Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “process control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Metrology for Fuel Cell Manufacturing

The project was divided into three subprojects. The first subproject is Fuel Cell Manufacturing Variability and Its Impact on Performance. The objective was to determine if flow field channel dimensional variability has an impact on fuel cell performance. The second subproject is Non-contact Sensor Evaluation for Bipolar Plate Manufacturing Process Control and Smart Assembly of Fuel Cell Stacks. The objective was to enable cost reduction in the manufacture of fuel cell plates by providing a rapid non-contact measurement system for in-line process control. The third subproject is Optical Scatterfield Metrology for Online Catalyst Coating Inspection of PEM Soft Goods. The objective was to evaluate the suitability of Optical Scatterfield Microscopy as a viable measurement tool for in situ process control of catalyst coatings.

08 HYDROGEN↗

In situ characterization of nanoscale catalysts during anodic redox processes

Controlling the structure and composition of the anode is critical to achieving high efficiency and good long-term performance. In addition to being a mixed electronic and ionic conductor, the ideal anode material should act as an efficient catalyst for oxidizing hydrogen, carbon monoxide and dry hydrocarbons without de-activating through either sintering or coking. It is also important to develop novel anode materials that can operate at lower temperatures to reduce costs and minimized materials failure associated with high temperature cycling. We proposed to synthesize and characterize novel anodecermets materials based on ceria doped with Pr and/or Gd together with either a Ni or Cu metallic components. Ceria is a good oxidation catalyst and is an ionic conductor at room temperature. Doping it with trivalent rare earths such as Pr or Gd retards sintering and makes it a mixed ion conductor (ionic and electronic).

08 HYDROGEN↗

Application of Bf-EVALPSN to Real-time Process Order Control

We have already proposed a paraconsistent annotated logic program called EVALPSN. In this paper, EVALPSN is developed to deal with before-after relations between two processes (time intervals), and its application to real-time process order control based on logical safety verification.

99 GENERAL AND MISCELLANEOUS↗

Special Analyses for the Hanford Integrated Disposal Facility Performance Assessment - 20102

In 2014, the Department of Energy (DOE) Office of River Protection and its contractors began to develop a performance assessment for the near-surface disposal of low-level and mixed low-level waste at the Hanford Site's Integrated Disposal Facility (IDF). The IDF is a doubly-lined landfill that was constructed between 2004 and 2006 to be the disposal facility for the vitrified low-activity waste that will be produced at the Waste Treatment and Immobilization Plant (WTP). IDF is also expected to receive solid secondary waste produced at the WTP and other solid wastes from site activities. The IDF has been in a preoperational state awaiting authorization from DOE and a RCRA permit modification from the State of Washington Department of Ecology to receive waste. Both the Disposal Authorization Statement and permit modification require a performance assessment demonstrating that the system of engineered and natural features will limit releases of radionuclides and hazardous chemicals from the IDF and be protective of human health and the environment. The simulated duration is 10,000 years. Based on the analyses presented in the 2017 Integrated Disposal Facility Performance Assessment, DOE issued a conditional Operating Disposal Authorization Statement for the IDF in June 2018. The long-term performance of the IDF to be protective of human health and the environment was evaluated under the requirements of DOE Order 435.1, Radioactive Waste Management. Computer simulations were performed to evaluate whether or not the IDF would comply with DOE requirements. In the time that has passed since the performance assessment was approved by DOE, new information has been discovered that had not been considered in the performance assessment. Since this new information has not been evaluated, the potential impact of the changes have not been taken into consideration in DoE's disposal authorization. DOE and its contractors follow a change control process to screen and, when necessary, evaluate new information that could potentially impact the conclusions of the completed performance assessment. This paper will describe the change control process and provide two examples of evaluations performed following the change control process. The first example evaluates a new waste form for liquid secondary waste that was not evaluated in the performance assessment. In the performance assessment, liquid secondary waste was assumed to be solidified with grout. A new recommendation to dispose of the liquid secondary waste after drying it to a powder was evaluated. The second example evaluates inventory implications from changes to the flow sheet that estimates the feed composition to the low-activity waste vitrification facility. The changes result in higher strontium concentrations in the vitrified waste stream. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modelica-json: Transforming energy models to digitize the control delivery process

Building simulation models are typically not used to generate the documentation required for bidding and project delivery of commercial building systems, or for their semantic modeling and commissioning. This paper presents a software tool that aids in digitizing the control delivery process, spanning simulation during design to implementation and formal verification during commissioning. The tool can generate from Modelica models digital documentation of control sequences. This digital documentation, along with other project drawings and specifications can be used for project bidding. It can also be used for implementation of control sequences through machineto-machine translation to commercial legacy control products, for which we are currently developing the proposed ASHRAE Standard 231P based on the presented work. Moreover, as-installed control sequences can be formally verified against the design specification, and a semantic model in Brick can be exported to aid in configuration of building analytics and fault detection. The paper presents what we believe is the first translation of a Modelica-implemented control sequence to a native implementation on a commercial control platform, using the webCTRL product line from Automated Logic. The paper also shows how a webCTRL implementation can be formally verified against its Modelica specification. These use cases have all been demonstrated with a prototype implementation that is now being further developed.

Wetter, Michael↗

Nucleation and Growth of PbBrF Crystals at the Liquid Mercury–Electrolyte Interface Studied by Operando X-ray Scattering

In this work, detailed in operando studies of electrochemically induced PbBrF deposition at the liquid mercury/liquid electrolyte interface are presented. The nucleation and growth were monitored using time-resolved X-ray diffraction and reflectivity combined with electrochemical measurements, revealing a complex potential-dependent behavior. PbBrF deposition commences at potentials above –0.7 V with the rapid formation of an ultrathin adlayer of one unit cell thickness, on top of which (001)-oriented three-dimensional crystallites are formed. Two potential regimes are identified. At low overpotentials, slow growth of a low surface density film of large crystals is observed. At high overpotentials, crossover to a potential-independent morphology occurs, consisting of a compact PbBrF deposit with a saturation thickness of 25 nm, which forms within a few minutes. This potential behavior can be rationalized by the increasing supersaturation near the interface, caused by the potential-dependent Pb2+ deamalgamation, which changes from a slow reaction-controlled process to a fast transport-controlled process in this range of overpotentials. In addition, growth on the liquid substrate is found to involve complex micromechanical effects, such as crystal reorientation and film breakup during dissolution.

36 MATERIALS SCIENCE↗

Processing Parameter Control of Lifetime-Limiting Failure Mechanisms in Al-Si Cast Alloys at Room and Elevated Temperatures

Aluminum-silicon cast alloys widely used throughout the transportation sector, A356, 319, and A390, have been studied with respect to chemical compositions and processing parameters that control the resultant mechanical behavior. First, the development of strengthening mechanisms is discussed in terms of the role that alloying elements, solidification behavior, and thermal treatments play. Based on this understanding, an extensive matrix of material conditions was developed and characterized in order to provide practical guidelines for alloy development. In order to provide an understanding of lifetime-limiting failure mechanisms, fatigue crack growth and hot compressive dwell behaviors were further investigated. Fatigue crack growth tests were conducted for all alloys at R = 0.1 and room temperature, and creep–fatigue of 319 was studied at R = − 1.5 and 250 °C. The role of processing parameters in controlling the mechanical properties is identified and discussed, and recommendations for optimized design are made.

36 MATERIALS SCIENCE↗

NAVIGATING A QUALITY ROUTE TO A NATIONAL SAFETY AWARD

Deming quality methodologies applied to safety are recognized with the National Safety Council's annual Robert W. Campbell Award. Over the last ten years, the implementation of Statistical Process Control and quality methodologies at the U.S. Department of Energy's Hanford Site have contributed to improved safety. Improvements attributed to Statistical Process Control are evidenced in Occupational Safety and Health records and documented through several articles in Quality Progress and the American Society of Safety Engineers publication, Professional Safety. Statistical trending of safety, quality, and occurrence data continues to playa key role in improving safety and quality at what has been called the world's largest environmental cleanup project. DOE's Hanford Site played a pivotal role in the nation's defense beginning in the 1940s, when it was established as part of the Manhattan Project. After more than 50 years of producing material for nuclear weapons, Hanford, which covers 586 square miles in southeastern Washington state, is now focused on three outcomes: (1) Restoring the Columbia River corridor for multiple uses; (2) Transitioning the central plateau to support long-term waste management; and (3) Putting DOE assets to work for the future. The current environmental cleanup mission faces challenges of overlapping technical, political, regulatory, environmental, and cultural interests. From Oct. 1, 1996 through Sept. 30, 2008, Fluor Hanford was a prime contractor to the Department of Energy's Richland Operations Office. In this role, Fluor Hanford managed several major cleanup activities that included dismantling former nuclear-processing facilities, cleaning up the Site's contaminated groundwater, retrieving and processing transuranic waste for shipment and disposal off-site, maintaining the Site's infrastructure, providing security and fire protection, and operating the Volpentest HAMMER Training and Education Center. On October 1,2008, a transition occurred that changed Fluor's role at Hanford. Fluor's work at Hanford was split in two with the technical scope being assumed by the CH2M HILL Plateau Remediation Company (CHPRC) CHPRC is now spearheading much of the cleanup work associated with former nuclear-processing facilities, contaminated groundwater, and transuranic waste. Fluor is an integrated subcontractor to CH PRC in this effort. In addition, at the time of this writing, while the final outcome is being determined for the new Mission Support Contract, Fluor Hanford has had its contract extended to provide site-wide services that include security, fire protection, infrastructure, and operating the HAMMER facility. The emphasis has to be on doing work safely, delivering quality work, controlling costs, and meeting deadlines. Statistical support is provided by Fluor to the PRC, within Fluor Hanford, and to a third contractor, Washington Closure Hanford, which is tasked with cleaning up approximately 210 square miles designated as the Columbia River corridor along the outer edge of the Hanford Site. The closing months of Fluor Hanford's 12 year contract were busy, characterized by special events that capped its work as a prime cleanup contractor, transitions of work scope and personnel, and the completion numerous activities. At this time, Fluor's work and approach to safety were featured in state and national forums. A 'Blockbuster' presentation at the Washington State Governor's Industrial Safety Conference in September 2008 featured Fluor Hanford's Chief Operating Officer, a company Safety Representative, and me. Simultaneously, an award ceremony in Anaheim, Calif. recognized Fluor Hanford as the winner of the 2008 Robert W. Campbell Award. The Robert W. Campbell Award is co-sponsored by Exxon Mobil Corporation and the National Safety Council. Named after a pioneer of industrial safety, the Campbell Award recognizes organizations that demonstrate how integration of environmental, health and safety (EHS) management into business operations is a cornerstone of their corporate success. Fluor Hanford received the award for corporations with more than 1,000 employees. Campbell Award winners undergo rigorous assessments that include site visits and comprehensive evaluations of their commitment to, and implementation of, EHS practices. Award winners work with an international partnership of 21 organizations to develop case studies that illustrate their superior EHS programs and best practices, for use by top business and engineering schools worldwide. Quality methodologies in place at Fluor Hanford played a key role in the award process. Fluor Hanford's integrated use of Statistical Process Control and Pareto Charts for analyzing and displaying EHS performance were viewed favorably by the award judges.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Advanced High-Level Waste Glass Research and Development Plan

The U.S. Department of Energy Office of River Protection (ORP) has implemented an integrated program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product quality requirements. The integrated ORP program is focused on providing a technical, science-based foundation from which key decisions can be made regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities. The fundamental data stemming from this program will support development of advanced glass formulations, key process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste (HLW) vitrification facilities with an appreciation toward reducing overall mission life. The purpose of this advanced HLW glass research and development plan is to identify the near-, mid-, and longer-term research and development activities required to develop and validate advanced HLW glasses and their associated models to support facility operations at WTP, including both direct feed and full pretreatment flowsheets. This plan also integrates technical support of facility operations and waste qualification activities to show the interdependence of these activities with the advanced waste glass (AWG) program to support the full WTP mission. Figure ES-1 shows these key ORP programmatic activities and their interfaces with both WTP facility operations and qualification needs. The plan is a living document that will be updated to reflect key advancements and mission strategy changes. The research outlined here is motivated by the potential for substantial economic benefits (e.g., significant increases in waste throughput and reductions in glass volumes) that will be realized when advancements in glass formulation continue and models supporting facility operations are implemented. Developing and applying advanced glass formulations will reduce the cost of Hanford tank waste management by reducing the schedule for tank waste treatment and reducing the amount of HLW glass for storage, transportation, and disposal. Additional benefits will be realized if advanced glasses are developed that demonstrate more tolerance for key components in the waste (such as Al 2 O 3 , Cr 2 O 3 , SO 3 and Na 2 O) above the currently defined WTP constraints. Tolerating these higher concentrations of key waste loading limiters may reduce the burden on (or even eliminate the need for) leaching to remove Cr and Al and washing to remove excess S and Na from the HLW fraction. Advanced glass formulations may also make direct vitrification of the HLW fraction without significant pretreatment more cost effective. Finally, the advanced glass formulation efforts seek not only to increase waste loading in glass, but also to increase glass production rate. When coupled with higher waste loading, ensuring that all of the advanced glass formulations are processable at or above the current contract processing rate leads to significant improvements in waste throughput (the amount of waste being processed per unit time),which could significantly reduce the overall WTP mission life. The integration of increased waste loading, reduced leaching/washing requirements, and improved melting rates provides a system-wide approach to improve the effectiveness of the WTP process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Real-time process monitoring for direct ink write additive manufacturing

Direct ink write (DIW) printing of reactive resins presents a unique challenge due to the time-dependent nature of the rheological and chemical properties of the ink. As a result, careful print optimization or process control is important to obtain consistent, high quality prints. The present invention uses a flow-through characterization cell for in situ chemical monitoring of a resin ink during DIW printing. Additionally, in-line extrusion force monitoring can be combined with off-line post inspection using machine vision. By combining in-line spectroscopy and force monitoring, it is possible to follow reaction kinetics (for example, curing of a reactive resin) and viscosity changes during printing, which can be used for a closed-loop process control. Additionally, the capability of machine vision to automatically identify and quantify print artifacts can be incorporated on the printing line to enable real-time, AI-assisted quality control of the printed products. Together, these techniques can form the building blocks of an optimized process control strategy when complex reactive ink must be used to produce printed hardware.

Cook, Adam W.↗

Recommended Practice for Patch Management of Control Systems

A key component in protecting a nation’s critical infrastructure and key resources is the security of control systems. The term industrial control system refers to supervisory control and data acquisition, process control, distributed control, and any other systems that control, monitor, and manage the nation’s critical infrastructure. Critical Infrastructure and Key Resources (CIKR) consists of electric power generators, transmission systems, transportation systems, dam and water systems, communication systems, chemical and petroleum systems, and other critical systems that cannot tolerate sudden interruptions in service. Simply stated, a control system gathers information and then performs a function based on its established parameters and the information it receives. The patch management of industrial control systems software used in CIKR is inconsistent at best and nonexistent at worst. Patches are important to resolve security vulnerabilities and functional issues. This report recommends patch management practices for consideration and deployment by industrial control systems owners.

42 ENGINEERING↗

Operability and control in process intensification and modular design: Challenges and opportunities

Abstract In this article, the importance of considering operability and control criteria in the analysis and design of intensified and modular processes is discussed. We first analyze the impact on operability of key factors including: (i) degrees of freedom, (ii) process constraints, (iii) numbering up vs. scaling up, and (iv) dynamic/periodic operation. Comparative examples are presented to showcase the pros and cons in intensified/modular systems vs. their conventional counterparts from operability and control aspects. Then we look into metrics and tools to address these challenges such as: (i) flexibility analysis, (ii) operability‐based design, and (iii) advanced model‐based control. Considering different conceptual design stages as synthesis intensification, steady‐state design, and dynamic operational optimization, we highlight the need to incorporate different levels of operability considerations. Future research opportunities and perspectives are also identified, particularly emphasizing the importance of a holistic strategy for integrated design, operability, and control of intensified and modular process systems.

Pistikopoulos, Efstratios N.↗

Catalytic process for control of NO.sub.x emissions using hydrogen

A selective catalytic reduction process with a palladium catalyst for reducing NOx in a gas, using hydrogen as a reducing agent. A zirconium sulfate (ZrO.sub.2)SO.sub.4 catalyst support material with about 0.01-2.0 wt. % Pd is applied to a catalytic bed positioned in a flow of exhaust gas at about 70-200.degree. C. The support material may be (ZrO.sub.2--SiO.sub.2)SO.sub.4. H.sub.2O and hydrogen may be injected into the exhaust gas upstream of the catalyst to a concentration of about 15-23 vol. % H.sub.2O and a molar ratio for H.sub.2/NO.sub.x in the range of 10-100. A hydrogen-containing fuel may be synthesized in an Integrated Gasification Combined Cycle power plant for combustion in a gas turbine to produce the exhaust gas flow. A portion of the fuel may be diverted for the hydrogen injection.

08 HYDROGEN↗

Beam Shaping and Oscillation for Metals Additive Manufacturing

Additive Manufacturing (AM) is pivotal for next-generation industrial manufacturing but is hampered by process control challenges leading to unwanted defects and sub-optimal material properties. Our research builds on prior work that utilized beam oscillation techniques to mitigate these issues (Wu et al., 2023). We focus on investigating the influence of beam oscillation frequency on melt pool dynamics, utilizing in-situ synchrotron material characterization from the ESRF (Chen et al., 2026). Preliminary findings indicated that beam oscillation results in unique fluid flow patterns and enhanced melting stability. These findings suggested the possibility of optimized AM process control, including minimized defects and tailored thermal histories. We proposed further research to explore the effects of beam oscillation frequencies comprehensively, using the in-situ characterization capabilities at the ESRF. The goal was to quantify this relationship, offering a pathway to more precise AM process control and optimization. Our research is expected to offer new scientific insights into the fluid mechanics and thermal behaviour in AM, contributing to its broader applicability and commercial viability.

36 MATERIALS SCIENCE↗

Integrating Smart Plug and Process Load Controls into Energy Management Information System Platforms: A Landscaping Study

Plug and process loads (PPLs) already represent a significant fraction of total energy use in commercial buildings and their contribution is expected to increase in the future. Although plug-in devices are typically not monitored or controlled, new wireless technologies are being developed that can provide these functions. These 'smart' outlets collect data from connected devices and transmit it to cloud services for energy measurement, tracking, and control purposes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗