Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ramp”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Polymorphism of gold under laser-based ramp compression to 690 GPa

The high-pressure behavior and polymorphism of gold has attracted strong recent interest from theory as well as from both static and dynamic experiments. In this study, gold was dynamically ramp-compressed to 690 GPa via laser ablation using the Omega Laser Facility (U. Rochester) in order to investigate the stability regions of this noble metal's polymorphs. Here, stresses were determined from measurements of surface or interface velocities by laser interferometry. In situ X-ray diffraction was carried out to constrain the structure and density. The ambient face-centered-cubic (fcc) phase was observed at 162 GPa, followed by a mixed phase region consisting of the fcc and body-centeredcubic (bcc). The presence of only the bcc phase was observed between 377 and 690 GPa. Our results are consistent with recent shock compression experiments and demonstrate that gold transforms to the bcc phase under conditions of both ramp and shock loading.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Equation of state and strength of diamond in high-pressure ramp loading

Diamond is used extensively as a component in high-energy-density experiments, but existing equation of state (EOS) models do not capture its observed response to dynamic loading. In particular, in contrast with first-principles theoretical models of equilibrium multiphase EOS, no solid-solid phase changes have been detected, and no general-purpose EOS models match the measured ambient isotherm. We have performed density functional theory (DFT) calculations of the diamond phase to ~10 TPa, well beyond its predicted range of thermodynamic stability, and used these results as the basis of a Mie-Grüneisen EOS. We also performed DFT calculations of the elastic moduli, and calibrated an algebraic elasticity model for use in simulations. We then estimated the flow stress of diamond by comparison with the stress-density relation measured experimentally in ramp-loading experiments. Furthermore, the resulting constitutive model allows us to place a constraint on the Taylor-Quinney factor (the fraction of plastic work converted to heat) from the observation that diamond does not melt on ramp compression.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Observations of twinning microstructure in iron ramp-compressed through the α – ε phase transition

Single crystal iron was ramp-compressed along the [100] axis at 4 GPa/ns through the α–ϵ phase transformation at 13 GPa. Unlike shock experiments, in these ramp compression experiments the bcc lattice is observed to be nearly isotropically relaxed before the phase transition. There was a mixed α/ϵ phase region starting at ~13 GPa which was observed for 0.75 ns until the peak stress of 18 GPa was reached. In situ x-ray diffraction measurements show the formation of new hcp orientations not reported in shock or quasistatic compression experiments. The new hcp orientations appear to be caused by {10¯11} <10¯1 ¯2> → {¯1011} <¯101¯2> sequential twins that occur during the phase transition. This twinning mechanism relieves the shear strain caused by the bcc-hcp phase transition from the isotropically relaxed bcc phase while subject to uniaxial compression. Furthermore, these results show that in iron the induced microstructure through a phase transition and the phase transition mechanism depend on the loading history.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Strain-rate dependence of ramp-wave evolution and strength in tantalum

We have conducted molecular dynamics (MD) simulations of quasi-isentropic ramp-wave compression to very high pressures over a range of strain rates from 10 11 down to 10 8 1/s. Using scaling methods, we collapse wave profiles from various strain rates to a master profile curve, which shows deviations when material response is strain-rate dependent. Thus, we can show with precision where, and how, strain-rate dependence affects the ramp wave. We find that strain rate affects the stress-strain material response most dramatically at strains below 20%, and that above 30% strain the material response is largely independent of strain rate. We show good overall agreement with experimental stress-strain curves up to approximately 30% strain, above which simulated response is somewhat too stiff. We postulate that this could be due to our interatomic potential or to differences in grain structure and/or size between simulation and experiment. Strength is directly measured from per-atom stress tensor and shows significantly enhanced elastic response at the highest strain rates. As a result, this enhanced elastic response is less pronounced at higher pressures and at lower strain rates.

36 MATERIALS SCIENCE↗

Generation and Measurement of Relativistic Electron Bunches Characterized by a Linearly Ramped Current Profile

We report the first successful attempt to generate ultrashort (1-10 ps) relativistic electron bunches characterized by a ramped longitudinal current profile that rises linearly from head to tail and then falls sharply to zero. Bunches with this type of longitudinal shape may be applied to plasma-based accelerator schemes as an optimized drive beam, and to free-electron lasers as a means of reducing asymmetry in microbunching due to slippage. The scheme used to generate the ramped bunches employs an anisochronous dogleg beam line with nonlinear correction elements to compress a beam having an initial positive time-energy chirp. The beam current profile is measured using a deflecting mode cavity, and a pseudoreconstruction of the beam's longitudinal phase space distribution is obtained by using this diagnostic with a residual horizontal dispersion after the dogleg.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Ramp Generator for Electron Scanner in SNS Beam Profile Measurements System

A new fast high voltage Ramp Generator to deflect an electron beam in the Electron Scanner is required at the Spallation Neutron Source (SNS) in the Oak Ridge National Laboratory. The Electron Scanner is used for non-destructively measuring the transverse profiles of the proton beam in the accumulator ring of the SNS [1]. The existing deflector is obsolete and needs to be replaced. A new Ramp Generator is proposed based on fast high voltage MOSFET power switches. Two configurations have been considered. One is bipolar, with two opposite polarity power supplies and one switch module or two single switches, and the other is unipolar, with one power supply and two switch modules. Schematics and performance of both options are described, and results of the prototype testing are presented in the paper.

Peplov, Vladimir↗

Record High Ramping Rates in HTS Based Superconducting Accelerator Magnet

Here we report results of experimental test of the High Temperature Superconductor (HTS) based fast-cycling prototype accelerator magnet capable to operate up to about 300 T/s field ramping rate with some 0.5 T B-field in the magnet gap. The measured upper limit for the cryogenic cooling power required to support magnet conductor operation at high ramping rates indicates great potential for such type of magnets in rapid cycling synchrotrons for neutrino research or acceleration of very short-lived muons. The test magnet design, construction and supporting cryogenic and power systems are briefly described. The magnet's power test results are discussed in terms of a possible upgrade of this magnet design to 2 T B-field, a maximum feasible with super-ferric magnet.

43 PARTICLE ACCELERATORS↗

Scheduling and Pricing for Expected Ramp Capability in Real-Time Power Markets

Higher variable renewable generation penetrations are occurring throughout the world on different power systems. These resources increase the variability and uncertainty on the system which must be accommodated by an increase in the flexibility of the system resources in order to maintain reliability. Many scheduling strategies have been discussed and introduced to ensure that this flexibility is available at multiple timescales. To meet variability, that is, the expected changes in system conditions, two recent strategies have been introduced: time-coupled multi-period market clearing models and the incorporation of ramp capability constraints. To appropriately evaluate these methods, it is important to assess both efficiency and reliability. But it is also important to assess the incentive structure to ensure that resources asked to perform in different ways have the proper incentives to follow these directions, which is a step often ignored in simulation studies. Here we find that there are advantages and disadvantages to both approaches. We also find that look-ahead horizon length in multi-period market models can impact incentives. This paper proposes scheduling and pricing methods that ensure expected ramps are met reliably, efficiently, and with associated prices based on true marginal costs that incentivize resources to do as directed by the market. Case studies show improvements of the new method.

25 ENERGY STORAGE↗

Impact of Balancing Area Size, Obligation Sharing, and Energy Markets on Mitigating Ramping Requirements in Systems with Wind Energy

Balancing area reserve sharing holds the promise of significantly reducing wind integration costs. In a companion paper we examine wind integration costs as a function of balancing area size to determine if the larger system size helps mitigate wind integration cost increases. In this paper we turn to an examination of the NYISO sub-hourly energy market to understand how it incentivizes generators to respond to ramping signals without having to explicitly pay for the service. Because markets appear to have the ability of bringing out supply response in sub-hourly energy markets, and because existing thermal resources appear to have significant untapped ramping capability, we believe that a combination of fast energy markets and combined balancing area operations can increase the grid's ability to absorb higher wind penetrations without experiencing significant operational problems or costs.

17 WIND ENERGY↗

FRIB Transition to User Operations, Power Ramp Up, and Upgrade Perspectives

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. During the first 12 months of user operations, the FRIB accelerator complex delivered 5250 beam hours, including 1528 hours to nine science experiments conducted with primary beams of 36Ar, 48Ca, 70Zn, 82Se, 124Xe, and 198Pt at beam energies >200 MeV/u; 2724 hours for beam developments, studies, and tuning; and 998 hours to industrial users and non-scientific programs using the FRIB Single Event Effect (FSEE) beam line. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on FRIB status and progress since SRF2021, emphasizing lessons learned during the transition from beam commissioning to machine operations, challenges and resolutions for the power ramp-up, progress with accelerator improvements, and R&D for the energy upgrade.

43 PARTICLE ACCELERATORS↗

Analysis of failed ramps during the RHIC FY09 run

The Relativistic Heavy Ion Collider (RHIC) is a versatile accelerator that supports operation with polarized protons of up to 250 GeV and ions with up to 100 GeV/nucleon. During any running period, various operating scenarios with different particle species, beam energies or accelerator optics are commissioned. In this report the beam commissioning periods for establishing full energy beams (ramp development periods) from the FY09 run are summarized and, for the purpose of motivating further developments, we analyze the reasons for all failed ramps.

43 PARTICLE ACCELERATORS↗

Installation of Ramps and Utility Cabinet at TA-18-1 Slotin Building (Historic Building Report No. 395)

The information below is presented in response to requests for additional information that resulted from a phone conference on November 12, 2020 between Harvey Kaplan of the New Mexico State Historic Preservation Office, DOE NNSA Los Alamos Field Office Manhattan Project National Historical Park Representative, Vicki Loucks, LANL Program Manager for Manhattan Project National Historical Park, Cheryl Abeyta, and LANL Historic Buildings Program Staff, Jeremy Brunette and J.T. Stark. The DOE NNSA Field Office (Field Office) initiated the call to propose additional work be performed to a previously reviewed project, “Restoration of TA-18-0001 (Slotin Building)” (LA-UR-19-26609) (HPD Log # 111110). Of the six actions discussed on the call, which included (1) exterior paint color, (2) entrance ramps, (3) non-period metal siding removal, (4) interior floor finish, (5) reopening secondary entrance door, and (6) addition of utility cabinet with period doors, additional information for two of the actions was requested for further review. The two actions, the construction of entrance ramps and installation of a utility cabinet are addressed in detail.

42 ENGINEERING↗

Experimental Study of Reversed Shear Alfven Eigenmodes During The Current Ramp In The Alcator C-Mod Tokamak

Experiments conducted in the Alcator C-Mod tokamak at MIT have explored the physics of reversed shear Alfven eigenmodes (RSAEs) during the current ramp. The frequency evolution of the RSAEs throughout the current ramp provides a constraint on the evolution of qmin, a result which is important in transport modeling and for comparison with other diagnostics which directly measure the magnetic field line structure. Additionally, a scaling of the RSAE minimum frequency with the sound speed is used to derive a measure of the adiabatic index, a measure of the plasma compressibility. This scaling bounds the adiabatic index at 1.40 ± 0:15 used in MHD models and supports the kinetic calculation of separate electron and ion compressibilities with an ion adiabatic index close to 7~4.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Computer programs for pressurization (RAMP) and pressurized expulsion from a cryogenic liquid propellant tank

An analysis to predict the pressurant gas requirements for the discharge of cryogenic liquid propellants from storage tanks is presented, along with an algorithm and two computer programs. One program deals with the pressurization (ramp) phase of bringing the propellant tank up to its operating pressure. The method of analysis involves a numerical solution of the temperature and velocity functions for the tank ullage at a discrete set of points in time and space. The input requirements of the program are the initial ullage conditions, the initial temperature and pressure of the pressurant gas, and the time for the expulsion or the ramp. Computations are performed which determine the heat transfer between the ullage gas and the tank wall. Heat transfer to the liquid interface and to the hardware components may be included in the analysis. The program output includes predictions of mass of pressurant required, total energy transfer, and wall and ullage temperatures. The analysis, the algorithm, a complete description of input and output, and the FORTRAN 4 program listings are presented. Sample cases are included to illustrate use of the programs.

Masters, P. A.↗

Bayonet plug with ramp-activated lock

Matched pair of washers with broad surface ramps is locking mechanism in bayonet plug. It can be used where threaded springs and fasteners are impractical because of extreme temperatures or other environmental incompatibility. Matched pair of ramped washers is placed on plug and bayonet inserted. Inner slot of one washer matches contour of plug; this washer is stationary. Inner slot of second washer is circular. When second washer is rotated, washers push against bayonet plug, locking it in place. Retaining wire secures plug.

Wood, K. E.↗

Tangential blowing for control of strong normal shock - Boundary layer interactions on inlet ramps

The use of tangential blowing from a row of holes in an aft facing step is found to provide good control of the ramp boundary layer, normal shock interaction on a fixed geometry inlet over a wide range of inlet mass flow ratios. Ramp Mach numbers of 1.36 and 1.96 are investigated. The blowing geometry is found to have a significant effect on system performance at the highest Mach number. The use of high-temperature air in the blowing system, however, has only a slight effect on performance. The required blowing rates are significantly high for the most severe test conditions. In addition, the required blowing coefficient is found to be proportional to the normal shock pressure rise.

Schwendemann, M. F.↗