Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “transmission deployment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Survey of timing/synchronization of operating wideband digital communications networks

In order to benefit from experience gained from the synchronization of operational wideband digital networks, a survey was made of three such systems: Data Transmission Company, Western Union Telegraph Company, and the Computer Communications Group of the Trans-Canada Telephone System. The focus of the survey was on deployment and operational experience from a practical (as opposed to theoretical) viewpoint. The objective was to provide a report on the results of deployment how the systems performed, and wherein the performance differed from that predicted or intended in the design. It also attempted to determine how the various system designers would use the benefit of hindsight if they could design those same systems today.

Mitchell, R. L.↗

PowerSat: A technology demonstration of a solar power satellite

PowerSat is a preliminary design strategy for microwave wireless power transfer of solar energy. Solar power satellites convert solar power into microwave energy and use wireless power transmission to transfer the power to the Earth's surface. The PowerSat project will show how new developments in inflatable technology can be used to deploy solar panels and phased array antennas.

Sigler, Douglas L.↗

Generalization Across Experimental Parameters in Neural Network Analysis of High-Resolution Transmission Electron Microscopy Datasets

Neural networks are promising tools for high-throughput and accurate transmission electron microscopy (TEM) analysis of nanomaterials, but are known to generalize poorly on data that is “out-of-distribution” from their training data. Given the limited set of image features typically seen in high-resolution TEM imaging, it is unclear which images are considered out-of-distribution from others. Here, we investigate how the choice of metadata features in the training dataset influences neural network performance, focusing on the example task of nanoparticle segmentation. We train and validate neural networks across curated, experimentally collected high-resolution TEM image datasets of nanoparticles under various imaging and material parameters, including magnification, dosage, nanoparticle diameter, and nanoparticle material. Overall, we find that our neural networks are not robust across microscope parameters, but do generalize across certain sample parameters. Additionally, data preprocessing can have unintended consequences on neural network generalization. Our results highlight the need to understand how dataset features affect deployment of data-driven algorithms.

42 ENGINEERING↗

The space station tethered elevator system

The optimized conceptual engineering design of a space station tethered elevator is presented. The elevator is an unmanned mobile structure which operates on a ten kilometer tether spanning the distance between the Space Station and a tethered platform. Elevator capabilities include providing access to residual gravity levels, remote servicing, and transportation to any point along a tether. The potential uses, parameters, and evolution of the spacecraft design are discussed. Engineering development of the tethered elevator is the result of work conducted in the following areas: structural configurations; robotics, drive mechanisms; and power generation and transmission systems. The structural configuration of the elevator is presented. The structure supports, houses, and protects all systems on board the elevator. The implementation of robotics on board the elevator is discussed. Elevator robotics allow for the deployment, retrieval, and manipulation of tethered objects. Robotic manipulators also aid in hooking the elevator on a tether. Critical to the operation of the tethered elevator is the design of its drive mechanisms, which are discussed. Two drivers, located internal to the elevator, propel the vehicle along a tether. These modular components consist of endless toothed belts, shunt-wound motors, regenerative power braking, and computer controlled linear actuators. The designs of self-sufficient power generation and transmission systems are reviewed. Thorough research indicates all components of the elevator will operate under power provided by fuel cells. The fuel cell systems will power the vehicle at seven kilowatts continuously and twelve kilowatts maximally. A set of secondary fuel cells provides redundancy in the unlikely event of a primary system failure. Power storage exists in the form of Nickel-Hydrogen batteries capable of powering the elevator under maximum loads.

Anderson, Loren A.↗

Advanced Transmission Technologies (ATTs) Supplier Cohort Workshops Cohort Summary [Slides]

This Summary slide deck summarizes the key outcomes of the Advanced Transmission Technologies (ATTs) supplier cohort, part of Idaho National Laboratory’s (INL) Technical Assistance for Digital Assurance (TADA) program. The program aimed to strengthen grid resilience through cybersecurity controls, supply-chain security, and Cyber-Informed Engineering (CIE) for advanced transmission technologies. The cohort brought together vendors representing the full range of Grid-Enhancing Technologies (GETs), including providers of Dynamic Line Ratings (DLR), Advanced Power Flow Control (APFC), Transmission Topology Optimization (TTO), and High-Performance Conductors (HPCs). Discussions focused on institutional, integration, and operational barriers limiting GET adoption; cybersecurity risks at EMS/SCADA, cloud, and network integration points; and supply-chain transparency issues such as semiconductor dependence and SBOM/HBOM expectations. Participants also addressed operator trust, human-in-the-loop requirements, and challenges with utility adoption, while exploring how CIE can support secure deployment of GETs. This deck represents a consolidated summary of challenges and risks identified by vendors, cross-cutting themes and technology-specific insights from three cohort workshops, and actionable mitigations to guide utilities, vendors, and the Department of Energy in advancing secure, trusted deployment of GETs.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Impedance Methods for Analyzing Stability Impacts of Inverter-Based Resources: Stability Analysis Tools for Modern Power Systems

Power systems around the world are undergoing a major transformation because of the increasing shares of renewable energy, growing deployment of energy storage systems, proliferation of distributed energy resources, electrification of other sectors, and so on. In the United States, wind and solar provided almost 10% of electricity in 2019. The U.S. Energy Information Administration, in its 2020 Annual Energy Outlook, forecasted that the share of electricity from renewables will reach 38% by 2050, of which more than 80% will come from wind and solar. Wind and solar, along with battery energy storage systems, interface with the grid using power electronic inverters; hence, they are collectively referred to as inverter-based resources (IBRs). The increasing annual share of electricity from IBRs in a power system means that during more times of the year, the system will operate at a much higher concentration of IBRs. Figure 1 presents the hourly share of wind and solar generation in the Electric Reliability Council of Texas (ERCOT) system in Texas in 2019. While the annual wind share was at 20%, the instantaneous percentage share was much higher. Moments of high shares of IBRs (>50%) will continue to grow as more IBRs will be deployed in a power system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Influence of Inverter-Based Resources on Microgrid Protection: Part 1: Microgrids in Radial Distribution Systems

Microgrids are being deployed at a rising rate, primarily as a means of increasing power system resilience. Commonly, a microgrid today includes at least some inverter-based resources (IBRs), and many microgrids have modes or conditions under which they are entirely energized by IBRs. Also, most microgrids today are deployed on radial distribution circuits, but it is conceivable that they could also be considered for deployment on secondary network systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preliminary Analysis of Nuclear-Powered Data Center Scenarios

This report provides a comprehensive analysis of the potential for nuclear energy to meet the growing energy demands of data centers (DCs). It evaluates the technical, economic, and socio-environmental implications of coupling Nuclear Power Plants (NPPs) with DCs, providing initial responses to several key research questions: What is the potential increased energy demand from DCs in the U.S., in the short, medium and long term? The U.S. is experiencing a rapid increase in energy demand from DCs, with projections indicating a total increase of 24-74 GWy(e) by 2028. Meeting this demand with nuclear energy would require 27–85 GWe of installed capacity. While this surge is expected to slow in the long term, the DC industry needs reliable, scalable, and clean energy sources. How much nuclear capacity can be deployed to meet DC demand and in which timeframe? Several pathways for increasing nuclear capacity were identified, including uprates, restarts of recently retired reactors, power purchase agreements with existing fleet, and new construction. Approximately 20‒28 GWe of nuclear capacity could be dedicated to DCs by the early 2030s. How much High Assay Low Enriched Uranium (HALEU) would be needed to support some nuclear deployment scenarios for DCs? Meeting the deployment targets announced by Google and Amazon for the Kairos Power Fluoride-Salt-Cooled High-Temperature Reactor or KP-FHR (~500 MWe by 2035) and the Xe-100 (~1 GWe by 2040), respectively, requires ramping up 19.75% enriched HALEU production to ~6 t/yr by 2040. What types of nuclear energy/DC coupling options exist, and what are the different benefits/challenges? Five coupling options were analyzed, ranging from grid-connected configurations to colocated, behind-the-meter setups. Key design considerations include the proximity to high- and/or medium-voltage transmission lines, the desired internal fault tolerance, and the sources of alternative/backup power during outages. Each coupling option offers unique benefits and challenges in terms of reliability, system costs, regulation, timeline, etc. A list of NPP/DC deployment scenarios was developed, considering existing or newly built NPP or DC projects. Colocated DCs with new small modular reactors or large reactors on greenfield and brownfield sites are the focus of this report. What types of reactors, especially what size, may be incentivized by DCs? Reactor sizing optimization revealed that the ideal reactor size and number of units depend on DC demand, coupling configurations defined in this report, and other economic factors. Larger reactors are preferred for high-demand DCs and grid-connected systems, while larger number of smaller reactors are better suited for DC configurations without grid backup. Which sites may be compatible with co-located nuclear-powered DCs? Siting those projects is a complicated evaluation factoring local water resources, grid connection availability and reliability, IT infrastructure, local work force, proximity to population zones, etc. For this effort greenfield and brownfield sites such as retired coal-fired plants were used to evaluate this question. This evaluation is not meant to recommend any particular site but it highlights key siting criteria and demonstrates large-scale site availability. What are the socio-economic impacts of co-located nuclear-powered DCs? Those projects generate substantial economic benefits to the local economy, particularly in urban settings. Hyperscale DCs colocated with nuclear power plants (sized around 1 GW of power) can create nearly 1,700 jobs for annual operations and more than 7,300 jobs among the supply chain and local businesses as a result of increased household spending. Rural projects also provide significant benefits, but at lower magnitudes compared to urban deployments.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Least-Cost Pathways for India's Electric Power Sector

The Government of India has a target of deploying 175 GW from renewable energy by 2022 and 40% of electricity capacity from renewable energy by 2030 and has indicated that ambitions for 2030 could be higher. Rapid changes in technology costs and performance could drive further deployment of wind and solar capacity beyond these policy targets. Increased deployment of variable renewable energy (VRE) raises new questions for power system planning regarding the optimal siting of generation capacity, trade-offs between generation and transmission infrastructure, and system flexibility needs. This study aims to evaluate least-cost pathways for India's electric power system over the period 2017-2047. Uniquely, this work considers an expanded planning horizon and range of scenarios not previously analyzed in national planning studies in India. The data collection and model design processes undertaken for this study provides a framework for recurring planning studies. This study finds anticipated changes in electricity demand and component costs can drive a significant shift in India's future electricity supply and how this system will be operated. In the Base scenario, the share of generation from VRE reaches 54% by 2047. Reducing the capital cost of wind has a larger impact on VRE penetration than reducing the capital cost of solar PV or battery storage. In the lowest wind cost scenario (40% capital cost decline by 2047 relative to the Base scenario), the penetration of VRE in the generation mix reaches 722%, exceeding the penetration levels achieved when the cost of battery storage or solar PV are reduced by an even greater 50%. In a future system with high penetrations of RE, capacity additions are driven by the coincidence of demand and RE generation rather than peak demand alone. This study finds the system could have surplus capacity during the peak demand months of July–September because this period corresponds to periods with high wind speeds and more wind generation available to meet peak demand. By contrast, new capacity is needed to meet demand during moderate demand months of October–November when output from wind plants falls more than 75% nationally compared to the previous two months. Finally, the success for gas for electricity production may depend on cost competitiveness rather than fuel availability. Increasing the amount of gas available for electricity production had no significant impact on the capacity or generation mix by 2047, as determined from a scenario that significantly increases fuel availability throughout the planning horizon. In fact, over 80% of new gas fuel available for the power sector remains unused. This suggests the high cost of gas plant operations relative to other technologies may constrain the expansion of gas generation in India more than fuel availability.

14 SOLAR ENERGY↗

Intra-EVA Space-to-Ground Interactions when Conducting Scientific Fieldwork Under Simulated Mars Mission Constraints

The Biologic Analog Science Associated with Lava Terrains (BASALT) project is a four-year program dedicated to iteratively designing, implementing, and evaluating concepts of operations (ConOps) and supporting capabilities to enable and enhance scientific exploration for future human Mars missions. The BASALT project has incorporated three field deployments during which real (non-simulated) biological and geochemical field science have been conducted at two high-fidelity Mars analog locations under simulated Mars mission conditions, including communication delays and data transmission limitations. BASALT's primary Science objective has been to extract basaltic samples for the purpose of investigating how microbial communities and habitability correlate with the physical and geochemical characteristics of chemically altered basalt environments. Field sites include the active East Rift Zone on the Big Island of Hawai'i, reminiscent of early Mars when basaltic volcanism and interaction with water were widespread, and the dormant eastern Snake River Plain in Idaho, similar to present-day Mars where basaltic volcanism is rare and most evidence for volcano-driven hydrothermal activity is relict. BASALT's primary Science Operations objective has been to investigate exploration ConOps and capabilities that facilitate scientific return during human-robotic exploration under Mars mission constraints. Each field deployment has consisted of ten extravehicular activities (EVAs) on the volcanic flows in which crews of two extravehicular and two intravehicular crewmembers conducted the field science while communicating across time delay and under bandwidth constraints with an Earth-based Mission Support Center (MSC) comprised of expert scientists and operators. Communication latencies of 5 and 15 min one-way light time and low (0.512 Mb/s uplink, 1.54 Mb/s downlink) and high (5.0 Mb/s uplink, 10.0 Mb/s downlink) bandwidth conditions were evaluated. EVA crewmembers communicated with the MSC via voice and text messaging. They also provided scientific instrument data, still imagery, video streams from chest-mounted cameras, GPS location tracking information. The MSC monitored and reviewed incoming data from the field across delay and provided recommendations for pre-sampling and sampling tasks based on their collective expertise. The scientists used dynamic priority ranking lists, referred to as dynamic leaderboards, to track and rank candidate samples relative to one another and against the science objectives for the current EVA and the overall mission. Updates to the dynamic leaderboards throughout the EVA were relayed regularly to the IV crewmembers. The use of these leaderboards enabled the crew to track the dynamic nature of the MSC recommendations and helped minimize crew idle time (defined as time spent waiting for input from Earth during which no other productive tasks are being performed). EVA timelines were strategically designed to enable continuous (delayed) feedback from an Earth-based Science Team while simultaneously minimizing crew idle time. Such timelines are operationally advantageous, reducing transport costs by eliminating the need for crews to return to the same locations on multiple EVAs while still providing opportunities for recommendations from science experts on Earth, and scientifically advantageous by minimizing the potential for cross-contamination across sites. This paper will highlight the space-to-ground interaction results from the three BASALT field deployments, including planned versus actual EVA timeline data, ground assimilation times (defined as the amount of time available to the MSC to provide input to the crew), and idle time. Furthermore, we describe how these results vary under the different communication latency and bandwidth conditions. Together, these data will provide a basis for guiding and prioritizing capability development for future human exploration missions.

Beaton, Kara H.↗

MODAQ-BB (Modular Offshore Data Acquisition System - Blackbox) [SWR-24-72]

MODAQ-BB is a compact, rapid deployment data acquisition system that can withstand water depths up to 400m. Codenamed "BlackBox" (or simply BB), since its initial purpose was to track marine assets and record vital data streams that could later be recovered in the event of a mishap - much like a traditional black box used in aviation and shipping, the name has stuck. MODAQ BlackBox is a battery-operable microcontroller platform with internal inertial sensing, GPS, satellite communications, and additional I/O (input/output) support in a depth-rated pressure enclosure. Since BB is self-contained and relatively compact, it can be quickly deployed with minimal effort. The enclosure can be clamped to a tube (such as part of a railing) or mast in a location with unobstructed view of the sky using the available clamp accessory or a common hose clamp. While BB is designed to operate unattended, users can configure what data are uploaded and the frequency of satellite transmissions. Once data are uploaded, they can be relayed to an email distribution list, the MODAQ:Web operational dashboard, or a custom destination. BB has found utility in the National Laboratory of the Rockies' (NLR's) Waterpower projects beyond its original vision and has been configured and successfully deployed in more traditional data-gathering applications where a simple, battery-operated solution was indicated. As part of the MODAQ family, BB fills a space in the spectrum of missions that can be supported that were previously impractical using the traditional MODAQ hardware architecture due to factors such as weight, size, and cost.

Raye, Robert↗

Space-to-Ground Interactions While Conducting Scientific Fieldwork Under Mars Mission Constraints

The Biologic Analog Science Associated with Lava Terrains (BASALT) project is a 4-year program dedicated to iteratively designing, implementing, and evaluating concepts of operations (ConOps) and supporting capabilities to enable and enhance scientific exploration for future human Mars missions. BASALT incorporates three field deployments during which real (non-simulated) biological and geochemical field science is conducted at two high-fidelity Mars analog locations under simulated Mars mission conditions, including communication de-lays and data transmission limitations. BASALT’s primary science objective is to investigate how the redox conditions of altered basaltic environments affect the development of microbial communities in these Mars-relevant settings. Field sites include the active East Rift Zone on the Big Island of Hawaii, reminiscent of early Mars when basaltic volcanism and interaction with water were widespread, and the dormant eastern Snake River Plain in Idaho, similar to present-day Mars where basaltic volcanism is rare and most evidence for volcano-driven hydrothermal activity is relict. BASALT’s primary science operations objective is to investigate exploration ConOps and capabilities that facilitate scientific return during human-robotic exploration under Mars mission constraints. Each field deployment consists of ten extravehicular activities (EVAs) on the volcanic flows in which two extravehicular and two intravehicular (IV) crew-members conduct the science while communicating across time delay and under bandwidth constraints with an Earth-based Mission Support Center (MSC) comprised of expert scientists and operators. Communication latencies of 5 and 15-minute one-way light time and low (0.512 Mb/s uplink, 1.54 Mb/s down-link) and high (5.0 Mb/s uplink, 10.0 Mb/s downlink) bandwidth conditions are being evaluated. EVA crewmembers communicate with the MSC via voice and text messaging and provide scientific instrument data, still imagery, video streams, and GPS tracking information. The MSC reviews this data across delay and provides recommendations for presampling and sampling tasks. The scientists used dynamic leaderboards (priority rank-ing lists), to track and rank candidate samples relative to one another and against the science objectives for the current EVA and the overall mission. Updates to the dynamic leaderboards are relayed regularly to the IV crewmembers to provide scientific feedback from Earth and to help minimize crew idle time (time spent waiting for Earth input during which no productive tasks are performed). EVA timelines are strategically designed to enable continuous (delayed) feedback from an Earth-based science team while simultaneously minimizing crew idle time. Such timelines are operationally advantageous, reducing transport costs by eliminating the need for crews to return to the same locations on multiple EVAs while still providing opportunities for recommendations from science experts on Earth, and scientifically advantageous by minimizing the potential for cross-contamination across sites. This paper will highlight the space-to-ground interaction results from the three BASALT field deployments, including planned versus actual EVA time-line data, ground assimilation times (the amount of time available to the MSC to provide input to the crew), and idle time. Furthermore, we describe how these results vary under the different communication latency and bandwidth conditions. Together, these data will provide a basis for guiding and prioritizing capability development for future human exploration missions.

Beaton, Kara H.↗

Opportunities for Hybrid Wind and Solar PV Plants in India

The share of variable renewable energy (VRE) on India's grid has surpassed 100 GW, and the government has ambitious plans reach 450 GW by 2030. One strategy to increase wind and solar PV deployment is through the co-location of wind and solar PV plants to form a single hybrid power plant. Hybrid plants have the potential to reduce transmission infrastructure costs and variability in the output power profile compared to a standalone plant with a single technology, and this resource analysis aims to take a first step towards quantifying the potential savings from hybridizing wind and solar PV plants in India and the size of this opportunity. We utilize a brute-force optimization to minimize the levelized cost of energy (LCOE) for standalone wind, standalone solar PV, and hybrid wind/solar PV plants across all of India. By comparing these LCOEs, we determine that locations where hybrid plants exhibit potential cost savings and grid benefits exhibit both; a high interconnection cost and; a wind capacity factor between roughly 34% and 38%. However, because our work does not capture the value of the electricity generated by looking at energy prices, nor does it quantify the potential of hybrids to provide other value streams such as firm capacity and reserves. Further, because the work does not compare solar PV and wind hybrids to alternative generation technologies or storage systems, it cannot be considered a holistic cost-benefit analysis.

14 SOLAR ENERGY↗

Advanced Distributed Wind Turbine Controls Series: Part 1-Flatirons Campus Model Overview – Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL)

Wind turbines are typically deployed to provide energy, reduce diesel-fuel consumption, reduce carbon emissions, and reduce costs for energy and fuel transportation. However, in addition to solely providing energy to the power system, wind turbines contain rotating masses and inverter-based controls that can enable various reliability and resilience services through advance controls. As part of the Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL), it is demonstrated that advanced wind turbine controls can be employed to support higher contributions of wind, and to demonstrate ways that wind can play a role in supporting grid stability in islanded or grid-connected configurations. This paper documents models of various subsystem comprising a portion of NREL's Flatirons campus that will be used in three subsequent reports to demonstrate capabilities of advanced wind turbine controls. The series of reports will detail advanced capabilities of distributed wind turbines to provide support to isolated grids, distribution grids, and microgrids. We developed models to simulate a wind turbine (600 kW), solar PV (430 kW), battery energy storage system (1 MW/1MWh), a diesel generator (2 MW) and various types of loads (critical, dynamic). The model of the subsystems in MATLAB/Simulink are validated with available data from real-world components on NREL's Flatirons Campus. These validated models can be configured for various studies including four MIRACL use cases: 1) isolated grids, 2) microgrids, and 3) behind-the-meter, and 4) front-of-the-meter wind turbine deployments.

17 WIND ENERGY↗

Dynamic Inverter Characterization for Modeling

The goal of the project was to develop data to be used for modeling the dynamic characteristics of smart inverters. The inverters were tested in both a lab setting, and a subset was deployed in residential homes for longer term data collection during real-world use.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pipeline Monitoring Using Highly Sensitive Vibration Sensor Based on Fiber Ring Cavity Laser

A vibration fiber sensor based on a fiber ring cavity laser and an interferometer based single-mode-multimode-single-mode (SMS) fiber structure is proposed and experimentally demonstrated. The SMS fiber sensor is positioned within the laser cavity, where the ring laser lasing wavelength can be swept to an optimized wavelength using a simple fiber loop design. To obtain a better signal-to-noise ratio, the ring laser lasing wavelength is tuned to the maximum gain region biasing point of the SMS transmission spectrum. A wide range of vibration frequencies from 10 Hz to 400 kHz are experimentally demonstrated. In addition, the proposed highly sensitive vibration sensor system was deployed in a field-test scenario for pipeline acoustic emission monitoring. An SMS fiber sensor is mounted on an 18” diameter pipeline, and vibrations were induced at different locations using a piezoelectric transducer. The proposed method was shown to be capable of real-time pipeline vibration monitoring.

47 OTHER INSTRUMENTATION↗

COMLINK proposal for future missions of tethered satellite

The quality of the communications links between satellites was tested. The interaction between the VLF and ELF waves, generated by the conducting tether, and the SHF and YHF electromagnetic waves, generated by the 20/30 GHz transmitters were investigated. The ionspheric electron density irregularities was measured by means of phase-coherent RF transmission between the two vehicles. The motion of the tethered satellite was observed through the Doppler link established between the shuttle and the satellite. The technology and deployment of spaceborne antennas of large diameter was tested.

Sciarrino, F.↗

Quantifying Impacts of Renewable Electricity Deployment on Air Quality and Human Health in Southeast Asia Based on AIMS III Scenarios

This study augments the ASEAN Interconnection Masterplan Study III (AIMS III) by quantifying changes to air quality and human health that result from its renewable integration and transmission interconnection scenarios. Performing this analysis requires translation of the changes in projected generation from different power sector fuel sources in the AIMS III scenarios to changes in air pollutant emissions, developing what is known as an emissions inventory for each scenario and year evaluated. An emissions inventory represents who emits air pollutants, from where the pollutants are emitted, when, and how much of which air pollutants are emitted. With the assistance of the ASEAN Centre for Energy and leveraging the best available in-region public data sources, the National Renewable Energy Laboratory (NREL) team compiled a detailed inventory of power plants in the ASEAN region, mapping their PM 2.5 , sulfur oxides (SOx), and nitrogen oxides (NOx) emissions. A new, first-of-its-kind, and user-friendly global air quality model, Global InMAP (Thakrar et al. 2022), is then used to transform the inventory of changes in emissions to changes in concentration of fine particulate matter. Global InMAP then maps the location of human populations in ASEAN countries to calculate humans' exposure to PM 2.5 and estimate excess PM 2.5 -caused mortality attributable to thermal generation sources, as modeled in the AIMS III scenarios.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗