Clearance Analysis of CTC2 (on ELC4) to S-TRRJ HRS Radiator Rotation Envelope

In response to the planned retirement of the Space Shuttle Program, International Space Station (ISS) management began stockpiling spare parts on the ISS. Many of the larger orbital replacement units were stored on the Expedite the Processing of Experiments to Space Station (EXPRESS) Logistics Carriers (ELCs) mounted on the end of the S3 and P3 truss segments, immediately outboard of the Thermal Radiator Rotary Joints (TRRJs) and their attached radiators. In an August 2009 computer-aided design (CAD) assessment, it was determined that mounting the Cargo Transport Container (CTC) 2 on the inboard face of ELC4 as planned would create insufficient clearance between the CTC2 and the rotational envelope of the radiators when the TRRJs were rotated to a gamma angle of 35.0 degrees. The true clearance would depend on how the Unpressurized Cargo Carrier Attachment System (UCCAS) was mounted to the S3 truss and how the ELC4 was attached to it. If the plane of the UCCAS attachment points were tilted even slightly inboard, it would significantly change the clearance between CTC2 and the Starboard TRRJ (S-TRRJ) radiators. Additionally, since CTC2 would be covered in multilayer insulation (MLI), the true outer profile of CTC2 was not captured in the CAD models used for the clearance assessment. It was possible that, even if the S-TRRJ radiators cleared CTC2, they could snag the MLI covering. In the fall of 2010, the Image Science and Analysis Group (ISAG) was asked to perform an on-orbit clearance analysis to determine the location of CTC2 on ELC4 and the S-TRRJ radiators at the angle of closest approach so that a positive clearance could be assured. To provide the measurements as quickly as possible to aid in the assessment, it was decided that the clearance analysis would be broken into two phases. Phase I: The location and orientation of the UCCAS fittings, which support and hold the ELC4 in place, would be measured relative to the ISS Analytical Coordinate System (ISSACS) as defined by nine preexisting Space Vision System (SVS) targets affixed to the forward/zenith side of the S1 and S3 truss segments. The location of the outboard edge of the S-TRRJ radiator would also be measured when positioned at the angle of closest approach to CTC2 (gamma = 35.0 degrees). This data would allow the Digital Pre-Assembly Group to predict how the ELC4 would sit on the UCCAS and how that would translate into the clearance between CTC2 and the S-TRRJ radiators. Phase II: After the ELC4 was delivered and installed into the UCCAS, the position of the CTC2 mounting plate on the inboard face of ELC4, would be measured in the ISSACS coordinate system relative to the SVS control points used in Phase I. Although CTC2 would not yet be mounted on ELC4, the working envelope of CTC2 could be mathematically added to the measured position of ELC4 to produce a best estimate for CTC2's mounted location. Comparing CTC2's best estimated location to the S-TRRJ radiator (measured in Phase I); relative to the ISSACS coordinate system, would provide a direct measurement of the expected clearance. Due to the impending delivery of ELC4 (scheduled for January 2011), planning for the Phase I clearance analysis began immediately. Using the Dynamic Onboard Ubiquitous Graphics (DOUG) program, ISAG designed a way to acquire images of the SVS control points on truss segments S1 and S3, the aft facing edge of the S-TRRJ Heat Rejection Subsystem (HRS) radiator, and the three UCCAS latch mechanisms mounted on the zenith face of the S3 truss using the Space Station Remote Manipulator System (SSRMS). To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which they are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which the majority of the needed imagery could be acquired. Five additional images would be acquired using the CP-3 external ISS camera mounted on the S1 truss immediately inboard of ELC4. Based on a photogrammetric simulation, it was estimated that the measured location of the HRS radiator and UCCAS latch points would be accurate to about 0.3 in. in each of the three axes relative to ISSACS. Working with ROBO, ISAG collected 78 images of the ISS December 29, 2010. From this imagery, the best 40 were selected for use in the analysis process. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for the nine SVS targets on the S1 and S3 trusses in the ISSACS coordinate system.

Liddle, Donn↗

FASTSAT-HSV01 Synergistic Observations of the Magnetospheric Response During Active Periods: MINI-ME, PISA and TTI

Understanding the complex processes within the inner magnetosphere of Earth particularly during storm periods requires coordinated observations of the particle and field environment using both in-situ and remote sensing techniques. In fact in order to gain a better understanding of our Heliophysics and potentially improve our space weather forecasting capabilities, new observation mission approaches and new instrument technologies which can provide both cost effective and robust regular observations of magnetospheric activity and other space weather related phenomenon are necessary. As part of the effort to demonstrate new instrument techniques and achieve necessary coordinated observation missions, NASA's Fast Affordable Science and Technology Satellite Huntsville 01 mission (FASTSAT-HSVOI) scheduled for launch in 2010 will afford a highly synergistic solution which satisfies payload mission opportunities and launch requirements as well as contributing iri the near term to our improved understanding of Heliophysics. NASA's FASTSAT-HSV01 spacecraft on the DoD Space Test Program-S26 (STP-S26) Mission is a multi-payload mission executed by the DoD Space Test Program (STP) at the Space Development and Test Wing (SDTW), Kirtland AFB, NM. and is an example of a responsive and economical breakthrough in providing new possibilities for small space technology-driven and research missions. FASTSAT-HSV is a unique spacecraft platform that can carry multiple small instruments or experiments to low-Earth orbit on a wide range of expendable launch vehicles for a fraction of the cost traditionally required for such missions. The FASTSAT-HSV01 mission allows NASA to mature and transition a technical capability to industry while increasing low-cost access to space for small science and technology (ST) payloads. The FASTSAT-HSV01 payload includes three NASA Goddard Space Flight Center (GSFC) new technology built instruments that will study the terrestrial space environment and potentially contribute to space weather research in a synergistic manner. MINI-ME, a neutral atom imager, will observe the neutral atom inputs to ionospheric heating which can be important during high levels of magnetospheric activity. PISA, a plasma impedance spectrometer, will measure simultaneously the local electron densities and temperatures as well as measure small scale density structure (500 m spatial scale) during these active periods. TTI, a thermospheric imager, will remotely determine the thermospheric temperature response to this magnetospheric activity. Together, these observations will contribute significantly to a comprehensive understanding of the flow of energy through and the response of the storm-time terrestrial magnetosphere.

Casas, Joseph C.↗

Automated and Adaptive Mission Planning for Orbital Express

The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

scheduling↗

An MILP-Based Distributed Energy Management for Coordination of Networked Microgrids

An MILP-based distributed energy management for the coordination of networked microgrids is proposed in this paper. Multiple microgrids and the utility grid are coordinated through iteratively adjusted price signals. Based on the price signals received, the microgrid controllers (MCs) and distribution management system (DMS) update their schedules separately. Then, the price signals are updated according to the generation–load mismatch and distributed to MCs and DMS for the next iteration. The iteration continues until the generation–load mismatch is small enough, i.e., the generation and load are balanced under agreed price signals. Through the proposed distributed energy management, various microgrids and the utility grid with different economic, resilient, emission and socio-economic objectives are coordinated with generation–load balance guaranteed and the microgrid customers’ privacy preserved. In particular, a piecewise linearization technique is employed to approximate the augmented Lagrange term in the alternating direction method of multipliers (ADMM) algorithm. Thus, the subproblems are transformed into mixed integer linear programming (MILP) problems and efficiently solved by open-source MILP solvers, which would accelerate the adoption and deployment of microgrids and promote clean energy. The proposed MILP-based distributed energy management is demonstrated through various case studies on a networked microgrids test system with three microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Robust Scheduling of Microgrids Considering Unintentional Islanding Conditions

This paper proposes a robust scheduling model for microgrids considering the stochastic unintentional islanding conditions. The proposed model minimizes the total operating cost of the microgrid by efficiently coordinating the supply of power from local distributed energy resources and the main grid. To capture the prevailing uncertainties in renewable generation and demand as well as unintentional islanding conditions, a two-stage adaptive robust optimization model is formulated to minimize the total operating cost under the worst realization of the modeled uncertainties. The column and constraint generation (C&CG) method is used to solve the problem in an iterative manner. The solution of the proposed scheduling model ensures robust microgrid operation in consideration of all possible realization of renewable generation, demand and unintentional islanding condition. Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, two micro-turbines, a diesel generator and a battery demonstrate the effectiveness of the proposed approach.

Liu, Guodong↗

Bridging paradigms: Designing for HPC-Quantum convergence

Here, this paper presents a comprehensive software stack architecture for integrating quantum computing (QC) capabilities with High-Performance Computing (HPC) environments. While quantum computers show promise as specialized accelerators for scientific computing, their effective integration with classical HPC systems presents significant technical challenges. We propose a hardware-agnostic software framework that supports both current noisy intermediate-scale quantum devices and future fault-tolerant quantum computers, while maintaining compatibility with existing HPC workflows. The architecture includes a quantum gateway interface, standardized APIs for resource management, and robust scheduling mechanisms to handle both simultaneous and interleaved quantum–classical workloads. Key innovations include: (1) a unified resource management system that efficiently coordinates quantum and classical resources, (2) a flexible quantum programming interface that abstracts hardware-specific details, (3) A Quantum Platform Manager API that simplifies the integration of various quantum hardware systems, and (4) a comprehensive tool chain for quantum circuit optimization and execution. We demonstrate our architecture through implementation of quantum–classical algorithms, including the variational quantum linear solver, showcasing the framework’s ability to handle complex hybrid workflows while maximizing resource utilization. This work provides a foundational blueprint for integrating QC capabilities into existing HPC infrastructures, addressing critical challenges in resource management, job scheduling, and efficient data movement between classical and quantum resources.

97 MATHEMATICS AND COMPUTING↗

Observation, Analysis, and Recommendations for ND Management Reviews (W88-0/Mk5 ALT 370 Program Report)

Progress and status reviews allow teams to provide updates and targeted information designed to inform the customer of progress and to help the customer understand current risks and challenges. Both presenters and the customer should have well-calibrated expectations for the level of content and information. However, what needs to be covered in systems-level management reviews can too often be poorly defined. These unclear expectations can lead teams to overpreparing or attempting to guess what information the customer considers as most critical. This aspect of the review process is stressful, disruptive, and bad for morale – and time spent overpreparing reports is time spent not focusing on the technical work necessary to stay on schedule. To define and address these issues, this report was designed to observe various aspects of development program coordination and review activities for NNSA and Navy customers, and then to conduct unbiased, independent Human Factors observation and analysis from an outside perspective. The report concludes with suggestions and recommendations for improving the efficiency of information flow related to reviews, with the goals of increasing productivity and benefitting both Sandia and the customer.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Tools and Methods for Optimization of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plants (NPP) operating cycle. Refueling outages are extremely costly for a NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities in a duration of around 30 days on average. Outage staff begin working on the schedule more than a year ahead of the outage start and make every effort to build a robust schedule. Despite the robust and detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjusting. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. The Optimization of Outage Activities project under the Risk-Informed Systems Analysis Pathway (RISA) sponsored by Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program focuses on developing tools and methods to support nuclear power plants with optimization of outage schedules. The goal of the outage optimization is the completion of all planned and emergent outage activities as fast as possible while maintaining highest level of safety. This report describes the initial development of tools to support outage management that leverage computational and machine learning methods developed in other RISA and LWRS projects.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Methods and Tools To Assess Robustness of Nuclear Plant Outages

Refueling outages are one of the most challenging phases in a nuclear power plant (NPP) operating cycle. Refueling outages are extremely costly for an NPP due to the large amount of required resources and because of lost revenue due to plant being off the grid. Outage durations have steadily decreased across the industry over that last few decades primarily due to improved planning and coordination, but there are still many plants that struggle to meet the performance metrics accomplished by other utilities. Schedule resilience is one of the issues. NPP outages require scheduling thousands of activities within 30 days on average. Despite detailed planning, once the outage starts, numerous emergent issues typically appear along with schedule delays requiring continuous replanning and adjustment. When schedule disruption occurs during an outage, plant staff make urgent efforts to recover but are often not able to maintain the planned outage duration. These outage delays can cost a utility several million dollars per day. Tools that could help outage schedulers create a more resilient schedule and allow them to optimally reschedule emergent work could significantly reduce outage delays. One key aspect of creating a resilient schedule is to have accurate estimates for activity duration. Another important outage scheduling capability is the ability to schedule emergent work with minimal disruption. This paper focuses on developing tools and methods to support NPPs with outage schedule optimization and it describes the initial development of tools to support outage management that leverage computational and machine learning methods.

97 - MATHEMATICS AND COMPUTING↗

Retracted Article: Distributed energy management for networked microgrids in a three-phase unbalanced distribution network

Owing to increased penetration of three-phase and single-phase microgrids, distributed energy resources (DERs), and responsive loads, the maintenance of a three-phase balance by distribution networks is a significant challenge. Existing literature on distributed energy management for networked microgrids generally neglects the distribution network or employs a simplified phase balanced distribution network; thus, these evaluations are not applicable. Further, the underlying mutual coupling between the different phases of distribution feeders results in a more challenging situation. Here, to solve this issue, this study sought to propose distributed energy management based on a three-phase unbalanced distribution network. Various three-phase or single-phase microgrids, utility-owned DERs, and responsive loads were coordinated through iteratively adjusted price signals. Based on the price signals received, the microgrid controllers (MCs) and distribution management system (DMS) updated the schedules of the DERs and responsive loads under their jurisdiction separately. The price signals were then updated according to the generation-load mismatch at each node and distributed to the corresponding MCs and DMS for the next iteration. The iteration continued until a sufficiently small generation-load mismatch was achieved at all nodes, that is, a balanced generation and load at all nodes under the agreed price signals. Considering a three-phase unbalanced distribution network, the price signals were determined per phase per node. Overall, the proposed distributed energy management coordinates microgrids, utility-owned DERs, responsive loads with guaranteed network constraints, and preserves the privacy of microgrid customers. This distributed energy management method was further demonstrated through various case studies on a three-phase networked microgrid test system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technology for the Mission to Planet Earth

Mission to Planet Earth is a concept referring to the endeavor of making long term, space based global observations for the purpose of understanding earth system processes. The Ad Hoc Review Team on Space Technology was formed to determine what technologies must be developed in the near term to support this endeavor. The review team's central finding is that the Office of Aeronautics and Space Technology has identified all the correct technologies to pursue, but that the mission and system architecture has not been developed sufficiently to permit determination of meaningful priorities. Some of the specific recommendations of the review team are as follows: (1) long term, space based investigation of global changes and the earth's systems; (2) studies should begin that include the performance of relative cost-benefit trade-off analyses and development of operations concepts; (3) funding should be increased, especially in research and development; (4) pursue new technology in information processing; (5) improve interagency integration and coordination; and (6) after architecture studies are complete, another team should meet to consider questions of technology priorities, development schedules, and funding allocation.

Graham, Amy↗

Chandra X-Ray Observatory's Radiation Environment and the AP-8/AE-8 Model

The Chandra X-ray Observatory (CXO) was launched on July 23, 1999 and reached its final orbit on August 7, 1999. The CXO is in a highly elliptical orbit, approximately 140,000 km x 10,000 km, and has a period of roughly 63.5 hours (approx. 2.6 days). It transits the Earth's Van Allen belts once per orbit during which no science observations can be performed due to the high radiation environment. The Chandra X-ray Observatory Center (CXC) currently uses the National Space Science Data Center's "near Earth" AP-8/AE-8 radiation belt model to predict the start and end times of passage through the radiation belts. However, our scheduling software only uses a simple dipole model of the Earth's magnetic field. The resulting B, L magnet coordinates, do not always give sufficiently accurate predictions of the start and end times of transit of the Van Allen belts. We show this by comparing to the data from Chandra's on-board radiation monitor, the EPHIN (Electron, Proton, Helium Instrument particle detector) instrument. We present evidence that demonstrates this mis- of the radiation belts as well as data that also demonstrate the significant variability of one radiation belt transit to the next as experienced by the CXO. We present an explanation for why the dipole implementation of the AP-8/AE-8 gives inaccurate results. We are also investigating use of the Magnetospheric Specification and Forecast Model (MSM) - a model that also accounts for radiation belt variability and geometry.

Virani, S. N.↗

Monitor support on accelerated processing device

A technique for implementing synchronization monitors on an accelerated processing device (“APD”) is provided. Work on an APD includes workgroups that include one or more wavefronts. All wavefronts of a workgroup execute on a single compute unit. A monitor is a synchronization construct that allows workgroups to stall until a particular condition is met. Responsive to all wavefronts of a workgroup executing a wait instruction, the monitor coordinator records the workgroup in an “entry queue.” The workgroup begins saving its state to a general APD memory and, when such saving is complete, the monitor coordinator moves the workgroup to a “condition queue.” When the condition specified by the wait instruction is met, the monitor coordinator moves the workgroup to a “ready queue,” and, when sufficient resources are available on a compute unit, the APD schedules the ready workgroup for execution on a compute unit.

42 ENGINEERING↗

Depot-Based Vehicle Data for National Analysis of Medium- and Heavy-Duty Electric Vehicle Charging

Medium- and heavy-duty vehicles (MHDVs) are a major source of greenhouse gases and local criteria air pollutants. Electrifying MHDVs may reduce these harmful emissions, which disproportionately impact disadvantaged communities. Due to their relatively high per-vehicle energy needs, consistent fleet operations, and frequent colocation of multiple vehicles at depots, MHDVs may have more spatially and temporally concentrated charging demands than light-duty passenger electric vehicles. That charging concentration means their electrification may require careful advance planning and coordination to manage potential impacts to the electrical grid via charge management or infrastructure upgrades. However, MHDV duty cycles and parking schedules are highly variable across vocations of operation, and there is a shortage of nationally representative, vocationally diverse public data describing typical MHDV operations. This report summarizes the methodology - designed with national representativeness in mind - used to create a new set of data describing typical daily driving distances, dwell durations, and normalized electric vehicle depot charging load curves for MHDVs. The dataset reflects the subset of MHDV operating patterns that may originate from a consistent depot each day and rely on the same depot for charging. In addition to trucks with depot-centric vocational patterns, the data describes operations of transit buses and school buses, each with a depot-centric focus. The dataset is available to the public and suitable for national analysis. It can inform research, infrastructure planning, and policymaking regarding the electrification of MHDVs.

33 ADVANCED PROPULSION SYSTEMS↗

Airline Operations Aid

C Language Integrated Production System (CLIPS), a NASA-developed expert systems program, is used by American Airlines for three purposes: as a rapid prototyping tool; to develop production prototypes; and to develop production application. An example of the latter is CLIPS' use in "Hub S1AAshing," a knowledge based system that recommends contingency plans when severe schedule reductions must be made. Hub S1AAshing has replaced a manual, labor intensive process. It saves time and allows Operations Control Coordinators to handle more difficult situations. Because the system assimilates much of the information necessary to facilitate educated decision making, it minimizes negative impact in situations where it is impossible to operate all flights.

Source record↗

A Comparison of Machine Learning Methods for Frequency Nadir Estimation in Power Systems: Preprint

An increasing penetration level of inverter-based renewable energy resources changes the inertia of power systems, posing challenges for maintaining the desired system frequency stability. An accurate frequency nadir estimation is crucial for power system operators to prepare preventive actions against large frequency excursions. In this paper, five machine learning methods - linear regression, gradient boosting, support vector regression, an artificial neural network, and XGBoost - are applied to two different sets of preprocess data for the prediction of the frequency nadir in the Western Electricity Coordinating Council 240-bus system with high renewable penetration levels. The training and testing data sets are collected by extensive generation scheduling simulations on the Multi-timescale Integrated Dynamic and Scheduling (MIDAS) toolbox. Numerical results show that all five machine learning methods can achieve high performance accuracy for power system nadir frequency estimation. Among them, the gradient boosting and the XGBoost are clear winners by providing the best prediction accuracy.

data driven↗