Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “wind cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Fixed pitch wind turbines

Wind turbines designed for fixed pitch operation offer potential reductions in the cost of the machine by eliminating many costly components. It was shown that a rotor can be designed which produces the same energy annually as Mod-0 but which regulates its power automatically by progressively stalling the blades as wind speed increases. Effects of blade twist, taper, root cutout, and airfoil shape on performance are discussed as well as various starting technqiues.

Fenn, D. B.↗

A Sounding-based Severe Weather Tool to Support Daily Operations at Kennedy Space Center and Cape Canaveral Air Force Station

People and property at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS) are at risk when severe weather occurs. Strong winds, hail and tornadoes can injure individuals and cause costly damage to structures if not properly protected. NASA's Launch Services Program and Ground Systems Development and Operations Program and other KSC programs use the daily and weekly severe weather forecasts issued by the 45th Weather Squadron (45 WS) to determine if they need to limit an activity such as working on gantries, or protect property such as a vehicle on a pad. The 45 WS requested the Applied Meteorology Unit (AMU) develop a warm season (May-September) severe weather tool for use in the Meteorological Interactive Data Display System (MIDDS) based on the late morning, 1500 UTC (1100 local time), CCAFS (XMR) sounding. The 45 WS frequently makes decisions to issue a severe weather watch and other severe weather warning support products to NASA and the 45th Space Wing in the late morning, after the 1500 UTC sounding. The results of this work indicate that certain stability indices based on the late morning XMR soundings can depict differences between days with reported severe weather and days with no reported severe weather. The AMU determined a frequency of reported severe weather for the stability indices and implemented an operational tool in MIDDS.

Hail↗

Improving large-scale testing capability by modifying the 40- by 80-foot wind tunnel

Interagency studies conducted during the last several years have indicated the need to improve full-scale testing capabilities. The studies showed that the most effective trade between test capability and facility cost was provided by repowering the existing Ames Research Center 40- by 80-foot wind tunnel to increase the maximum speed from about 100 m/s (200 knots) to about 150 m/s (300 knots) and by adding a new 24- by 37-m (80- by 120-ft) test section powered for about a 50-m/s (100-knot) maximum speed. This paper reviews the design of the facility, a few of its test capabilities, and some of its unique features.

Mort, K. W.↗

Dispersed storage and generation case studies

Three installations utilizing separate dispersed storage and generation (DSG) technologies were investigated. Each of the systems is described in costs and control. Selected institutional and environmental issues are discussed, including life cycle costs. No unresolved technical, environmental, or institutional problems were encountered in the installations. The wind and solar photovoltaic DSG were installed for test purposes, and appear to be presently uneconomical. However, a number of factors are decreasing the cost of DSG relative to conventional alternatives, and an increased DSG penetration level may be expected in the future.

Bahrami, K.↗

Optimum full-scale subsonic wind tunnel

The needs and reasons for performing full-scale subsonic research have been studied. Full-scale wind-tunnel requirements are described; recommended size, airspeed, acoustic capabilities, and flow quality are developed; and data-acquisition systems, productivity, automation, and some cost elements are discussed. It is proposed that the optimum full-scale, subsonic wind tunnel be large enough to accommodate aerodynamic and acoustic investigations on most advanced aircraft, which exhibit complex engine/lifting-surface flow-field interactions, including advanced rotorcraft.

Mort, K. W.↗

Wind loading on solar concentrators: Some general considerations

A survey was completed to examine the problems and complications arising from wind loading on solar concentrators. Wind loading is site specific and has an important bearing on the design, cost, performance, operation and maintenance, safety, survival, and replacement of solar collecting systems. Emphasis herein is on paraboloidal, two-axis tracking systems. Thermal receiver problems also are discussed. Wind characteristics are discussed from a general point of view. Current methods for determining design wind speed are reviewed. Aerodynamic coefficients are defined and illustrative examples are presented. Wind tunnel testing is discussed, and environmental wind tunnels are reviewed. Recent results on heliostat arrays are reviewed as well. Aeroelasticity in relation to structural design is discussed briefly.

Roschke, E. J.↗

Terrestrial adaptation of the thermal heliotrope.

The principle of using bimetal helical coils to cause solar arrays to track the sun in space is presently under consideration for array orientation on several spacecraft. Adaptation of this thermal heliotrope to terrestrial applications introduces additional design considerations. The dominance of solar-radiation energy input to the helical coil over convective energy losses has to be ensured, and wind effects must be minimized. As long as the cost of solar cells remains high, orientation will always result in a significant cost saving for the converter.

Fairbanks, J. W.↗

Some extemporaneous comments on our experiences with towers for wind generators

A wind generator tower must be designed to withstand fatigue forces and gust winds loads. Optimum tower height depends on the energy cost to the customer because an increase in height results in an increase in the cost of the plant. It is suggested that costs are minimum for the shortest tower possible and that the rotor should be as large as possible.

Hutter, U.↗

Constraint-based scheduling

The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

Zweben, Monte↗

Constraint-based scheduling

The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

Zweben, Monte↗

Constraint-based scheduling

The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

Zweben, Monte↗

Severe Weather Tool using 1500 UTC Cape Canaveral Air Force Station Soundings

People and property at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS) are at risk when severe weather occurs. Strong winds, hail and tornadoes can injure individuals and cause costly damage to structures if not properly protected. NASA's Launch Services Program and Ground Systems Development and Operations Program and other KSC programs use the daily and weekly severe weather forecasts issued by the 45th Weather Squadron (45 WS) to determine if they need to limit an activity such as working on gantries, or protect property such as a vehicle on a pad. The 45 WS requested the Applied Meteorology Unit (AMU) develop a warm season (May-September) severe weather tool for use in the Meteorological Interactive Data Display System (MIDDS) based on the late morning, 1500 UTC (1100 local time), CCAFS (XMR) sounding. The 45 WS frequently makes decisions to issue a severe weather watch and other severe weather warning support products to NASA and the 45th Space Wing in the late morning, after the 1500 UTC sounding. The results of this work indicate that certain stability indices based on the late morning XMR soundings can depict differences between days with reported severe weather and days with no reported severe weather. The AMU determined a frequency of reported severe weather for the stability indices and implemented an operational tool in MIDDS.

Bauman, William H., III↗

Leveraging Large Eddy Simulations to Characterize Aeroacoustic Environments on Launch Vehicles

NASA's Space Launch System (SLS) program has relied on multiple wind tunnel campaigns to predict expected aeroacoustic environments. Time, cost, Reynolds number matching, contamination from test section acoustics, and limitations in spatial resolution are all factors that impact the use experimental data for development of launch vehicle environments. Methodological and computational advances over the last decade are enabling scale resolving computational fluid dynamics (CFD) simulations to be completed that can address some the challenges with conventional datasets, enabling more complete/accurate modeling of dynamic loading events on ascent. These simulations are classified as so-called "Large-Eddy Simulations" (LES). As the name implies, these simulations seek to directly resolve the turbulence in the largest, most-energetic turbulent structures, or eddies, and the dissipation of the smallest eddies in the flow field, is modeled. Like anything else, these simulations still must undergo rigorous testing and validation for the results to ultimately be trusted in the analysis of a launch vehicle. EV33 has begun to conduct some of this early-stage testing and validation to better support NASA missions in the future.

Jonathan Boustani↗

Experimental Demonstration of a Supersonic Spike Ejector

Spike diffusers are presented as a means to improve supersonic ejector efficiency via reduction in shock losses. Design, fabrication, and testing of an articulated prototype is described. Experimental results are compared to empirical performance curves representing the loci of optimal one- and two-stage conventional ejectors driven by dry air and discharging to atmosphere. Operated at a compression ratio of ~10 with all inputs equal, the spike ejector is shown to have achieved up to 2.19X and 1.83X the secondary mass throughput of the one- and two-stage references, respectively. This suggests the potential of spike diffusers to reduce ejector operating costs by ~50%.

wind tunnel↗

Effects of Rotor Design Variations on Tiltrotor Whirl-Mode Stability

Ultimate tiltrotor performance is constrained by coupled wing/rotor whirl-mode aeroelastic instability. A multifaceted research effort to alleviate those constraints is currently underway at NASA Ames Research Center. Design changes to the XV-15 rotor created large increases in the predicted stability boundary; alternatively, they allowed large increases in pitch-flap coupling (delta-three) for a given stability margin. A wind-tunnel experiment has been proposed to demonstrate the improvements at minimum cost. The design methods are also being applied to the V-22. This report summarizes the results to date for the V-22 and compares them to those for the XV-15. A proposed small-scale wind-tunnel model of the XV-15 proprotor is described.

Acree, C. W., Jr.↗

Advancements to Wind Tunnel Testing at the Marshall Space Flight Center Aerodynamic Research Facility by the Utilization of Additively Manufactured Models

In recent years, the Aerodynamic Research Facility (ARF) at NASA’s Marshall Space Flight Center (MSFC) has heavily utilized additive manufacturing (AM) technology for the manufacturing of models for aerodynamic testing in the 14 x 14-inch Trisonic Wind Tunnel (TWT). This process change resulted in speed and cost improvements to the design and manufacture of model parts, which has provided the capability to perform parametric tests at a rapid pace with high fidelity models that are more finely detailed than previously tested. This paper outlines the model design and fabrication workflow of the ARF and the improvements made, focusing specifically on two vehicles tested. First, identical traditionally machined and AM models of a test missile configuration were tested to isolate effects of differences in manufacturing. Second, a high-fidelity model of NASA’s Space Launch System (SLS) was tested to investigate improvements in data quality possible by utilizing AM on small-scale wind tunnel tests. This paper also discusses detailed model inspections and data comparisons that were performed to prove the reliability of data across the TWT’s entire Mach range.

Ryan C Connelly↗

Operational results for the experimental DOE/NASA Mod-OA wind turbine project

The Mod-OA wind turbine project which was to gain early experience in the operation of large wind turbines in a utility environment is discussed. The Mod-OA wind turbines were a first generation design, and even though not cost effective, the operating experience and performance characteristics had a significant effect on the design and development of the second and third generation machines. The Mod-OA machines were modified as a result of the operational experience, particularly the blade development and control system strategy. The results of study to investigate the interaction of a Mod-OA wind turbine with an isolated diesel generation system are discussed. The machine configuration, its advantages and disadvantages and the machine performance and availability are discussed.

Shaltens, R. K.↗

Facility Upgrade/Replacement Tasks ('planned') at the NASA Glenn Research Center 10x10 Supersonic Wind Tunnel

Facility upgrades and large maintenance tasks needed at the NASA Glenn 10x10 Supersonic Wind Tunnel requires significant planning to make sure implementation proceeds in an efficiently and cost effective manner. Advanced planning to secure the funding, complete design efforts and schedule the installation needs to be thought out years in advance to avoid interference with wind tunnel testing. This presentation describes five facility tasks planned for implementation over the next few years. The main focus of the presentation highlights the efforts on possible replacement of the diesel generator and the rationale behind the effort.

Giriunas, Julius A.↗