Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “tank”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Tank Waste Retrieval Lessons Learned at the Hanford Site

One of the environmental remediation challenges facing the nation is the retrieval and permanent disposal of approximately 90 million gallons of radioactive waste stored in underground tanks at the U. S. Department of Energy (DOE) facilities. The Hanford Site is located in southeastern Washington State and stores roughly 60 percent of this waste. An estimated 53 million gallons of high-level, transuranic, and low-level radioactive waste is stored underground in 149 single-shell tanks (SSTs) and 28 newer double-shell tanks (DSTs) at the Hanford Site. These SSTs range in size from 55,000 gallons to 1,000,000 gallon capacity. Approximately 30 million gallons of this waste is stored in SSTs. The SSTs were constructed between 1943 and 1964 and all have exceeded the nominal 20-year design life. Sixty-seven SSTs are known or suspected to have leaked an estimated 1,000,000 gallons of waste to the surrounding soil. The risk of additional SST leakage has been greatly reduced by removing more than 3 million gallons of interstitial liquids and supernatant and transferring this waste to the DST system. Retrieval of SST salt-cake and sludge waste is underway to further reduce risks and stage feed materials for the Hanford Site Waste Treatment Plant. Regulatory requirements for SST waste retrieval and tank farm closure are established in the Hanford Federal Facility Agreement and Consent Order (HFFACO), better known as the Tri- Party Agreement, or TPA. The HFFACO was signed by the DOE, the State of Washington Department of Ecology (Ecology), and U.S. Environmental Protection Agency (EPA) and requires retrieval of as much waste as technically possible, with waste residues not to exceed 360 ft{sup 3} in 530,000 gallon or larger tanks; 30 ft{sup 3} in 55,000 gallon or smaller tanks; or the limit of waste retrieval technology, whichever is less. If residual waste volume requirements cannot be achieved, then HFFACO Appendix H provisions can be invoked to request Ecology and EPA approval of an exception to the waste retrieval criteria for a specific tank. Tank waste retrieval has been conducted at the Hanford Site over the last few decades using a method referred to as Past Practice Hydraulic Sluicing. Past Practice Hydraulic Sluicing employs large volumes of DST supernatant and water to dislodge, dissolve, mobilize, and retrieve tank waste. Concern over the leak integrity of SSTs resulted in the need for tank waste retrieval methods capable of using smaller volumes of liquid in a more controlled manner. Retrieval of SST waste in accordance with HFFACO requirements was initiated at the Hanford Site in April 2003. New and innovative tank waste retrieval methods that minimize and control the use of liquids are being implemented for the first time. These tank waste retrieval methods replace Past Practice Hydraulic Sluicing and employ modified sluicing, vacuum retrieval, and in-tank vehicle techniques. Waste retrieval has been completed in seven Hanford Site SSTs (C-106, C-103, C-201, C-202, C-203, C-204, and S-112) in accordance with HFFACO requirements. Three additional tanks are currently in the process of being retrieved (C-108, C-109 and S-102) Preparation for retrieval of two additional SSTs (C-104 and C-110) is ongoing with retrieval operations forecasted to start in calendar year 2008. Tank C-106 was retrieved to a residual waste volume of 470 ft{sup 3} using oxalic acid dissolution and modified sluicing. An Appendix H exception request for Tank C-106 is undergoing review. Tank C-103 was retrieved to a residual volume of 351 ft{sup 3} using a modified sluicing technology. This approach was successful at reaching the TPA limits for this tank of less than 360 ft{sup 3}and the limits of the technology. Tanks C-201, C-202, C-203, and C-204 are smaller (55,000 gallon) tanks and waste removal was completed in accordance with HFFACO requirements using a vacuum retrieval system. Residual waste volumes in each of these four tanks were less than 25 ft{sup 3}. Tank S-112 retrieval was completed February 28, 2007, meeting the TPA Limits of less than 360 cu ft using salt-cake dissolution, modified sluicing, in-tank vehicle with high pressure water spray and caustic dissolution. Tanks C-108 and C-109 have been retrieved to 90% and 85% respectively. Modified sluicing was no longer effective at retrieving the remaining 5,000 to 10,000 gallons of residual. A Mobile Retrieval Tool (FoldTrac) is scheduled for installation early in 2008 to assist in breaking up chunks of waste and mobilizing the waste for transfer. Lessons learned from application of new tank waste retrieval methods are being documented and incorporated into future retrieval operations. They address all phases of retrieval including process design, equipment procurement and installation, supporting documentation, and system operations. Information is obtained through interviews with retrieval project personnel, focused workshops, review of problem evaluation requests, and evaluation of retrieval performance data. This paper presents current retrieval successes and lessons learned from retrieval of tank waste at the Hanford Site and discusses how this information is used to optimize retrieval system efficiency, improve overall cost effectiveness of retrieval operations, and ensure that HFFACO requirements are met. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Structural Integrity of Single Shell Tanks at Hanford - 9491

The 149 Single Shell Tanks at the Hanford Site were constructed between the 1940’s and the 1960’s. Many of the tanks are either known or suspected to have leaked in the past. While the free liquids have been removed from the tanks, they still contain significant waste volumes. Recently, the tank farm operations contractor established a Single Shell Tank Integrity Program. Structural integrity is one aspect of the program. The structural analysis of the Single Shell Tanks has several challenging factors. There are several tank sizes and configurations that need to be analyzed. Tank capacities range from fifty-five thousand gallons to one-million gallons. The smallest tank type is approximately twenty feet in diameter, and the three other tank types are all seventy-five feet in diameter. Within each tank type there are varying concrete strengths, types of steel, tank floor arrangements, in-tank hardware, riser sizes and locations, and other appurtenances that need to be addressed. Furthermore, soil properties vary throughout the tank farms. The Pacific Northwest National Laboratory has been conducting preliminary structural analyses of the various single shell tank types to address these parameters. The preliminary analyses will assess which aspects of the tanks will require further detailed analysis. Evaluation criteria to which the tanks will be analyzed are also being developed for the Single Shell Tank Integrity Program. This information will be reviewed by the Single Shell Tank Integrity Expert Panel that has been formed to issue recommendations to the DOE and to the tank farm operations contractor regarding Single Shell Tank Integrity. This paper provides a summary of the preliminary analysis of the single shell tanks, a summary of the recommendations for the detailed analyses, and the proposed evaluation criteria by which the tanks will be judged.

54 ENVIRONMENTAL SCIENCES↗

Characterization and CST Batch Contact Equilibrium Testing of Modified Tank 9H Process Supernate Samples in Support of TCCR

The Tank Closure Cesium Removal (TCCR) system uses ion exchange columns filled with crystalline silicotitanate (CST) media to process radioactive waste solutions for the removal of ¹³⁷Cs. TCCR currently focuses on dissolving Savannah River Site (SRS) radioactive tank waste (primarily sodium saltcake solids) within Tank 10H followed by at-tank ion exchange column treatment. Two supernate batches from Tank 10H have been processed through the TCCR unit and processing of a third batch is expected soon. After processing of this supernate batch, plans are to replace the CST columns and process dissolved salt solution from Tank 9H through Tank 10H and then through the new CST columns installed in the TCCR unit. The new columns are expected to contain either a media similar to an archived CST batch (IE-911) or the R9120-B CST media used in the current TCCR columns (the two materials are fundamentally the same; just different specifications, product names, and preconditioning steps). Samples of Tank 9H dissolved saltcake were received at the Savannah River National Laboratory (SRNL) and characterized. The Tank 9H supernate contained a high sodium concentration (~9.6 M Na⁺) and will require dilution to near 6 M [Na⁺] prior to processing through the TCCR unit. The cesium concentration in Tank 9H is currently significantly higher than was observed with Tank 10H. Three dilutions of the Tank 9H supernate were conducted to mimic possible dilutions that could be conducted in the tank farm prior to TCCR processing using inhibited water, sodium hydroxide, and sodium nitrate solutions. Dilution #1 was prepared by diluting the Tank 9H supernate by a factor of 1.6 with inhibited water, Dilution #2 was prepared by diluting the Tank 9H supernate by a factor of 3.7 with a mixed sodium hydroxide/sodium nitrate diluent, and Dilution #3 was prepared by also diluting by a factor of 3.7 but with sodium hydroxide only. All three dilutions have similar Na⁺ concentrations (~6 M), but Dilutions #2 and #3 contain significantly less cesium. Major and key minor components of the diluted Tank 9H supernate samples are provided in Table ES-1. Batch contact equilibrium tests were conducted with the Tank 9H dilutions and the two different CST media batches being considered for use in the new TCCR columns. Results are summarized in Table ES-2 and compared to ZAM model predictions. The highest cesium distribution coefficient and percent removal were observed with Dilution #3. IE-911 CST (an archived CST media batch) was more effective at removing cesium than the more recently prepared R9120-B CST media, though both media samples removed >88% of the cesium and the differences may not be statistically different considering the overall uncertainty. Based on the results, maximum cesium loadings were calculated for each CST media type and Tank 9H dilution. In general, maximum cesium loadings from dilutions of this supernate batch are quite high (approaching 0.1 mmol total Cs⁺/g CST for Dilution #1). The highest calculated maximum ¹³⁷Cs loading for the Tank 9H dilutions using the ZAM model with input of the tank compositions and batch contact results was 207 Ci/kg CST (Dilution #1 with IE-911 CST). In all cases, higher maximum cesium loading values were predicted for IE-911 CST versus R9120-B, although the differences varied considerably between the dilutions. The maximum loading value for IE-911 CST with Tank 9H Dilution #1 was only 7% higher than the maximum loading for R9120-B. The maximum loading value for IE-911 CST with Dilution #3 was 24% higher than the maximum loading for R9120-B. Dilution #2 was intermediate between these values. Note that these maximum loading values are the theoretical calculated values, and actual operating conditions will cause differences. A CST binder dilution (correction) factor near 0.7 (relative to pure powder CST) was required for each batch contact test with IE-911 engineered CST using the three Tank 9H dilutions. Correction factors calculated for R9120-B CST ranged from 0.56 to 0.66 for the three dilutions. Following the batch contact tests, the CST samples were isolated from the Tank 9H solution, washed, dried, and digested in acid following established procedures. The analysis results are provided in Table ES-3. Total cesium loading values determined by CST digestion were similar to the calculated loading values based on solution analysis (Table ES-2) for all samples. In addition, the CST was observed to load calcium (R9120-B sample only), iron, strontium, lead, uranium, and plutonium after contact with the waste supernate, as has been observed previously.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Technology Development (Tank Farms) - 12509

The mission of the Department of Energy's Office of River Protection (ORP) is to safely retrieve and treat the 56 million gallons of Hanford's tank waste and close the Tank Farms to protect the Columbia River. The millions of gallons of tank waste are a byproduct of decades of plutonium production. After irradiated fuel rods were taken from the nuclear reactors to the processing facilities at Hanford they were exposed to a series of chemicals designed to dissolve away the rod, which enabled workers to retrieve the plutonium. Once those chemicals were exposed to the fuel rods they became radioactive and extremely hot. They also couldn't be used in this process more than once. Because the chemicals are caustic and extremely hazardous to humans and the environment, underground storage tanks were built to hold these chemicals until a more permanent solution could be found. One key part of the ongoing work at Hanford is retrieving waste from the single-shell tanks, some of which have leaked in the past, and transferring that waste to the double-shell tanks - none of which have ever leaked. The 56 million gallons of radioactive tank waste is stored in 177 underground tanks, 149 of which are single-shell tanks built between 1943 and 1964. The tanks sit approximately 250 feet above the water table. Hanford's single-shell tanks are decades past their 20-year design life. In the past, up to 67 of the single-shell tanks are known or suspected to have leaked as much as one million gallons of waste to the surrounding soil. Starting in the late 1950's, waste leaks from dozens of the single-shell tanks were detected or suspected. Most of the waste is in the soil around the tanks, but some of this waste is thought to have reached groundwater. The Vadose Zone Project was established to understand the radioactive and chemical contamination in the soil beneath the tanks as the result of leaks and discharges from past plutonium-production operations. The vadose zone is the area of soil between the ground surface and the water table 200-to-300 feet below. The project tracks and monitors contamination in the soil. Technologies are being developed and deployed to detect and monitor contaminants. Interim surface barriers, which are barriers put over the single-shell tanks, prevent rain and snow from soaking into the ground and spreading contamination. The impermeable barrier placed over T Farm, which was the site of the largest tank waste leak in Hanford's history, is 60,000 square feet and sloped to drain moisture outside the tank farm. The barrier over TY Farm is constructed of asphalt and drains moisture to a nearby evaporation basin. Our discussion of technology will address the incredible challenge of removing waste from Hanford's single-shell tanks. Under the terms of the Tri-Party Agreement, ORP is required to remove 99 percent of the tank waste, or until the limits of technology have been reached. All pumpable liquids have been removed from the single-shell tanks, and work now focuses on removing the non-pumpable liquids. Waste retrieval was completed from the first single-shell tank in late 2003. Since then, another six single-shell tanks have been retrieved to regulatory standards. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

STATUS OF MECHANICAL SLUDGE REMOVAL AND COOLING COILS CLOSURE AT THE SAVANNAH RIVER SITE - F TANK FARM CLOSURE PROJECT - 9225

The Savannah River Site F-Tank Farm Closure project has successfully performed Mechanical Sludge Removal using the Waste on Wheels (WOW) system within two of its storage tanks. The Waste on Wheels (WOW) system is designed to be relatively mobile with the ability for many components to be redeployed to multiple tanks. It is primarily comprised of Submersible Mixer Pumps (SMPs), Submersible Transfer Pumps (STPs), and a mobile control room with a control panel and variable speed drives. These tanks, designated as Tank 6 and Tank 5 respectively, are Type I waste tanks located in F-Tank Farm (FTF) with a capacity of 2839 cubic meters (750,000 gallons) each. In addition, Type I tanks have 34 vertically oriented cooling coils and two horizontal cooling coil circuits along the tank floor. DOE intends to remove from service and operationally close Tank 5 and Tank 6 and other HLW tanks that do not meet current containment standards. After obtaining regulatory approval, the tanks and cooling coils will be isolated and filled with grout for long term stabilization. Mechanical Sludge Removal of the remaining sludge waste within Tank 6 removed {approx} 75% of the original 25,000 gallons in August 2007. Utilizing lessons learned from Tank 6, Tank 5 Mechanical Sludge Removal completed removal of {approx} 90% of the original 125 cubic meters (33,000 gallons) of sludge material in May 2008. The successful removal of sludge material meets the requirement of approximately 19 to 28 cubic meters (5,000 to 7,500 gallons) remaining prior to the Chemical Cleaning process. The Chemical Cleaning Process will utilize 8 wt% oxalic acid to dissolve the remaining sludge heel. The flow sheet for Chemical Cleaning planned a 20:1 volume ratio of acid to sludge for the first strike with mixing provided by the submersible mixer pumps. The subsequent strikes will utilize a 13:1 volume ratio of acid to sludge with no mixing. The results of the Chemical Cleaning Process are detailed in the 'Status of Chemical Cleaning of Waste Tanks at the Savannah River Site--F Tank Farm Closure Project--Abstract 9114'. To support Tank 5 and Tank 6 cooling coil closure, cooling coil isolation and full scale cooling coil grout testing was completed to develop a strategy for grouting the horizontal and vertical cooling coils. This paper describes in detail the performance of the Mechanical Sludge Removal activities and SMP operational strategies within Tank 5. In addition, it will discuss the current status of Tank 5 & 6 cooling coil isolation activities and the results from the cooling coil grout fill tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cathodic Protection Modeling for Hanford Underground Double-Shell Tank Farms

Hanford stores millions of gallons of radioactive and chemically hazardous waste from the production of weapon materials in tank farms consisting of underground carbon-steel storage tanks surrounded by reinforced concrete. Six of these Hanford tank farms use double-shell storage tanks (DSTs). The DST farms were constructed from 1968 to 1986 with a planned 40–50 year design life, so some are already operating beyond their initial life expectancy. Ultrasonic testing (UT) has indicated significant thinning on the bottom of the secondary (outer) liner of these tanks, believed to arise from groundwater intrusion driving concrete side corrosion. There is no direct access to the steel/concrete interface between the tank and the concrete pad, making it difficult to apply a chemical-based mitigation strategy or to conduct repairs, but cathodic protection (CP) is a possible method to inhibit further concrete-side corrosion. Hanford already uses CP to protect below grade steel piping within the tank farms and connected to the tanks, but this system was not designed to protect the tank bottoms. CP design must account for the structures surrounding the DSTs, including the steel reinforcing bars (rebar) within the concrete pad and vault, various process lines, and the existing CP system. In this study, finite element analysis (FEA) modeling was carried out to simulate CP protection of 1) a single tank and CP anode to develop options for modeling the rebar and to compare to a simpler circuit model and 2) the entire Hanford AN tank farm as a representative example consisting of seven tanks, associated piping, and both existing and new CP anodes. Both circuit and FEA models predict that significant protective current could be delivered to the bottoms of the tanks with the addition of tank-protection anodes below the depth of the tanks. Simulations with only the existing pipe-protection anodes active confirmed that only a very small current to the tank bottoms is predicted under present conditions. Multiple simplified representations of the dome and wall rebar were tested to reduce the computational complexity of the tank-farm simulations, resulting in modeling the rebar as edge elements with a prescribed effective circumference that matches the real rebar surface area. The geometry of the rebar is also simplified into horizontal hoops around the tank walls and radial rebar over the dome with increased effective circumference to retain the target surface area. This simplification was found to greatly reduce the complexity and solution time of the models without large changes in current distributions, especially to the tank bottom. A range of values were tested for model parameters such as soil and concrete resistivities and polarization resistance to investigate their impact on the current and electric potential distributions. Depending on the parameters used, FEA simulations predict some risk of overprotection, particularly on the piping system; since overprotection can also lead to surface damage associated with hydrogen gas generation at the interface (e.g. hydrogen embrittlement or damage to coatings), this needs to be considered when refining the design of the new CP system. Comparison between the FEA models and the circuit model representation demonstrated that the circuit model could not match the predicted FEA current distribution, even when using the exact same surface areas. This discrepancy appeared to be at least partly attributable to the impact of the relative positions of the tank components and anodes to each other and to the ground surface. The FEA model accounts for the relative positions since it solves the governing equations in three dimensions, but the circuit model cannot account for the positioning. In particular, the circuit model underpredicts the current to the tank bottom and overpredicts the current to the dome compared to FEA for the baseline geometry. The FEA models omitted the electrically isolated rebar in the bottom concrete slab. However, a circuit based stray current model estimated that only 2.1% of the total current through the slab would stray into the rebar, corresponding to ~0.21 A for a target current density of 2 mA/ft2 to the tank bottom. The estimated corrosion driven by this amount of stray current is predicted to yield a lifetime of >400 years for the minimum rebar diameter, assuming an acceptable cross-section area loss of 10%.

d'Entremont, Anna [Savannah River National Laborat↗

Radio-Frequency Tank Eigenmode Sensor for Propellant Quantity Gauging

Although there are several methods for determining liquid level in a tank, there are no proven methods to quickly gauge the amount of propellant in a tank while it is in low gravity or under low-settling thrust conditions where propellant sloshing is an issue. Having the ability to quickly and accurately gauge propellant tanks in low-gravity is an enabling technology that would allow a spacecraft crew or mission control to always know the amount of propellant onboard, thus increasing the chances for a successful mission. The Radio Frequency Mass Gauge (RFMG) technique measures the electromagnetic eigenmodes, or natural resonant frequencies, of a tank containing a dielectric fluid. The essential hardware components consist of an RF network analyzer that measures the reflected power from an antenna probe mounted internal to the tank. At a resonant frequency, there is a drop in the reflected power, and these inverted peaks in the reflected power spectrum are identified as the tank eigenmode frequencies using a peak-detection software algorithm. This information is passed to a pattern-matching algorithm, which compares the measured eigenmode frequencies with a database of simulated eigenmode frequencies at various fill levels. A best match between the simulated and measured frequency values occurs at some fill level, which is then reported as the gauged fill level. The database of simulated eigenmode frequencies is created by using RF simulation software to calculate the tank eigenmodes at various fill levels. The input to the simulations consists of a fairly high-fidelity tank model with proper dimensions and including internal tank hardware, the dielectric properties of the fluid, and a defined liquid/vapor interface. Because of small discrepancies between the model and actual hardware, the measured empty tank spectra and simulations are used to create a set of correction factors for each mode (typically in the range of 0.999 1.001), which effectively accounts for the small discrepancies. These correction factors are multiplied to the modes at all fill levels. By comparing several measured modes with the simulations, it is possible to accurately gauge the amount of propellant in the tank. An advantage of the RFMG approach of applying computer simulations and a pattern-matching algorithm is that the Although there are several methods for determining liquid level in a tank, there are no proven methods to quickly gauge the amount of propellant in a tank while it is in low gravity or under low-settling thrust conditions where propellant sloshing is an issue. Having the ability to quickly and accurately gauge propellant tanks in low-gravity is an enabling technology that would allow a spacecraft crew or mission control to always know the amount of propellant onboard, thus increasing the chances for a successful mission. The Radio Frequency Mass Gauge (RFMG) technique measures the electromagnetic eigenmodes, or natural resonant frequencies, of a tank containing a dielectric fluid. The essential hardware components consist of an RF network analyzer that measures the reflected power from an antenna probe mounted internal to the tank. At a resonant frequency, there is a drop in the reflected power, and these inverted peaks in the reflected power spectrum are identified as the tank eigenmode frequencies using a peak-detection software algorithm. This information is passed to a pattern-matching algorithm, which compares the measured eigenmode frequencies with a database of simulated eigenmode frequencies at various fill levels. A best match between the simulated and measured frequency values occurs at some fill level, which is then reported as the gauged fill level. The database of simulated eigenmode frequencies is created by using RF simulation software to calculate the tank eigenmodes at various fill levels. The input to the simulations consists of a fairly high-fidelity tank model with proper dimensions and including internal tank harare, the dielectric properties of the fluid, and a defined liquid/vapor interface. Because of small discrepancies between the model and actual hardware, the measured empty tank spectra and simulations are used to create a set of correction factors for each mode (typically in the range of 0.999 1.001), which effectively accounts for the small discrepancies. These correction factors are multiplied to the modes at all fill levels. By comparing several measured modes with the simulations, it is possible to accurately gauge the amount of propellant in the tank. An advantage of the RFMG approach of applying computer simulations and a pattern-matching algorithm is that the

Zimmerli, Gregory A.↗

Numerical Simulation of No Vent Chill and Fill of a Large Liquid Hydrogen Tank

On orbit transfer of cryogenic liquids is necessary for many future space missions. The techniques required to transfer cryogens in micro gravity are quite different from ground system applications. In normal gravity, cryogenic tanks are usually filled from the bottom at nearly atmospheric pressure. The vapor generated due to heat transfer from warm tank walls, is allowed to vent from the top of the tank while the tank is being filled. If the normal gravity technique is used on orbit, the uncertainty of liquid and vapor distributions in unsettled condition may result in dumping of large amounts of liquid propellant overboard. The Vented Chill and No Vent Fill (VCNVF) process is a methodology [1] used to reduce propellant loss by holding the vent valve open during initial wall chilldown, preventing over-pressurization of the tank and stalling of the incoming flow, but closing the tank vent valve after chilling the tank wall sufficiently. An accurate simulation of no vent tank chill and fill is necessary to estimate the amount of propellant necessary to chill the tank, determine the maximum sustainable flowrate to fill the tank without stalling, and establish a timeline for the filling process. Numerical modeling of filling a cryogenic tank is complex because the flow is two-phase and the process involves both boiling and condensation with heat transfer between solid and fluid. In recent years, progress has been made to develop a numerical modeling technique [2,3,4] that has been verified by comparing with the test data from a small flight tank using liquid nitrogen [5]. The purpose of the present paper is to apply this technique in a larger tank with liquid hydrogen and compare with the test data of Chato [1]. The K-site Test Facility [1], shown in Figure 1, consists of a Test Tank, spray system, instrumentation, and the vacuum chamber. The test tank selected was ellipsoidal with an 87 inch major diameter and a 1.2 to 1 major to minor axis ratio. The two ends are joined by a short 1.5 inch cylindrical section. The tank is made of 2219 aluminum chemically milled to a nominal thickness of 0.087 inches. The tank weighs 329.25 pounds, and the tank volume is 175 ft 3 . The GFSSP model of the Test Tank is shown in Figure 2. Node 13 is a boundary node that represents the supply tank which is supplying liquid hydrogen at a given pressure and temperature. The total measured flowrate is evenly distributed through Branches 131 through 139. Nodes 1 through 9 represent the test tank and they are connected with metal solid nodes 14 through 22 through fluid-to-solid conductors that allow convective heat transfer between the solid and fluid nodes. The predicted tank pressure, filling rate, wall temperature and fluid temperature will be compared with test data.

Alok Majumdar↗

SINGLE-SHELL TANK INTEGRITY PROJECT ANALYSIS OF RECORD-PRELIMINARY MODELING PLAN FOR THERMAL AND OPERATING LOADS

This document is a Phase I deliverable for the Single-Shell Tank Analysis of Record effort. This document is not the Analysis of Record. The intent of this document is to guide the Phase II detailed modeling effort. Preliminary finite element models for each of the tank types were developed and different case studies were performed on one or more of these tank types. Case studies evaluated include thermal loading, waste level variation, the sensitivity of boundary effects (soil radial extent), excavation slope or run to rise ratio, soil stratigraphic (property and layer thickness) variation at different farm locations, and concrete material property variation and their degradation under thermal loads. The preliminary analysis document reviews and preliminary modeling analysis results are reported herein. In addition, this report provides recommendations for the next phase of the SST AOR project, SST detailed modeling. Efforts and results discussed in this report do not include seismic modeling as seismic modeling is covered by a separate report. The combined results of both static and seismic models are required to complete this effort. The SST AOR project supports the US Department of Energy's (DOE) Office of River Protection (ORP) mission for obtaining a better understanding of the structural integrity of Hanford's SSTs. The 149 SSTs, with six different geometries, have experienced a range of operating histories which would require a large number of unique analyses to fully characterize their individual structural integrity. Preliminary modeling evaluations were conducted to determine the number of analyses required for adequate bounding of each of the SST tank types in the Detailed Modeling Phase of the SST AOR Project. The preliminary modeling was conducted in conjunction with the Evaluation Criteria report, Johnson et al. (2010). Reviews of existing documents were conducted at the initial stage of preliminary modeling. These reviews guided the topics that were explored in the SST preliminary modeling. The reviews determined the level of detail necessary to perform the analyses of the SSTs. To guide the Phase II detailed modeling effort, preliminary finite element models for each of the tank types were developed and different case studies were performed on one or more of these tank types. Case studies evaluated include thermal loading, waste level variation, the sensitivity of boundary effects (soil radial extent), excavation slope or run to rise ratio, soil stratigraphic (property and layer thickness) variation at different farm locations, and concrete material property variation and their degradation under thermal loads. Conclusions were derived from case studies on one of the tank types when no additional runs of similar cases on other types of tanks were found necessary to derive those conclusions. The document reviews provided relatively complete temperature histories for Type IV tanks. The temperature history data for Type I, II, and III tanks was almost nonexistent for years prior to 1975. Document reviews indicate that there might be additional useful data in the US Department of Energy, Richland Operations Office (DOE-RL) records in Seattle, WA, and these records need to be reviewed to extract data that might have been disregarded during previous reviews. Thermal stress analyses were conducted using different temperature distribution scenarios on Type IV tanks. Such studies could not be carried out for other tank types due to lack of temperature history data. The results from Type IV tank analyses indicate that factors such as temperature distribution in the tank waste and rate of rise in waste temperature have a significant impact on the thermal stresses in the tank structures. Overall, the conclusion that can drawn from the thermal stress analyses is that these studies should be carried out for all tank types during the detailed analysis phase with temperature values that are reasonably close to the typical temperature histories of the respective tank types. If and/or when additional waste temperature data is acquired for tank Type I, II, and III tanks, additional cases need to be considered as tank structural integrity is sensitive to thermal loads. A few case studies were also performed using Type IV-b models to comprehend the effects of excavation boundaries, change in soil stratigraphy (layer thickness and properties), and radial extent of soil in the finite element models. The result from the case studies indicates that the slight variation in soil stratigraphy has little effects on the tank sections force and moment demands under mechanical loads. The case study for excavation slope or backfill transition boundary indicated that inclusion of such boundary yields conservative demands in the wall region while demands at other locations remain unaffected. Hence this excavation slope will be modeled in the detailed analysis of SSTs.

54 ENVIRONMENTAL SCIENCES↗

BLENDING STUDY FOR SRR SALT DISPOSITION INTEGRATION: TANK 50H SCALE-MODELING AND COMPUTER-MODELING FOR BLENDING PUMP DESIGN, PHASE 2

The Salt Disposition Integration (SDI) portfolio of projects provides the infrastructure within existing Liquid Waste facilities to support the startup and long term operation of the Salt Waste Processing Facility (SWPF). Within SDI, the Blend and Feed Project will equip existing waste tanks in the Tank Farms to serve as Blend Tanks where 300,000-800,000 gallons of salt solution will be blended in 1.3 million gallon tanks and qualified for use as feedstock for SWPF. Blending requires the miscible salt solutions from potentially multiple source tanks per batch to be well mixed without disturbing settled sludge solids that may be present in a Blend Tank. Disturbing solids may be problematic both from a feed quality perspective as well as from a process safety perspective where hydrogen release from the sludge is a potential flammability concern. To develop the necessary technical basis for the design and operation of blending equipment, Savannah River National Laboratory (SRNL) completed scaled blending and transfer pump tests and computational fluid dynamics (CFD) modeling. A 94 inch diameter pilot-scale blending tank, including tank internals such as the blending pump, transfer pump, removable cooling coils, and center column, were used in this research. The test tank represents a 1/10.85 scaled version of an 85 foot diameter, Type IIIA, nuclear waste tank that may be typical of Blend Tanks used in SDI. Specifically, Tank 50 was selected as the tank to be modeled per the SRR, Project Engineering Manager. SRNL blending tests investigated various fixed position, non-rotating, dual nozzle pump designs, including a blending pump model provided by the blend pump vendor, Curtiss Wright (CW). Primary research goals were to assess blending times and to evaluate incipient sludge disturbance for waste tanks. Incipient sludge disturbance was defined by SRR and SRNL as minor blending of settled sludge from the tank bottom into suspension due to blending pump operation, where the sludge level was shown to remain constant. To experimentally model the sludge layer, a very thin, pourable, sludge simulant was conservatively used for all testing. To experimentally model the liquid, supernate layer above the sludge in waste tanks, two salt solution simulants were used, which provided a bounding range of supernate properties. One solution was water (H{sub 2}O + NaOH), and the other was an inhibited, more viscous salt solution. The research performed and data obtained significantly advances the understanding of fluid mechanics, mixing theory and CFD modeling for nuclear waste tanks by benchmarking CFD results to actual experimental data. This research significantly bridges the gap between previous CFD models and actual field experiences in real waste tanks. A finding of the 2009, DOE, Slurry Retrieval, Pipeline Transport and Plugging, and Mixing Workshop was that CFD models were inadequate to assess blending processes in nuclear waste tanks. One recommendation from that Workshop was that a validation, or bench marking program be performed for CFD modeling versus experiment. This research provided experimental data to validate and correct CFD models as they apply to mixing and blending in nuclear waste tanks. Extensive SDI research was a significant step toward bench marking and applying CFD modeling. This research showed that CFD models not only agreed with experiment, but demonstrated that the large variance in actual experimental data accounts for misunderstood discrepancies between CFD models and experiments. Having documented this finding, SRNL was able to provide correction factors to be used with CFD models to statistically bound full scale CFD results. Through the use of pilot scale tests performed for both types of pumps and available engineering literature, SRNL demonstrated how to effectively apply CFD results to salt batch mixing in full scale waste tanks. In other words, CFD models were in error prior to development of experimental correction factors determined during this research, which provided a technique to use CFD models for salt batch mixing and transfer pump operations. This major scientific advance in mixing technology resulted in multi-million dollar cost savings to SRR. New techniques were developed for both experiment and analysis to complete this research. Supporting this success, research findings are summarized in the Conclusions section of this report, and technical recommendations for design and operation are included in this section of the report.

08 HYDROGEN↗

F-AREA PUMP TANK 1 MIXING ANALYSIS

The F-area pump tanks are used to transfer supernate, sludge, and other materials. In any transfer, the solution must stay well mixed without allowing particulate matter to settle out of the liquid and, thus, accumulate in the bottom of the pump tank. Recently, the pulse jet mixing in F-area Pump Tank 1 (FPT1) has been decommissioned. An analysis of the liquid transfer through FPT1 has been performed using computational fluid dynamics (CFD) methods to assess whether or not the velocities throughout the tank will remain high enough to keep all particulate suspended using only transfer and recirculation pumps. The following paragraph is an abbreviated synopsis of the transfer procedure for FPT1 [1, 2]. Prior to a transfer, FPT1 begins to be filled with inhibited water through the inlet transfer line (TI). When the tank liquid level reaches 52.5 inches above the absolute tank bottom, the recirculation pump (RI and RO) is activated. At a tank liquid level of 72.5 inches above the absolute tank bottom, the outlet transfer line (TO) is activated to reduce the liquid level in FPT1 and transfer inhibited water to H-area Pump Tank 7 (HPT7). The liquid level is reduced down to 39.5 inches, with an allowable range from 37.5 to 41.5 inches above the absolute tank bottom. HPT7 goes through a similar procedure as FPT1 until both have tank liquid levels of approximately 39.5 inches above the absolute tank bottom. The transfer of inhibited water continues until a steady-state has been reached in both pump tanks. At this point, the supernate/sludge transfer begins with a minimum flow rate of 70 gpm and an average flow rate of 150 gpm. After the transfer is complete, the pump tanks (both FPT1 and HPT7) are pumped down to between 20.5 and 22.5 inches (above absolute bottom) and then flushed with 25,000 gallons of inhibited water to remove any possible sludge heal. After the flushing, the pump tanks are emptied. Note that the tank liquid level is measured using diptubes. Figure 2.1 provides a simplified sketch (not to scale) of FPT1 during the steady-state transfer condition, which consists of two inlet flows that impact the liquid surface as plunging jets and two outlet flows drawn from near the bottom of the tank. During the transfer, the supernate level is held at 39.5 inches above the absolute bottom of the tank [1, 2]. In addition, the FPT1 can contain up to 16.7 wt.% sludge particles within the supernate for a given transfer [2]. Test results from Tank 40 sludge Batch 3 [3] provide a typical range of particulate diameters between 0.1 and 25 {micro}m, with approximately 20 vol.% of the sludge distribution consisting of particles less than 1 {micro}m in diameter. The purpose of this analysis is to estimate FPT1 flow field during the steady-state transfer conditions to ensure that the tank remains mixed and that the velocities throughout the tank are sufficient to keep all sludge particulate suspended.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress in Hanford's Double-Shell Tank Integrity Project

The U.S. Department of Energy's Office of River Protection has an extensive integrity assessment program for the Hanford Site Double-Shell Tank System. The DOE Orders and environmental protection regulations provide the guidelines for the activities used to inspect and maintain 28 double-shell tanks (DSTs), the waste evaporator, and ancillary equipment that compose this system. This program has been reviewed by oversight and regulatory bodies and found to comply with the established guidelines. The basis for the DOE Order 435.1-1 for tank integrity comes from the Tank Structural Integrity Panel led by Brookhaven National Laboratory during the late 1990's. These guidelines established criteria for performing Non-Destructive Examination (NDE), for acceptance of the NDE results, for waste chemistry control, and for monitoring the tanks. The environmental regulations mirror these requirements and allow for the tank integrity program to provide compliant storage of the tanks. Both sets of requirements provide additional guidance for the protection of ancillary equipment. CH2M HILL uses two methods of NDE: visual inspection and Ultrasonic Testing (UT). The visual inspection program examines the primary tank and secondary liner of the DST. The primary tank is examined both on the interior surface above the waste in the tank and on the exterior surface facing the annulus of the DST. The interior surface of the tank liner is examined at the same time as the outer surface of the primary tank. The UT program examines representative areas of the primary tank and secondary liner by deploying equipment in the annulus of the tank. Both programs have led to the development of new equipment for remote inspection of the tanks. Compact camera and enhanced lighting systems have been designed and deployed through narrow access ports (called risers) into the tanks. The UT program has designed two generations of crawlers and equipment for deployment through risers into the thermally hot and radioactive environment. Also extensions were developed to allow inspection of the tank's curve upper (haunch) and lower (knuckle) surfaces. CH2M HILL primarily maintains chemistry control of the DST by ensuring that the concentrations of hydroxide and nitrite ions are favorable with respect to the nitrate ion concentration in the waste. This control program is supported by an extensive sampling program that obtains samples from the supernatant and solid layers in the tank to ensure compliance with the chemical specification. At DOE direction, CH2M HILL has embarked on a waste chemistry optimization program to enhance the protection of the tank surface and the understanding of the parameters that affect general and localized corrosion in the tanks. Over the past decade, DOE has deployed Electrochemical Noise corrosion probes in the DST to monitor localized corrosion. From the information gathered as part of the chemistry control, new information has been identified about the parameters requiring control to ensure tank integrity. CH2M HILL is deploying a series of corrosion probes to test and employ these parameters to provide real time corrosion monitoring of the DSTs. (authors)

42 ENGINEERING↗

PROGRESS IN HANFORDS DOUBLE SHELL TANK (DST) INTEGRITY PROJECT

The U.S. Department of Energy's Office of River Protection has an extensive integrity assessment program for the Hanford Site Double-Shell Tank System. The DOE Orders and environmental protection regulations provide the guidelines for the activities used to inspect and maintain 28 double-shell tanks (DSTs), the waste evaporator, and ancillary equipment that compose this system. This program has been reviewed by oversight and regulatory bodies and found to comply with the established guidelines. The basis for the DOE Order 435.1-1 for tank integrity comes from the Tank Structural Integrity Paneled by Brookhaven National Laboratory during the late 1990s. These guidelines established criteria for performing Non-Destructive Examination (NDE), for acceptance of the NDE results, for waste chemistry control, and for monitoring the tanks. The environmental regulations mirror these requirements and allow for the tank integrity program to provide compliant storage of the tanks. Both sets of requirements provide additional guidance for the protection of ancillary equipment. CH2M HILL uses two methods of NDE: visual inspection and Ultrasonic Testing (UT). The visual inspection program examines the primary tank and secondary liner of the DST. The primary tank is examined both on the interior surface above the waste in the tank and on the exterior surface facing the annulus of the DST. The interior surface of the tank liner is examined at the same time as the outer surface of the primary tank. The UT program examines representative areas of the primary tank and secondary liner by deploying equipment in the annulus of the tank. Both programs have led to the development of new equipment for remote inspection of the tanks. Compact camera and enhanced lighting systems have been designed and deployed through narrow access ports (called risers) into the tanks. The UT program has designed two generations of crawlers and equipment for deployment through risers into the thermally hot and radioactive environment. Also extensions were developed to allow inspection of the tank's curve upper (haunch) and lower (knuckle) surfaces. CH2M HILL primarily maintains chemistry control of the DST by ensuring that the concentrations of hydroxide and nitrite ions are favorable with respect to the nitrate ion concentration in the waste. This control program is supported by an extensive sampling program that obtains samples from the supernatant and solid layers in the tank to ensure compliance with the chemical specification. At DOE direction, CH2M HILL has embarked on a waste chemistry optimization program to enhance the protection of the tank surface and the understanding of the parameters that affect general and localized corrosion in the tanks. Over the past decade, DOE has deployed Electrochemical Noise corrosion probes in the DST to monitor localized corrosion. From the information gathered as part of the chemistry control, new information has been identified about the parameters requiring control to ensure tank integrity. CH2M HILL is deploying a series of corrosion probes to test and employ these parameters to provide real time corrosion monitoring of the DSTs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SLUDGE BATCH 7 PREPARATION TANK 4 AND 12 CHARACTERIZATION

Samples of PUREX sludge from Tank 4 and HM sludge from Tank 12 were characterized in preparation for Sludge Batch 7 (SB7) formulation in Tank 51. SRNL analyses on Tank 4 and Tank 12 were requested in separate Technical Assistance Requests (TAR). The Tank 4 samples were pulled on January 19, 2010 following slurry operations by F-Tank Farm. The Tank 12 samples were pulled on February 9, 2010 following slurry operations by H-Tank Farm. At the Savannah River National Laboratory (SRNL), two 200 mL dip samples of Tank 4 and two 200 mL dip samples of Tank 12 were received in the SRNL Shielded Cells. Each tank's samples were composited into clean 500 mL polyethylene storage bottles and weighed. The composited Tank 4 sample was 428.27 g and the composited Tank 12 sample was 502.15 g. As expected there are distinct compositional differences between Tank 4 and Tank 12 sludges. The Tank 12 slurry is much higher in Al, Hg, Mn, and Th, and much lower in Fe, Ni, S, and U than the Tank 4 slurry. The Tank 4 sludge definitely makes the more significant contribution of S to any sludge batch blend. This S, like that observed during SB6 washing, is best monitored by looking at the total S measured by digesting the sample and analyzing by inductively coupled plasma - atomic emission spectroscopy (ICPAES). Alternatively, one can measure the soluble S by ICP-AES and adjust the value upward by approximately 15% to have a pretty good estimate of the total S in the slurry. Soluble sulfate measurements by ion chromatography (IC) will be biased considerably lower than the actual total S, the difference being due to the non-sulfate soluble S and the undissolved S. Tank 12 sludge is enriched in U-235, and hence samples transferred into SRNL from the Tank Farm will need to be placed on the reportable special nuclear material inventory and tracked for total U per SRNL procedure requirements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vented Chill / No-Vent Fill of Cryogenic Propellant Tanks

Architectures for extended duration missions often include an on-orbit replenishment of the space vehicle's cryogenic liquid propellants. Such a replenishment could be accomplished via a tank-to-tank transfer from a dedicated tanker or a more permanent propellant depot storage tank. Minimizing the propellant loss associated with transfer line and receiver propellant tank thermal conditioning is essential for mass savings. A new methodology for conducting tank-to-tank transfer while minimizing such losses has been demonstrated. Charge-Hold-Vent is the traditional methodology for conducting a tank-to-tank propellant transfer. A small amount of cryogenic liquid is introduced to chill the transfer line and propellant tank. As the propellant absorbs heat and undergoes a phase change, the tank internal pressure increases. The tank is then vented to relieve pressure prior to another charge of cryogenic liquid being introduced. This cycle is repeated until the transfer lines and tank are sufficiently chilled and the replenishment of the propellant tank is complete. This method suffers inefficiencies due to multiple chill and vent cycles within the transfer lines and associated feed system components. Additionally, this system requires precise measuring of cryogenic fluid delivery for each transfer, multiple valve cycling events, and other complexities associated with cycled operations. To minimize propellant loss and greatly simplify on-orbit operations, an alternate methodology has been designed and demonstrated. The Vented Chill / No Vent Fill method is a simpler, constant flow approach in which the propellant tank and transfer lines are only chilled once. The receiver tank is continuously vented as cryogenic liquid chills the transfer lines, tank mass and ullage space. Once chilled sufficiently, the receiver tank valve is closed and the tank is completely filled. Interestingly, the vent valve can be closed prior to receiver tank components reaching liquid saturation temperature. An incomplete fill results if insufficient energy is removed from the tank's thermal mass and ullage space. The key to successfully conducting the no vent fill is to assure that sufficient energy is removed from the system prior to closing the receiver tank vent valve. This paper will provide a description of the transfer methodology and test article, and will provide a discussion of test results.

Rhys, Noah O.↗

Evaluation of Electrical Resistivity Tomography to Monitor the Transport of Past Releases Beneath Tank Farms

Underground storage tanks at the Hanford Site, in southeastern Washington State, hold radioactive waste generated from four decades of plutonium production. The 149 single-shell tanks and the 28 double-shell tanks have all exceeded their initial design life of approximately 25 years. At least 67 tanks are assumed to have leaked in the past, resulting in radioactive releases into the vadose zone. Gamma ray logging within dry monitoring wells is currently the primary method for tracking the migration of leaked tank waste through the vadose zone. While this approach provides an accurate assessment of radioactive contamination, that information is only provided near (within ~1m) the borehole, leaving most of the vadose zone unmonitored, particularly the important region directly beneath the tank. This report describes a numerical study that investigates the feasibility and performance of time-lapse 3D electrical resistivity tomography (ERT) for long-term monitoring of a hypothetical tank waste location and migration through the vadose zone. ERT is a method of remotely imaging the bulk electrical conductivity (EC) of the subsurface, which is significantly impacted by the presence of conductive solid and liquid tank waste. The release of liquid tank wastes increases subsurface fluid conductivity and saturation over time, creating a target to use time-lapse ERT for long-term monitoring. Although the presence of metallic infrastructure can cause ERT interference, recent advancements in ERT data processing enable the deleterious effects of buried metallic infrastructure (e.g. pipes, wellbore casings, tanks) to be removed to better determine the liquid tank waste migration over time. Three hypothetical realistic scenarios were simulated in the ERT evaluation. The first two scenarios assume the same leak amount and rate (i.e., between 1/1/1951 and 12/31/1951 at the rate of 347 m 3 per year) but different leaky tanks. Scenario 1 assumes leaks under tank B-102, which is located on the edge of the B-tank farm and surrounded by a few metallic infrastructure including cased pipes/wells/tanks. Scenario 2 assumes leaks under tank B-108, which is located near the center of the B-tank farm and surrounded by larger amount of metallic infrastructure than B-102. Scenario 3 assumes the same metallic infrastructure as B-102, with a more recent contaminant leak that was simulated to have occurred between 1/1/2018 and 12/31/2023 at a rate of 1.89 m 3 per year. The leak time in Scenarios 1 and 2 corresponds to a historical overfill event in 1951 and Scenario 3 corresponds to a recent found tank leak in 2019. In each scenario, a “true” bulk EC model vs. time reflecting contaminant migration was generated. ERT data was simulated from these “true” bulk EC models and a time-lapse ERT inversion produced “imaged” bulk EC vs. time. Three electrode configurations in two, four and eight boreholes surrounding the leak tank were used in the ERT simulations in each scenario. These borehole configurations were considered logistically feasible and cost-effective for monitoring. The hypothetical ERT boreholes are assumed to have non-metallic casing. By comparing the “imaged” bulk EC with the “true” bulk EC, it was demonstrated that the three configurations of wells used (two, four, and eight wells) were able to successfully monitor the migration of tank leaks through the vadose zone, with bulk EC resolution increasing with the number of down borehole ERT arrays for all scenarios. Therefore, the use of eight boreholes to perform ERT monitoring beneath the tanks provided the best spatiotemporal information.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A STRUCTURAL IMPACT ASSESSMENT OF FLAWS DETECTED DURING ULTRASONIC EXAMINATION OF TANK 15

Ultrasonic (UT) inspection of Tank 15 was conducted between April and July 2007 in accordance with the Tank 15 UT inspection plan. This was a planned re-inspection of this tank, the previous one was performed in 2002. Ten cracks were characterized in the previous examination. The re-inspection was performed to verify the present models and understanding for stress corrosion cracking. During this re-examination, one indication that was initially reported as a 'possible perpendicular crack <25% through wall' in 2002, was clearly shown not to be a crack. Additionally, examination of a new area immediately adjacent to other cracks along a vertical weld revealed three new cracks. It is not known when these new cracks formed as they could very well have been present in 2002 as well. Therefore, a total of twelve cracks were evaluated during the re-examination. A critical review of the information describing stress corrosion crack behavior for the SRS waste tanks, as well as a summary review of the service history of Tank 15, was performed. Each crack was then evaluated for service exposure history, consistency of the crack behavior with the current understanding of stress corrosion cracking, and present and future impact to the structural integrity of the tank. Crack instability calculations were performed on each crack for a bounding waste removal loading condition in Tank 15. In all cases, the crack behavior was determined to be consistent with the previous understanding of stress corrosion cracking in the SRS waste tank environment. The length of the cracks was limited due to the short-range nature of the residual stresses near seam, repair and attachment welds. Of the twelve cracks, nine were located in the vapor space above the sludge layer, including the three new cracks. Comparison of the crack lengths measured in 2002 and 2007 revealed that crack growth had occurred in four of the six previously measured vapor space cracks. However, the growth remained within the residual stress zone. None of the three cracks beneath the sludge showed evidence of growth. The impact of the cracks that grew on the future service of Tank 15 was also assessed. Tank 15 is expected to undergo closure activities including sludge waste removal. A bounding loading condition for waste removal of the sludge at the bottom of Tank 15 was considered for this analysis. The analysis showed that the combination of hydrostatic, seismic, pump and weld residual stresses are not expected to drive any of the cracks identified during the Tank 15 UT inspection to instability. Wall thickness mapping for general thinning and pitting was also performed. No significant wall thinning was observed. The average wall thickness values were well above nominal. Two isolated pit-like indications were observed. Both were approximately 30 mils deep. However, the remaining wall thickness was still greater than nominal specified for the original construction plate material. It was recommended that a third examination of selected cracks in Tank 15 be performed in 2014. This examination would provide information to determine whether any additional detectable degradation is occurring in Tank 15 and to supplement the basis for characterization of conditions that are non-aggressive to tank corrosion damage. The in-service inspection program is re-evaluated on a three year periodicity. The Type I and II tanks are not active receipt tanks at present, and are therefore not a part of the In-Service Inspection Program for the Type III Tanks [1]. Changes to the mission for Tank 15 and other Type I and II tanks may be considered by the In-Service Inspection Review Committee (ISIRC) and the program adjusted accordingly.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗