Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Design Initiative for a 10 TeV pCM Wakefield Collider

This document outlines a community-driven Design Study for a 10 TeV pCM Wakefield Accelerator Collider. The 2020 ESPP Report emphasized the need for Advanced Accelerator R&D, and the 2023 P5 Report calls for the ``delivery of an end-to-end design concept, including cost scales, with self-consistent parameters throughout." This Design Study leverages recent experimental and theoretical progress resulting from a global R&D program in order to deliver a unified, 10 TeV Wakefield Collider concept. Wakefield Accelerators provide ultra-high accelerating gradients which enables an upgrade path that will extend the reach of Linear Colliders beyond the electroweak scale. Here, we describe the organization of the Design Study including timeline and deliverables, and we detail the requirements and challenges on the path to a 10 TeV Wakefield Collider.

43 PARTICLE ACCELERATORS↗

The Missing Correlation Between the Potential Rate Impacts of Rooftop Solar and the Timing of State Net Metering Policy Revisions

Data supporting the article “The Missing Correlation Between the Potential Rate Impacts of Rooftop Solar and the Timing of State Net Metering Policy Revisions” (https://www.nlr.gov/docs/fy25osti/93543.pdf). Residential solar photovoltaic (PV) output in most states is credited at the retail electricity rate, a policy commonly known as net metering. Twelve states have replaced net metering with alternative rate structures that reduce PV adopter bill savings. Proponents of these revisions argue that net metering increases the electricity rates of customers without PV. Here, we analyze the degree to which the timelines of net metering revisions have correlated with potential electricity rate impacts. We estimate that potential rate impacts at the end of 2023 were less than 1% of typical customer bills in 37 of 44 states that have offered net metering. There are no statistically significant differences in average or median estimated rate impacts between states that have and have not revised net metering. Nine of the states that had revised net metering did so when estimated impacts were less than 1% of typical customer bills. Many states have retained net metering into higher PV deployment levels with increased risk of potential rate impacts. Only two states-California and Hawaii-retained net metering beyond estimated rate impacts of 5%, and both have revised net metering. These findings do not suggest a clear, consistent link between net metering revision timelines and potential rate impacts. The timing and nature of net metering revisions are ultimately policy decisions based on state-level priorities and considerations.

14 SOLAR ENERGY↗

Study of astronaut restraints and mobility aids in a weightless shirtsleeve environment

A study, established to produce needed information about manual performance limits in intravehicular weightlessness such as the motions induced by the astronaut's direct application of force against the body of the vehicle or an object to be moved, is presented. Using both conventional and water immersion techniques, it was possible to develop realistic time estimates for astronaut station-to-station translation in Skylab, to simulate and analyze specific Skylab tasks involving force application and motion dynamics, and to evaluate certain thresholds of force application in weightlessness. The study was divided into three tasks. The first related to locomotion and verification or modification of present Skylab translation timelines. In all cases, translation times were less than the Skylab timelines indicated. The second task studied mass handling and transfer. Specifically, this involved measurement of the astronaut's ability to relocate the Skylab food lockers to stowage levels of three different heights and his ability to transfer the M509 PSS bottles between the OWS and the recharge station. The third task helped define the physical limits of man's ability to perform Skylab translation tasks under weightless conditions.

Loats, H. L., Jr.↗

Geosynchronous platform definition study. Volume 7: Geosynchronous transporation requirements

The analyses and trade studies are presented which were conducted to define the interfaces between geosynchronous platforms and the space transportation system. Mission timelines are synthesized for both manned and unmanned placement and servicing operations. Physical, operational, and functional interfaces between platforms and the space shuttle and tug are derived from the timelines. Where interface incompatibilities exist, alternate approaches are evaluated and a preferred approach is defined. An evaluation of the adaptation of the solar electric propulsion (SEP) stage for geosynchronous operations is presented. A comparison of geosynchronous platform programs with and without the SEP stage in the transportation system is developed.

Myers, H. L.↗

Space processing applications payload equipment study. Volume 2D: SPA supplemental power and heat rejection kit

The design and application of a supplementary power and heat rejection kit for the Spacelab are discussed. Two subsystems of electric power and thermal control were analyzed to define the requirements for the power and heat rejection kit (PHRK). Twelve exemplary experiments were defined and power timelines were developed. From these timeline, the experiment requirements for sustained power, peak power, and energy were determined. The electrical power subsystem of the PHRK will consist of two fuel cells, oxygen and hydrogen reactant tank assemblies, water storage tanks, plumbing, cabling, and inverters to convert the nominal 28 volt dc fuel cell output to ac power.

Hammel, R. L.↗

Application of Shuttle EVA Systems to Payloads. Volume 2: Payload EVA Task Completion Plans

Candidate payload tasks for EVA application were identified and selected, based on an analysis of four representative space shuttle payloads, and typical EVA scenarios with supporting crew timelines and procedures were developed. The EVA preparations and post EVA operations, as well as the timelines emphasizing concurrent payload support functions, were also summarized.

Source record↗

An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

Moore, J. E.↗

Payload Operations Control Center (POCC)

The Spacelab payload operations control center (POCC) timeline analysis program which is used to provide POCC activity and resource information as a function of mission time is described. This program is fully automated and interactive, and is equipped with tutorial displays. The tutorial displays are sufficiently detailed for use by a program analyst having no computer experience. The POCC timeline analysis program is designed to operate on the VAX/VMS version V2.1 computer system.

Shipman, D. L.↗

Ambitious STS-7 mission to feature first landing at Kennedy

The STS-7 press briefing schedule, NASA select television schedule; launch preparations, countdown and liftoff; major countdown milestones; launch window; STS-7 flight sequence of events, landing timeline; STS-7 flight timeline; landing and post landing operations; flight objectives; Telesat's ANIK-C 2; PALAPA-B; STS-7 experiments; and spacecraft tracking and data network are presented.

Garrett, D.↗

Manned spaceflight activity planning with knowledge-based systems

An on-board expert system, capable of assisting with crew-activity planning and platform-status monitoring, could provide unprecedented autonomy to the crew of a permanently manned space station. To demonstrate this concept's feasibility, an existing knowledge-based system is adapted to support Space Shuttle crew-activity timeline planning. Proposed timeline changes are to be checked for compliance with crew capabilities and mission operating guidelines, so that a nonexpert can be guided through a successful plan modification. Early lessons that have been learned about the scope of the adaptation needed to achieve this objective are presented.

Mogilensky, J.↗

Orbital transfer vehicle concept definition and system analysis study. Volume 4, Appendix A: Space station accommodations. Revision 1

Orbit Transfer Vehicle (OTV) processing at the space station is divided into two major categories: OTV processing and assembly operations, and support operations. These categories are further subdivided into major functional areas to allow development of detailed OTV processing procedures and timelines. These procedures and timelines are used to derive the specific space station accommodations necessary to support OTV activities. The overall objective is to limit impact on OTV processing requirements on space station operations, involvement of crew, and associated crew training and skill requirements. The operational concept maximizes use of automated and robotic systems to perform all required OTV servicing and maintenance tasks. Only potentially critical activities would require direct crew involvement or supervision. EVA operations are considered to be strictly contingency back-up to failure of the automated and robotic systems, with the exception of the initial assembly of Space-Based OTV accommodations at the space station, which will require manned involvement.

Randall, Roger M.↗

Thiokol/Wasatch installation evaluation of the redesigned field joint protection system (concepts 1 and 3)

The procedures, performance, and results obtained from the Thiokol Corporation/Wasatch Redesigned Field Joint Protection System (FJPS) Installation Evaluation are documented. The purpose of the evaluation was to demonstrate and develop the procedures required to install two different concepts (referred to as Concepts 1 and 3) of the redesigned FJPS. The processing capability of each configuration was then evaluated and compared. The FJPS is installed on redesigned solid rocket motors (RSRM) to protect the field joints from rain intrusion and to maintain the joint temperature sensor measurement between 85 and 122 F while the boosters are on the launch pad. The FJPS is being redesigned to reduce installation timelines at KSC and to simplify or eliminate installation processing problems related to the present design of an EPDM moisture seal/extruded cork combination. Several installation techniques were evaluated, and a preferred method of application was developed for each concept. The installations were performed with the test article in the vertical (flight) position. Comparative timelines between the two concepts were also developed. An additional evaluation of the Concept 3 configuration was performed with the test article in the horizontal position, to simulate an overhead installation on a technical evaluation motor (TEM).

Cook, M.↗

Post-launch operations and data production

Postlaunch operations scheduled in connection with the October 5, 1990, launch of Space Shuttle Discovery with the Ulysses payload are detailed. A summary is presented of postlaunch events up to and including the separation of Ulysses from Discovery, providing a timeline for the upper-stage burn and spacecraft separation. A timeline is also provided for the payload switch-on. Initial in-orbit and routine operations are discussed and missions-operations organization, the data ground segment, and Ulysses data production are considered.

Beech, P.↗

The phase 2 NRA

We present points of special interest to potential proposers for the Compton Observatory Phase 2 Guest Investigator (GI) program. A general summary of some of the most important details of the phase 2 NASA Research Announcement (NRA) is followed by an enumeration of the modes of participation and proposal types available to GI proposers. Finally, the method which is planned for the selection of the Phase 2 Guest Investigators in parallel with the development of a preliminary Phase 2 observing timeline is outlined. The ways in which the selection of targets by GI's could be affected by the Phase 2 timeline development procedure is described.

Chipman, Eric↗

SEI reference mission

Presentation on the Space Exploration Initiative (SEI). The goal of the reference mission is to expand the human presence to the moon and Mars in order to enhance our understanding of the universe, to seek terrestrial benefits from this exploration, and to establish the beginnings of a sustainable spacefaring civilization. Topics covered here include a phased definition of initial programmatic milestones and follow-on capabilities, near-term mission strategy, a lunar mission timeline, and a Mars mission timeline.

Dwayne Weary↗

Conceptual analysis of a lunar base transportation system

Important to the planning for a lunar base is the development of transportation requirements for the establishment and maintenance of that base. This was accomplished as part of a lunar base systems assessment study conducted by the NASA Langley Research Center in conjunction with the NASA Johnson Space Center. Lunar base parameters are presented using a baseline lunar facility concept and timeline of developmental phases. Masses for habitation and scientific modules, power systems, life support systems, and thermal control systems were generated, assuming space station technology as a starting point. The masses were manifested by grouping various systems into cargo missions and interspersing manned flights consistent with construction and base maintenance timelines. A computer program that sizes the orbital transfer vehicles (OTV's), lunar landers, lunar ascenders, and the manned capsules was developed. This program consists of an interative technique to solve the rocket equation successively for each velocity correction (delta V) in a mission. The delta V values reflect integrated trajectory values and include gravity losses. As the program computed fuel masses, it matched structural masses from General Dynamics' modular space-based OTV design. Variables in the study included the operation mode (i.e., expendable vs. reusable and single-stage vs. two-stage OTV's), cryogenic specific impulse, reflecting different levels of engine technology, and aerobraking vs. all-propulsive return to Earth orbit. The use of lunar-derived oxygen was also examined for its general impact. For each combination of factors, the low-Earth orbit (LEO) stack masses and Earth-to-orbit (ETO) lift requirements are summarized by individual mission and totaled for the developmental phase. In addition to these discrete data, trends in the variation of study parameters are presented.

Hoy, Trevor D.↗

In-space operations for lunar and Mars space transfer vehicles

The objective of this paper is to discuss the in-space operations required to process the lunar and Mars mission vehicles envisioned for the Space Exploration Initiative (SEI). Recent studies, which have examined the degree to which on-orbit operations change as a function of the Earth-to-orbit (ETO) launch vehicle size, identified a common set of on-orbit vehicle processing tasks, and generated functional requirements for in-space processing nodes are summarized in this paper. Timelines for on-orbit processing of two different lunar transfer vehicles (LTV's) were developed to compare a 'current practice,' labor-intensive EVA approach to ones utilizing telerobotics and advanced automation. LTV aerobrake concepts ranging from simple deployment to considerable assembly are compared. Similar timelines for the on-orbit processing of a nuclear Mars transfer vehicle (MTV) are also presented. Aerobrakes can be processed in a timely manner and should not be ruled out for SEI missions. The 'tall pole' time interval for on-orbit vehicle initial processing is the delivery of elements to orbit, not the processing tasks.

Raper, James L., Sr.↗