Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “testing facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Influence of Glycolate Anion on Aqueous Corrosion in DWPF and Downstream Facilities – SCC Testing

Glycolic acid is being evaluated as an alternate reductant in the preparation of High Level Waste for the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS). During processing, the glycolic acid may not be completely consumed with small quantities of the glycolate anion being carried forward to waste facilities. The SRS liquid waste contractor requested an assessment of the influence of the glycolate anion on the corrosion of the materials of construction (MoC) throughout the waste processing system since this concern had not been previously evaluated. The influence of glycolic acid on the occurrence of stress corrosion cracking (SCC) had not been evaluated specifically in the previous testing. The present testing used electrochemical and coupon immersion testing to assess this influence. Additionally, the primary guidance on corrosion for operating DWPF with a formate-based flowsheet is based on testing that utilized test solutions with a small number of constituents. Recent testing used more complex solutions based on flowsheet development for DWPF. Additional electrochemical tests were also conducted to assess the influence of this difference on test results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NSTTF Voucher Program RPPR-1 (Final Report)

Sandia issued a Request for Proposals (RFP) to solicit proposals from industry, academia, research laboratories, government agencies, and individuals on the use of the National Solar Thermal Test Facility (NSTTF) to increase CSP technology market adoption across the United States. The voucher funds will be used to cover the cost of NSTTF test facilities usage and technical staff support for analysis, design and test planning and execution. Sandia will collect submitted proposals, coordinate their review through DOE SETO, and work in partnership or under contract with the applicants to complete the funded research. Through this program, participants will be supported in their use of the world class facilities and expertise available at the NSTTF at Sandia in Albuquerque, NM to accelerate the advancement of CST technologies toward meeting 2030 SETO goals for CSP. The goals of this semi-annual reporting period were to complete all administrative tasks and contracting, begin testing on three of the vouchers, and report on initial findings. The fourth voucher (University of Michigan) is predicated on the results of an ongoing heat exchanger test that is expected to conclude by the end of FY22.

14 SOLAR ENERGY↗

The Innovation of I-Loop

The closing and decommissioning of Halden Boiling Water Reactor in Norway resulted in the loss of many nuclear irradiation testing facilities, notably those providing boiling water reactor (BWR) environments. To lighten the loss of such an important asset, the Advanced Test Reactor (ATR) is being called upon. The recent overhaul of the ATR’s core and the installation of the new Top Head Closure Plate now makes it possible to utilize the ATR’s I-loop locations for I-Loop Tube test facilities. Similar to the current in-pile tube facilities, these new I-Loop facilities will capitalize on the available space and neutron flux the ATR generates in this region of the core for fuels and materials testing. Current efforts are underway to add new PWR and BWR I-Loop Tube facilities to the I-Loop positions for these purposes.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Performance Evaluation of an Additively Manufactured ultra-High Operating Temperature SiC Solar-Thermal Air Receiver (HOTSSTAR) Test Module

Increasing operating temperatures of solar receivers is paramount to the efficiency of concentrated solar thermal and solar power systems. GE Aerospace Research in collaboration with Heliogen Inc and Sandia National Laboratories (SNL) is engaged in the development of ultra-High Operating Temperature SiC-matrix Solar Thermal Air Receiver (HOTSSTAR) enabled by additive manufacturing. HOTSSTAR goal is to demonstrate SiC receiver with air exit temperatures up to 1100oC. We discuss fabrication and on-sun test results of a prototype 50kWth test module. The receiver architecture is based on a radial airflow design and consists of a series of radial SiC receiver sectors organized around central absorber. These components were fabricated using binder-jet printed SiC followed by melt-infiltration reaction bonding process. To enhance the thermo-mechanical reliability of SiC test articles in thermal gradient/ shock environment of the application, the components were laminated with GE’s MI SiC CMC. A dedicated test facility was constructed at SNL Solar Tower to evaluate the operational performance of HOTSSTAR module under solar fluxes >200 W/cm2. We report on our final 50kW test module fabrication, integration at the test facility at Sandia, and discuss on-sun test results. We compare the performance of HOTSSTAR module relative to our model predictions.

14 SOLAR ENERGY↗

Film condensation with high heat fluxes and scaled experiments using pure steam for reactor containment cooling

Condensation tests were performed using a newly developed test facility for scaling the passive containment cooling system (PCCS) to a small modular reactor (SMR). The PCCS of the SMR plays a pivotal role in ensuring greater safety, reliability, and compactness than what is afforded by traditional reactors. Therefore, a well-designed PCCS is essential to SMRs. However, previous studies and test data were unsuitable for scaling, due to high variation in the test geometry and operating conditions. This study intends to close this research gap by using a novel designed scaled test facility consisting of vertical condensing test sections featuring 1-, 2-, and 4-inch-diameter condensing tubes with annular water cooling, and by applying superheated and saturated steam with different steam mass flow ranges of 5–25 g/s. Further, the primary test data, including axial temperatures, mass flow rates, and pressures, were used in conjunction with a standard data reduction method to estimate critical parameters such as heat fluxes, heat transfer coefficients, and condensation rates. These scaled test data would support improving empirical correlations and validating condensation models to identify scaling distortion for SMR PCCSs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Performance Analysis and Simulaion of the Hydraulic Scram System in TREAT Reactor

The Transient Reactor Test Facility (TREAT) at Idaho National Laboratory (INL) serves a vital role in nuclear fuel safety research, enabling transient experiments that simulate reactivity excursions and accident scenarios. Central to these operations is the transient control rod drive system (TCRDS), which drives rapid motion of the transient control rods such that TREAT can simulate rapid power changes typical of reactor accidents. The reliability and performance of this system are critical for protecting both fuel specimens and reactor infrastructure. This study presents the initial phase of a two-year investigation into the dynamics and reliability of the TREAT hydraulic TCRDS. Conducted in collaboration with INL, the research employs a combined computational and experimental approach to analyze the system's response time, pressure transients, and potential failure modes. Emphasis is placed on understanding how fluid characteristics influence the TCRDS’s ability to achieve both rapid power changes and mechanical stability. The TRDS and the skid that powers it will be analyzed throughout this investigation. Computational modeling using computational fluid dynamics (CFD) will simulate the hydraulic response under varying conditions. In parallel, experimental testing planned at INL will validate these models and capture key performance metrics. This paper outlines the system design, analytical framework, and modeling strategies that form the foundation for later testing. Ultimately, this work aims to support improvements to the TCRDS’s design and reliability, contributing to the broader goal of enhancing nuclear fuel safety and sustaining TREAT’s mission as a premier nuclear fuel test facility.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Test Beam and Irradiation Facilities

Progress in particle physics depends on a multitude of unique facilities and capabilities that enable to advance detector technologies. Among others, key facilities involve test beams and irradiation facilities, which allow users to test the performance and lifetime of their detectors under realistic conditions. Test beam facilities are particularly important for collider and neutrino detector applications, while irradiation facilities are crucial for collider as well as some space-based astro particle detectors. This contributed Snowmass paper aims to summarize existing test beam and irradiation facilities as well as develop the need and proposals for future facilities.

43 PARTICLE ACCELERATORS↗

Advanced Measurement and Visualization Techniques for High-Temperature Heat Pipe Experiments

This report conducts a preliminary investigation of the available literature and summarizes some potential advanced measurement and visualization techniques for operating high-temperature heat pipe (HP) that can be implemented to support the United States (U.S.) Department of Energy (DOE) Microreactor Program (MRP). The primary objective for the extensive literature research is to investigate the possibilities and feasibility for the design and construction of an advanced experimental test facility with the aim of producing high-fidelity high-resolution heat pipe data during its operation. Based on the existing HP test facilities at Idaho National Laboratory (INL)—including the Single Primary Heat Extraction and Removal Emulator (SPHERE) and the Microreactor Agile Non-Nuclear Experimental Test Bed (MAGNET)—further efforts will be made to examine the technical feasibility to HP measurements and support the research, development, and demonstration (RD&D) process for an HP-cooled microreactor. Continuing collaborations with the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program, other research institutes and universities are considered to be extremely important so that the experimental facility and resultant database can satisfy the validation needs of advanced heat pipe modeling codes being developed under DOE NEAMS program.

42 ENGINEERING↗

Determination of Scale Bar for AGHCF Metallography Data

The DOE Nuclear Energy Advanced Reactor Technologies (ART) Fast Reactor Program (FRP) has supported the development of several databases containing information on the safety performance of fast reactors, components, and fuels. This growing collection of legacy experimental data, operating data, and analysis is available online to registered users. Metallography data represents one of the most critical types of post-irradiation examination (PIE) data being collected, organized, and archived in several ART Fast Reactor Databases (https://frdb.ne.anl.gov), including the Metallic Fuels Irradiation & Physics Database (FIPD), Out-of-Pile Transient Database (OPTD), and TREAT (the Transient Reactor Test Facility) Experimental Relational Database (TREXR). These databases contain three principal sets of metallography data. The first set comprises metallography data from Experimental Breeder Reactor-II (EBR-II) and Fast Flux Test Facility (FFTF) irradiated fuel pins examined in the Hot Fuel Examination Facility (HFEF). The second set consists of metallography data from EBR-II irradiated fuel pins examined in the Alpha-Gamma Hot Cell Facility (AGHCF). The third set includes metallography data from transient-tested fuel pins (including both out-of-pile furnace tests and TREAT tests) examined in AGHCF. Since both the second and third sets were generated in AGHCF, they are governed by identical specifications. The metallography data in the databases consist of digital images scanned from either positive or negative photographic films. To analyze the microstructure of a fuel pin, a series of preparatory steps are required, including sectioning, epoxy mounting, mechanical grinding and polishing, and etching. Following sample preparation, specimens are transferred for metallographic examination. The AGHCF and HFEF metallography data were generated using optical microscopes manufactured by Leitz and Bausch and Lomb (B&L). Images were recorded on Polaroid film at preset magnifications. Magnification verification for the Leitz and B&L metallographs was conducted every two months prior to 1989 and at least every six months from 1989 through the conclusion of the IFR program. Magnifications determined from imaging of microslide standards were compared to the instrument settings for magnifications ranging from 50× to 500×. If the magnifications determined from standards deviated from the instrument settings, adjustments were made to the bellows extension until agreement was achieved. The specifications for AGHCF and HFEF legacy metallography data have been established based on available hard-copy and digital records, most of which have been incorporated into the data repositories associated with FIPD, OPTD, and TREXR. Detailed specifications including hard-copy records, digitized records, cutting diagrams and sectioning schemes, high-magnification photographs, photomosaics (composites), information tags, scale bars, and magnification verification procedures can be found in a separate report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Specifications of Legacy U(Pu)Zr Metallography Data

The DOE Nuclear Energy Advanced Reactor Technologies (ART) Program has supported the creation of several databases with information describing the safety performance of fast reactors, components, and fuels. This growing collection of legacy experimental data, operating data, and analysis is available online to registered users. Metallography data is one of the most important types of PIE data being collected, organized and stored in several ART Fast Reactor Databases (https://frdb.ne.anl.gov), including the Fuels Irradiation & Physics Database (FIPD), Out-of-Pile Transient Database (OPTD), and TREAT (the Transient Reactor Test Facility) Experimental Relational Database (TREXR). These databases contain three main sets of metallography data. The first set is the metallography data from Experimental Breeder Reactor-II (EBR-II) and Fast Flux Test Facility (FFTF) irradiated fuel pins measured in the Hot Fuel Examination Facility (HFEF); the second set is the metallography data from EBR-II irradiated fuel pins measured in the Alpha-Gamma Hot Cell Facility (AGHCF); the third set is the metallography data from transient tested fuel pins (the transients tests include the out-of-pile tests and TREAT tests) measured in AGHCF. Since both the second and third sets of data were measured in AGHCF, they are governed by the same specification. The metallography data in the databases are digital images scanned from either positive or negative photos. The quality of the images, including their resolution and contrast, relies on the preserved quality of the pictures and the scanning conditions. To analyze the microstructure of a fuel pin, a series of preparatory steps must be undertaken. These include sectioning, epoxy mounting, mechanical grinding and polishing, and often etching. The resulting samples were then transferred to a secondary hot cell, or glovebox (depending the strength of radiation field) for microscopy examination. The specifications provided herein focus on the metallography examinations. The sample grinding, polishing and etching processes are also discussed. The procedures involving sectioning and epoxy mounting are out of the scope of the current specification; details can be found in the corresponding operation manuals. If more data are collected and added to the ART Fast Reactor Databases, this specification will be updated to accommodate the additional data.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Real-Time Health Monitoring for Gas Turbine Components Using Online Learning and High-Dimensional Data

Capital-intensive turbomachinery, such as gas turbines and combined cycle plants, are constantly being monitored for performance anomalies, faults, and physical degradation. Although these power-generating assets are equipped with hundreds of sensors, existing monitoring tools can only handle moderate-sized data. As a result, only a handful of aggregate metrics are used to monitor machine health. At the same time, developing advanced tools suitable for large datasets have been restricted by the lack of appropriate data. The objective of this proposal was to demonstrate a Big Data analytics framework for fault detection and diagnosis in gas turbine applications. We develop a predictive analytics framework methodology guided by these experimental data, industrial data from our collaborators, and physics-based models with engineering domain knowledge. Our analytics framework consists of four key components (1) a data curation process that addresses data storage, data quality assessments, and integrity checks, (2) a feature engineering component that utilizes statistical methods and transformation algorithms guided by physics-based models to extract high-fidelity fault features that can be leveraged for fault detection and classifying fault severities, (3) a Machine Learning-based fault detection and diagnostics algorithms for detecting operational and hardware faults in the combustion and the turbines section. We utilize two industry-class gas turbine component test rigs to generate first of its kind data for critical gas turbine faults with varying severity levels. Advanced gas turbine test facilities will be interrogated using state-of-the-art instrumentation techniques to build fault signatures and data trends for key combustor and turbine faults. Data generated from a combustor test rig (Georgia Tech) and a turbine test rig (Penn State) during both normal operation and with seeded faults serve as the basis for the Big Data sets. The test conditions in the two test facilities include common, critical events that occur in the operation. Utilizing the combustor test rig, we examine two common combustor faults: lean blowout and centerbody degradation. For the turbine section we develop analytic models for monitoring cooling faults in the gas turbine

03 NATURAL GAS↗

Real-Time Health Monitoring for Gas Turbine Components Using Online Learning and High-Dimensional Data (Final Report)

Capital-intensive turbomachinery, such as gas turbines and combined cycle plants, are constantly being monitored for performance anomalies, faults, and physical degradation. Although these power-generating assets are equipped with hundreds of sensors, existing monitoring tools can only handle moderate-sized data. As a result, only a handful of aggregate metrics are used to monitor machine health. At the same time, developing advanced tools suitable for large datasets have been restricted by the lack of appropriate data. The objective of this proposal was to demonstrate a Big Data analytics framework for fault detection and diagnosis in gas turbine applications. We develop a predictive analytics framework methodology guided by these experimental data, industrial data from our collaborators, and physics-based models with engineering domain knowledge. Our analytics framework consists of four key components: (1) a data curation process that addresses data storage, data quality assessments, and integrity checks, (2) a feature engineering component that utilizes statistical methods and transformation algorithms guided by physics-based models to extract high-fidelity fault features that can be leveraged for fault detection and classifying fault severities, (3) a Machine Learning-based fault detection and diagnostics algorithms for detecting operational and hardware faults in the combustion and the turbines section. We utilize two industry-class gas turbine component test rigs to generate first of its kind data for critical gas turbine faults with varying severity levels. Advanced gas turbine test facilities will be interrogated using state-of-the-art instrumentation techniques to build fault signatures and data trends for key combustor and turbine faults. Data generated from a combustor test rig (Georgia Tech) and a turbine test rig (Penn State) during both normal operation and with seeded faults serve as the basis for the Big Data sets. The test conditions in the two test facilities include common, critical events that occur in the operation. Utilizing the combustor test rig, we examine two common combustor faults: lean blowout and centerbody degradation. For the turbine section we develop analytic models for monitoring cooling faults in the gas turbine.

20 FOSSIL-FUELED POWER PLANTS↗

ACCELERATING MICROREACTOR DEVELOPMENT AND DEPLOYMENT THROUGH JOINT PUBLIC TEST BEDS AND PRIVATE ADVANCED REACTOR DEVELOPMENT

The United States Department of Energy (DOE) has funded the National Reactor Innovation Center (NRIC) to accelerate the development and commercialization of small modular reactors and other advanced reactor technologies. As part of this effort NIRC is building two strategic assets at the Idaho National Laboratory (INL) to facilitate public-private partnerships for the development and testing of advanced nuclear microreactors and Small Modular Reactors (SMR). One will provide a safe, secure, and affordable location for High-Assay Low Enriched Uranium (HALEU) fueled reactors and a second for Highly Enriched Uranium (HEU) fueled reactors. Together these testbeds fill a nuclear testing infrastructure gap. The availability of such comprehensive testing facilities at the national labs eliminates the significant financial and operational burdens associated with each developer building and licensing their own test facilities. Consequently, this approach will not only accelerate technological innovation and reduce time-to-market for advanced nuclear solutions but it also underscores the DOE's commitment to fostering an ecosystem where nuclear energy will thrive as a clean, reliable, and efficient source of power. The Demonstration of Microreactor Experiments (DOME) and Laboratory for Operations and Testing in the United States (LOTUS) have planned availability in 2026, and 2027 respectively.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Fermilab’s horizontal test stand upgrade overview and commissioning

Cryo-assemblies with the low-beta Nb3Sn quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab’s magnet test facility. Total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational more than a decade. In order to restore the test stand functions and meet the design and test requirements for the high luminosity LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded test stand was completed during the first cryo-assembly test in 2023. These tests verified all the cryo-mechanical installations, as well as the test stand operations, including controlled cooldown and operation at 1.9 K, the helium recovery capabilities, magnet protection and process controls.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Structural Testing Technology Development: Cooperative Research and Development Final Report, CRADA Number CRD-06-00200

NREL is the only organization in the US that is accredited to conduct tests of wind turbine systems and components in accordance with International Electrotechnical Commission (IEC) test standards. The National Wind Technology Center houses the only full-scale wind turbine blade drivetrain test facilities in the US. To maintain these facilities, accreditation, and the acceptance of the wind industry, NREL must strive continuously to maintain and improve staff capabilities, procedures, facility and equipment. In addition, as wind turbines continue to increase in size, NREL must improve its capability to test the larger components associated with these new turbines. NREL is currently investigating methods to increase blade and drivetrain testing capabilities. Mitsubishi Power Systems (MPS) must also strive to meet the demands of the evolving wind energy industry by developing, proving and manufacturing new, cost-effective blades for its turbines. Mitsubishi has established a joint venture with TPI composites of Rhode Island for manufacturing blades to be installed on US wind turbines. There is an obvious advantage to test these prototype blades in a US facility. The NREL blade test facility is uniquely capable of fulfilling this need. In addition, NREL can provide other testing support to MPS through the use of its dynamometer facility for drivetrain testing and through the use of NREL’s field-testing capabilities for testing wind turbine systems. This CRADA provides the opportunity for both organizations to achieve critical goals in development of wind energy in the US. MPS obtains verification of its wind turbine components and system. NREL obtains improved test capabilities.

17 WIND ENERGY↗

Research to Develop Flood Barrier Testing Strategies for Nuclear Power Plants

This report presents results of research performed by Idaho National Laboratory (INL) for the Nuclear Regulatory Commission (NRC) to identify and develop strategies for testing nuclear power plant (NPP) flood barriers. This research project began with a literature review that documented the results of previous NRC-funded research, work performed by other government agencies, reports generated by industry organizations, NRC licensee submittals, information from testing facilities, and information from commercial firms engaged in NPP decommissioning. This literature review was then used to develop a simplified flood protection categorization scheme and related glossaries. Using this categorization scheme and glossaries, a survey of currently used flood barriers was conducted, focusing on both permanent and temporary flood barriers. External flood barriers such as levees and berms were outside the scope of this survey. This research project also assessed the current state of NPP decommissioning for potential flood barrier harvesting opportunities, surveyed capabilities of domestic and international flood testing facilities, and explored technical challenges to harvesting and testing of flood barriers. Other factors that should be considered in developing flood barrier testing strategies were also explored and are documented in this report (e.g., selection of flood barriers for testing, codes and standards for flood barrier testing, potential alternatives to harvesting such as in-situ testing, testing performance criteria, and testing parameters).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Operation Redwing

Cherokee exploded with an impressive yield of 3.8 megatons but missed its aiming point by six miles. Although regrettable, the miss was not overly significant because the event proved “that the United States owned a real [thermonuclear] weapon.” Cherokee was the second of seventeen tests conducted during Operation Redwing, whose primary purpose was to proof test bombs and warheads for an emerging generation of weapon systems. Eleven tests took place at Enewetak Atoll and six at Bikini Atoll. The parsing of tests between the two atolls was based largely on expected yields. Lower yield tests were held at Enewetak with the expectation that they would not impact the permanent tests facilities located on the atoll. Higher yield shots were detonated at Bikini. Although this division worked for the most part, fallout from one Bikini test, Tewa, reached Enewetak, contaminating both personnel and permanent test facilities.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

FY23 Report on Water NSTF Testing at Two-Phase Conditions: Off-normal Scenarios

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large-scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems in advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. In addition to the experimental activities detailed in this report, a supportive computational modeling effort is on-going which has been demonstrated to significantly strengthen the experimental program while also improving accuracy of the computer models. Together these create a mutually beneficial relationship integral to meeting the overall program objective of examining the heat removal performance of the RCCS concept. This report details the experimental activities and upgrades performed during the program’s fifth year of water-based operation. The theme of this year of testing was examining off-normal scenarios. In practice, that meant examining scenarios with blockages or other design basis conditions. From a maintenance and capability standpoint that meant assessing valving options for implementing blockages, assessing drain and refill capabilities, and ensuring in all cases that operators could safely, efficiently, and repeatably bring the facility to an off-normal condition and return it to the normal operating state. In one notable case, no solution existed, nor was a solution commercially available, that met the facility needs for implementing blockages within the two-phase region of the chimney. A valve and feedthrough were custom-designed for NSTF to operate submerged in saturated water while being safely actuated from outside the tank. The fifth year of testing included eight matrix tests consisting of 162 hours of active heating, 9,735 kWh of electrical heating, with seven tests classified as Accepted per NQA-1 and one as Trending. All matrix tests were performed at two-phase flow conditions. The power parametric series from previous years was extended to include another scenario with a decay load equivalent to 1.75 MWt, full scale, further resolving the system flow oscillation response as a function of input power. A depletion test was performed to extend previous work and examine the system’s approach to stagnation and geysering that were not previously observed. This test began at an initial inventory level of 50%, prototypic power of 2.1 MWt, and employed an accelerated drain of 0.75 gpm plus boiloff until stagnation conditions were achieved and multiple geysering events were recorded. Further exploring the geysering phenomenon was a separate effects test examining static boiling in the risers and chimney. This static boiling test was performed at 48 kWe, a higher power than testing in the previous year, and included enhancements to the drain system to remove inventory in a better-controlled and more reliable manner. Two tests were performed, at prototypic conditions of 1.4 MWt and 2.4 MWt, respectively, examining the system response to throttled conditions in the singlephase region of the piping. A ball valve immediately before he riser inlet header was increasingly throttled, progressing the system through a repeatable pattern of two-phase oscillations and stable regimes before ultimately inducing stagnation and geysering. Concluding the year, two tests were performed at baseline conditions of 70% initial inventory level and 2.1 MWt of prototypic decay heat to examine both repeatability and the response to throttling within the two-phase region, at the inventory tank inlet using the custom valve mentioned above. The first such test repeated transient operating conditions and revealed significant sensitivity t

22 GENERAL STUDIES OF NUCLEAR REACTORS↗