Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2022”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 235 records · Page 13

State-of-the-Art: Small Spacecraft Technology

When the first edition of NASA’s Small Spacecraft Technology State-of-the-art report was published in 2013, 247 CubeSats and 105 other non-CubeSat small spacecraft under 50 kilograms (kg) had been launched worldwide, representing less than 2% of launched mass into orbit over multiple years. In 2013 alone, around 60% of the total spacecraft launched had a mass under 600 kg, and of those under 600 kg, 83% were under 200 kg and 37% were nanosatellites (1). Of the total 1,849 spacecraft launched in 2021, 94% were small spacecraft with an overall mass under 600 kg, and of those under 600 kg, 40% were under 200 kg, and 11% were nanosatellites (1). Since 2013, the fight heritage for small spacecraft has increased by over 30% and has become the primary source to space access for commercial, government, private, and academic institutions. The total number of spacecraft launched in the past 10 years is 5,681 and 45% of those had a mass. As with all previous editions of this report, the 2022 edition captures and distills a wealth of new information available on small spacecraft systems from NASA and other publicly available sources. This report is limited to publicly available information and cannot reflect major advances in development that are not publicly disclosed. We encourage any opportunity to publish mission outcomes and technology development milestones (e.g., via conference papers, press releases, company website) so they can be reflected in this report. Overall, this report is a survey of small spacecraft technologies sourced from open literature; it does not endeavor to be an original source, and only considers literature in the public domain to identify and classify devices. Commonly used sources for data include manufacturer datasheets, press releases, conference papers, journal papers, public filings with government agencies, news articles, presentations, the compendium of databases accessed via NASA’s Small Spacecraft Systems Virtual Institute (S3VI) Information Search, and engagement with companies. Data not appropriate for public dissemination, such as proprietary, export controlled, or otherwise restricted data, are not considered. As a result, this report includes many dedicated hours of desk research performed by subject matter experts reviewing resources noted above. Content in this 2022 edition is based on data available by October 2022. This report should not be considered as a comprehensive overview of all the technologies but a great reference for the current state-of-the-art SmallSat technologies. The organizational approach for each chapter is relatively consistent with previous editions and includes an introduction of the technology, current development status of the technology’s procurable systems, and summary tables of technologies surveyed. The content in each chapter is uniquely organized to present a mini-stand-alone report on spacecraft subsystems. As in previous years, chapters include information from previous editions but are updated with new and maturating technologies and reference missions. Tables in each section provide a convenient summary of the technologies discussed, with explanations and references in the body text. The authors have attempted to isolate trends in the small spacecraft industry to point out which technologies have been adopted after successful demonstration missions. Lastly, the authors tried to use the terms “SmallSat,” “microsatellite,” “nanosatellite,” and “CubeSat” in a consistent manner, even as these terms are often used interchangeably in the space industry. Every subsystem chapter contains updated information to reflect the growth in the small spacecraft market. Significant changes are included in several chapters. The “Complete Spacecraft Platforms” chapter now includes information on the two main market options, hosted payload services and dedicated buses. The “Power” chapter provides information on the development of solid-state batteries with significantly higher energy than the current state-of-theart lithium-ion batteries. A large effort was made to update the “Communications” chapter to appropriately capture the recent technology maturation of optical communications for SmallSats. The “Ground Data Systems and Mission Operations” chapter was updated to reflect the recent establishment of the Near Space Network and influx of SmallSat Optical Ground Stations. The “Guidance, Navigation and Control” chapter was updated to include Lidar sensor technology. The “Deorbit Systems” chapter includes a discussion of recently proposed changes by the Federal Communications Commission (FCC) to limit a spacecraft’s lifetime to no longer than 5 years after end-of-mission. The “Identification and Tracking” Chapter includes updated information on the progress of SmallSat tracking. Finally, this report now encompasses technology funded by NASA’s Small Spacecraft Technology (SST) program’s SmallSat Technology Partnerships (STP) initiative which is described further in this Introduction. The reader can find the included SST technology in the “On the Horizon” section of the “Thermal Systems”, “Communications”, and “Guidance, Navigation, and Control” chapters. A central element of this report is to list state-of-the-art technologies by NASA standard Technology Readiness Level (TRL) as defined by the 2020 NASA Engineering Handbook, found in NASA NPR 7123.1C NASA Systems Engineering Processes and Requirements. The authors have endeavored to independently verify the TRL value of each technology by reviewing and citing published test results or publicly available data to the best of their ability. Where test results and data disagree with vendors’ own advertised TRL, the authors have attempted to engage the vendors to discuss the discrepancy. Readers are strongly encouraged to follow the references cited in the literature describing the full performance range and capabilities of each technology. Readers of this report should reach out to individual companies to further clarify information. It is important to note that this report takes a broad system-level view. To attain a high TRL, the subsystem must be in a flight-ready configuration with all supporting infrastructure—such as mounting points, power conversion, and control algorithms—in an integrated unit. An accurate TRL assessment requires a high degree of technical knowledge on a subject device, and an in-depth understanding of the mission (including interfaces and environment) on which the device was flown. There is variability in TRL values depending on design factors for a specific technology. For example, differences in TRL assessment based on the operating environment may result from the thermal environment, mechanical loads, mission duration, or radiation exposure. If a technology has flown on a mission without success, or without providing valid confirmation to the operator, such claimed “flight heritage” was discounted. The authors believe TRLs are most accurately determined when assessed within the context of a program’s unique requirements. While the overall capability of small spacecraft has matured since the 2021 edition of this report, technologies are still being developed to make deep space SmallSat missions more routine and more cost effective. Future editions of this report may include content dedicated to the rapidly growing fields of assembly, integration, and testing services, and mission modeling and simulation–all of which are now extensively represented at small spacecraft conferences. Many of these subsystems and services are still in their infancy, but as they evolve and reliable conventions and standards emerge, the next iteration of this report may also evolve to include additional chapters.

Bruce Yost↗

Wilson Corners Solid Waste Management Unit (SWMU) 001: 2021 Annual Long-Term Monitoring Report, Kennedy Space Center, Florida

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2021 at Wilson Corners, Solid Waste Management Unit (SWMU) 001, at Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Adaptive site management is being utilized through ongoing assessment, design, and interim measures (IM). Annual LTM of the groundwater is also being conducted at the site. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code (F.A.C.). The goal of LTM at this site is threefold: to determine groundwater flow characteristics, monitor the downgradient concentration trends, and monitor select locations internal to the groundwater plume. Every 5 years, upgradient and side-gradient monitoring wells are sampled to verify delineation. The last time this was performed was in 2015. The sampling of these wells in 2020 was replaced with the direct push technology (DPT) investigations completed in October 2020 and April 2021. This DPT groundwater data was presented in an Advance Data Package (ADP) in September 2021 and discussed in the Implementation Work Plan (IWP) dated November 2021 for installation of an air sparge (AS) system. Based on results from groundwater sampling activities performed during the previous reporting period, including the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified. The 2021 LTM sampling plan was modified to include the sampling of monitoring wells located around the perimeter of the low concentration plume (LCP); the area with concentrations of contaminants of concern [COCs] greater than Groundwater Cleanup Target Levels [GCTLs]), and sampling of 10 monitoring wells proposed for installation (April 2021 KSC Remediation Team (KSCRT) Meeting, Decision 2104-D32). The modified LTM plan received team consensus at the September 2021 KSCRT Meeting (Decision Number 2109-D03), and sampling of the existing monitoring wells was completed in December 2021. The proposed monitoring wells are planned for installation in late 2022, concurrent with ongoing IM construction activities. December 2021 LTM data was presented at the May 2022 KSCRT Meeting, and activities are summarized in this report. The activities presented in this report include the December 2021 groundwater gauging of 42 monitoring wells and sampling of 44 monitoring wells. During the December 2021 event, the low flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds (VOCs), including 1,1,2-trichloro-1,2,2-trifluoroethane (Freon 113). The following conclusions can be made based on the 2021 LTM results: - In December 2021, groundwater flow for the site was generally to the west at all intervals. This is generally consistent with historical observations at the site, with the exception of a southwest and southeast flow component observed at 34 to 48 feet below land surface (bls). - The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet bls. The results from the two vertical extent monitoring wells, WILC-MW0078 (screened 65 to 70 feet bls) and WILC-MW0130 (screened 56 to 66 feet bls) that were sampled during the 2021 LTM indicate that groundwater vinyl chloride (VC) concentrations in both wells were greater than the GCTL. The Remediation Team has previously agreed to delay deeper DPT investigations in this area to prevent the creation of additional pathways for vertical migration. - The LCP continues to extend both horizontally, predominantly to the west, and vertically beyond the current monitoring well network, with some retraction observed to the southeast. Evaluation of this data combined with data from the 2020 and 2021 DPT sampling event indicate that the LCP encompasses an estimated 20.7 acres based on an expanded sampling area, as compared to the 2020 LCP footprint of 17.0 acres. - Freon 113 was not detected above GCTLs during the 2021 LTM event. Based on groundwater sampling activities performed in 2021, including April 2021 DPT groundwater sampling, the following recommendations are provided: - Perform the next LTM sampling event, targeted to occur in 2023, concurrently with the IM baseline sampling prior to AS system installation; - Include sampling from nine monitoring wells that are planned to be installed in late 2022, concurrent with upcoming IM construction activities. Installation of one deep vertical well, screened 70 to 80 feet bls, will be delayed to prevent the creation of an additional pathway for vertical migration; - Continue to sample under the modified annual LTM plan as presented in Table 4-1 concurrently with IM baseline sampling; and - Once the AS system install and start-up is complete, select monitoring wells from the LTM program will transition into the performance monitoring plan, and LTM will be temporarily discontinued. Performance monitoring will be performed quarterly, and the monitoring well network will be evaluated following the first performance monitoring sampling event.

long-term monitoring (LTM)↗

Stratospheric Circulation Changes Associated with the Hunga Tonga-Hunga Ha'apai Eruption

The 15 January 2022 eruption of the Hunga Tonga-Hunga Ha'apai underwater volcano injected an unprecedented amount of water directly into the stratosphere. This study attempts to quantify this impact on the temperature, as well as the subsequent changes to the stratospheric circulation, during the months following the eruption based on reanalysis fields. The extreme nature of the temperature, wind, and circulation changes are tracked through comparisons of the months of 2022 with the past 42 years. Examination of the data assimilation process shows that at 20 hPa the data is forcing temperature cooling at record rates resulting in record cold temperatures. Details of the stratospheric perturbations in latitude and pressure are presented for June 2022 where record strong cooling is found at 20 hPa from 60oS to 30oS. In response to the cooling the atmosphere adjusts by creating record strong winds above the temperature anomaly and large changes to the downward and poleward mean meridional circulation.

Lawrence Coy↗

Base Support Building and Kennedy Athletic, Recreation, and Social Park II, SWMU 014 and SWMU 118, PFAS Site Assessment Progress Report, Kennedy Space Center, Florida

This Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report (SAPR) presents the findings of the 2022 PFAS investigation conducted from February 2022 through June 2022 at the Base Support Building (previously known as the Maintenance and Operation Building), Solid Waste Management Unit (SWMU) 014, and at the Kennedy Athletic, Recreation, and Social (KARS) Park II, (SWMU 118) located within Kennedy Space Center (KSC), Florida. SWMUs 014 and 118 were investigated independently, however, the results of the investigations indicated a single PFAS groundwater plume covering both SWMUs, so the two sites are being reported together.

PFAS↗

Coronado Ecological Conservation: Assessing Vegetation Change Due to Border Wall Construction and Shifting Social Trails

Species monitoring is essential in mitigating the impacts of plant invasion, such as radical changes in an area’s ecosystem, degraded soil health, increased wildfire severity, landslides, and increased flooding. NASA DEVELOP partnered with the National Park Service (NPS) to investigate invasive species in disturbed lands: specifically, areas affected by off-trail walking and US-Mexico border construction activities. The team assessed how construction has impacted the distribution of Lehmann’s lovegrass and Russian thistle invasives throughout Coronado National Memorial, AZ from 1986 to 2022. Using data from Landsat 5 and 8, Sentinel-2, the National Agriculture Imagery Program, and PlanetScope, the team computed vegetation indices including the Normalized Difference Vegetation Index, Normalized Difference Moisture Index, Modified Soil Adjusted Vegetation Index 2, Enhanced Vegetation Index, and Tasseled Cap Wetness, Brightness, and Greenness transformations as vegetation health indicators to input into various machine learning algorithms. To minimize noise, the team conducted Principal Component Analysis on the vegetation indices and spectral bands before running k-means++ clustering and random forest classification algorithms. Between all datasets, we found the median area fully overtaken by invasive plants was 5.37% of the park’s total area in 2022. The NPS will use the end products to help increase restoration efforts in disturbed areas with high concentrations of invasive plants. The NPS’s collection of ground data for 2022–2023, in conjunction with future data collection, will notably improve the accuracy of classification models, leading to more precise monitoring of invasive spread over time.

Carson Schuetze↗

Subsonic Ultra Green Aircraft Research: Phase V – Buffet Test Report

This test report summarizes work performed by the Boeing Subsonic Ultra-Green Aircraft Research (SUGAR) team in the Phase V Transonic Truss-Braced Wing contract task. The task was awarded in September 2020, and ended at the end of September 2022. As a part of the SUGAR Phase V contract task, Boeing developed a wind tunnel test plan, model requirements, then fabricated and conducted a dedicated transonic buffet wind tunnel test. The test focused on the investigation of buffet onset, and the ability to accurately predict buffet onset for the TTBW configuration. This report summarizes the results and post-test analysis of the 9% scale, semispan, Transonic Truss-Braced Wing (TTBW) transonic buffet model tested at the NASA Ames Research Center Unitary Plan Wind Tunnel (UPWT) 11-Foot Transonic Wind Tunnel (11-Ft TWT) facility located at Moffett Field, CA. It was tested from January 24, 2022, through February 18, 2022. The wind tunnel test was successful in capturing buffet onset at the model design dynamic pressure. Multiple configurations were tested starting in the wing-body-strut configuration and ending with the full configuration including wing-body-strut-nacelle/pylon, and flap hinge. The test also measured the effect of control surface deflections (ailerons and spoilers), as well as the effect of an outboard strut flap. Steady data collected during the test included standard force and moment measurements, as well as wing, strut, nacelle, and body (fuselage) static pressures. These data were collected in a standard pitch-pause mode. Unsteady data captured in the test, collected in continuous pitch mode, included wing and strut dynamic pressures, accelerations, and strains. According to test data, previous concerns regarding critical buffet onset on the strut (at low vehicle lift coefficient) and in the wing-strut channel have been mitigated. Buffet onset on the TTBW appears to follow conventional wing-induced buffet onset mechanisms. However, the critical station where buffet onset first occurs has moved inboard to the wing-strut juncture span location (55-60% span) from the typical ~70% span location. Test data obtained by unsteady pressure transducers provided a good match to expected buffet onset modes. An assessment of different tools and methodologies for predicting buffet onset was conducted. Reasonable agreement was found for buffet boundary predictions between most of the methods examined when using a forward trip location, with the greatest discrepancies from the pitching moment break and trailing edge pressure divergence methods. When an aft trip location was used the buffet boundary predictions diverged more significantly from unsteady pressure measurements. In addition, good agreement between the buffet onset trends were found when the Reynolds number, configuration, or spanload was changed.

strut↗

Sewage Treatment Plant #1 Area, SWMU 117 Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment Progress Report

This Per- and Polyfluoroalkyl Substances (PFAS) Site Assessment (SA) Progress Report (SAPR) discusses the investigation activities and findings for the Sewage Treatment Plant #1 (STP1) Area located at Kennedy Space Center (KSC), Florida (Figure 1-1). This site has been designated Solid Waste Management Unit (SWMU) 117 under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action Program, as the sewage treatment plant and associated areas were identified as a potential source of PFAS to the environment. This PFAS SAPR was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0070. This is the first progress report to document on-going SA activities; supplemental progress reports will be provided as additional data is collected. PFAS SA activities were conducted between April 2020 and March 2022 to collect additional data to supplement the existing datasets to better understand the extent of PFAS impacts to the environment in the STP1 Area. The SA for the STP1 Area covers an approximately 130-acre investigation area with multiple structures and buildings. The focus of the SA is the STP1 Complex and associated structures, including the former Polishing Pond, former Sludge Disposal8 Area, and former Spray Field. The STP1 Complex is located in the KSC Industrial Area, at the southwest corner of 4th Street SE and C Avenue SE. The STP1 Complex is located approximately ¼-mile south and downgradient of the Fire Station #1 site (SWMU 116), which is also currently undergoing a PFAS SA because of potential releases of PFAS-containing aqueous film-forming foam (AFFF). During the SA, a total of seven soil, 131 groundwater direct push technology (DPT), 24 groundwater monitoring well, and 11 surface water samples were collected between April 2020 and March 2022. Monitoring well samples were analyzed for 18 PFAS compounds, with all other samples analyzed for 28 PFAS compounds. The SA sample results were used along with historical results to evaluate the extent of PFAS impacts to the environment in the STP1 Area. Data generated to date and prior results were screened against the United States Environmental Protection Agency (USEPA) May 2022 Tap Water Regional Screening Levels (RSL) for groundwater and residential RSLs for soil (hazard quotient of 0.1). Surface water results were screened against the State of Florida Human Health Surface Water Screening Levels (SWSLs). Results from the SA showed exceedances of the applicable screening criteria for groundwater and surface water. Considering the current and historical dataset, PFOS is the prevalent PFAS compound. Based on these results, additional groundwater DPT and surface water sampling should be considered for PFAS analysis, focused on evaluating surface water bodies in the southeast portion of the Industrial Area, which discharge into the Banana River. Additionally, installation of monitoring wells should be considered to evaluate the interaction between the groundwater and surface water at the site. Collection of additional samples for TOC analysis should also be considered from representative groundwater (saturated soils) and surface water locations to further evaluate potential correlations between PFAS and TOC to provide a more comprehensive dataset to assist in fate and transport analyses.

Sewage Treatment Plant↗

NASA's Efforts to Pursue Commercial Communications Services for Missions in Near Space

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN) Program enables high speed, robust, secure and cost-effective space communications and navigation services to current and future science and exploration missions. Consistent with National Space Policy, NASA is seeking commercial services for all its future near Earth requirements by incorporating additional direct to Earth (DTE) providers and introducing commercial satellite communications (SATCOM) vendors as NASA’s Tracking and Data Relay Satellites (TDRS) begin to decline. Through the progression of these efforts, SCaN is also integrating commercial services in the cislunar domain. The overarching objective is to satisfy the demands from the mission community – both in terms of capacity and capability – in a robust and cost-effective way, leveraging the strong and growing commercial space sector. For near earth space relay, six SATCOM vendors were awarded Funded Space Act Agreements in June of 2022 to demonstrate the ability to serve near-Earth missions, and are working through their committed milestones. The failure of TDRS Flight-9 (F9) in late 2022 prompted an increased tempo of mission engagement to identify driving user needs that commercial SATCOM can meet in the near-term. NASA has set a course to accelerate a decision to terminate commitments for TDRS services to new missions and has developed a plan to execute validation and risk reduction efforts with early adopter “pathfinder” missions to pave the way to earlier operational services. As the Artemis Program matures and builds on the successful Artemis I flight in November/December of 2022, the definition of the supporting communications and navigation architecture has further been refined. Although NASA government assets will continue to play a key role in provision of services, such as through the Deep Space Network, SCaN is pursuing commercial services offerings to expand ground network capability and implement lunar relay services. In February of 2023, SCaN released solicitation for services that include DTE services to missions near-Earth and in cislunar space, as well as lunar relay services. Further, SCaN is seeking opportunities to integrate commercial capability into lunar surface communications infrastructure. NASA is also advocating for standards that promote interoperability and strategic technology investments in the commercial sector. This paper addresses the recent progress and future plans in the near-Earth space and lunar regimes, discusses the unified approach for industry engagement, and highlights both the common and unique challenges of commercialization efforts in the two regimes.

commercialization↗

Hunga Tonga-Hunga Ha’apai Water Vapour and Composition of the Stratospheric Polar Vortices

We investigate the impacts of water vapor from the Hunga Tonga-Hunga Ha'apai (HTHH) eruption on the Antarctic stratospheric vortices in 2022 and 2023 and the Arctic stratospheric vortex in 2022/2023. Trace gas abundances from the Aura Microwave Limb Sounder (MLS) and the Modern Era Retrospective-analysis for Research and Applications (MERRA-2) Stratospheric Composition REanalysis with Aura MLS (M2-SCREAM), along with meteorological fields from the longer MERRA-2 record, are used to detail the evolution of the stratospheric polar vortex and its composition during these winter/spring seasons. Through austral winter and spring 2022, HTHH water vapor was effectively excluded from the Antarctic vortex until it broke up. The 2022 Antarctic vortex itself was large, strong, and long-lived, but not exceptionally so. By austral fall 2023, HTHH stratospheric water vapor had spread globally, and Antarctic vortex values in the lower through middle stratosphere were over 2 ppmv higher than usual when the vortex formed; these record-shattering water vapor concentrations led to earlier polar stratospheric cloud formation and chlorine activation, especially at levels that are typically the highest altitudes for polar processing. In the 2022/2023 Arctic winter/spring, HTHH water vapor reached the Arctic vortex region after the vortex had formed and was largely excluded until a major sudden stratospheric warming in mid-February 2023 eroded the vortex and mixed midlatitude and vortex air throughout the hemisphere.

Gloria L Manney↗

NASA’s Efforts to Pursue Commercial Communications Services for Missions in Near Space

The National Aeronautics and Space Administration (NASA) Space Communications and Navigation (SCaN) Program enables high speed, robust, secure, and cost-effective space communications and navigation services to current and future science and exploration missions. Consistent with National Space Policy, NASA is seeking commercial services for all its future near-Earth requirements by incorporating additional direct to Earth (DTE) providers and introducing commercial satellite relay communications (SATCOM) vendors as NASA’s Tracking and Data Relay Satellites (TDRS) begin to decline. Through the progression of these efforts, SCaN is also integrating commercial services in the cislunar domain. The overarching objective is to satisfy the demands from the mission community – both in terms of capacity and capability – in a robust, reliable, and cost-effective way, leveraging the strong and growing commercial space sector. For near earth space relay, six SATCOM vendors were awarded Funded Space Act Agreements in June of 2022 to demonstrate the ability to serve near-Earth missions with space-based communication relay services. All six vendors are working through their committed milestones with end-to-end service demonstrations tacking place throughout the mid-2020’s. The failure of TDRS Flight-9 (F9) in late 2022 prompted an increased tempo of mission engagement to identify driving user needs that commercial SATCOM can meet in the near-term. NASA has set a course to accelerate a decision to terminate offering TDRS services to new missions and is developing a plan to execute validation and risk reduction efforts with early adopter “pathfinder” missions, paving the way to operational services. As the Artemis Program matures and builds on the successful Artemis I flight in November-December of 2022, the definition of the supporting communications and navigation architecture has further been refined. Although NASA government assets will continue to play a key role in provision of services, such as through the Deep Space Network, SCaN is pursuing commercial services offerings to expand ground network capability and implement lunar relay services. In February of 2023, SCaN released solicitation for services that include DTE services to missions near-Earth and in cislunar space, as well as lunar relay services. Further, SCaN is seeking opportunities to integrate commercial capability into lunar surface communications infrastructure. NASA is also advocating for standards that promote interoperability and strategic technology investments in the commercial sector. This paper addresses the recent progress and future plans in the near-Earth space and lunar regimes, discusses the unified approach for industry engagement, and highlights both the common and unique challenges of commercialization efforts in the two regimes.

commercial services↗

2021-2022 Long-Term Groundwater Monitoring Report Industrial Area Kennedy Space Center, Florida

This report presents the groundwater sampling results from the National Aeronautics and Space Administration (NASA) Industrial Area (IA) 2021-2022 Long-Term Monitoring (LTM) activities and results of the 2023 DPT activities at three of the sites. The NASA IA LTM Program includes the following 14 sites: - Ransom Road Landfill (RRLF) – Solid Waste Management Unit (SWMU) 003 - Orsino Storage Yard (ORSY) – SWMU 004 - Building M7-0505 Treatment Tank Area (M505) – SWMU 039 - Hypergol Maintenance Facility Hazardous Waste South Staging Area (HMF South) – SWMU 070 - Operations and Checkout Building (O&C) – SWMU 076 - Vertical Processing Facility (VPF) – SWMU 077 - Environmental Health Facility (EHF) – SWMU 079 - Kennedy Athletic, Recreation, and Social Park 1 (KARS Park 1) – SWMU 084 - Engineering Development Laboratory (EDL) – SWMU 085 - Launch Equipment Test Facility (LETF) – SWMU 091 - Mobil Service Station (MOBIL) – SWMU 093 - General Services Administration Seized Property (GSSP) – SWMU 095 - Space Station Processing Facility (SSPF) – SWMU 098 - Fuel Storage Area #1 Underground Storage Tank (UST) [Building 1044] (FSA1) – Potential Release Location (PRL) 157 Groundwater levels were gauged at each site during the 2021 and 2022 LTM field activities. Sampling events for the IA LTM Program are conducted seasonally during the dry and wet seasons, which occur in May and November, respectively. The sites in the NASA IA LTM Program are sampled on annual, biennial, or 5-year sampling frequencies based on historical trends. Due to contract transitions and monitoring well installations, 2021 dry season activities were conducted during September 2021, while dry season activities for 2022 resumed in May 2022.

groundwater↗

Launch Complex 39B, SWMU 009 Air Sparging System Expansion Implementation Work Plan Kennedy Space Center, Florida

This Implementation Work Plan (IWP) for expansion of the Air Sparging (AS) system at Launch Complex 39B (LC39B), presents the design and coordination specifics to expand the existing AS Interim Measure (IM) at LC39B located at Kennedy Space Center (KSC), Florida. The existing AS system at LC39B was installed in 2017 and included 279 AS wells. LC39B has been designated as Solid Waste Management Unit (SWMU) 009 under the KSC Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Expansion of the AS IM will include installation of an additional five AS wells to depths of approximately 13 and 17 feet below land surface (bls) to remediate contaminated groundwater identified northwest of the launch pad, near the liquid oxygen (LOX) tank. The expansion will target concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC) greater than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs) that were identified during direct push technology (DPT) sampling events between 2019-2022 in shallow intervals between 8 and 16 feet bls. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to below NADCs to support transition to monitored natural attenuation (MNA) through a long-term monitoring (LTM) program. This expansion will treat approximately 0.07-acres of residual groundwater contamination. The IWP design for this expansion will utilize the existing AS system trailer that is already onsite and operating. The five new AS expansion wells will be integrated into the existing Zone Z4 distribution manifold to deliver compressed air to the new AS wells. To deliver airflow, three existing lateral lines will be split in the field at a lateral split junction point (using 2-way or 3-way splits). Each split lateral will supply air to AS wells at the same depth interval to minimize preferential pathways. The trenching layout for the new AS wells was developed to minimize ground disturbance due to the amount of utilities in the area. One new monitoring well will also be installed and added to LC39B’s performance monitoring program to evaluate the effectiveness of the AS system expansion. This well will be sampled on a semi-annual basis for volatile organic compounds, with results evaluated to determine if system adjustments may be required. The main components of this IWP were presented to the KSC Remediation Team (KSCRT) at the October 2022 Meeting (Meeting 2210-M05). DPT delineation data from the LOX area were also presented, which included some inferred boundaries due to physical restrictions of the LOX tank and associated concrete pad and infrastructure. Planned monitoring well sampling in this area will help determine if back-diffusion may be occurring from beneath the pad. Additionally, based on potential petroleum odors and staining identified at two DPT locations during the January 2022 DPT event in the 10-16 feet bls range, a KSCRT action item was assigned during the October 2022 meeting to collect soil samples for petroleum compounds if similar odors or staining are identified during IM implementation. Construction completion and performance monitoring will be incorporated into LC39B’s groundwater monitoring reports, which are currently submitted on an annual basis to FDEP to document operation and maintenance activities and results from the AS IM.

Deborah M. Wilson↗

Hunga Tonga-Hunga Ha’apai Water Vapour and Composition of the Stratospheric Polar Vortices

We investigate the impacts of water vapor from the Hunga Tonga-Hunga Ha'apai (HTHH) eruption on the Antarctic stratospheric vortices in 2022 and 2023 and the Arctic stratospheric vortex in 2022/2023. Trace gas abundances from the Aura Microwave Limb Sounder (MLS) and the Modern Era Retrospective-analysis for Research and Applications (MERRA-2) Stratospheric Composition REanalysis with Aura MLS (M2-SCREAM), along with meteorological fields from the longer MERRA-2 record, are used to detail the evolution of the stratospheric polar vortex and its composition during these winter/spring seasons. Through austral winter and spring 2022, HTHH water vapor was effectively excluded from the Antarctic vortex until it broke up. The 2022 Antarctic vortex itself was large, strong, and long-lived, but not exceptionally so. By austral fall 2023, HTHH stratospheric water vapor had spread globally, and Antarctic vortex values in the lower through middle stratosphere were over 2 ppmv higher than usual when the vortex formed; these record-shattering water vapor concentrations led to earlier polar stratospheric cloud formation and chlorine activation, especially at levels that are typically the highest altitudes for polar processing. In the 2022/2023 Arctic winter/spring, HTHH water vapor reached the Arctic vortex region after the vortex had formed and was largely excluded until a major sudden stratospheric warming in mid-February 2023 eroded the vortex and mixed midlatitude and vortex air throughout the hemisphere.

Gloria L Manney↗

TRIDENT Drill Validation at Mars and Lunar Analog Field Sites

Drilling on Earth is typically a human-intensive activity. Drilling on other planets is further complicated by the lack of prior local field surveys of their target area, hence blindly drilling into uncertain target rocks. Field conditions on the Moon or Mars are also different than for shallow drilling on Earth: lower temperatures and pressures, less power available, low masses (hence less weight-on-bit). Given the cost of transport from Earth, no drilling muds or working fluids are likely to be available to carry away cuttings. And impact-gardened regolith and dust vary mechanically and texturally from most terrestrial soils. The Regolith and Ice Drill for Exploration of New Terrains (TRIDENT) is a rotary-percussive 1m-class drill from Honeybee Robotics. It is low-power (rotary and percussive actuators are 200 W each) and lightweight (<20 kg) with the maximum weight on bit limited to 200 N. TRIDENT has been manifested for the Volatiles Investigating Polar Exploration Rover (VIPER) and PRIME-1 lunar south pole missions in 2024, has previously been field tested at a hot, dry analog site in the Atacama Desert, and in lunar conditions in thermal vacuum chamber tests. TRIDENT was also part of the 2019 Icebreaker Mars Discovery proposal, as well as in the Mars Life Explorer concept. During ARADS tests, drill control and fault recovery automation software enabled hands-off operations of a rover-mounted TRIDENT drill. TRIDENT Drill Analog Site Validation: Past TRIDENT tests in thermal vacuum (TVAC) chambers targeted containers of manufactured lunar simulants with added volatiles. 2022 TRIDENT ambient testing at NASA Ames drilled into cemented lunar simulant materials. Low cuttings-permeability led to cuttings buildup, and drill choking and binding was observed. The Atacama analog site in ARADS had desiccated unconsolidated sediments that did not challenge the TRIDENT design. However, lunar polar regolith is expected to be diverse and heterogeneous with varying clast sizes, with abundant impactites and perhaps subsurface ice deposits. Neither the simulants nor Atacama testing had completely covered the TRIDENT-targeted field characteristics, motivating further analog tests prior to the planned lunar missions. To gain more insight into the behavior of the TRIDENT hardware in diverse impactites and subsurface ice, and to verify the software automation in that environment, in August 2023 TRIDENT was brought to Haughton Crater, a field analog site in the Canadian Arctic. In September 2023 the same drill was brought to the Bishop Tuff in southern California to verify whether drilling binding behaviors previously seen in lunar simulant testing would be observed in naturally occurring fine-grained massive layers. The ~22 Ma Haughton Crater impact structure is located at 75 ̊22’ N, 89 ̊41’ W, on northwestern Devon Island, Nunavut, Canada. Numerous deposits of pale-grey crater-fill polymictic impact-melt breccia are found within the crater with a typical thickness reaching ~125 m or greater and covering ~60 km -2 . An approximately 600m-thick permafrost layer is also present with ice typically found within 0.5-0.6m of the surface. The volcanic tableland north of Bishop, CA exposes densely welded tuff laid down during the eruption that created the Long Valley Caldera at approximately 0.76 Ma. Extensional faults and the Owens River gorge expose cross-sections across the plateau. The area is viewed as an analog site for Mars features believed to be of pyroclastic origin. Results: Haughton Crater.Drilling tests were conducted 8-13 August 2023 at a previously undisturbed area separated 5-10 m from past years’ Drill Hill test sites (75.4208, -089.7613). In six days, TRIDENT drilled 8 holes to nearly 1 m depth each, totaling 7.80 m. The active layer/ice boundary was at ~67 cm depth, with a total of approximately 2.4 m drilled into ice or ice-cemented impact breccia. During drilling, five drill fault states were observed and successfully recovered. Holes 23-1, 4 and 7 were drilled under manual control, using Honeybee’s Thorax user interface. Holes 23-5, 6, and 8 were drilled with the Ames IBexec automated drilling control software. TRIDENT was observed to have little difficulty in the thawed uncemented impact breccia above the active layer boundary, but required percussion to make slower headway in the ice-cemented breccia. In Hole 23-7 (Fig.1), drilling slowed down in a massive unit just above the active-layer boundary (perhaps a large rock extending into the ice-cementation?), with only 7cm progress made in 27 minutes of high auger torque and constant percussion, leading to a choking fault and then a binding fault. A similar pattern had been observed in TRIDENT Rio Tinto test data from 2017 [6] as well as in the 2022laboratory tests.Bishop Tuff.A team from NASA Ames and the US Geological Survey deployed the same TRIDENT drill to Bishop Sites 1B and 1C (37.4203, -118.4289; 37.4265, -118.4215) on 13-16 September 2023, on the Bishop Tuff plateau. A third drill site was used 17-18 September 2023(37.4598, -118.3667) in an abandoned pumice mine. Four holes (totaling 2.5m depth) were drilled into the fine-grained, meters-thick tuff units at Sites 1B and 1C, and a further two boreholes (totaling 1.98m depth) were made at the pumice site. Drill behavior in the tuff below 10 cm depth was similar to that seen at 65-74 cm depth in Haughton Hole 23-7 (Fig. 1) and that seen in the 2022 lab simulant drilling. Drill safety torque limits were exceeded multiple times resulting in drill stops downhole. These freezes then required external added torques (with a pipe wrench) to resume rotation, to unstick the drill for withdrawal. To prevent this choking and binding behavior we found that more-frequent cuttings removal was necessary, e.g., reducing the “drill bite” size from the nominal 10 cm to 2 cm per bite --bringing the auger up to the surface more frequently, as seen in Bishop Site 1C Hole 2 (Fig.2). This permitted slow progress without drill binding and without external interventions. Conversely, TRIDENT drilling in the more porous pumice target material showed no cuttings buildup issue, and single bites as large as 40 cm were demonstrated. Discussion: We observed that TRIDENT easily penetrated unconsolidated heterogeneous soils (both above the active layer boundary at Haughton and previously in the Atacama). Cemented or consolidated targets that were cuttings-permeable (icy impact breccia, pumice) required more energy applied and percussion. However, in non-cuttings-permeable targets (welded microporous tuff, cemented simulants, boulder) TRIDENT was observed to be prone to excessive cuttings accumulation leading to choking/binding faults and stalling. The wedge cutting bit, used by TRIDENT in field tests and in its flight versions, pulverizes the target rock and creates fine cuttings that ideally are transported up the auger spirals for removal. In porous, fractured or vesicular target materials (such as at the Bishop pumice site) a significant portion of the cuttings are pushed aside, but for non-fractured, microporous targets the cuttings remain in the borehole and accumulate. Rock powder is relatively incompressible as a working fluid at only 100-200N downward force (TRIDENT limits) and hence eventual drilling progress slows or stops. Our recommended strategy for improving TRIDENT cuttings removal in massive target units with low cuttings-permeability is to reduce TRIDENT bite sizes when encountering these units, from 10cm to as little as 1-2cm, to effectively bail the accumulating cuttings. This approach was demonstrated to reduce choking and allowed slow progress to continue in cuttings-impermeable microporous target units (viz. the Bishop tuff in our September 2023 tests or cemented simulants in 2022 ambient tests).

robotic drilling↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Assessment of landscape-scale fluxes of carbon dioxide and methane in subtropical coastal wetlands of South Florida

Coastal wetlands play a significant role in the storage of “blue carbon,” indicating their importance in the carbon biogeochemistry in the coastal zone and in global climate change mitigation strategies. We present airborne eddy covariance observations of CO 2 and CH 2 fluxes collected in southern Florida as part of the NASA BlueFlux mission during April 2022, October 2022, February 2023, and April 2023. The flux data generated from this mission consists of over 100 flight hours and more than 6,000 km of horizontal distance over coastal saline and freshwater wetlands. We find that the spatial and temporal heterogeneity in CO 2 and CH 2 exchange is primarily influenced by season, vegetation type, ecosystem productivity, and soil inundation. The largest CO 2 uptake fluxes of more than 20 μmol m -2 s -1 were observed over mangroves during all deployments and over swamp forests during flights in April. The greatest CH 4 effluxes of more than 250 nmol m -2 s -1 were measured at the end of the wet season in October 2022 over freshwater marshes and swamp shrublands. Although the combined Everglades National Park and Big Cypress National Preserve region was a net sink for carbon, CH 4 emissions reduced the ecosystem carbon uptake capacity (net CO 2 exchange rates) by 11%–91%. Average total net carbon exchange rates during the flight periods were −4 to −0.2 g CO 2 -eq m -2 d -1 . Our results highlight the importance of preserving mangrove forests and point to potential avenues of further research for greenhouse gas mitigation strategies.

atmosphere↗

Overview of the Spacecraft Design for the Psyche Mission Concept

In January 2017, Psyche and a second mission concept were selected by NASA for flight as part of the 14th Discovery mission competition. Assigned for an initial launch date in 2023, the Psyche team was given direction shortly after selection to research the possibility for earlier opportunities. Ultimately, the team was able to identify a launch opportunity in 2022 with a reduced flight time to its destination. This was accomplished in large part to crosscutting trades centered on the electrical power subsystem. These trades were facilitated through the Psyche mission's planned use of Solar Electric Propulsion (SEP), which enables substantial flexibility with respect to trajectory design. In combination with low-thrust trajectory analysis tools, the team was able to robustly converge to solutions with a higher fidelity and accuracy of results. These trades also took advantage of the 1300 series product line produced by Space Systems Loral (SSL), which enabled power growth while maintaining strong system-level heritage through its modular design that has been utilized on a large number of geostationary (GEO) communications satellites. This paper presents an overview of the Psyche mission concept, and the unique architecture that enables the use of commercially developed electric propulsion and space power systems from Space Systems Loral to provide flexibility in mission design. This paper then discusses the trades that allowed the Psyche team to meet a 2022 launch date.

Prikl, Zachary↗