At least 217 records · Page 12

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management Facility (EMF) stack monitor location was qualified using a combination of scale model stacks to mitigate the risk of identifying that the sampling location does not meet the qualification criteria on the full-scale stack. The LV-S1 scale model stack was used as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling locations were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. The LV-S1, LB-S1, and LV-S2 scale model stack tests have met the criteria of the ANSI/HPS N13.1-1999 standard to demonstrate the stack sampling locations are well mixed. Verification tests of the EMF stack were performed at normal operating conditions. The minimum 1/6 DV value and the maximum 6 DV value from the scale model testing determine the range of stack flow rates for which the full-scale stack may be operated while remaining in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rate along with the average and maximum qualified stack flow rate based on the LV-S1 scale model DV values. The operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were <5°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, all of which were within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all planned fan operating configurations. This includes each combination of ACV fans with DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

IT Security Support for the Spaceport Command Control System Development

My job title is IT Security support for the Spaceport Command & Control System Development. As a cyber‐security analyst it is my job to ensure NASA's information stays safe from cyber threats, such as, viruses, malware and denial-of-service attacks by establishing and enforcing system access controls. Security is very important in the world of technology and it is used everywhere from personal computers to giant networks ran by Government agencies worldwide. Without constant monitoring analysis, businesses, public organizations and government agencies are vulnerable to potential harmful infiltration of their computer information system. It is my responsibility to ensure authorized access by examining improper access, reporting violations, revoke access, monitor information request by new programming and recommend improvements. My department oversees the Launch Control System and networks. An audit will be conducted for the LCS based on compliance with the Federal Information Security Management Act (FISMA) and The National Institute of Standards and Technology (NIST). I recently finished analyzing the SANS top 20 critical controls to give cost effective recommendations on various software and hardware products for compliance. Upon my completion of this internship, I will have successfully completed my duties as well as gain knowledge that will be helpful to my career in the future as a Cyber Security Analyst.

IT Security↗

PNNL-Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2023

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Sequim campus. Some research projects have the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, "Radiation Protection–Air Emissions." Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) member of the public with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The PNNL-Sequim campus has only fugitive emissions sources.

40 CFR 61 Subpart H↗

Machine-Learning for Safety Critical Airborne Applications Part II: Case Study

The exceptional progress in the field of Artificial Intelligence (AI) systems, enabled by Machine Learning (ML) technology in recent years provides historic opportunities for the aviation industry. Current certification standards for avionics were developed prior to the ML renaissance and have several fundamental incompatibilities with the ML technology. WG-114 is working hard to release a new standard as soon as possible but for now there is no recognized means of compliance for ML based systems even of low criticality. In this talk, we present the custom ML workflow that can be used comply with all objectives of the current certification standards for a low-criticality (DAL D and C) ML-based system. To illustrate the practical application of the custom ML workflow we present a case study of a system based on a Deep Neural Network (DNN) intended to detect and identify airport runway signs. We present the system design, data generation, training, and verification in detail and describe how the design assurance objectives can be met for a DAL D and DAL C systems.

Johann Schumann↗

All Hands On Deck: Raising the Bar on Whole Building Performance-Based Code Compliance and Above-Code Programs

In 2019 a large-scale national effort was launched with support from U.S. Department of Energy, Pacific Northwest National Laboratory and Northwest Energy Efficiency Alliance (NEEA). The project aimed to develop a long-term vision and a roadmap for achieving a practical application of whole building performance-based code and above code program compliance in commercial buildings. The work was aided by engaging over 70 stakeholders across the country representing jurisdictions, above-code programs such as LEED and ENERGY STAR Multifamily Program, members of the ASHRAE Standard 90.1 and other Standard committees, IBPSA and software developers. The performance path requires whole building energy modeling and is gaining momentum. Many see it as the future of the commercial energy codes and the main pathway for achieving zero energy buildings. The paper describes the findings from a stakeholder survey funded by NEEA on the current state of performance-based path, its market penetration, trends, implementation practices and adoption challenges. It discusses the patterns revealed by experience of the states with decades-long history of performance-based compliance such as Florida and California and opportunities for taking advantage of the synergies between code and above-code programs. In addition, the paper provides an overview of the tools and resources developed as part of the effort including the compliance form for ASHRAE Standard 90.1 Section 11 and Appendix G, modeling submittal review manual, and modeler and reviewer qualification requirements. The tools and resources would help remove market barriers, deliver immediate benefits to jurisdictions and rating authorities, and achieve energy efficiency through whole-building performance path.

TSPR, Performance Based Complinace, Washington Sta↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management facility (EMF) stack monitor location was qualified using the LV-S1 scale model stack as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale models and its sampling locations were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the EMF stack was performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of stack flow rates for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on the LV-S1 scale model test DV values, the corresponding stack flow rates for the EMF stack are as listed in Table S1. Table S1. Effluent Management Facility Stack Qualified Flow Range. Stack Parameter EM-1 Minimum Qualified Stack Flow (scfm) 781 Maximum Qualified Stack Flow (scfm) 53,432 The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were less than 5°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, which were all within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes each combination of ACV fan with the DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The WTP LAB stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the ANSI/HPS N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the DV of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The maximum 6 DV value from the scale model testing determines the maximum conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be = 20°. Second, the velocity uniformity at the full-scale stack must be = 20% COV. Finally, the velocity uniformity results for the actual and scale model stacks must agree within 5% COV. In general, these criteria were met through the full-scale stack tests at the LAB facility. Some specific items for each scale model and full-scale stack comparison should be noted in assessing the validity of the verification tests. The LB-C2 scale model stacks were performed with single fan operations at then-minimum flow conditions. These conditions resulted in DV values that were too low to meet the DV range criterion, and therefore are unable to be used in qualifying single fan operations on the full-scale stack. However, the single fan operations demonstrated COV values for velocity uniformity as well as flow angles that were comparable to the dual-fan operations at high flows. Overall, the test conditions and test results were within the range of acceptable values based on current design flow rates. Single fan operations are expected to only occur infrequently for maintenance needs and is therefore not a planned operating condition at this time. The LB-S1 scale model stacks were performed at three fan combinations, and in each combination, at least one test was performed at the then-minimum flow conditions as well as at then-maximum flow conditions. While the then-minimum flow conditions result in a DV range that is lower than the verification test DV value, and therefore does not meet the criterion, these tests are un-necessary for the verification test acceptance. The normal and maximum flow conditions from the scale model stack tests meet the DV range criterion, and the velocity uniformity test results compare favorably with the full-scale stack results. The LB-S2 scale model stacks were performed at nominally the same maximum flow condition; however, the 6 DV value for Fan A operation was slightly lower than the full-scale stack test DV. The COV values from the scale model stacks were comparable between the Fan A and Fan B results, and the overall test conditions are within the range of acceptable values. The stack verification is therefore considered acceptable for both Fan A and Fan B operations. The verification tests were performed at flows that were appreciably higher than the design conditions, and further elevated flow rates would be beyond the range of acceptable DV. Based on these stack verification test results, the three LAB filtered exhaust stacks meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard. Further changes to the system configuration or operating conditions that are outside the bounds described in this and the scale model test reports (Glissmeyer, Flaherty, and Piepel (2001), Glissmeyer and Geeting (2013)) may require additional tests and additional analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAB stacks are 625 to 47,237 scfm for LB-C2, 1,704 to 103,131 scfm for LB-S1, and 467 to 18,088 scfm for LB-S2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10 degrees, except for the LB-C2 Fan A results, which were an average of 17.6 degrees; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 3.5% COV, which were all within the range of the target %COV values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

INTERSECT Architecture Specification: System-of-systems Architecture (Version 0.5)

Oak Ridge National Laboratory (ORNL)’s Self-driven Experiments for Science / Interconnected ScienceEcosystem (INTERSECT) architecture project, titled “An Open Federated Architecture for the Laboratory of the Future”, creates an open federated hardware/software architecture for the laboratory of the future using a novel system of systems (SoS) and microservice architecture approach, connecting scientific instruments, robot-controlled laboratories and edge/center computing/data resources to enable autonomous experiments, “self-driving” laboratories, smart manufacturing, and artificial intelligence (AI)-driven design, discovery and evaluation. The architecture project is divided into three focus areas: design patterns; SoS architecture; and microservices architecture. The design patterns area focuses on describing science use cases as design patterns that identify and abstract the involved hardware/software components and their interactions interms of control, work and data flow. The SoS architecture area focuses on an open architecture specification for the federated ecosystem that clarifies terms, architectural elements, the interactions between them and compliance. The microservices architecture describes blueprints for loosely coupled microservices, standardized interfaces, and multi-programming language support. This document is the SoS Architecture specification only, and captures the system of systems architecture design for the INTERSECT Initiative and its components. It is intended to provide a deep analysis and specification of how the INTERSECT platform will be designed, and to link the scientific needs identified across disciplines with the technical needs involved in the support, development, and evolution of a science ecosystem. PLEASE NOTE: This is a working document and reflects current discussions and design activity among the authors. There may be inconsistencies within the document as different parts evolve at a different pace. We invite comments and thoughts from the public on this and following working drafts. The first finished version of this document is scheduled for release in September 2023.

97 MATHEMATICS AND COMPUTING↗

Experimental Investigation and Analysis of an Annular Pogo Accumulator

An experimental investigation was conducted on a scaled annular pogo accumulator for the Ares I Upper Stage. The test article was representative of the LO2 feedline and preliminary accumulator design, and included multiple designs of a perforated ring connecting the accumulator to the core feedline flow. The system was pulse tested in water over a range of pulse frequency and flow rates. Time dependent measurements of pressure at various locations in the test article were used to extract system compliance, inertance, and resistance. Results indicate a significant deviation from standard orifice flow theory and suggest a strong dependence on feedline average velocity. In addition, several CFD analyses were conducted to investigate the details of the time variant flow field. Both two-dimensional and three-dimensional simulations were performed with time varying boundary conditions used to represent system pulsing. The CFD results compared well with the sub-scale results and demonstrated the influence of feedline average velocity on the flow into and out of the accumulator

Peugeot, John↗

Hanford Waste Treatment Plant Low Activity Waste Facility Stack Effluent Monitoring - Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant low activity waste (LAW) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAW stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAW stacks are 815–55,758 scfm for LV-S1, 980–112,078 scfm for LV-S2, 264–22,901 scfm for LV-S3, and 981–79,832 scfm for LV-C2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAW facility. Flow angle results were primarily less than 10°, except for one LV-S2 Fan A result, which was 13.2°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 1.5 COV and 9.2% COV, which were all within the range of the target % COV values from the scale model tests. Based on these stack verification test results, the four LAW filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan operating conditions for LV-S1 and LV-S2, dual-fan operations for LV-S3 at both the continuous air monitor and record sampler locations, and both the single-fan as well as the dual-fan operations for LV-C2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing, determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rates along with the average and maximum qualified stack flow rates for each of the LAB facility stacks. For each stack, the operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10°, except for the LB-C2 Fan A results, which were an average of 13.7°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 4.1% COV, which were all within the range of the target percent coefficient of variation values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cybersecurity in Photovoltaic Plant Operations

This paper provides practical information for PV plant operators regarding cybersecurity. Plans to integrate photovoltaic generation into utility systems requires that cybersecurity be considered in every aspect- from customer data to business information to plant monitoring and control operations. This paper describes the types of threats encountered in operation of PV plants; challenges faced by photovoltaic plant operators in implementing cybersecurity; cybersecurity standards that apply to photovoltaic plant operations; cybersecurity response plans and recommended best practices to ensure photovoltaic plant cybersecurity.

14 SOLAR ENERGY↗

DER Cybersecurity Standards: Assessment and Gap Analysis

The purpose of this report is to share the comprehensive gap analysis of existing cybersecurity standards applicable to Distributed Energy Resources (DERs) within the electric power sector. This analysis aims to identify critical deficiencies in current standards, assess their alignment with industry needs, and provide actionable recommendations for enhancing cybersecurity measures. The scope encompasses various DER technologies, including solar, wind, energy storage, and hydrogen fuel cells, and emphasizes the significance of establishing robust cybersecurity frameworks and standards to safeguard these increasingly integrated systems. The report provides valuable insights for stakeholders in the DER ecosystem, including manufacturers, utilities, and regulators. It underscores the importance of continued development and refinement of cybersecurity standards to keep up with the technical advances in DERs and associated cybersecurity challenges. The analysis evaluated IEC, IEEE, ISA, ISO, and UL standards relevant to DER cybersecurity. Standards were assessed on their coverage of key requirements including data availability, integrity, confidentiality, access control, authentication, encryption, and system hardening. For each standard, the analysis assessed its alignment with current industry practices, regulatory compliance, effectiveness in addressing known risks, coverage of emerging risks, and how it promotes interoperability. The evaluation also considered potential integration challenges and barriers to adoption.

97 MATHEMATICS AND COMPUTING↗

Orbital Debris Mitigation

Policies on limiting orbital debris are found throughout the US Government, many foreign space agencies, and as adopted guidelines in the United Nations. The underlying purpose of these policies is to ensure the environment remains safe for the operation of robotic and human spacecraft in near‐ Earth orbit. For this reason, it is important to consider orbital debris mitigation during the design of all space vehicles. Documenting compliance with the debris mitigation guidelines occurs after the vehicle has already been designed and fabricated for many CubeSats, whereas larger satellites are evaluated throughout the design process. This paper will provide a brief explanation of the US Government Orbital Debris Mitigation Standard Practices, a discussion of international guidelines, as well as NASA's process for compliance evaluation. In addition, it will discuss the educational value of considering orbital debris mitigation requirements as a part of student built satellite design.

Kelley, R. L.↗

Cyber-Informed Engineering: Standards Development Organization Quick Start Guide

Cyber-Informed Engineering (CIE) is an emerging methodology focused on identifying and reducing high-consequence events that may affect physical critical infrastructure systems as a result of their dependence on digital technology. CIE, developed by National Laboratories and promoted by the Department of Energy (DOE), incorporates consequence-focused planning into the design and engineering process from the earliest stages of a project. This guide provides a concise overview of CIE and offers practical insight into how Standards Development Organizations (SDOs) can interpret CIE principles and apply those concepts in updates to various standards. It is important to remember that CIE extends beyond a compliance checklist, emphasizing a broader, interpretive approach. Instead, it encourages an interpretive mindset - a "turning of 'what if' to 'even if'" approach that anticipates and engineers out high-consequence events. The authors encourage SDOs to establish and promote CIE principles as enhancements for more resilient-by-design outcomes across critical infrastructure energy sectors. The 12 core principles of CIE outline specific behaviors and actions that SDOs and engineers may adopt to enhance system resilience. This guide applies these principles in a manner intended to be relevant across various technologies and threat landscapes. We welcome institutions and vendors to identify new or different framework alignments and mappings as we collectively work towards a safer and more reliable digital landscape.

97 MATHEMATICS AND COMPUTING↗

SetGo: Metadata Readiness for Scientific AI Datasets

Scientific datasets intended for AI use require both computational readiness for model training and metadata readiness for discovery, sharing, and reuse. The Readiness Engine for Data Integration (REDI) addresses computational readiness, but no corresponding tool evaluates whether a dataset’s metadata are sufficiently complete, governed, and standards-compliant for publication and agent-based consumption. Existing FAIR assessors operate only on published repository records, and no single system covers FAIR compliance, licensing, provenance, governance, reproducibility, and catalog readiness together. We present SetGo, an open-source Python toolkit that assesses and repairs metadata readiness across these six dimensions before a dataset is published or archived. Applied to four scientific corpora, SetGo surfaces deficiencies that general-purpose tools do not detect: ERA5 climate metadata scores 4% on ACDD 1.3 compliance; materials datasets fail OPTIMADE species-definition requirements; and PDB-derived proteomics data carries licensing terms incompatible with standard SPDX identifiers. Guided enrichment raises overall FAIR scores from 52–57% to 81–91%, and a single setgo publish command pushes to Hugging Face Hub, CKAN, or OpenMetadata with ML Commons Croissant 1.0 metadata sidecars. To support interactive and automated workflows, SetGo integrates with coding agents powered by large language models (LLMs) through a /setgo skill that enables natural-language execution of the full assess–enrich–publish loop, with user involvement limited to supplying missing metadata values.

Wilkinson, Sean [ORNL] (ORCID:0000000214437479)↗

SolarAPP+ ® (Solar Automated Permit Processing Plus) [SWR-19-51]

SolarAPP+ ®: Safe and affordable home solar through permitting automation. NREL has launched a collaborative effort with key code officials, authorities having jurisdiction (AHJs), and the solar industry to develop an instant online solar permitting platform for code compliant residential systems. SolarAPP (Solar Automated Permit Processing) will: -Provide a flexible, web-based PV-permitting tool for residential systems at no-cost to AHJs. -Enable standardization of instant permitting processes. -Evaluate applications for safety and code compliance. -Offer opportunities to incorporate energy storage and expand to other market segments.

Cook, Jeffrey↗