Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “substations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Revising the Feasibility Study for Solar PV Deployment Conducted for Pueblo of Zia in 2013

The project team comprising ICAST (International Center for Appropriate and Sustainable Technology), a national 501 c3 nonprofit, and Pueblo of Zia worked to determine the feasibility of constructing two different types of solar projects. The first is a 5 MW solar farm on tribal land, adjacent to the Tri-State Generation and Transmission substation, the utility that has exclusive rights to serve the Pueblo of Zia. The second is behind-the-meter solar installations on or near Pueblo of Zia buildings, such as the Zia Enrichment Library, the T'siya Enrichment Center, the Health and Wellness Center, the Tribal Administration Building, and Zia Pueblo Senior Center.

14 SOLAR ENERGY↗

Quantum Lock Technologies: Innovation Crossroads Final CRADA Report

At Quantum Lock Technologies, our mission is to use future-proof hardware and software to bridge the gap between physical access control and cyber security. Physical security includes access to doors, lockboxes/containers, and machinery/robots. Connecting physical access control to the cloud allows for remote detection, fast ledger updates, and mobile or remote access. However, this also opens physical security up to the world of cyber-attacks. At Quantum Lock, we use quantum random number generation to generate completely random and unpredictable digital keys to be used by connected equipment in a facility. This quantum technology is then paired with end-to-end encryption and a one-time-key communication protocol to ensure the highest level of security. Through the Innovation Crossroads program at Oak Ridge National Laboratory, we have developed benchtop prototypes of our technology, connected with utility boards as our first target customers, and prepared for our first pilot with customers (target end of summer 2022). Below is a photograph of myself at an energy substation where we plan to eventually apply our technology.

42 ENGINEERING↗

SLIA Reference Architecture Models

The SLIA Reference Architecture Models project, sponsored by the DOE CESER Energy CyberSense Program (Oct 2024–Sep 2025), advanced LLNL’s PySCES simulation tool to better support CyTRICS Prioritization and Initial Risk Assessment (PIRA) reference architectures. Key achievements include enhancements to the PySCES transmission substation facility model, expanded asset coverage, and enhancements to the PySCES code base. Software improvements reduced code complexity, migrated PySCES to Python version 3.11, introduced an object-oriented design, and added a schema database for easier updates and validation. New features support device criticality assessments and a more precise parametric simulation mode. Remaining gaps include model validation, workflow limitations, Monte Carlo convergence issues, full device criticality metric implementation, model fidelity, and general software improvements. Continued development is recommended to address these gaps and fully align PySCES with CyTRICS PIRA requirements.

97 MATHEMATICS AND COMPUTING↗

Recovery Simulator and Analysis Formulation: Mathematical Framework for Enhanced Resilience and Resource Allocation

This report introduces recovery simulator and analysis (RSA), a framework aimed at enhancing the resilience of electrical grids post-disruption. The RSA model leverages an optimization problem formulation that focuses on maximizing the load served (or optionally customers served) through a coordinated and cooptimized recovery of non-black start generation, transmission lines, feeders and substations subject to labor budget constraints. By integrating advanced linear programming techniques, the simulator selects efficient reocovery pathways, optimizing both short-term and long-term grid recovery strategies. The mathematical framework guides decision-making through a comprehensive evaluation of potential recovery actions, factoring in the trade-offs between labor constraints and load (or optionally customer) restoration efficacy. This enables grid operators to simulate diverse outage scenarios and delineate optimal recovery pathways, thereby prioritizing critical repair tasks and ensuring resource allocation is both economical and effective. The intended use case of RSA is to allow planners to explore many recovery scenarios quickly and determine assets most critical across a wide range of scenarios, and therefore strong candidates for hardening or additional investment. RSA might also be used in an operational setting, following a single event, for exploring efficient recovery pathways.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Considerations for Distributed Edge Data Centers and Use of Building Loads to Support Large Interconnections

The rapid expansion of artificial intelligence (AI) and machine learning is driving unprecedented electricity demand from data centers. It is predicted that by 2030, 90% of AI workloads will be inference-based, requiring interconnection of multiple low-latency edge data centers (<20 MW) sited closer to end users - often on already constrained distribution feeders. Although individually small, these loads can aggregate to large loads per feeder, straining infrastructure, creating multi-year interconnection delays, and driving up customer costs. This paper proposes a data center-focused grid-integration framework that combines feeder hosting capacity analysis with building energy efficiency, building load flexibility, and waste heat reuse to expand effective feeder and substation headroom. Such approaches can reduce interconnection delays, lower costs for ratepayers, and accelerate AI-ready infrastructure deployment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Feasibility Analyses for the Microgrid of the Mountain in the Cordillera Central Region of Puerto Rico

Distributed energy resource (DER) development can benefit communities through improvement of access to reliable electricity and a resilient energy system. Many place-specific considerations must be accounted for when designing electrical systems with co-located generation and loads. This paper presents an overview of four studies focusing on different aspects for regional DER development in the Cordillera Central region of Puerto Rico, including a grid and load stability study with the introduction of solar energy generation, microgrid design based on the solar resource in the area, resilience considerations during power outage scenarios, and qualitative risk aspects for components in the microgrid. Additionally, a conceptual substation microgrid analysis is conducted using the Microgrid Design Toolkit (MDT) to evaluate trade-offs between cost and energy availability, providing insights into optimal design strategies. A microgrid resilience assessment is performed using the Resilient Nodal Cluster Analysis Tool (ReNCAT) to identify critical loads and evaluates their accessibility during outages, emphasizing the importance of community needs. Finally, a qualitative risk assessment utilizing Hazard and Operability Analysis (HAZOP) methods highlights potential hazards and mitigations for microgrid components, ensuring robust system design and operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Voltage Optimization

Voltage optimization refers to a volt-var optimization technique which was originally designed to minimize energy consumption and improve end-use efficiency on the distribution system. This reduces source voltage at a substation, which lowers generation demand, reduces system losses, and improves system stability. This has been the conventional implementation of voltage optimization: focusing on regulation of voltages throughout the distribution system via coordinated adjustments of load tap changers, line-voltage regulators, switched shunt compensation, and the targeted placement of new shunt compensation. These methods have received increased focus following a growth in distributed-energy resources (DERs) interconnecting at the distribution level, given their developing capability to participate in voltage regulation. This is paired with the intermittency challenges they pose, load imbalances, and voltage fluctuations. Voltage optimization has long been an area of extensive research within the distribution system, with various strategies and philosophies demonstrating a range of effects. The conventional focus on the distribution system owes to the typical operation of transmission systems, which assumes firm local resources and flows strictly from generation resources to loads. The strategies employed in distribution have also been optimized for this typically radial configuration and operation of the distribution system.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

One Earth Energy FEED Process Design Basis

This report establishes the process design basis for the front-end engineering design (FEED) of a carbon capture and injection facility at One Earth Energy's (OEE) ethanol production plant in Gibson City, Illinois, developed as part of the Illinois Storage Corridor CarbonSAFE Phase III project. The facility is designed to compress and dehydrate up to approximately 458,000 metric tonnes of CO 2 per year, sourced directly from OEE's ethanol fermenters, for permanent injection into a saline aquifer approximately four miles from the plant. At normal operating conditions, the system will process 1,290 metric tonnes of CO 2 per day, assuming 355 operating days per year and an ethanol production rate of 160 million gallons per year. The proposed process trains a multistage centrifugal blower with a five-stage reciprocating compressor, delivering CO 2 to the injection wellhead at up to 1,500 psig. Triethylene glycol (TEG) dehydration, applied after the fourth compression stage, reduces water content to a target of 10 lb/MMscf, well within the 30 lb/MMscf injection limit. Beyond dehydration, no additional treatment is required; trace impurities including oxygen and nitrogen will remain in the injected stream. Key design considerations include the absence of spare cooling tower capacity at the site, necessitating new cooling infrastructure, and the need for a new electrical substation to support large motor loads. The facility is designed for continuous, largely unattended operation, monitored around the clock by existing OEE operations staff. This document serves as the foundational reference for all subsequent detailed engineering activities associated with the OEE CO 2 injection facility.

01 COAL, LIGNITE, AND PEAT↗

Digital Assurance for Grid Reliability in the Era of Large Load Growth

The rapid expansion of large electric loads is reshaping the operational and regulatory landscape of the U.S. electric grid. These facilities are reaching new scales of expansion, now exceeding a gigawatt per site, and their highly sensitive, digitally driven behaviors introduce new reliability risks. Recent grid events, including large load losses following routine transmission disturbances, highlight the consequences of limited ride-through capability, inconsistent protection settings, inadequate modeling, and lack of behind-the-meter visibility. Parallels to earlier integration challenges of new grid technologies suggest that the grid’s existing processes, standards, and interconnection frameworks are no longer adequate for emerging large loads. This brief synthesizes lessons from the evolution of inverter-based resource regulation and applies them to large-load integration. It identifies critical gaps in modeling accuracy, interconnection processes, performance standards, and compliance mechanisms. Technical recommendations emphasize advanced monitoring, improved modeling, coordinated communication protocols, modernized substations, and structured behind-the-meter control schemes. Collectively, these measures provide a roadmap to maintain bulk power system reliability while enabling the continued growth of large, electrified digital infrastructure.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Securing Grid Communications Infrastructure: Addressing Gaps Beyond NERC CIP Facility Perimeters

The North American electric grid relies on a complex communications infrastructure that extends beyond facility perimeters traditionally covered by NERC Critical Infrastructure Protection (CIP) standards. While CIP requirements have significantly strengthened cybersecurity within Electronic Security Perimeters, many operational communications—such as those between control centers, substations, and third-party networks—fall outside current regulatory scope. As grid modernization introduces new technologies and connectivity models, these external pathways present evolving security challenges. This brief explores the nature of these challenges, including emerging attack vectors and supply chain considerations, and highlights how ongoing grid transformation increases exposure to sophisticated threats. It outlines practical strategies and policy options to complement existing standards, such as expanding secure communications practices, enhancing supply chain transparency, and fostering collaboration among federal, state, and industry stakeholders. Near-term actions like encryption, authentication, and contractual safeguards can help reduce risk while longer-term frameworks are developed to ensure resilient and secure grid operations.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Lake Erie Energy Development Corporation (LEEDCo): Project Icebreaker TM

Lake Erie Energy Development Corporation (LEEDCo) began early‐stage development of Project Icebreaker (Icebreaker), a 20 Megawatt (MW) offshore wind project 8 miles north of Cleveland, OH in Lake Erie, in 2009. Icebreaker’s objective was to promote and accelerate responsible offshore wind development in Lake Erie and the Great Lakes. It is an ideal location that offers over 56,000 MW of gross potential in close proximity to 2,800 MW of underutilized substations as well as large load centers. Offshore wind energy in Lake Erie would help the Midwest reduce its greenhouse gas emissions, diversify its energy supply, provide cost‐competitive electricity, and stimulate economic revitalization of key sectors of the economy.

17 WIND ENERGY↗

Powered By ERAD [Slides]

Energy Resilience Analysis for Distribution Power System (ERAD) is a free, open-source Python toolkit for estimating the energy and service impacts of hazards like earthquakes and flooding. It uses a graph-based approach to capture high resolution connectivity among the grid, critical services, and customers and rapidly compute household level metrics and aggregated statistics across large distribution systems. It uses asset fragility curves that relate hazard severity to survival probability for power system equipment including cables, transformers, substations, etc. The tool is designed to be modular and extensible, allowing it to interface with third-party hazard simulators and integrate into broader resilience analysis workflows. ERAD enables researchers, students, communities, distribution utilities, and other stakeholders to understand hazard impacts and evaluate the effectiveness of different programs to improve energy resilience. The webinar was hosted by NLR researcher Aadil Latif.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Role of the U.S. Electric Distribution System in Serving Data Center and Other Large Loads

The rapid expansion of data centers in the United States is reshaping how the electric distribution system must plan for and accommodate large load interconnections. This report evaluates the role of the distribution grid in serving these loads, from small edge facilities to hyperscale campuses. Using national datasets, utility filings, and industry studies, we assess demand growth, reliability requirements, interconnection thresholds, and infrastructure needs at substations and feeders. The analysis highlights the mismatch between fast data center development timelines and slower utility planning and construction cycles, as well as strategies such as phased energization, on-site generation, hosting capacity maps, and structured interconnection frameworks. While focused on data centers, the insights also apply to other high-density loads such as advanced manufacturing, hydrogen production, and electrified transportation. The report concludes with approaches to align planning processes, transparency tools, and regulatory frameworks so utilities can manage new large loads in ways that support a reliable and resilient grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Equipment Self-Assessment Guide Checklist

This Equipment Self-Assessment Checklist is designed for asset owners and operators (AOOs) responsible for the deployment, operation, maintenance, or cybersecurity oversight of grid systems and digital energy technologies. It provides a structured inspection checklist for evaluating the security, integrity, and operational trustworthiness of equipment across substations, generation sites, distributed energy resources (DERs), and control environments.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

A Public Data Set of Auto-Generated Geotagged PV Site Equipment, Generated via Deep Learning

In this research, we present a data set over 100 photovoltaic (PV) sites in TX, which have been automatically geotagged via a fully autonomous deep learning (DL) pipeline. Specifically, locations of inverters, tracker/fixed tilt rows, batteries, and substations are labeled algorithmically. To ensure high data quality, all systems have been reviewed manually and any deep learning errors have been corrected. This public data set, as well as the open-sourced pipeline used to generate it, is valuable for site planning, modelling, and insurance purposes. Given time and resources, we hope to extend the data set to additional states/regions in the US.

14 SOLAR ENERGY↗

Ripple-Type Voltage Control for Extreme-Event Contingencies: Preprint

Frequent and intense extreme events make grid operation unprecedentedly challenging. Disruptive events could lead to dangerous voltage drops and even voltage collapse if corrective actions are not quickly taken. In this paper, we present a real-time algorithm for voltage control suitable for mitigating electric grid damage scenarios. In our strategy, when agents (generators, substations) experience a dangerous undervoltage, they first respond locally. When the local control resources are depleted, agents seek assistance from peer nodes over a communication network. The algorithm is simulated on a realistic test transmission system. Using fragility curve methodology, we simulate hurricane damages to the components of the synthetic 2000-bus grid representing the ERCOT system. Although being tested over a damaged grid after a hurricane event, our algorithm can be equally successfully applied to any other emergency low-voltage situation.

extreme weather events↗

Grid-Ready Flexible Transformers for Resilient Transmission Networks

Today’s transmission networks extend for hundreds of kilometers, transferring significant amounts of electrical energy. For every country, there are sort of “back- bone” lines, where a massive failure of transformers would create serious challenges to sustain a reliable energy supply. Natural phenomena and human driven actions could be triggers of such catastrophic events. For large utilities, or groups of utilities, it would be highly convenient to count with “flexible transformers”, which could be used as replacements for different voltage levels and with impedance adjustable to match optimum local requirements of impacted substations. Currently applied “emergency transformers” are fixed-impedance devices. In this contribution, a new concept of flexible, “future-grid ready” type of power transformers, specially devised for transmission networks is explained. This transformer has adjustable impedance features, which could be on-line operated. The concept has been proven to be functional and stable in the factory lab and in the field, by means of a prototype autotransformer of of 100 MVA, 165/69 Kv.

impedance of transformers↗

Electricity and Gas IDS Dataset

The following dataset was collected from a set of cybersecurity experiments conducted in an Electricity and Natural Gas environment. The architecture was instantiated within the powerNET testbed at Pacific Northwest National Laboratory, and is comprised of both simulated components and hardware-in-the-loop devices. The test environment consisted of a substation and control center network representative of electrical systems. In addition, it also contained a compressor station, and an odorizer and pressure regulation station representative of oil and natural gas systems. The various devices on the electrical and gas systems were organized into multiple networks to mimic real-world deployments. There were 14 testing scenarios overall that covered a wide variety of cybersecurity and infrastructure events.

Industrial Control↗