SPS High Bandwidth Transverse Feedback System MD: Intermodulation/Nonlinearity Measurements of ADC
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
Abstract not provided.
We continue to have problems remaining synchronized with the beam. At this point we are not sure what the cause is. Typical problems associated with the timing shift: loss of synchronization of back end timing with the bunch by as much at a fraction of a nanosecond to several nanoseconds. Sometimes the front end timing changes and sometimes not. We eventually were able to synchronize quickly, by simply looking at the kicker load signal. JC has begun to recognize waveform traces typical of proper synchronization. For these initial tests, this should be good enough. Used a 200 MHz non amplitude modulated signal, measured the sum of the 200 MHz signal out of excitation and feedback systems, file Jan-22-932. Typically, out of the H9, 320 mV pp corresponds to both system begin aligned, with set attenuation. We were able to take many measurements where we scanned the phase of the FIR filter and varied the gain to determine the phase that damps the beam motion. $\phi$ ~ 90°. Performed some drive and damp measurements, driving mode 0, see Table 2 for details. Had a chromaticity sweep implemented and monitored the bunch with feedback on and off, see Table 3 for details.
For this test, we used the existing back end configuration. For the burst type signal we used the excitation system, and for the continuous type signal we used an arbitrary function generator. The frequencies of the signal are 100, 200, 300, 400 MHz. The signals were adjusted to be approximately the same level when input into the back end chain. At the MUX out load we measure the signal with a Tektronix oscilloscope, triggering on the load signal itself, recording 1K turns (fiducial triggers). The negative (${V{_{load}^{-p}}}$) and positive (${V{_{load}^{p}}}$) peak voltages generated were recorded, from which peak to peak voltages (${V{_{load}^{pp}}}$) were computed. The input signal was attenuated by 10 dB compared to the normal operating signal used for beam excitation as a cautionary measure. One measurement was made at normal operating power. We measure the loads of two amplifiers, amp 2 and amp 4.
Abstract not provided.
When a bunch passes through the undulator of LCLS-II, the wakefields of the vacuum chamber will result in an added energy variation along the bunch, one that can negatively impact the FEL performance. The wakefield of the vacuum chamber is primarily due to the resistance of the walls and the roughness of the surface. To minimize the impact of the wakes, one would like a wall surface smooth enough so that the roughness component of the wake is a small fraction of the total wake. In LCLS-I, with an undulator vacuum chamber of the same material (aluminum) and roughly the same aperture as proposed for LCLS-II, the wall roughness tolerance specified as an rms slope of the surface of (y') rms = 10–15 mr was difficult to achieve. The goal of this study is to understand the consequences to LCLS-II of loosening the roughness specification, say by a factor of 2 to 30 mr.
The Accelerator Test Facility 2 (ATF2) aims to test the novel chromaticity correction for higher chromaticity lattices as the one of CLIC. To this end the ATF2 ultra-low ß* lattice is designed to vertically focus the beam at the focal point or usually referred to as interaction point (IP), down to 23 nm. However when the measured multipole components of the ATF2 magnets are considered in the simulations, the evaluated spot sizes at the IP are well above the design value. The designed spot size is effectively recovered by inserting a pair of octupole magnets. In this note we address the technical specifications required for these octupole magnets.