Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “site characterization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region

The project Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region is one of 9 site characterization projects that were implemented as part of ARRA (American Recovery and Reinvestment Act). Data from this project was used to improve resolution of data in NATCARB in the area of study. Data related to this study has already been incorporated in NATCARB Atlas. The Rocky Mountain Carbon Capture and Storage (RMCCS) project investigated multiple geologic formations and characterized a local site on the Colorado Plateau for future CCS opportunities. The RMCCS project focused on the Cretaceous Dakota, Jurassic Entrada, and Pennsylvanian Weber Sandstones, the three largest regional formations. All formations in this project are potential CO2 storage resources for future power plants, natural gas processing plants, cement plants, and oil shale development projects. The area adjacent to Craig, Colorado, (Sand Wash Basin) was the area selected for detailed geologic characterization on the RMCCS project. The basin was selected in part because the geology can be extrapolated to other sites on the Colorado Plateau. Field mapping and seismic surveys were conducted to identify and evaluate the basin's structural configuration. A 9,745-foot deep characterization well was drilled to collect 131 feet of core and a suite of geophysical well log data. Petrophysical tests on samples of core were used to calibrate geophysical log data, which can be used to obtain storage resource estimates and evaluate associated uncertainty as well as simulate the hydrologic behavior of injected CO2. A detailed analysis of the primary formations (Dakota, Entrada and Weber sandstones) yielded a more accurate CO2 storage resource assessment for these formations within the Colorado Plateau; RMCCS estimates indicate a total CO2 storage resource of more than 38,000 million metric tons. The characterization of the Sand Wash Basin (2-D seismic surveys, multiple well logs and lithological, petrophysical and geochemical analyses) allowed for a detailed 3-D model to be constructed. The model served as the framework for analyses ranging from CO2 storage resource, injectivity, and subsurface flow to uncertainty estimates to evaluation of risk.

2-D seismic↗

NASA Radiometric Characterization

This viewgraph presentation reviews the characterization of radiometric data by NASA. The objective was to perform radiometric vicarious calibrations of imagery and compare with vendor-provided calibration coefficients. The approach was to use multiple, well-characterized sites. These sites are widely used by the NASA science community for radiometric characterization of airborne and space borne sensors. Using the data from these sites, the investigators performed independent characterizations with independent teams. Each team has slightly different measurement techniques and data processing methods.

Holekamp, Kara↗

A Study on Radionuclides Selection for DCGLs Development for Site Release of KRR Units 1 and 2 site in Korea - 20256

The selection of Derived Concentration Guideline Levels (DCGLs) in nuclear facilities decommissioning is important because they serve as criteria for site characterization and final status surveys. DCGLs should be derived for KAERI TRIGA Mark II and III research reactor site clearance and prior to the work, a radionuclides list for DCGLs consideration was created. Radionuclides selection for DCGLs was performed according to the procedure proposed by the US NRC based on the characterization survey related to the decommission site. By evaluating the dose contribution of each radionuclide using D and D computer code, radionuclides with a dose contribution fraction of 0.1% or more for the entire radionuclide were selected. As a result, the selected radionuclides were beta radionuclides H-3, C-14 and Sr-90 and gamma radionuclides Co-60, Cs-137, Eu-152 and Eu-154. The selected radionuclides can be presented for consultation with domestic regulatory agencies in the future and will be used as the technical base of DCGLs for the final status survey. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Long-Term Performance of Transuranic Waste Inadvertently Disposed in a Shallow Land Burial Trench at the Nevada Test Site

In 1986, 21 m3 of transuranic (TRU) waste was inadvertently disposed in a shallow land burial trench at the Area 5 Radioactive Waste Management Site on the Nevada Test Site. U.S. Department of Energy (DOE) TRU waste must be disposed in accordance with Title 40, Code of Federal Regulations (CFR), Part 191, Environmental Radiation Protection Standard for Management and Disposal of Spent Nuclear Fuel, High-Level, and Transuranic Radioactive Wastes. The Waste Isolation Pilot Plant is the only facility meeting these requirements. The National Research Council, however, has found that exhumation of buried TRU waste for disposal in a deep geologic repository may not be warranted when the effort, exposures, and expense of retrieval are not commensurate with the risk reduction achieved. The long-term risks of leaving the TRU waste in-place are evaluated in two probabilistic performance assessments. A composite analysis, assessing the dose from all disposed waste and interacting sources of residual contamination, estimates an annual total effective dose equivalent (TEDE) of 0.01 mSv, or 3 percent of the dose constraint. A 40 CFR 191 performance assessment also indicates there is reasonable assurance of meeting all requirements. The 40 CFR 191.15 annual mean TEDE for a member of the public is estimated to reach a maximum of 0.055 mSv at 10,000 years, or approximately 37 percent of the 0.15 mSv individual protection requirement. In both assessments greater than 99 percent of the dose is from co-disposed low-level waste. The simulated probability of the 40 CFR 191.13 cumulative release exceeding 1 and 10 times the release limit is estimated to be 0.0093 and less than 0.0001, respectively. Site characterization data and hydrologic process modeling support a conclusion of no groundwater pathway within 10,000 years. Monte Carlo uncertainty analysis indicates that there is reasonable assurance of meeting all regulatory requirements. Sensitivity analysis indicates that the results are insensitive to TRU waste-related parameters. Limited quantities of TRU waste in a shallow land burial trench can meet DOE performance objectives for disposal of TRU waste and contribute negligibly to disposal site risk. Leaving limited quantities of buried TRU waste in-place may be preferred over retrieval for disposal in a deep geologic repository.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Columbia River Component Data Gap Analysis

This Data Gap Analysis report documents the results of a study conducted by Washington Closure Hanford (WCH) to compile and reivew the currently available surface water and sediment data for the Columbia River near and downstream of the Hanford Site. This Data Gap Analysis study was conducted to review the adequacy of the existing surface water and sediment data set from the Columbia River, with specific reference to the use of the data in future site characterization and screening level risk assessments.

54 ENVIRONMENTAL SCIENCES↗

Remediation Guidance for Major Airports after a Bioterrorist Attack

This document provides general guidelines for airport managers, local officials, and other stakeholders for developing a response and recovery plan for a major airport following the release of a biological warfare agent, with specific guidance for remediation. San Francisco International Airport was selected as the example airport during development of the guidance to illustrate specific details. The spore-forming bacterium Bacillus anthracis was selected as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the agents most likely to be used as a biological weapon. The focus of the guidance is on cleanup and disposal activities associated with the Characterization, Decontamination, and Clearance Phases that are defined herein. Activities associated with the Notification and First-Response Phases are brieÀy discussed in Appendixes A and B, respectively. In addition to the main text of this Remediation Guidance document and associated appendixes, a data supplement was developed specifically for San Francisco International Airport. Requests for the data supplement must be made directly to the Emergency Planning Operations Division of San Francisco International Airport. This document does not describe public health responses to release of a biological warfare agent. If laboratory analytical results confirm the presence of a biological agent, the responsible public health agency involved in the response will commence appropriate public health actions, such as treatment (CDC 2004) and decontamination of potentially contaminated individuals, distribution of prophylaxis, and medical examinations. See the Centers for Disease Control and Prevention web site for more information on emergency public health responses (http://www.bt.cdc.gov/). Effective communication with the media and the public is an essential component of airport remediation and recovery. Whereas such communication is beyond the scope of this document, many helpful resources are available. (See Section 1.1 for more information.) The concept of operations described in this document for cleanup of a Bacillus anthracis release at a major airport conforms to the National Response Framework (NRF) (DHS 2008) and implementation of the National Incident Management System (NIMS 2004). In most cases, a Unified Command would be formed to direct the cleanup process jointly and to take ultimate responsibility for all cleanup decisions. The Unified Command would likely include the Airport Manager or Airport Emergency Operations Manager, representatives from state and local public health and emergency management agencies, and Federal agencies, such as the U.S. Environmental Protection Agency. The Unified Command and Incident Command Staff would ideally be co-located in an Incident Command Post in an uncontaminated area of the airport. If a release is large or complex, co-location of all key players may not be possible. If a major incident is declared, a Principal Federal Official may be appointed by the Department of Homeland Security to facilitate Federal support to the Unified Command. In some facilities and jurisdictions, additional response plans or procedures (such as BioWatch or other emergency response plans, procedures, or protocols) may govern notification and first response. Facility personnel, responders, and emergency management coordinators should be aware of all applicable plans and procedures and how to implement them. Cleanups following the anthrax attacks of 2001 in the U.S. pre-dated the NRF and NIMS and did not make use of a NIMS Incident Command System as we know it today. Most Incident Commanders for the larger of those cleanups chose to convene a Technical Working Group (TWG) of multi-agency, multi-disciplinary, outside experts to advise in developing sampling and decontamination plans. Most of the Incident Commanders also convened a separate Environmental Clearance Committee (ECC) to independently review pre- and post decontamination sampling data as well as data on decontamination parameters, to evaluate whether the decontamination was effective, and to add credibility regarding a decision that decontaminated areas may be reoccupied. Use of such specialized technical expertise is strongly recommended, although it would now operate within the construct of the NIMS Incident Command System. The TWG, if convened, would act in an advisory capacity to the Environmental Unit within the Planning Section. Likewise, the ECC, if convened, would provide independent peer review of products and recommendations by the Environmental Unit. For maximum impartiality, the ECC could also provide recommendations directly to the Unified Command. Cleanup activities commence with site characterization. The principal goal of characterization is to define the extent of contamination and to gather information needed to design the decontamination approach. Initial sampling data collected by first responders are assessed to approximate the location(s) of contamination. Confirmation of the agent type and viability is obtained from a Laboratory Response Network laboratory. Additional characterization data are collected to determine the extent of contamination and where decontamination actions are needed. Areas suspected of being contaminated are contained and isolated to the degree possible to prevent further movement of an agent to uncontaminated areas or the environment, and to reduce the potential for future exposure from the agent or fumigant, if fumigation is needed. Agent air monitoring in areas adjacent to the contained contamination zones is done to ensure the protection of remediation personnel and to monitor any release from the contained zones. Various sampling approaches are considered. For example, wipe samples can be used to sample hard, nonporous surfaces. Swab samples can be used to sample nooks, crannies, joints, and seams. Appendix I is a template for preparing an incident-specific, operational characterization plan. Upon completion of the characterization plan, an internal review is initiated. Upon approval of the plan by the Unified Command, characterization commences. The Site Safety Officer develops a Health and Safety Plan to ensure that coordinated health and safety measures are in place for all responding personnel. This plan describes physical, chemical, and biological hazards at the site, personal protective equipment, personal decontamination procedures, and emergency procedures to be used by sampling and remediation personnel. An incident-specific Remediation Action Plan is developed, which describes the decontamination methods to be used and other details, including waste disposal. Under NIMS, this overall plan, as well as other plans described below, are implemented through a series of standardized, shorter-term Incident Action Plans, which describe specific activities that will take place during a shift or a day. The template in Appendix J is designed to facilitate preparation of the Remediation Action Plan. If fumigation will be done, a Sampling and Analysis Plan will be needed, as well as an Ambient Air Monitoring Plan, which can be a component of the Remediation Action Plan. These three plans are needed to obtain a crisis exemption from the U.S. Environmental Protection Agency for authorized use of an unregistered sterilant or pesticide during cleanup. If pesticide products become registered for inactivation of B. anthracis in the future, the three plans will likely be required by the product’s labeling, but the plans would no longer be submitted to the U.S. Environmental Protection Agency for approval; rather, the Incident Commander would approve them. If fumigation is used, an Emergency Response Plan is also recommended, although such a plan is not required for a crisis exemption. For some nonpersistent biological warfare agents, natural attenuation may be an adequate decontamination option. In cases where contamination is not extensive or an agent is not persistent, application of surface decontaminants or other methods of medical infection control may be effective. For extensive contamination by persistent agents, such as Bacillus anthracis, fumigation may be necessary. In those cases, the Decontamination Phase commences with source reduction, such as pre-cleaning surfaces to reduce the contaminant load. To expedite cleanup and prevent costs from escalating unnecessarily, a cost–benefit analysis should be incorporated in the decision process related to retention versus disposal of facility items and materials. Certain materials and structural components can be decontaminated for reuse, but it may not be feasible or cost-effective to decontaminate other items. Those items must be pre-treated, packaged (with the package decontaminated externally), and removed for disposal as waste. Site preparation includes sealing openings to prevent leaks and setting up equipment. Decontamination reagents and delivery systems are selected, and pre-testing all systems is done before carrying out chemical treatment(s). The important choice of decontamination technologies depends on characteristics of the agent, the nature and extent of contamination, and other site parameters identified during characterization. Decontamination-related decisions can have a major impact on waste-disposal costs, and it is necessary to develop a disposal plan that identifies a means of disposal, necessary approvals, transportation, and other details. A clearance strategy is developed to ensure that after decontamination, the risk of exposure to residual contamination is negligible. A clearance sampling plan is developed, which sets clearance criteria, specifies how to determine whether the criteria have been met, and describes how and where to collect clearance samples after decontamination. In most cases, clearance sampling includes both surface and aggressive air samples. Appendix K is a clearance plan template that identifies the types of required information. To determine whether the decontaminated area may be reoccupied, the Environmental Unit (and the ECC separately, if one is convened) evaluates the results of clearance samples. For the anthrax incidents to date, and given methods that have been used, cleanup was considered successful only when there was no growth of B. anthracis cultured from any environmental samples taken after decontamination. Other factors that will be considered include the decontamination process parameters (e.g., temperature, relative humidity, decontaminant concentration, and contact time) and the results from post-decontamination culture of biological indicators that may have been used during fumigation or sterilization processes. From such an evaluation the Environmental Unit or ECC, or both, recommend whether the area may be reoccupied, or whether further decontamination is necessary. The UC makes the final decision that a facility is appropriately decontaminated for reoccupancy. The facility owner or responsible public health agency makes the final decision to reopen a decontaminated facility. A theme that is emphasized throughout this document is that many activities can greatly reduce the time required to restore airport operations if those activities are conducted prior to an actual release of biological warfare agent. A summary of specific resources (such as Federal, state, and local agency contacts; contractors; prospective team members; subject-matter experts; laboratory facilities; and other entities) that should be identified in advance by airport officials is provided in each pertinent section of this document, and summary contact lists of such resources are provided in Appendix L. A summary of overall pre-planning actions that should be completed by airport officials is presented at the end of this document.

59 BASIC BIOLOGICAL SCIENCES↗

Value of Information Analysis Project Gnome Site, New Mexico

The Project Gnome site in southeastern New Mexico was the location of an underground nuclear detonation in 1961 and a hydrologic tracer test using radionuclides in 1963. The tracer test is recognized as having greater radionuclide migration potential than the nuclear test because the tracer test radionuclides (tritium, 90Sr, 131I, and 137Cs) are in direct contact with the Culebra Dolomite aquifer, whereas the nuclear test is within a bedded salt formation. The tracer test is the topic here. Recognizing previous analyses of the fate of the Gnome tracer test contaminants (Pohll and Pohlmann, 1996; Pohlmann and Andricevic, 1994), and the existence of a large body of relevant investigations and analyses associated with the nearby Waste Isolation Pilot Plant (WIPP) site (summarized in US DOE, 2009), the Gnome Site Characterization Work Plan (U.S. DOE, 2002) called for a Data Decision Analysis to determine whether or not additional characterization data are needed prior to evaluating existing subsurface intrusion restrictions and determining long-term monitoring for the tracer test. Specifically, the Work Plan called for the analysis to weigh the potential reduction in uncertainty from additional data collection against the cost of such field efforts.

54 ENVIRONMENTAL SCIENCES↗

Enhancing performance assessments using the ASCEM tool-set - 15222

The Office of Soil and Groundwater Remediation within the U.S. Department of Energy's Office of Environmental Management (EM) is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is an open source and modular computing framework that incorporates new advances and tools for predicting contaminant fate and transport in natural and engineered systems. ASCEM integrates modeling tools into a common work-flow that facilitates integrated approaches to modeling and site characterization, and enables robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project includes collaboration with end users engaged in performance assessments and subsurface simulation. Two working groups are engaged in performance assessment activities at the Hanford Site and Savannah River Site (SRS). The Hanford Site working group is focused on evaluating an alternative conceptual model that includes fine-scale heterogeneities. The baseline conceptual model for the performance assessment includes the large-scale stratigraphy at the site. The working group is applying the ASCEM tool-set to develop and evaluate alternative conceptual models and evaluate the effect of heterogeneities on long-term transport under rainfall-driven conditions. Because the heterogeneous models require long compute times due to increased model complexity, the simulations are implemented on a high-performance computing platform to reduce simulation times. The ASCEM Akuna work-flow enables efficient organization, simulation execution, and processing and visualization of results. Current performance assessments for waste tank closure at the SRS are limited to two-dimensional axi-symmetric representations. The SRS working group is collaborating with the site contractor to address technical review issues by resolving fine-scale tank features and simulating three-dimensional flow with Richards equation for selected closure scenarios using the ASCEM simulator, Amanzi. The Akuna tool-set is being applied to support model setup, sensitivity analysis, uncertainty quantification, and visualization. Both of the ASCEM working groups are addressing issues that cannot readily be evaluated with the existing tools. In these efforts, ASCEM is being used to provide technical underpinnings for ongoing performance assessments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CarbonSAFE East Sub-Basin Site Feasibility Plan Subtask 4.5 – Topical Report: DOE-FE0029445-12

Regional industrial facilities were considered for potential commercial-scale [50 million metric tons (55 tons) or more] geological storage in a CO 2 source and storage network study for the CarbonSAFE Illinois East Sub-Basin region (DOE-FE0029445-9). The study area has a number of potential geologic sequestration targets, including three significant deep saline reservoirs with corresponding seals, and potential enhanced oil recovery (CO 2 -EOR) opportunities (Figure 1). Recent geological research has focused on a high porosity, arkosic zone within the Lower Mt. Simon Sandstone as a prospective storage resource play in the region. This report summarizes the regional geology of the East Sub-Basin and discusses considerations leading from pre-feasibility work into the Wabash CarbonSAFE feasibility project (DE-FE0031626), recently underway in conjunction with the Wabash Valley Resources (WVR) ammonia plant retrofit taking place at the former US DOE Integrated Gasification Combined Cycle (IGCC) plant located near Terre Haute, Indiana. As part of the feasibility study, geological and site characterization work will address data gaps and risks outlined in Table 1 and will aid continued steps toward commercial-scale CCS at the WVR site. The feasibility plan discussed here draws upon regional assessment work in the East Sub-Basin as it pertains to risk and data needs to characterize the WVR site, highlights plans for data acquisition to support characterization efforts, and offers insight into the legal and permitting landscape surrounding CCS in the state of Indiana.

01 COAL, LIGNITE, AND PEAT↗

Mercury Issues and Complexities in Oak Ridge, Tennessee; Redefining the Conceptual Model - 12277

Releases of mercury from an industrial facility in Oak Ridge, Tennessee in the 1950's and early 1960's resulted in contamination of soil and groundwater within the facility, as well as downstream surface waters. Remediation efforts, which began in the 1980's, have decreased waterborne mercury concentrations near the facility, but elevated levels of mercury remain in the soil, sediment, water, and biota. Widespread distribution of mercury sources and complex mercury transport pathways are some of many challenges at the site. For effective environmental management and closure decision making relative to mercury contamination at the facilities, an up-to-date conceptual model of mercury source areas, processes, likely flow paths, and flux was deemed necessary. Recent facility and reconfiguration efforts, site characterizations, remedial actions, and research are facilitating the collection of new mercury data in Oak Ridge. To develop the current model, a multi-organizational team reviewed existing conceptual models from a variety of sources, consolidated historical data and source information, gathered input from local experts with extensive site knowledge, and used recently collected mercury data from a variety of sampling programs. The developed site conceptual model indicates that the nature and extent of mercury concentration and contaminant flux has significantly changed in the ten years since flux-based conceptual models were used for previous remedial action decisions. A new water treatment system has effectively reduced mercury inputs to the creek and is removing substantially greater quantities of mercury from groundwater than was expected. However, fish concentrations in downstream waters have not responded to decreased water concentrations in the stream. Flux from one large out-fall at the creek's headwaters appears to be a greater percentage of the overall flux leaving the site than previous years, albeit year to year variation in flux is large, and the many small sources of mercury identified in the model may also be important if the goal is to reach very low mercury levels in stream water and fish. The conceptual model is a key reference in helping to prioritize future remedial actions, defining future monitoring, conducting numerical modeling efforts, and evaluating research needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Simulation Capability for Environmental Management (ASCEM): Early Site Demonstration

The U.S. Department of Energy Office of Environmental Management, Technology Innovation and Development (EM-32), is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific tool and approach for understanding and predicting contaminant fate and transport in natural and engineered systems. The modular and open source high performance computing tool will facilitate integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. As part of the initial development process, a series of demonstrations were defined to test ASCEM components and provide feedback to developers, engage end users in applications, and lead to an outcome that would benefit the sites. The demonstration was implemented for a sub-region of the Savannah River Site General Separations Area that includes the F-Area Seepage Basins. The physical domain included the unsaturated and saturated zones in the vicinity of the seepage basins and Fourmile Branch, using an unstructured mesh fit to the hydrostratigraphy and topography of the site. The calculations modeled variably saturated flow and the resulting flow field was used in simulations of the advection of non-reactive species and the reactive-transport of uranium. As part of the demonstrations, a new set of data management, visualization, and uncertainty quantification tools were developed to analyze simulation results and existing site data. These new tools can be used to provide summary statistics, including information on which simulation parameters were most important in the prediction of uncertainty and to visualize the relationships between model input and output.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling Single Well Injection-Withdrawal (SWIW) Tests for Characterization of Complex Fracture-Matrix Systems

The ability to reliably predict flow and transport in fractured porous rock is an essential condition for performance evaluation of geologic (underground) nuclear waste repositories. In this report, a suite of programs (TRIPOLY code) for calculating and analyzing flow and transport in two-dimensional fracture-matrix systems is used to model single-well injection-withdrawal (SWIW) tracer tests. The SWIW test, a tracer test using one well, is proposed as a useful means of collecting data for site characterization, as well as estimating parameters relevant to tracer diffusion and sorption. After some specific code adaptations, we numerically generated a complex fracture-matrix system for computation of steady-state flow and tracer advection and dispersion in the fracture network, along with solute exchange processes between the fractures and the porous matrix.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydroisomerization of n-Hexane Using Acidified Metal-Organic Framework and Platinum Nanoparticles.

Exceptionally high surface area and ordered nanopores of a metal-organic framework (MOF) are exploited to encapsulate and homogeneously disperse a considerable amount of phosphotungstic acid (PTA). When combined with platinum nanoparticles positioned on the external surface of the MOF, the construct shows a high catalytic activity for hydroisomerization of n-hexane, a reaction requiring hydrogenation/dehydrogenation and moderate to strong Brønsted acid sites. Characterization of the catalytic activity and acidic sites as a function of PTA loading demonstrates that both the concentration and strength of acidic sites are highest for the catalyst with the largest amount of PTA. The MOF construct containing 60% PTA by weight produces isoalkanes with 100% selectivity and 9-fold increased mass activity as compared to a more traditional aluminosilicate catalyst, further demonstrating the capacity of the MOF to contain a high concentration of active sites necessary for the isomerization reaction.

Sabyrov, Kairat↗

Lessons Learned from PNNL Support to Army Corp of Engineers Munitions Sites

PNNL developed and demonstrated statistically-based methods for characterizing sites where unexploded ordnance (UXO) is a concern. These methods, incorporated into PNNL’s Visual Sample Plan (VSP) software, can be used to design geophysical transect surveys and conduct data analyses to identify potential target areas, map and estimate anomaly density across the study area, and delineate target areas where UXO are most likely to be found. These methods have been tested and demonstrated on several wide area sites under the Department of Defense Environmental Security Technology Certification Program (ESTCP).

Pulsipher, Brent A.↗

NETL CO 2 Injection and Storage Cost Model

The basic framework for this model provides costs for compliance with various sections of EPA's Class VI regulation and Subpart RR of the GHG Reporting Program. Cost analysis at two levels is provided by this model: site specific where the modeler can enter their own reservoir and cost data and regional in the form of cost supply curves. This model includes costs from initial regional geologic evaluation through site characterization, permitting, injection/MVA operations, post-injection site care to final site closure and transfer to long-term stewardship. A geologic and cost database was developed to support this model.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12-60-01, Drilling/Welding Shop Outfalls, contains no COCs above action levels. No further action is required for this site; however, as a BMP, three drain pipe openings will be sealed with grout.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model for Correlating Real-Time Survey Results to Contaminant Concentrations - 12183

The U.S. Environmental Protection Agency (EPA) Superfund program is developing a new Counts Per Minute (CPM) calculator to correlate real-time survey results, which are often expressed as counts per minute, to contaminant concentrations that are more typically provided in risk assessments or for cleanup levels, usually expressed in pCi/g or pCi/m{sup 2}. Currently there is no EPA guidance for Superfund sites on correlating count per minute field survey readings back to risk, dose, or other ARAR based concentrations. The CPM calculator is a web-based model that estimates a gamma detector response for a given level of contamination. The intent of the CPM calculator is to facilitate more real-time measurements within a Superfund response framework. The draft of the CPM calculator is still undergoing internal EPA review. This will be followed by external peer review. It is expected that the CPM calculator will at least be in peer review by the time of WM2012 and possibly finalized at that time. The CPM calculator should facilitate greater use of real-time measurement at Superfund sites. The CPM calculator may also standardize the process of converting lab data to real time measurements. It will thus lessen the amount of lab sampling that is needed for site characterization and confirmation surveys, but it will not remove the need for sampling. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final report : phase I investigation at the former CCC/USDA grain storage facility in Savannah, Missouri.

From approximately 1949 until 1970, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility on federally owned property approximately 0.25 mi northwest of Savannah, Missouri (Figure 1.1). During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities. In November 1998, carbon tetrachloride was detected in a private well (Morgan) roughly 50 ft south of the former CCC/USDA facility, as a result of state-wide screening of private wells near former CCC/USDA facilities, conducted in Missouri by the U.S. Environmental Protection Agency (EPA 1999). The 1998 and subsequent investigations by the EPA and the Missouri Department of Natural Resources (MoDNR) confirmed the presence of carbon tetrachloride in the Morgan well, as well as in a second well (on property currently owned and occupied by the Missouri Department of Transportation [MoDOT]), described as being approximately 400 ft east of the former CCC/USDA facility. The identified concentrations in these two wells were above the EPA maximum contaminant level (MCL) and the default target level (DTL) values of 5.0 {micro}g/L for carbon tetrachloride in water used for domestic purposes (EPA 1999; MoDNR 2000a,b, 2006). (The DTL is defined in Section 4.) Because the observed contamination in the Morgan and MoDOT wells might be linked to the past use of carbon tetrachloride-based fumigants at its former grain storage facility, the CCC/USDA is conducting an investigation to (1) characterize the source(s), extent, and factors controlling the subsurface distribution and movement of carbon tetrachloride at Savannah and (2) evaluate the potential risks to human health, public welfare, and the environment posed by the contamination. This work is being performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and the MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The site characterization at Savannah is being conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A phased approach is being employed by the CCC/USDA and Argonne, with the approval of the MoDNR, so that information obtained and interpretations developed during each incremental stage of the study can be used most effectively to guide subsequent aspects of the program. This report presents the technical findings of Phase I of Argonne's studies. The Phase I investigation was undertaken in accord with the final site-specific Phase I Work Plan for Savannah (Argonne 2007), as well as with the Master Work Plan (MWPK) for CCC/USDAArgonne operations in the state of Kansas (Argonne 2002), which the MoDNR reviewed and approved (with minor revisions) for temporary use in Missouri to facilitate the start-up of the CCC/USDA's activities at Savannah. (Argonne is developing a similar Master Work Plan for operations in Missouri that is based on the existing MWPK, with the approval of the MoDNR. The Missouri document has not been finalized, however, at this time.) The site-specific Savannah Work Plan (Argonne 2007; approved by the MoDNR [2007a]) (1) summarized the pre-existing knowledge base for the Savannah investigation site compiled by Argonne and (2) described the site-specific technical objectives and the intended scope of work developed for this phase of the investigation. Four primary technical objectives were identified for the Phase I studies, as follows: (1) Update the previous (MoDNR 2000a,b) inventory and status of private wells in the immediate vicinity of the former CCC/USDA grain storage facility, and sample the identified wells for analyses for volatile organic compounds (VOCs) and geochemical constituents. (2) Investigate for possible evidence of a soil source of carbon tetrachloride contamination to groundwater beneath the former CCC/USDA facility. (3) Obtain preliminary information on the site-specific lithologies and hydrostratigraphy at the former CCC/USDA grain storage location. (4) Establish preliminary groundwater monitoring points, to investigate the patterns of groundwater movement affecting possible contaminant migration near the former CCC/USDA facility.

54 ENVIRONMENTAL SCIENCES↗