Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “task allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

The JPL Resource Allocation Planning and Scheduling Office (RAPSO) process

The Jet Propulsion Laboratory's Resource Allocation Planning and Scheduling Office is chartered to divide the limited amount of tracking hours of the Deep Space Network amongst the various missions in as equitable allotment as can be achieved. To best deal with this division of assets and time, an interactive process has evolved that promotes discussion with agreement by consensus between all of the customers that use the Deep Space Network (DSN). Aided by a suite of tools, the task of division of asset time is then performed in three stages of granularity. Using this approach, DSN loads are either forecasted or scheduled throughout a moving 10-year window.

RAPSO Resource Allocation Planning and Scheduling ↗

Coal gasification systems engineering and analysis. Appendix H: Work breakdown structure

A work breakdown structure (WBS) is presented which encompasses the multiple facets (hardware, software, services, and other tasks) of the coal gasification program. The WBS is shown to provide the basis for the following: management and control; cost estimating; budgeting and reporting; scheduling activities; organizational structuring; specification tree generation; weight allocation and control; procurement and contracting activities; and serves as a tool for program evaluation.

Source record↗

An integrated decision support system for TRAC: A proposal

Optimal allocation and usage of resources is a key to effective management. Resources of concern to TRAC are: Manpower (PSY), Money (Travel, contracts), Computing, Data, Models, etc. Management activities of TRAC include: Planning, Programming, Tasking, Monitoring, Updating, and Coordinating. Existing systems are insufficient, not completely automated, manpower intensive, and has the potential for data inconsistency exists. A system is proposed which suggests a means to integrate all project management activities of TRAC through the development of a sophisticated software and by utilizing the existing computing systems and network resources. The systems integration proposal is examined in detail.

Mukkamala, Ravi↗

NASDA knowledge-based network planning system

One of the SODS (space operation and data system) sub-systems, NP (network planning) was the first expert system used by NASDA (national space development agency of Japan) for tracking and control of satellite. The major responsibilities of the NP system are: first, the allocation of network and satellite control resources and, second, the generation of the network operation plan data (NOP) used in automated control of the stations and control center facilities. Up to now, the first task of network resource scheduling was done by network operators. NP system automatically generates schedules using its knowledge base, which contains information on satellite orbits, station availability, which computer is dedicated to which satellite, and how many stations must be available for a particular satellite pass or a certain time period. The NP system is introduced.

Yamaya, K.↗

STS payloads mission control study continuation phase A-1. Volume 2-C, task 3: Identification of joint activities and estimation of resources in preparation for joint flight operations

Payload mission control concepts are developed for real time flight operations of STS. Flight planning, training, simulations, and other flight preparations are included. Payload activities for the preflight phase, activity sequences and organizational allocations, and traffic and experience factors to establish composite man-loading for joint STS payload activities are identified for flight operations from 1980 to 1985.

Source record↗

Projecting manpower to attain quality

The resulting model is useful as a projection tool but must be validated in order to be used as an on-going software cost engineering tool. A procedure is developed to facilitate the tracking of model projections and actual data to allow the model to be tuned. Finally, since the model must be used in an environment of overlapping development activities on a progression of software elements in development and maintenance, a manpower allocation model is developed for use in a steady state development/maintenance environment. In these days of soaring software costs it becomes increasingly important to properly manage a software development project. One element of the management task is the projection and tracking of manpower required to perform the task. In addition, since the total cost of the task is directly related to the initial quality built into the software, it becomes a necessity to project the development manpower in a way to attain that quality. An approach to projecting and tracking manpower with quality in mind is described.

Rone, K. Y.↗

Operator versus computer control of adaptive automation

Adaptive automation refers to real-time allocation of functions between the human operator and automated subsystems. The article reports the results of a series of experiments whose aim is to examine the effects of adaptive automation on operator performance during multi-task flight simulation, and to provide an empirical basis for evaluations of different forms of adaptive logic. The combined results of these studies suggest several things. First, it appears that either excessively long, or excessively short, adaptation cycles can limit the effectiveness of adaptive automation in enhancing operator performance of both primary flight and monitoring tasks. Second, occasional brief reversions to manual control can counter some of the monitoring inefficiency typically associated with long cycle automation, and further, that benefits of such reversions can be sustained for some time after return to automated control. Third, no evidence was found that the benefits of such reversions depend on the adaptive logic by which long-cycle adaptive switches are triggered.

Hilburn, Brian↗

Multi-Source Autonomous Response for Targeting and Monitoring of Volcanic Activity

The study of volcanoes is important for both purely scientific and human survival reasons. From a scientific standpoint, volcanic gas and ash emissions contribute significantly to the terrestrial atmosphere. Ash depositions and lava flows can also greatly affect local environments. From a human survival standpoint, many people live within the reach of active volcanoes, and therefore can be endangered by both atmospheric (ash, debris) toxicity and lava flow. There are many potential information sources that can be used to determine how to best monitor volcanic activity worldwide. These are of varying temporal frequency, spatial regard, method of access, and reliability. The problem is how to incorporate all of these inputs in a general framework to assign/task/reconfigure assets to monitor events in a timely fashion. In situ sensing can provide a valuable range of complementary information such as seismographic, discharge, acoustic, and other data. However, many volcanoes are not instrumented with in situ sensors, and those that have sensor networks are restricted to a relatively small numbers of point sensors. Consequently, ideal volcanic study synergistically combines space and in situ measurements. This work demonstrates an effort to integrate spaceborne sensing from MODIS (Terra and Aqua), ALI (EO-1), Worldview-2, and in situ sensing in an automated scheme to improve global volcano monitoring. Specifically, it is a "sensor web" concept in which a number of volcano monitoring systems are linked together to monitor volcanic activity more accurately, and this activity measurement automatically tasks space assets to acquire further satellite imagery of ongoing volcanic activity. A general framework was developed for evidence combination that accounts for multiple information sources in a scientist-directed fashion to weigh inputs and allocate observations based on the confidence of an events occurrence, rarity of the event at that location, and other scientists' inputs. The software framework uses multiple source languages and is a general framework for combining inputs and incrementally submitting observation requests/reconfigurations, accounting for prior requests. The autonomous aspect of operations is unique, especially in the context of the wide range of inputs that includes manually inputted electronic reports (such as the Air Force Weather Advisories), automated satellite-based detection methods (such as MODVOLC and GOESVOLC), and in situ sensor networks.

Davies, Ashley G.↗

The human role in space. Volume 2: Research analysis and technology report

The human role in space was studied. The role and the degree of direct involvement of humans that will be required in future space missions are investigated. Valid criteria for allocating functional activities between humans and machines were established. The technology requirements, economics, and benefits of the human presence in space was examined. Topics discussed include: human qualifications for space activities; specific project assessments; technology requirements and tasks; and generalization on human roles in space.

Source record↗

Intelligent interfaces for tactical airborne platforms

Enhanced capabilities of tactical airborne platforms have resulted in increased number of aircrew tasks, greater task complexity, and increased time-stress in task performance. Embedded intelligence in the aircrew-vehicle interface (AVI) can help alleviate aircrew workload and enhance aircrew performance by: (1) optimizing the exchange of information between the aircrew and the onboard automation; and (2) adaptively allocating functions between aircrew and automation in response to situational demands. Intelligent interface issues are addressed in this report such as: (1) how to ensure that the aircrew can cope with the information influx; (2) how to present/portray both situational and internal status information; (3) how to allocate functions between the aircrew and the onboard automation; and (4) how to explain reasoning processes employed by onboard intelligence to the aircrew.

Madni, A.↗

A Meta-Analytic Approach to Investigating the Relationship Between Human-Automation Trust and Attention Allocation

Trust and attention allocation are pivotal determinants in human-automation interaction. However, there are scarce empirical findings regarding the relationship between trust and attention allocation. Observations from our previous work suggested there may be a negative correlation between trust in automation and eye movement towards automation, though no formal analysis of these data had been conducted to quantify this relationship. The present meta-analysis examined the relationship between three dimensions of trust in automation (performance, process, and purpose) and visual attention allocation to the automation. Specifically, we applied Cumming’s (2014) meta-analysis technique to combine evidence across three experiments. Results indicated a negative correlation between trust in automation and visual sampling of the automated system monitoring task for performance-based trust, but not for process- or purpose-based trust. These findings suggest that operators scanned the automation’s behavior less frequently when indicating higher performance-based trust towards the automation.

Human-Autonomy Teaming (HAT)↗

An Integrated Decision-Making Model for Categorizing Weather Products and Decision Aids

The National Airspace System s capacity will experience considerable growth in the next few decades. Weather adversely affects safe air travel. The FAA and NASA are working to develop new technologies that display weather information to support situation awareness and optimize pilot decision-making in avoiding hazardous weather. Understanding situation awareness and naturalistic decision-making is an important step in achieving this goal. Information representation and situation time stress greatly influence attentional resource allocation and working memory capacity, potentially obstructing accurate situation awareness assessments. Three naturalistic decision-making theories were integrated to provide an understanding of the levels of decision making incorporated in three operational situations and two conditions. The task characteristics associated with each phase of flight govern the level of situation awareness attained and the decision making processes utilized. Weather product s attributes and situation task characteristics combine to classify weather products according to the decision-making processes best supported. In addition, a graphical interface is described that affords intuitive selection of the appropriate weather product relative to the pilot s current flight situation.

Elgin, Peter D.↗

Design for Reliability (DfR) in Space Life Support

The engineering process of Design for Reliability (DfR) is well established in the automotive and aerospace industries. DfR should be useful in the future development of space life support systems. DfR is a sequence of tasks that develop system requirements and plan reliability analysis and testing. First and fundamentally, the reliability requirement is defined. Next the system reliability model is developed, often using a reliability block diagram. The overall system reliability requirement is allocated to the subsystems and an estimate of the attainable reliability is made. This expected reliability can be improved by simplifying the design by removing components or by replacing less reliable components. Improving reliability can require difficult compromises, such as reducing performance requirements, increasing budget, or extending testing. The actual system reliability can be determined only by testing, which should continue long enough to provide the required confidence in the measured value. New systems often have unexpected design errors that cause failures in early testing. The usual reliability improvement process of testing, finding the failure modes, and redesigning to remove them reduces the failure rate and is referred to as “reliability growth.” After redesign has been completed, the system should be further tested to determine the actual achieved reliability more accurately. If the final system failure rate is too high, redundant systems can be used to improve overall operational reliability. Adding redundancy simply to increase the one- or two-fault tolerance metric may sometimes reduce reliability. Reliability can be improved in three ways: redesigning the system to include more reliable subsystems and components, reliability growth testing and failure mode removal, and by using parallel redundant systems. DfR should combine these approaches to achieve the required reliability while managing performance, cost, and schedule.

Reliability↗

Design for Reliability (DfR) in Space Life Support

The engineering process of Design for Reliability (DfR) is well established in the automotive and aerospace industries. DfR should be useful in the future development of space life support systems. DfR is a sequence of tasks that develop system requirements and plan reliability analysis and testing. First and fundamentally, the reliability requirement is defined. Next the system reliability model is developed, often using a reliability block diagram. The overall system reliability requirement is allocated to the subsystems and an estimate of the attainable reliability is made. This expected reliability can be improved by simplifying the design by removing components or by replacing less reliable components. Improving reliability can require difficult compromises, such as reducing performance requirements, increasing budget, or extending testing. The actual system reliability can be determined only by testing, which should continue long enough to provide the required confidence in the measured value. New systems often have unexpected design errors that cause failures in early testing. The usual reliability improvement process of testing, finding the failure modes, and redesigning to remove them reduces the failure rate and is referred to as “reliability growth.” After redesign has been completed, the system should be further tested to determine the actual achieved reliability more accurately. If the final system failure rate is too high, redundant systems can be used to improve overall operational reliability. Adding redundancy simply to increase the one- or two-fault tolerance metric may sometimes reduce reliability. Reliability can be improved in three ways: redesigning the system to include more reliable subsystems and components, reliability growth testing and failure mode removal, and by using parallel redundant systems. DfR should combine these approaches to achieve the required reliability while managing performance, cost, and schedule.

Reliability↗

Study of design and control of remote manipulators. Part 2: Vibration considerations in manipulator design

An investigation is reported involving a mathematical procedure using 4 x 4 transformation matrices for analyzing the vibrations of flexible manipulators. Previous studies with the procedure are summarized and the method is extended to include flexible joints as well as links, and to account for the effects of various power transmission schemes. A systematic study of the allocation of structural material and the placement of components such as motors and gearboxes was undertaken using the analytical tools developed. As one step in this direction the variables which relate the vibration parameters of the arm to the task and environment of the arm were isolated and nondimensionalized. The 4 x 4 transformation matrices were also used to develop analytical expressions for the terms of the complete 6 x 6 compliance matrix for the case of two flexible links joined by a rotating joint, flexible about its axis of rotation.

Book, W. J.↗

Laser geodynamic satellite/thermal/optical vibrational analyses and testing. Volume 2: Technical report, book 3

The overall plan for accomplishing the various tests required to achieve the program objectives and tasks of the LAGEOS thermal/optical/vibration analysis and test program is described. The requirements for each test are identified for the purpose of program review for the design and fabrication of the required test article and test fixtures, for the allocation of test facilities, equipment and expendables, and for the generation of the detail test procedures by which the specified data will be obtained at specified test conditions. The current internal test program schedules, by which the various individual preparatory subtasks are to be accomplished to ensure that the individual test will be conducted within the time period required to meet program objectives are included.

Source record↗

Direct broadcast satellite-radio: Portable and mobile reception trade-offs

There has been considerable international effort in the areas of system studies, system development, and regulatory work for a Direct Broadcast Satellite Radio (DBS-R). An important milestone will be the 1992 World Radio Administrative Conference (WARC 1992) consideration of frequency allocation in the 500 - 3000 MHz range for such a service. There is an interagency agreement between Voice of America and the National Aeronautics and Space Administration for a coordinated program in DBS-R. This program includes seven tasks: systems tradeoff studies, propagation measurements, satellite experiment and demonstration, receiver development, market studies, regulatory studies, and WARC preparations. The findings of ongoing work under the first task, systems tradeoff studies, are discussed. Topics covered include digital bit rate and audio quality, propagation considerations and link margin estimates for portable reception, link margin estimates for mobile reception, coverage, and satellite size and cost estimates for a regional DBS-R coverage example.

Golshan, Nasser↗

International organisation of ocean programs: Making a virtue of necessity

When faced with the needs of climate prediction, a sharp contrast is revealed between existing networks for the observation of the atmosphere and for the ocean. Even the largest and longest-serving ocean data networks were created for their value to a specific user (usually with a defence, fishing or other maritime purpose) and the major compilations of historical data have needed extensive scientific input to reconcile the differences and deficiencies of the various sources. Vast amounts of such data remain inaccessible or unusable. Observations for research purposes have been generally short lived and funded on the basis of single initiatives. Even major programs such as FGGE, TOGA and WOCE have been driven by the dedicated interest of a surprisingly small number of individuals, and have been funded from a wide variety of temporary allocations. Recognising the global scale of ocean observations needed for climate research, international cooperation and coordination is an unavoidable necessity, resulting in the creation of such bodies as the Committee for Climatic Changes and the Ocean (CCCO), with the tasks of: (1) defining the scientific elements of research and ocean observation which meet the needs of climate prediction and amelioration; (2) translating these elements into terms of programs, projects or requirements that can be understood and participated in by individual nations and marine agencies; and (3) the sponsorship of specialist groups to facilitate the definition of research programs, the implementation of cooperative international activity and the dissemination of results.

Mcewan, Angus↗