Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “units”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Submicrosecond time transfer between the United States, United Kingdom, and Australia via satellite

During 1972 time transfer experiments were run between the U.S. Naval Observatory and the Royal Greenwich Observatory and, in 1973, between the U.S. Naval Observatory and the Division of National Mapping in Canberra, Australia. In both cases the time transfer agent was the TIMATION 2 satellite, 1969-82B. The satellite ephemerides were computed from data provided by the Defense Mapping Agency TRANET. This net tracked the satellite's Doppler transmissions. The phase of the satellite clock was determined from knowledge of the position of the satellite and of the observer and the computed distance between the two. By monitoring the clock on successive passes the rate of the satellite clock was determined at Washington. By again monitoring the satellite clock at the distant station the satellite clock could be compared to the local clock and this local clock compared to the U.S. Naval Observatory clocks. In 1972 the RMS of observations at Greenwich deviated by approximately 1/4 microsecond from a straight line when compared to the Naval Observatory. In 1973 the observation errors at Canberra were approximately half as great.

Easton, R. L.↗

Microcoding of communications in accident investigation - Crew coordination in United 811 and United 232

Two recent airline accidents that underscored the value of cockpit resource management (CRM) to line operations, especially under stressful, high workload conditions are reviewed. An analysis of the verbal behavior of each crew was conducted to explore how catastrophic events impact upon the dynamics of crew interaction. In both cases the Captain stated that training in CRM contributed significantly to the overall effectiveness of the crews.

Predmore, Steven C.↗

Energy management system, method of controlling one or more energy storage devices and control unit for one or more power storage units

Systems, methods and apparatuses are provided for reducing peak energy demand and to smooth intermittent energy profiles from onsite variable energy sources and loads. Some embodiments use system level and device level analysis and optimization to adaptively adjust the operation of a behind the meter energy storage (BMES) to smooth out energy generation variabilities and follow a reference load signal, including at short time resolutions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Federal Emergency Management Agency Mobile Housing Unit Running Gear Testing (Final Report)

The Federal Emergency Management Agency (FEMA) stages manufactured housing units (MHUs) at key locations to be used during disasters when other housing accommodations cannot be arranged for individuals or families. Due to the unpredictability of natural disasters and the limitations of the manufactured housing industry to produce large numbers of MHUs in very short periods of time, it is necessary for FEMA to store a large number of units for many months or years. With these long storage periods come degradation issues with frames, tires, bearing, and braking systems. These types of issues are also of interest to the U.S. Department of Transportation (DOT) Federal Motor Carrier Safety Administration (FMCSA) because regulated carriers normally transport these units and 49 CFR 393.75 Tires specifies tire loading restrictions for manufactured homes. To compare the running gear (tires, brakes, drums, bearings, axles, springs, and spring mounting hardware) currently specified in the 2014 Rugged Based Performance Requirements (RBPR) and the newly recommended running gear specified in the upcoming revision to the RBPR, the Oak Ridge National Laboratory (ORNL) outlined a Longevity Test Plan, which focused on the assessment of component longevity (failure rates by component type). The Test Plan also studied the forces imparted to the MHU from the running gear from interaction with the roadway for both the running gear in the 2014 RBPR and the running gear specified in the upcoming RBPR revision. Since the assessment of component longevity and failures are also issues of concern for FMCSA, both agencies collaborated to support the research presented in this report. The tests and data collection were conducted at the Navistar Proving Grounds (NPG) in New Carlisle (near South Bend), Indiana, during the May-November 2018 period. Four alternatives for the suspension system of a typical three-bedroom MHU were considered in this test. Alternative 0 was the MHU that was selected from the FEMA staging area in Selma, Alabama. Empirical data had shown that, on average, this alternative experiences one tire failure every 150 miles (or 0.0067 tire failures per mile traveled). Before testing, Alternative 0 was equipped with similar running gear hardware, although in new condition and installed following the manufacturer’s specifications. This became the Baseline Unit, or Alternative 1. Another unit, also selected from the FEMA staging area in Selma, Alabama, was equipped with better axles (i.e., axles that were rated for 7,000lbs as opposed to 6,000lbs for the Baseline Unit) and better tires. This became the Upgrade Unit, or Alternative 2. At the end of the Longevity Test, the Upgrade Unit was mounted with radial tires. This became Alternative 3.Alternative 1 (Baseline Unit) had, on average, one tire failure every 251 miles (or 0.0040 tire failures per mile traveled). So, by simply following the correct manufacturer’s specifications for the assembly of the transportation system, a reduction of 41% in the per mile tire failure was achieved. In the same test, Alternative 2 (Upgrade Unit) showed, on average, one tire failure every 728 miles traveled (or 0.0014 tire failure s per mile traveled). When the Upgrade Unit was mounted with radial tires in the last part of the test, no tire failures were observed for the 2,400 miles tested. That is, in the case of the radial tires (Alternative 3) the tire failure was less than one per 2,400 miles traveled (or less than 0.0004 tire failures per mile traveled). The data collected for the Longevity Test showed that the maximum accelerations were registered in all cases at the center of the MHU in the vertical direction. The overall maximum was registered by the Baseline Unit, Alternative 1. If that value is normalized to 100%, then the Upgrade Unit (Alternative 2) showed, on average, 81% at the same location, and Alternative 3 (radial-tire test) 59%. That is, the upgraded transportation system showed a reduction of 19% and 41% in the vertical accelerations transmitted to MHU at its center when regular and radial tires, respectively, were used. As part of the Test Protocol, NPG conducted a visual inspection of the MHUs and transportation system at the end of each test day. ORNL reviewed all the inspection reports in an attempt to determine if there was any difference in the damage that the Baseline and Upgrade MHUs showed during the test. The Upgrade Unit always showed lower accelerations transmitted to the MHU than the Baseline Unit. In most cases, these differences were statistically significant. The FEMA inspection report, conducted by a FEMA certified inspector at the end of the tests, included a shorter list of damaged items for the Baseline Unit than for the Upgrade Unit, although similar type of damages was described for both units. This may be an indication that, although lower than those of the Baseline Unit, the accelerations transmitted by the Upgrade Unit were above the threshold at which MHU elements start to fail.

42 ENGINEERING↗

Incorporating FLEX Strategies in Multi-Unit Probabilistic Risk Assessment

The catastrophic Fukushima nuclear accident reminded nuclear community about the possibilities of extreme accident scenarios, including those involving multiple reactor units on the same site. As the responses to the Fukushima accident, the nuclear power industry developed and implemented a series of strategies, including the Diverse and Flexible Coping Strategies (FLEX), to enhance the coping capacities of nuclear power plants (NPPs) under extreme accidents. This study intends to examine the impact of FLEX strategies on the risk from all the reactor units on the same NPP site, including risks from accidents involving a single unit and from accidents involving multiple units. The fundamental, methodological element of this study is Multi-Unit Probabilistic Risk Assessment (MUPRA), which requires a shift in Probabilistic Risk Assessment (PRA) from a “one-reactor-at-a-time” mindset to a “considering all reactors sharing a site as a unity” one. An integrated modeling approach for multi-unit event sequence development will be leveraged to develop MUPRA model and address the intra-unit and inter-unit dependencies. Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE), a PRA software developed and maintained by Idaho National Laboratory (INL) for the U.S. Nuclear Regulatory Commission (NRC), will serve as the platform for MUPRA modeling. This study selects Loss Of Offsite Power (LOOP) as a representative initiating event, which may occur on a generic two-unit NPP site and impacts both reactor units on the site. First, an MUPRA model, including multi-unit event trees, will be developed to obtain single-unit and multi-unit accident scenarios. Next, different FLEX strategies will be assumed, including FLEX equipment for a unit cannot be used for another unit, FLEX equipment for multiple units can be used in a cross-connected manner, etc. Lastly, the effectiveness of each postulated FLEX strategy will be evaluated by incorporating the corresponding FLEX equipment and deployment logic in the MUPRA model.

99 GENERAL AND MISCELLANEOUS↗

Combustion systems and power plants incorporating parallel carbon dioxide capture and sweep-based membrane separation units to remove carbon dioxide from combustion gases

Disclosed herein are combustion systems and power plants that incorporate sweep-based membrane separation units to remove carbon dioxide from combustion gases. In its most basic embodiment, the invention is a combustion system that includes three discrete units: a combustion unit, a carbon dioxide capture unit, and a sweep-based membrane separation unit. In a preferred embodiment, the invention is a power plant including a combustion unit, a power generation system, a carbon dioxide capture unit, and a sweep-based membrane separation unit. In both of these embodiments, the carbon dioxide capture unit and the sweep-based membrane separation unit are configured to be operated in parallel, by which we mean that each unit is adapted to receive exhaust gases from the combustion unit without such gases first passing through the other unit.

20 FOSSIL-FUELED POWER PLANTS↗