Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “usability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

A multi-model assessment of global freshwater temperature and thermoelectric power supply under climate change

Water temperature is a key abiotic factor influencing aquatic ecosystem health and the services provided to both nature and humans. Global water temperature models offer possibilities to improve our understanding of water temperature regimes, which is increasingly important against the backdrop of climate change. Yet, existing studies have predominantly relied on a single model, which can lead to an incomplete representation of uncertainty and potential biases, in addition to limited insight into the range of possible future conditions, which ultimately reduces the robustness of climate impact assessments. Here, we provide a comprehensive assessment of surface freshwater temperature changes from various river and lake models for both past conditions and under future scenarios of climate change. Global models consistently simulate that surface water temperatures are currently 0.5 °C–0.8 °C higher than at the turn of the century (i.e. 1981–2000), and that warming will extend and intensify with future global change throughout the 21st century. While the strength of warming is highly sensitive to the different water temperature models, emissions scenarios and global climate models, our multi-model ensemble shows a global average annual water temperature rise of between +1.3 °C and +4.1 °C by the end of the century. To illustrate a potential societal impact of our results, we evaluate how future changes in discharge and water temperature may affect existing thermoelectric power plants, estimating average annual reductions of 1.5%–6% in global usable capacity by the end of the century. However, with river water temperatures projected to exhibit more pronounced seasonal patterns in the future—especially under the more extreme climate change scenarios and during summer months in the Northern Hemisphere—intra-annual reductions in usable capacity can be much more severe. Given the challenges associated with (large-scale) adaptation to control water temperature regimes, strong climate change mitigation is crucial for minimising water temperature rises and its associated negative impacts on humankind and ecosystems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Re-Evaluating Virtual Reality Manipulation Techniques for Precise Alignment of Complex 3D Objects

Prior research has developed a number of manipulation techniques that can achieve precise object placement in virtual reality, but studies of these techniques typically use simple objects. We conducted a study comparing two existing techniques, (AMP-IT and WISDOM), during alignment of objects with complex geometry to evaluate the potential influence of geometric complexity on performance, usability, workload and preference. Our findings indicate that participants had faster completion times and higher trial completion rates with AMP-IT on high-precision alignment tasks, contrary to earlier findings that used simple objects. Yet WISDOM is still preferred and considered more usable, despite increased workload and poorer performance, exposing participants' willingness to trade objective performance for comfort during use.

97 MATHEMATICS AND COMPUTING↗

Reliability of Copper Inverse Opal Surfaces for Extreme-Heat-Flux Micro-Coolers in Low-Global-Warming-Potential Refrigerant R-1233zd Pool Boiling Experiments

This presentation provides a brief snapshot of the InterPACK paper InterPACK2023-113781. The paper explores copper inverse opal (CIO) surface reliability in pool boiling experiments in water and a new, low-global-warming-potential (GWP = 1) hydrofluoroolefin (HFO) refrigerant R-1233zd. The CIO-based structure is intended to develop enhanced two-phase heat transfer surfaces for extreme-heat-flux (approximately 1 kW/cm2) micro-coolers. In this study, a limited number of pool boiling experiments were performed using water and HFO-1233zd fluid, and the reliability of the CIO-based surfaces was evaluated. Critical heat flux (CHF) values in HFO-1233zd at 40 Degrees Celsius to 45 Degrees Celsius saturation temperatures and the corresponding saturation pressures were also measured. The CHF values with the refrigerant are significantly lower compared to those with water, but the refrigerant allows for a wider usable temperature range in the end application of the micro-coolers and is not limited to data centers with controlled ambient conditions. Reliability experiments with CIO surface samples - involving pool boiling with water on the CIO surfaces for approximately 48 hours and with HFO-1233zd for 144 hours - showed no structural degradation of the enhanced surface or any significant performance drop in heat transfer coefficients. The CIO surface samples in water were oxidized, most likely due to the presence of air in water and in the experimental vessel.

critical heat flux↗

The Scale and Activity of Symmetric Instability Estimated from a Global Submesoscale-Permitting Ocean Model

Abstract Symmetric instability (SI) extracts kinetic energy from fronts in the surface mixed layer (SML), potentially affecting the SML structure and dynamics. Here, a global submesoscale-permitting ocean model named MITgcm LLC4320 simulation is used to examine the Stone linear prediction of the maximum SI scale to estimate grid spacings needed to begin resolving SI. Furthermore, potential effects of SI on the usable wind work are estimated roughly: this estimate of SI “activity” is useful for assessing if these modes should be resolved or parameterized. The maximum SI scale varies by latitude with median values from 568 to 23 m. Strong seasonality is observed in the SI scale and activity. The median scale in winter is 188 m globally, 2.5 times of that of summer (75 m). SI is more active in winter: 15% of the time compared with 6% in summer. The strongest SI activity is found in the western Pacific, western Atlantic, and Southern Oceans. The required grid spacings for a global model to begin resolving SI eddies in the SML are 24 m (50% of regions resolved) and 7.9 m (90%) in winter, decreasing to 9.4 m (50%) and 3.6 m (90%) in summer. It is also estimated that SI may reduce usable wind work by an upper bound of 0.83 mW m −2 globally, or 5% of the global magnitude. The sensitivity of these estimates to empirical thresholds is provided in the text.

Dong, Jihai↗

Reliability of Open Public Electric Vehicle Direct Current Fast Chargers

The aim was to systematically evaluate the usability of all public electric vehicles (EV) direct current fast chargers (DCFC) in the San Francisco region. To achieve a rapid transition to EVs, a highly reliable and easy to use charging infrastructure is critical to building confidence among consumers. The functionality and usability of all 182 open, public DCFC charging stations with CCS connectors (combined charging system) in the 9 counties of the Bay Area were tested (655 electric vehicle service equipment (EVSE) ports). An EVSE was classified as functional if it charged an EV for 2 minutes. Overall, 73.3% of the 655 EVSEs were functional. The causes of the nonfunctioning EVSEs (23.5%) were blank or unresponsive screens or error messages; payment system failures; charge initiation failures; network failures; or broken connectors. In addition, the cable was too short to reach the EV inlet for 3.2% of the EVSEs. A random sampling of 10% of the EVSEs, approximately 8 days after the first evaluation, found no overall change in functionality. The level of functionality found with field testing conflicts with the 95–98% uptime reported by the EV service providers (EVSPs) who operate the EV charging stations. There is a need for precise and verifiable definitions of uptime, downtime, and excluded time, as applied to public EV chargers. In conclusion, the level of failure of the existing public EV DCFC charge infrastructure highlights the importance of improving the system design and maintenance to improve adoption of EVs.

33 ADVANCED PROPULSION SYSTEMS↗

ECP libraries and tools: An overview

The Exascale Computing Project (ECP) Software Technology and Co-Design teams addressed the growing complexities in high-performance computing (HPC) by developing scalable software libraries and tools that leverage exascale system capabilities. As we enter the exascale era, the need for reusable, optimized software solutions that can handle the unique challenges posed by these systems becomes increasingly important. The primary challenges the ECP teams faced were to create software libraries and tools that are performant on exascale architectures and portable and usable across diverse hardware platforms. Efforts addressed issues related to concurrent execution, memory management, and the integration of heterogeneous computing resources, such as GPUs from multiple vendors. The ECP’s strategy involved a structured development process encompassing the creation, optimization, and deployment of software in collaboration with industry, academia, and national laboratories. The project was organized into several technical areas: co-design of domain-specific suites with target applications, programming models and runtimes, development tools, mathematical libraries, data and visualization tools, and software ecosystem and delivery mechanisms. ECP has successfully developed a large portfolio of software libraries and tools that demonstrate significant improvements in performance and scalability on exascale systems. These products have been integrated into the Department of Energy’s computing facilities, supporting various scientific applications and ensuring robust performance across different hardware setups. ECP advancements in software development for exascale computing highlight the importance of a collaborative and adaptive approach to handling next-generation HPC systems complexities. The lessons learned emphasize the need for continuous engagement with end-users and vendors, and the importance of maintaining a balance between innovation and practical implementation. Future efforts will focus on ensuring scalability, keeping pace with rapid hardware advancements, and further enhancing the interoperability and usability of the software ecosystem. In conclusion, subsequent articles in this special issue provide in-depth discussions and case studies into specific library and tool efforts.

97 MATHEMATICS AND COMPUTING↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An Integrated Energy Systems Prototype Human-System Interface for a Steam Extraction Loop System to Support Joint Electricity-Hydrogen Flexible Operations

Due to increasing economic competition from renewables and combined-cycle natural gas plants, nuclear power plants are looking toward flexible operations to enhance their cost competitiveness. The Integrated Energy Systems project under the Light Water Reactor Sustainability program of the U.S. Department of Energy focuses on joint electricity-hydrogen flexible operations. Joint electricity-hydrogen flexible operations entail the nuclear power plant diverting thermal energy via main steam to a hydrogen production plant located nearby. The steam serves to enhance the efficiency of the hydrogen production. Furthermore, high temperature electrolysis requires a large amount of electricity, which the plant can also provide. The plant provides steam and electricity to the hydrogen plant throughout the day, but during peak demand hours the nuclear power plant returns to solely providing electricity to meet the high demand. Through this flexible concept of operations, the plant can optimize the thermal energy it produces without having to maneuver the power of the plant. This report documents the human factors process to design and develop a prototype human-system interface for the steam extraction loop that serves as the conduit between the nuclear power plant and the adjacent hydrogen plant. The design process followed the human factors guidelines set by NUREG-0711, Human Factors Engineering Program Review Model (O’Hara, Higgins, & Fleger, 2012), and expanded upon by the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE; Boring, Ulrich, Joe, & Lew, 2015; Boring, Lew, & Ulrich, 2016). The design process entailed operator interviews to determine the concept of operations for the steam extraction loop, a review and adaptation of digital interface design concepts developed by the team in prior projects, an iterative design process, and reviews conducted by both operators and human factors experts. Several versions of the prototype human-system interface were developed. Operators were interviewed to determine what design features they found useful and would like to see in the interface. The design underwent a review by human factors experts against NUREG-0700, Human Interface Design Review Guidelines (U.S. Nuclear Regulatory Commission, 2019), to ensure compliance with the latest human factors standards for digital interfaces in nuclear applications. The design was then prototyped as a functional windows-based application integrated with the Generic Pressurized Water Reactor simulator modified to include the steam extraction loop. The simulation is supported by the Human Systems Simulation Laboratory at Idaho National Laboratory, which supports operator-in-the-loop testing. This is an ongoing project and the next phase of the project entails performing an operator-in-the-loop usability study to evaluate the interface and examine the proposed concept of operations to extraction steam from the nuclear power plant for delivery to the coupled hydrogen production plant.

99 GENERAL AND MISCELLANEOUS↗

Towards Unlocking Insights from Logbooks Using AI

Electronic logbooks contain valuable information about activities and events concerning their associated particle accelerator facilities. However, the highly technical nature of logbook entries can hinder their usability and automation. As natural language processing (NLP) continues advancing, it offers opportunities to address various challenges that logbooks present. This work explores jointly testing a tailored Retrieval Augmented Generation (RAG) model for enhancing the usability of particle accelerator logbooks at institutes like DESY, BESSY, Fermilab, BNL, SLAC, LBNL and CERN. The RAG model uses a corpus built on logbook contributions and aims to unlock insights from these logbooks by leveraging retrieval over facility datasets, including discussion about potential multimodal sources. Our goals are to increase the FAIR-ness (findability, accessibility, interoperability, and reusability) of logbooks by exploiting their information content to streamline everyday use, to enable macro-analysis for root cause analysis, and to facilitate problem-solving automation.

43 PARTICLE ACCELERATORS↗

Assessment of tank designs for hydrogen storage on heavy duty vehicles using metal hydrides

The objective of this project was to evaluate material-based hydrogen storage solutions as a replacement for high-pressure hydrogen gas or liquid hydrogen on Class 7 or 8 tractor fuel cell electric vehicles. The project focused on low-density main-group hydrides, a well-known class of materials for hydrogen storage. Prior research has considered metal amides as storage materials for light-duty vehicles but not for heavy-duty applications. The project established the basis for further development of storage systems of this type for heavy duty vehicles (HDV). Systems analysis of an HDV storage system comprised of a tank and associated balance of plant (piping, coolant tubes, burner) was performed to determine the usable hydrogen capacity. A composite storage material comprised of a metal hydride mixed with a high thermal-conductivity carbon is predicted to have a usable hydrogen volumetric capacity comparable to or exceeding that of 700 bar pressurized hydrogen gas. The gravimetric capacity of this material is also predicted to be competitive with pressurized gas, particularly if costly carbon fiber composite Type III or Type IV tanks are excluded. The storage system design parameters and material properties served as inputs to a second model that simulates fuel cell operation in conjunction with the storage system during an HDV drive cycle. The results show that sufficient hydrogen pressure can be produced to operate a Class 8 HDV, yielding a range of ~480 miles. These results are particularly relevant for high-impact regions, such as the South Coast Air Quality Management District, for which an economical vehicular hydrogen storage system with minimal impact on cargo capacity could accelerate adoption of heavy-duty fuel cell electric vehicles. An additional benefit is that knowledge generated by this project can assist in development of material-based storage for stationary applications such as microgrids and backup power for data centers.

08 HYDROGEN↗

Woody Feedstock 2022 State of Technology Report

The U.S. Department of Energy promotes production of advanced liquid transportation fuels from lignocellulosic biomass by funding fundamental and applied research that advances the state of technology (SOT). As part of its involvement in this mission, Idaho National Laboratory completes an annual SOT report for n th -plant and 1 st -plant woody biomass feedstock logistics. The purpose of the SOT is to provide the status of feedstock supply system technology development for woody biomass to biofuels relative to technical targets and cost goals from specific design cases, based on data and experimental results. Conventional feedstock supply systems need to be modified to meet the demands of conversion pathways, specifically to have the ability to adjust the quality of the raw biomass materials. Advanced systems incorporate innovative methods of material handling, preprocessing and supply chain configuration. In advanced designs, variability of the raw biomass can be reduced to produce feedstocks of a uniform format, moving toward biomass commoditization. Against this backdrop, the 2022 Woody SOT for low-ash woody feedstocks utilizes feedstock fractionation by incorporating technologies that can separate the biomass into its anatomical fractions (wood, bark, needle, and extrinsic ash) to reduce impurities and attempt to maximize the retention of usable fractions that satisfy downstream quality considerations. By using a series of air classification steps, this strategy can reduce the extrinsic ash in forest residues, separate out a majority of the incoming needles (which can be supplied to alternate markets), and maximize the retention of whitewood in the usable fraction. The fractionated forest residues are then mixed with clean-pine chips in a 50-50 blend to prepare the feedstock for the desired conversion pathway. The n th -plant analysis estimated the delivered cost for the feedstock at $\$$69.23/dry ton (2016$\$$) which represents a $\$$6.64/dry ton decrease compared to the cost estimate of the 2021 Woody SOT supply system for low-ash woody feedstocks. The quality requirements in the 2022 Woody SOT were identical to those of the 2021 Woody SOT at = 1.00 wt % ash and = 50.51 wt% carbon. The cost savings derive primarily from reductions in dry matter losses during air classification. The GHG emissions for the n th -plant analysis were estimated at 178.39 kg CO2e/dry ton compared to 178.71 kg CO 2 e/dry ton in the 2021 Woody SOT, a decrease of 0.32 kg CO2e/dry ton. The small change stems from an increase in emissions attributed to preprocessing and slightly larger savings in emissions from transportation. In the 1 st -plant analysis of the 2022 Woody SOT system, the average throughput was estimated to be approximately 2,128 dry tons/day or 96.51% of the name plate capacity. During the simulation the daily throughput ranged from 1,090 dry tons/day to 2,200 dry tons/day, or 49.43% to 99.75% of the daily nameplate capacity. After the year of operation 722,403 tons of processed feedstock were produced in total without regard to quality considerations (99.64% of the annual nameplate capacity). The variability in throughput was primarily caused by equipment failures in the system. Regular failures, downtime caused by routine maintenance per manufacturer guidelines, contributed to a majority 62.50% of failures and 62.60% of downtime. Failures due to wear were the other cause of disruption within the system, impacting the rotary shear and orbital screen and accounting for 37.50% of the failures and 37.40% of the total downtime. Ultimately the system was on stream for 87.84% during the simulation period, which is only 2.16 percentage points below the nth-plant assumption for on-stream time. The production cost of the system averaged $\$$71.66/dry ton. The costs ranged from a minimum of $\$$71.23/dry ton to a maximum of $\$$2,115.30/dry ton. When dry matter losses (disposed low-quality fractions as well as other losses such as in grinders) were considered the costs increased to an average of $\$$75.11/dry ton with a minimum of $\$$74.69/dry ton and a maximum of $\$$2,136.86/dry ton...

09 BIOMASS FUELS↗

ARC Software Validation Work for the FFTF Reactor

Extensive efforts have been carried out at ANL for the verification and validation of the Argonne Reactor Codes (ARC) software package currently used for the design of Versatile Test Reactor (VTR). The ARC software package consists of steady state neutronics and thermal hydraulics modeling capabilities which are being used by the VTR program to develop most of the VTR reactor design details which will be part of the licensing application. It is anticipated that this software will continue to be used for the design work and for initial operations although additional software may be introduced at a later time. The validation work was focused primarily on obtaining validation data consistent with VTR and usable for the ARC software. Because no critical facilities or operating fast spectrum reactors are available to do experiments for the VTR, the next best option is to identify historical experimental data that can be used as validation data. Early on in VTR, the ZPPR-15 set of experiments was identified as good validation data because of 1) the availability and quality of the data, 2) existing staff that are already familiar with the experimental machine and measurements, 3) most of the ZPPR-15 loadings of interest have already been processed into ARC models, and 4) a full uncertainty quantification has already been done for several loadings of ZPPR-15. The FFTF startup and operations data was identified as the most consistent reactor type that has validation data usable for VTR. Finally, the EBR-II fuel depletion measurements were identified as the best available validation data for VTR. It is important to note that both the FFTF and EBR-II reactors typically come with higher uncertainties than the ZPPR. In the frame of the discussed verification and validation efforts, the present document discusses the analysis of selected FFTF measurements included in the benchmark specifications of the International Reactor Physics Experiment (IRPhE) handbook. The FFTF reactor core configurations from the benchmark specification are presented in Section 2. The analysis is performed with the use of the ARC code suite available at ANL for fast reactor studies and is discussed in Section 3. The reactor parameters from the benchmark include criticality, neutron spectra, effective delayed neutron spectra, control rod worth, isothermal temperature coefficient and low energy gamma-ray spectra. The calculated values and the comparison with the experimental data is discussed in Sections 4 to 9 for each considered reactor parameter. Finally, conclusions are presented in Section 10.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Practical Probabilistic Programming

Recent advances in probabilistic programming languages (PPLs) have provided the capability for exact inference: computing a closed-form probability distribution for a given probabilistic program. In particular, the new language Roulette uses a language oriented programming (LOP) approach, wherein analysts build new programming languages on top of a set of primitives provided by Roulette, which then translates these structures into a weighted model counting problem which can be solved by automated reasoning tools. However, because Roulette provides few convenience features, developing these new languages is challenging even for expert users. We developed a standard library of common probability functions for Roulette with the goal of improved usability. This included approximation of continuous probability density functions using discrete probability mass functions. We demonstrated this approach by modeling a cosmic ray striking a RAM controller. We found that Roulette provides a powerful interface for highly expressive probabilistic programs to be generated. In collaboration with the NNSA Advanced Simulation and Computing program, which resulted in development of a tool called Circulette, we were able to model complex circuits expressed in Verilog using probabilistic programs with an expressivity not previously possible. Our research question that motivated the development of a Roulette standard library was to determine whether non-experts could use a PPL to model relevant problems regarding radiation effects on microelectronics. This standard library improved the expressivity of Roulette by implementing common probability density functions, mathematical operators on distributions, and support for empirical distributions. While Roulette is a powerful modeling language, the untyped, LOP approach makes error messages difficult to understand and requires expert aid. We recommend further research on Roulette, especially with its error messages, to enable improved usability. At the same time, this project demonstrated that for users familiar with Roulette and the LOP approach, Roulette provides powerful new capabilities that can be integrated with other Sandia modeling capabilities.

97 MATHEMATICS AND COMPUTING↗

Development of Large Bore Rabbit Capsules in Support of BWR Cladding Irradiations in HFIR

The High Flux Isotope Reactor (HFIR) is an ideal tool for materials irradiation testing because of its intense steady-state neutron flux. Many programs take advantage of HFIR’s central flux trap for irradiation experiments using capsules, also known as rabbits, to support advanced materials development and reactor design. The facility that makes up the HFIR flux trap has recently undergone a design change that increases the HFIR primary coolant volumetric flow rate by removing restrictions in the system. As a result, the usable cross-sectional area within the facility increased, opening the door to increase the cross-sectional area of the rabbit capsules that fill the facility. This report documents a new large-diameter rabbit housing that increases the usable volume within the rabbit capsule by 22.6%. However, challenges arise with increasing the capsule size, such as establishing a new maximum capsule operating pressure and determining the thermal-hydraulic characteristics. This report addresses those challenges with previously adopted HFIR safety methods. The rupture pressure of the rabbit housings is demonstrated while verifying that capsule swelling during and after rupture will not block coolant flow. Then, a safety factor is applied to ascertain an administrative operating pressure. Additionally, the thermal-hydraulic performance of the HFIR facility filled with large-diameter rabbit capsules is shown to not violate previously determined safety criteria. Next, heat transfer coefficients are determined for use in design calculations. Furthermore, this report gives an example of internal configurations for the new, larger rabbit capsules that use relevant boiling water reactor (BWR) cladding geometry. Finally, this report documents an example thermal design performance for a rabbit capsule containing six gauge-curved tensile tube specimens. The thermal performance gives predicted temperature distributions within the capsule and shows the expected temperature of the passive thermometers for post-irradiation temperature comparisons.

99 GENERAL AND MISCELLANEOUS↗

Development of Large Bore Rabbit Capsules in Support of BWR Cladding Irradiations in HFIR

The High Flux Isotope Reactor (HFIR) is an ideal tool for materials irradiation testing because of its intense steady-state neutron flux. Many programs take advantage of HFIR’s central flux trap for irradiation experiments using capsules, also known as rabbits, to support advanced materials development and reactor design. The facility that makes up the HFIR flux trap has recently undergone a design change that increases the HFIR primary coolant volumetric flow rate by removing restrictions in the system. As a result, the usable cross-sectional area within the facility increased, opening the door to increase the cross-sectional area of the rabbit capsules that fill the facility. This report documents a new large-diameter rabbit housing that increases the usable volume within the rabbit capsule by 22.6%. However, challenges arise with increasing the capsule size, such as establishing a new maximum capsule operating pressure and determining the thermal-hydraulic characteristics. This report addresses those challenges with previously adopted HFIR safety methods. The rupture pressure of the rabbit housings is demonstrated while verifying that capsule swelling during and after rupture will not block coolant flow. Then, a safety factor is applied to ascertain an administrative operating pressure. Additionally, the thermal-hydraulic performance of the HFIR facility filled with large-diameter rabbit capsules is shown to not violate previously determined safety criteria. Next, heat transfer coefficients are determined for use in design calculations. Furthermore, this report gives an example of internal configurations for the new, larger rabbit capsules that use relevant boiling water reactor (BWR) cladding geometry. Finally, this report documents an example thermal design performance for a rabbit capsule containing six gauge-curved tensile tube specimens. The thermal performance gives predicted temperature distributions within the capsule and shows the expected temperature of the passive thermometers for post-irradiation temperature comparisons.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Methodology for Evaluating Operator Usage of Machine Learning Recommendations for Power Grid Contingency Analysis

This work presents the application of a methodology to measure domain expert trust and workload, elicit feedback, and understand the technological usability and impact when a machine learning assistant is introduced into contingency analysis for real-time power grid simulation. The goal of this framework is to rapidly collect and analyze a broad variety of human factors data in order to accelerate the development and evaluation loop for deploying machine learning applications. We describe our methodology and analysis, and we discuss insights gained from a pilot participant about the current usability state of an early technology readiness level (TRL) artificial neural network (ANN) recommender.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Ocean Energy: Markets - Currency - Impact. Dimension of & Choices in the Technology Development Space: Preprint

This paper presents considerations of the employment of ocean wave energy to support different energy demand side applications. The key aspect in these considerations is the wave energy supported achievable positive impact and associated tangible contribution in service of common societal good and of the natural commons. The level of impact that can be delivered is dependent on both, the level of contribution of the supported energy use application, and the compatibility and unique suitability of the wave energy resource and its characteristics with the needs of the application. Thus, a variety of ocean wave energy markets, the key value indicators or "currency' in which these markets trade the value delivered and the achievable positive impact, are reflected upon. Ocean wave energy supported acquisition of high quality ocean system data across a wide spectrum of system properties is identified as a highly impactful application enabling and/or improving a comprehensive range of impactful ocean system activities. The technology development process towards these markets and desired impacts requires relevant technology development progress guidance and metrics. Going beyond technology readiness levels and technology performance levels, the notion of further technology development progress scales towards high impact and high contribution are proposed. These scales and the associated technology properties can be regarded as additional technology development dimensions to span-up the technology development space in which desired system capability and functional requirement choices and subsequent ideation, innovation, research and technology development decisions can and are to be made.

data market↗

Near-infrared Spectral Characterization of Solar-type Stars in the Northern Hemisphere

Although solar-analog stars have been studied extensively over the past few decades, most of these studies have focused on visible wavelengths, especially those identifying solar-analog stars to be used as calibration tools for observations. As a result, there is a dearth of well-characterized solar analogs for observations in the near-infrared, a wavelength range important for studying solar system objects. We present 184 stars selected based on solar-like spectral type and V−J and V−K colors whose spectra we have observed in the 0.8–4.2 μm range for calibrating our asteroid observations. Each star has been classified into one of three ranks based on spectral resemblance to vetted solar analogs. Of our set of 184 stars, we report 145 as reliable solar-analog stars, 21 as solar analogs usable after spectral corrections with low-order polynomial fitting, and 18 as unsuitable for use as calibration standards owing to spectral shape, variability, or features at low to medium resolution. We conclude that all but five of our candidates are reliable solar analogs in the longer wavelength range from 2.5 to 4.2 μm. The average colors of the stars classified as reliable or usable solar analogs are V−J = 1.148, V−H = 1.418, and V−K = 1.491, with the entire set being distributed fairly uniformly in R.A. across the sky between −27° and +67° in decl.

79 ASTRONOMY AND ASTROPHYSICS↗