-type gateway to connect Controller Hardware-In-Loop (CHIL) and PHIL assets between labs. To enable this federated connection through ESnet, a deterministic network was established where latency variations were consistent. This consistency allowed the development of digital filters for the power system assets across CHIL and PHIL interfaces to avoid unstable and unreliable grid conditions. This report provides an overview of the cross-laboratory configuration and offers insights into interconnecting geographically distributed research assets to test them as if they were co-located. This experiment represents a step toward linking nine DOE national laboratories, enabling nation-wide simulations that can address utility-driven challenges with grid resilience, flexibility, and modernization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SRNL Nuclear Material Management Strategy

Started in FY22 to categorize with the goal of determining assets and liabilities for the new management team and reducing SRNL’s excess inventory. • Allow for program growth within the current material limits. • Prior to FY22 inventory was a ‘blackbox’. • No formal system for tracking utilization or future needs until items arrived. • Created friction between management and researchers • Slowed down incoming projects • Risk of breaking safety and/or security limits • Risk of jepardizing program growth.

Ramsey, Catherine M.↗

Asset Analysis and Operational Concepts for Separation Assurance Flight Testing at Dryden Flight Research Center

A preliminary survey of existing separation assurance and collision avoidance advancements, technologies, and efforts has been conducted in order to develop a concept of operations for flight testing autonomous separation assurance at Dryden Flight Research Center. This effort was part of the Unmanned Aerial Systems in the National Airspace System project. The survey focused primarily on separation assurance projects validated through flight testing (including lessons learned), however current forays into the field were also examined. Comparisons between current Dryden flight and range assets were conducted using House of Quality matrices in order to allow project management to make determinations regarding asset utilization for future flight tests. This was conducted in order to establish a body of knowledge of the current collision avoidance landscape, and thus focus Dryden s efforts more effectively towards the providing of assets and test ranges for future flight testing within this research field.

Costa, Guillermo J.↗

An Integrated Paradigm for the Management of Delivery Risk in Electricity Markets: From Batteries to Insurance and Beyond

If power systems transition to integrate higher amounts of variable renewable energy sources, storage technologies, and distributed energy resources (DERs), new risk management frameworks are necessary to ensure cost-effective and reliable power system operations. Projects funded by the Advanced Research Projects Agency-Energy (ARPA-E) Performance-based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) program aim to contribute new risk management frameworks by developing methods to quantify and manage risk at grid asset and system levels. The National Renewable Energy Laboratory (NREL) led a PERFORM project in collaboration with the Johns Hopkins University, the Electric Power Research Institute (EPRI), kWh Analytics, Packetized Energy, and Imperial Consultants (ICON). The project addressed two challenges related to risk management in electricity markets: managing net load imbalances and flexibility from DERs. This final technical report presents a list of project accomplishments, activities, and outputs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Natural Capital Management: An Evolutionary Paradigm for Sustainable Restoration Investment - 13455

Unlike other forms of capital assets (built infrastructure, labor, financial capital), the supply of usable or accessible air, land, and water elements (termed Natural Capital Assets or NCA) available to enterprise processes is structurally shrinking due to increased demand and regulatory restriction. This supply/demand imbalance is affecting all forms of public and private enterprise (including Federal Facilities) in the form of encroachment, production limits, cost increases, and reduced competitiveness. Department of Energy (DOE) sites are comprised of significant stocks of NCA that function as both conserved capital (providing ecosystem services and other reserve capacity), and as natural infrastructure (supporting major Federal enterprise programs). The current rubric of 'Environmental Stewardship' provides an unduly constrained management paradigm that is focused largely on compliance process metrics, and lacks a value platform for quantifying, documenting, and sustainably re-deploying re-capitalized natural asset capacity and capability. By adopting value-based system concepts similar to built infrastructure accounting and information management, 'stewarded' natural assets relegated to liability- or compliance-focused outcomes become 're-capitalized' operational assets able to support new or expanded mission. This growing need for new accounting and management paradigms to capture natural capital value is achieving global recognition, most recently by the United Nations, world leaders, and international corporations at the Rio+20 Summit in June of 2012. Natural Capital Asset Management (NCAM){sup TM} is such an accounting framework tool. Using a quantification-based design, NCAM{sup TM} provides inventory, capacity and value data to owners or managers of natural assets such as the DOE that parallel comparable information systems currently used for facility assets. Applied to Environmental Management (EM) and other DOE program activities, the natural asset capacity and value generated by EM projects and other investment and operational programming can be recorded and then allocated to mission and/or ecosystem needs as part of overall site, complex, and Federal decision-making. NCAM{sup TM} can also document post-restoration asset capability and value for use in weighing loss mitigation and ecosystem damage claims arising from past operational activities. A prototype NCAM{sup TM} evaluation developed at the Savannah River Site (SRS) demonstrates use of this framework as an advanced paradigm for NCA accounting and decision-making for the larger DOE complex and other enterprise using natural capital in operations. Applying a quantified value paradigm, the framework catalogues the results of activities that sustain, restore, and modernize natural assets for enterprise-wide value beyond that of compliance milestones. Capturing and assigning recapitalization value using NCAM{sup TM} concepts and tools improves effective reuse of taxpayer-sustained assets, records ecosystem service value, enables mission and enterprise optimization, and assures the sustainability of shared natural capital assets in regional pools vital to both complex sites and local and regional economies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

Future energy infrastructure, energy platform and energy storage

Today fossil energy dominates energy consumption across the world. There has been an increasing momentum to reduce fossil energy consumption and increase renewable energy utilization to more than 70%. Such high penetrations of distributed renewable resources bring large uncertainty and complexity that cannot be easily handled by the current infrastructure. For the last two decades, telecommunication industry has gone through a similar transition from centralized to distributed systems, and more recently to platform approaches, which become the corner stone of today’s vibrant platform economy. Based on telecommunication history, we believe that a platform-based approach, called the energy platform, is a viable solution for addressing the renewable energy challenges. The energy platform consists of an array of computational algorithms, sensing and control technologies for key industry, energy generators and users to jointly manage and control the complex energy infrastructure. It includes the following key components: (1) the hardware and software to generate, store, control and transmit electricity/data (the energy cloud), (2) the digital platforms and tools for key energy producers, digital, service and communication industry to share the assets, participate in and manage the complex infrastructure, and for customers to participate in energy transactions, (3) the transaction platform for new service and business models. Additionally, the energy platform requires breakthroughs in large scale energy storage and many other areas including efficient power electronics, sensors and controls, new mathematical and computational tools, and deep integration of energy technologies and information sciences to control and stabilize such complex chaotic systems.

25 ENERGY STORAGE↗

Applying Energy Data Tools to Inform the Valuation of Commercial Buildings

This case study describes a suite of free tools from DOE and EPA ENERGY STAR® and how users have applied them to enhance the value of commercial office building data through various aspects of energy and building performance. The tools addressed are EPA’s ENERGY STAR Portfolio Manager, DOE’s Building Energy Asset Score, and DOE’s Building Performance Database.

energy data, commercial, office, data tools, comme↗

Research Reactors Division Infrastructure Investment Plan for the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) is a unique national asset. Operational for nearly 60 years, continued investment into the aging infrastructure is necessary to ensure operation for another 6 decades. Additionally, growing missions require HFIR as well as important upgrades. Consequently, carefully integrated planning is required to ensure that infrastructure investments are timely executed to ensure long-term, reliable operation of HFIR. Concerns about challenges to the operational reliability of HFIR resulted in a recommendation from the 2023 Operations Review by the US Department of Energy (DOE) Office of Basic Energy Sciences that a HFIR management strategy be developed to address the infrastructure needs. This report defines the investment needs, which are evolving as new upgrade efforts are better defined. HFIR is part of the three-source strategy within the Neutron Sciences Directorate (NScD) and contributes to the five strategic science areas outlined in the NScD 10 Year Strategic Science Plan: quantum materials, soft matter, materials and engineering, chemistry, and biosciences. Fundamental to this strategy are three core values: operational excellence, responsible stewardship, and servant leadership. These values guide our mission of safe and reliable operation of the reactor and require a strong and just nuclear safety culture, a solemn respect for responsible care of the facility, good workforce development, robust procedures and processes, an effective communication strategy, world-class asset management, a determined customer focus, and a commitment to protecting the environment, the safety and health of the public and our people, and the quality of work performed within our facility. These principles are all essential to operate HFIR at a world-class level. The Research Reactors Division (RRD) will lead a new era of neutron science and isotope production at HFIR through responsible and purposeful leadership and unwavering support of the science community. The approach outlined in this plan highlights the direction leadership is taking to ensure that HFIR is ready to support the science challenges and national needs of the future and that the United States maintains world leadership in neutron sciences. The plan is in alignment with the DOE’s desire to continue operating HFIR and with the NScD strategic science goals for the future. HFIR is an aging facility with numerous infrastructure challenges and needs. It has an aging workforce in relation to the general population of Oak Ridge National Laboratory (ORNL), with many expected retirements over the next 5–10 years. With an increase in work scope caused by changing national priorities and science goals, several critical hires have been identified. To manage HFIR’s infrastructure needs, a prioritized list of equipment upgrades has been identified along with an analysis of future staffing requirements. A desire to operate HFIR at eight cycles per year will necessarily require some significant changes to procedures and processes currently in place as well as targeted staffing additions. Many of the equipment upgrades identified in this plan will significantly increase the reliability of the plant, thus contributing to the effort to reach the goal of safely operating eight cycles per year. A plan to attain eight-cycle operation is being prepared in parallel with the activities identified in this plan, although the actions identified to satisfy both plans will overlap. This plan identifies new infrastructure needs—for both plant equipment and staffing—thus necessitating formulation of future budget requests to fund the increased work scope and improvement activities. Some activities are currently being scheduled with the expectation that funding will be received. Any delays to funding or reductions of funding from the identified cost estimations will directly and negatively affect the plan’s implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Validation of the Public Radiation Exposure Calculation for the Incident at the National Institute of Standards and Technology Center for Neutron Research on February 3, 2021

The Department of Energy/National Nuclear Security Administration Consequence Management Program was contacted by the Health Physics Chief of the National Institute of Standards and Technology Center for Neutron Research (NCNR) to review public radiation exposure calculations for an event that occurred on its Gaithersburg, Maryland, campus on February 3, 2021. Subject matter experts from the Nuclear Emergency Support Team (NEST) assets, specifically the Consequence Management Home Team (CMHT) and the National Atmospheric Release Advisory Center (NARAC), were selected to provide support. CMHT used three separate modeling codes to validate the results the scientists at NCNR calculated using the HotSpot model. The analyses were performed using NARAC’s in-house Lagrangian dispersion codes known as LODI and Aeolus, as well as the Turbo FRMAC software from Sandia National Laboratories. The team used parameters provided by the NCNR scientists regarding the site, applicable observable meteorological data, and environmental survey and sampling data to estimate public exposure. Each model estimated public dose at much less than 0.5 mrem. CMHT concurs with the NCNR public radiation exposure calculations which state that members of the public at the 400-meter boundary would have received a radiological dose of less than 0.5 mrem.

61 RADIATION PROTECTION AND DOSIMETRY↗

An Overview of the NASA Aeronautics Test Program Strategic Plan

U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced portfolio of aeronautics ground and flight test capabilities that advance U.S. leadership in aeronautics in the short and long term. Key to the ATP vision is the concept of availability, not necessarily ownership; that is, NASA does not have to own and operate all facilities that are envisioned for future aeronautics testing. However, ATP will enable access to capabilities which are needed but not owned by NASA through strategic partnerships and reliance agreements. This paper will outline the major aspects of the ATP strategic plan for achieving its mission.

Marshall, Timothy J.↗

A Practical Comparison of Data-Driven Prognostics Methods for Energy Systems

This study explores data-driven prognostics for nuclear power plant (NPP) condensers, focusing on tube fouling. We utilized the Asherah nuclear power plant simulator (ANS) to compare four methods: Random Forest (RF), Support Vector Regressor (SVR), Fully Connected Neural Network (FCNN), and Long Short-Term Memory Neural Network (LSTM). By simulating various fouling scenarios in the ANS, we generated data with different degradation rates under transient operations. The models were trained and tested on these data, with performance evaluated visually and numerically including uncertainty assessment. The LSTM model excelled, exhibiting minimal prediction noise and the most accurate remaining useful life estimates across all degradation levels. Its ability to capture long-term dependencies and produce cleaner outputs makes it a strong candidate, although accurate training data across the entire component lifespan are crucial. The RF model emerged as a robust alternative, providing reliable predictions with high confidence. The FCNN and SVR models, while less effective overall, showed potential under specific conditions. FCNN offers a less complex alternative to LSTM and might benefit from larger datasets. SVR excels in precision when the quality of the training data is high. Furthermore, this study highlights the operational benefits of advanced prognostics in the energy sector and emphasizes the need for further research in NPP condenser health management through real-life experiments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Innovative Hot Lab Concept for Advanced D and D Application - 19175

Hot Labs are used in the nuclear industry for various purposes: maintenance of nuclear reactor, sampling and testing of fuel, inspection activities and decommissioning. Despite their vast use, their current designs and operations do not meet entirely today's needs and requirements of the operations nor tomorrow's. This paper will give an overview of the research and investigations performed around Hot Cells design and concept in order to integrate new operability modes and functions. The overall idea is to bring modularity, flexibility and adaptability to the Hot Lab nuclear industry. Taking the key principles of Model Based System Engineering, an interoperable data model, the most advanced digital technologies (Building Information Modelling - BIM, Virtual Reality / Augmented Reality, Artificial Intelligence), and looking at all the life-cycle of such a facility, a concept design of a new type of Hot Lab has been developed. Four mains aspects are implemented during this study: Implement the principles of the Industry 4.0; use modular and flexible solutions; explore the concept of in service maintenance and predictive maintenance; optimise the decommissioning and dismantling process by taking into account the entire life-cycle of the facility. The design was developed as a case study taking several assumptions to adapt to any project. The design developed demonstrates that modularity and flexibility can be brought in without compromising the core safety functions of such a facility. This Hot Lab concept brings the current Hot Lab to the next level as the design has been adapted to meet the current operational needs, implement novel ideas and consider its entire life-cycle. This paper will demonstrate how decommissioning and dismantling operations can become more efficient and safer with such a concept. In addition, the Model Based System Engineering approach used from the beginning of the design phase allows to have an optimum architecture during its entire lifetime. It also allowed to flag new topics to be further developed for the benefit of the nuclear industry as a whole. A first example would be the development of the Control System using digital tools and artificial intelligence to run remotely controlled equipment inside the Hot Lab. Assystem is an international engineering group. As a key participant in the nuclear industry for over 50 years, the Group supports its clients in managing their capital expenditure throughout their asset life-cycles. Assystem can offer support in project management, design, digital engineering, industrial control systems, security and safety and industrial digitalisation. Assystem's Imagine program is an internal program intending to serve as an incubator for the development of innovations. The Innovative Hot Lab project integrates one of the four innovation projects Assystem choose to develop and invest in. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Catalyzing deep decarbonization with federated battery diagnosis and prognosis for better data management in energy storage systems

Industrial data analytics methods play a central role in improving energy storage performance and efficiency, impacting the future of electrified transportation and renewable electricity generation. However, significant challenges hinder the large-scale deployment of batteries. Conventional methods rely on centralized collection and processing of fleet-level data, leading to database size issues and privacy concerns due to potential data breaches. To enable scalable deployment of battery management systems, this article proposes a federated battery diagnosis and prognosis model, which distributes the processing of battery standard current-voltage-time-usage data in a privacy-preserving manner. Instead of transferring the raw data, this approach communicates only the locally processed parameters, thus reducing communication load and preserving data confidentiality. The federated model offers a paradigm shift in battery health management through privacy-preserving distributed methods for battery data processing and lifetime prediction, ensuring the reliable and sustainable deployment of lithium-ion batteries in a rapidly evolving world.

asset health management↗